Summary
| Quality Assurance Services |
| Barisal Division, Bangladesh |
| Standard Bid Sheet |
| 18-Dec-15 |
| Duration of Construction: | 12 | months |
| Duration of Project: | 15 | months |
| | | | | | Labor Costs | | Notes |
| | SOW Section | | | | | | |
| Reference | Task No. | Task | Sub-task | Category | Rate | Hrs | TOTAL | |
| Labor Cost | Travel | Other | | | | | | |
| Costs | TOTAL | | | | | | | |
COST
| 2.1 | 1 | Organizational Structure | |
| 2.2 | 2 | QA Work Plans | |
| | | Design QA Work Plan |
Construction and Closeout QA Work Plan
2.3 3 Pre-Design Support
| 2.4 | 4 | Design Review Support | |
| 2.4.1 | 4.1 | | SSQCP Review |
2.4.2 4.2 QA/QC Coordination
2.4.3 4.3 Review of Design Documents
| 2.5 | 5 | Construction and Closeout Support | |
| 2.5.1 | 5.1 | | Safety Demonstration |
| 2.5.2 | 5.2 | Performance Monitoring |
| | Project Management |
| | Safety |
| | Field Coordination Oversite |
| | Site Super Oversite |
| | Logistics |
| | Materials and Equipment |
| | Prepare Weekly Reports |
Prepare Monthly Reports
| | Prepare Final Report |
| 2.5.3 | 5.3 | Review and Documentation |
| 2.5.4 | 5.4 | Coordination and Communication |
| | Project Management |
| | Field Coordination |
| | Site Supervision |
| 2.5.5 | 5.5 | Invoice Review |
| | PM Review of Submittals |
| | QA Review of Submittals |
| | Invoicing and Accounting |
| 2.5.6 | 4.6 | Review AS-Built and Conformance Submittals |
All Materials and Equipment TOTAL (Provide Detail) $0.00
| Item | |
| A | SUB-TOTAL | $0.00 |
| B | Overhead (O/H) | $0.00 |
| C | Profit/Fee | $0.00 |
| D | DBA (insurance) | |
| GRAND TOTAL (A+B+C) | $0.00 |
| NOTE: Insert appropriate detail under the major SOW Section References. | | |
Labor Summary by Category
| Category | Hours | Labor Cost |
| PM | 0 | $0 |
| Civil Engineer | 0 | $0 |
| Structural Engineer | 0 | $0 |
| Electrical Engineer | 0 | $0 |
| Mechanical Engineer | 0 | $0 |
| Logistics Officer | 0 | $0 |
| QA Supervisor | 0 | $0 |
| QA Engineer | 0 | $0 |
| Safety Engineer | 0 | $0 |
| CADD Support | 0 | $0 |
| Accountant | 0 | $0 |
TOTAL 0 $0
QA Personnel Detail
| QA PERSONNEL | | | | | | | | |
| Phase of Work | QA Oversight Required | QA Oversight Proposed (IF DIFFERENT) | Labor Category | Hours | Labor Cost | Travel | Other Cost | Notes |
| Contractor Mobilization, UXO Clearance, Site Preparation and Layout, Groundbreaking | Weekly | | | | | | | |
| Well Installation | Biweekly (twice each week) | | | | | | | |
| Main Building, Water Tower, Catchment Systems, and Toilet Foundation Excavation and Preparation, Forming (rebar, forms, ties, etc) and Rough-in | Daily (Continuous Oversight) | | | | | | | |
| Foundation Placement and Curing | Daily (Continuous Oversight) | | | | | | | |
| Electrical Rough In (As applicable) | Biweekly (twice each week) | | | | | | | |
| Masonry | Daily during start of work, biweekly after that (twice each week) | | | | | | | |
| Roof Work | Daily during start of work, biweekly after that (twice each week) | | | | | | | |
| Plaster | Daily during start of work, biweekly after that (twice each week) | | | | | | | |
| Painting | Daily (onsite checks, continuous oversight not required) | | | | | | | |
| Finish Work (Tile, Doors, Windows, Toilets, Sinks, Faucets, Hardware, Electrical Switches/Outlets, other electrical systems (pumps, solar, generators, etc.), Delivery of furniture and/or equipment) | Daily (onsite checks, continuous oversight not required) | | | | | | | |
| Septic System Installation | Daily During start of work and at completion | | | | | | | |
| Final Inspection and Turnover Preparation | Daily (Continuous Oversight) | | | | | | | |
| Site Cleanup, Demobilization, and Groundbreaking | Daily (Continuous Oversight) | | | | | | | |
Travel
| TRAVEL COSTS | | | | | |
| Task | Subtasks | Activity | SOW Section | Travel | Notes |
| TOTAL TRAVEL COSTS (CARRY TO SUMMARY SHEET): | | | | $0 | | |
| Travel Rates (PROVIDE RATES FOR BASE AND OPTION YEARS) | | | | | | |
| Base | UOM | Option 1 | UOM | Option 2 | UOM |
| Year 1-3 | Year 4 | Year 5 |
| (Mar 2016 - Feb 2019) | (Mar 2019 - Feb 2020) | (Mar 2020 - Feb 2021) |
| Rate | Rate | Rate |
| Notes: |
| UOM - Unit of Measure |
| Base and Option time periods are estimated and will be based on actual award dates. |
| ** Included in Lodging |
Equipment
EQUIPMENT COSTS
Units
Unit Cost Number Total Cost
TOTAL $0.00
| Equipment and Materials | | | | | | |
| Base | UOM | Option 1 | UOM | Option 2 | UOM |
| Year 1-3 | Year 4 | Year 5 |
| (Apr 2016 - Mar 2019) | (Apr 2019 - Mar 2020) | (Apr 2020 - Mar 2021) |
| Rate | Rate | Rate |
LaborRates
| LABOR RATES | | | | | | |
| HA Quality Assurance Services -- Bangladesh | | | | | | |
| Labor | | | | | | |
| Labor Category | Base | UOM | Option 1 | UOM | Option 2 | UOM |
| Year 1-3 | | Year 4 | | Year 5 | |
| (Mar 2016 - Feb 2019) | | (Mar 2019 - Feb 2020) | | (Mar 2020 - Feb 2021) | |
| Rate | | Rate | | Rate | |
| COMPLETE FOR EACH CATEGORY PLANNED | | hr | | hr | | hr |
| | hr | | hr | | hr |
| | hr | | hr | | hr |
| | hr | | hr | | hr |
| | hr | | hr | | hr |
| | hr | | hr | | hr |
| | hr | | hr | | hr |
| | hr | | hr | | hr |
| | hr | | hr | | hr |
| | hr | | hr | | hr |
| | hr | | hr | | hr |
| | hr | | hr | | hr |
| | hr | | hr | | hr |
| | hr | | hr | | hr |
| | hr | | hr | | hr |
| | hr | | hr | | hr |
| | hr | | hr | | hr |
| Notes: |
| UOM - Unit of Measure |
| Base and Option time periods are estimated and will be based on actual award dates. |
| * In Overhead |