Hydro_Axing_Maps_ _Photos.pdf

PDF 13 MB Posted

Attached to
Tree and Brush Clearing, Chena River Lakes Flood Control Project Federal contract opportunity
Solicitation number
W911KB-16-T-0008
Issued by
Department of the Army Corps of Engineers Engineering District Alaska

About this file

Maps and Photos

View the file

Other files for this federal contract opportunity

Other files attached to Tree and Brush Clearing, Chena River Lakes Flood Control Project, newest first.
File Type Posted
W911KB-16-T-0008-0001.pdf PDF
W911KB-16-T-0008.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Upstream of Control Works

Area 1

Tanana Levee Sill Groin Road

North Seepage Collector Channel Area 5

Area 4

Area 3

Area 2

Hydro-Axing areas Floodway/Seepage Collector Channel

Chena River Lakes Flood Control Project

0 5,000 10,000 Feet

Hydro Axe Mow_Area

Base Work Option Work

X:\Projects\Chena Flood Control\Areas3w_Opt2_Hydro_Axing_8_5X17_Portrait.mxd

Area 1

Area 5

Hydro-Axing areas Floodway/Seepage Collector Channel

Chena River Lakes Flood Control Project

0 500 1,000 Feet

Hydro Axe Mow_Area

Base Work Option Work

X:\Projects\Chena Flood Control\Areas3w_Opt2_Hydro_Axing_8_5X17_Portrait.mxd

70' width Northern Remainder of North Seepage Collector Channel

~ 2 ac ~ 2000' length

70' width East Side of North Seepage Collector Channel

~ 3.5 ac ~ 2500' length

Area 2

Hydro-Axing areas Floodway/Seepage Collector Channel

Chena River Lakes Flood Control Project

0 250 500 Feet

Hydro Axe Mow_Area

Base Work Option Work

X:\Projects\Chena Flood Control\Areas3w_Opt2_Hydro_Axing_8_5X17_Portrait.mxd

40' - 180' widths Upstream of Control Works Northern Bank

~ 8.5 ac ~ 4400' length

30' - 90' widths Southern Bank ~ 1.25 ac ~1000' length

Tan ana

Le vee

Sil l G roi n R oa d

Area 4

Area 3

Hydro-Axing areas Floodway/Seepage Collector Channel

Chena River Lakes Flood Control Project

0 500 1,000 Feet

Hydro Axe Mow_Area

Base Work Option Work

X:\Projects\Chena Flood Control\Areas3w_Opt2_Hydro_Axing_8_5X17_Portrait.mxd

10' width Each Side of Groin Road Continuation to GVEA crossing

~1.5 ac ~ 3100' length

50' width From Toe of Groin ~ 3.6 ac ~2900' length

Areas 3 and 4 - Tanana Levee Groin Road

Area 3 – Pictures 1 and 2 Area 4 – Pictures 3, 4, 5 and 6

1.) Area 3 - River Groin looking east

2.) Area 3 - River Groin looking west

3.) Area 4 - West Side Groin Road Looking North

4.) Area 4 - East Side Groin Road looking North

5.) Area 4 - West Side Groin Road Looking South

6.) Area 4 - East Side Groin Road looking South

Areas 1 and 5 – North Seepage Collector Channel

Area 1 – Pictures 10 and 11 Area 5 – Pictures 7, 8, and 9

7.) Area 5 - Northern Remainder of Northern Seepage Channel Looking North

8.) Area 5 - Northern Remainder of Northern Seepage Channel Looking South

9.) Area 5 - Northern Remainder of Northern Seepage Channel Looking North

10.) Area 1 - East Side of North Seepage Channel Looking North

11.) Area 1 - East Side of North Seepage Channel Looking North

Area 2 – Upstream of the Control Works

North Side of River – Pictures 12, 13, 14 and 15 South Side of River – Picture 16

12.) Area 2 - North Side of River Facing South West

13.) Area 2 - North Side of River Facing West

14.) Area 2 - North Side of River Facing East

15.) Area - North Side of River Facing North East

16.) Area 2 - South Side of River Facing East

File details come from the government source that posted it. Updated .