A.01.38_QA_Att_C_BIDSHEET_Bangladesh.xlsx

XLSX spreadsheet 37 KB Posted

Attached to
Quality Assurance Services in Bangladesh
Solicitation number
W911KB-16-R-0018
Issued by

About this file

Attachment C

View the file

Other files

File Type Posted
W911KB-16-R-0018-0001.pdf PDF
A.02.01_W911KB-16-R-0018.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

Quality Assurance Services
Barisal Division, Bangladesh
Standard Bid Sheet
18-Dec-15
Duration of Construction:12months
Duration of Project:15months
Labor CostsNotes
SOW Section
ReferenceTask No.TaskSub-taskCategoryRateHrsTOTAL
Labor CostTravelOther
CostsTOTAL

COST

2.11Organizational Structure
2.22QA Work Plans
Design QA Work Plan

Construction and Closeout QA Work Plan

2.3 3 Pre-Design Support

2.44Design Review Support
2.4.14.1SSQCP Review

2.4.2 4.2 QA/QC Coordination

2.4.3 4.3 Review of Design Documents

2.55Construction and Closeout Support
2.5.15.1Safety Demonstration
2.5.25.2Performance Monitoring
Project Management
Safety
Field Coordination Oversite
Site Super Oversite
Logistics
Materials and Equipment
Prepare Weekly Reports

Prepare Monthly Reports

Prepare Final Report
2.5.35.3Review and Documentation
2.5.45.4Coordination and Communication
Project Management
Field Coordination
Site Supervision
2.5.55.5Invoice Review
PM Review of Submittals
QA Review of Submittals
Invoicing and Accounting
2.5.64.6Review AS-Built and Conformance Submittals

All Materials and Equipment TOTAL (Provide Detail) $0.00

Item
ASUB-TOTAL$0.00
BOverhead (O/H)$0.00
CProfit/Fee$0.00
DDBA (insurance)
GRAND TOTAL (A+B+C)$0.00
NOTE: Insert appropriate detail under the major SOW Section References.

Labor Summary by Category

CategoryHoursLabor Cost
PM0$0
Civil Engineer0$0
Structural Engineer0$0
Electrical Engineer0$0
Mechanical Engineer0$0
Logistics Officer0$0
QA Supervisor0$0
QA Engineer0$0
Safety Engineer0$0
CADD Support0$0
Accountant0$0

TOTAL 0 $0

QA Personnel Detail

QA PERSONNEL
Phase of WorkQA Oversight RequiredQA Oversight Proposed (IF DIFFERENT)Labor CategoryHoursLabor CostTravelOther CostNotes
Contractor Mobilization, UXO Clearance, Site Preparation and Layout, GroundbreakingWeekly
Well InstallationBiweekly (twice each week)
Main Building, Water Tower, Catchment Systems, and Toilet Foundation Excavation and Preparation, Forming (rebar, forms, ties, etc) and Rough-inDaily (Continuous Oversight)
Foundation Placement and CuringDaily (Continuous Oversight)
Electrical Rough In (As applicable)Biweekly (twice each week)
MasonryDaily during start of work, biweekly after that (twice each week)
Roof WorkDaily during start of work, biweekly after that (twice each week)
PlasterDaily during start of work, biweekly after that (twice each week)
PaintingDaily (onsite checks, continuous oversight not required)
Finish Work (Tile, Doors, Windows, Toilets, Sinks, Faucets, Hardware, Electrical Switches/Outlets, other electrical systems (pumps, solar, generators, etc.), Delivery of furniture and/or equipment)Daily (onsite checks, continuous oversight not required)
Septic System InstallationDaily During start of work and at completion
Final Inspection and Turnover PreparationDaily (Continuous Oversight)
Site Cleanup, Demobilization, and GroundbreakingDaily (Continuous Oversight)

Travel

TRAVEL COSTS
TaskSubtasksActivitySOW SectionTravelNotes
TOTAL TRAVEL COSTS (CARRY TO SUMMARY SHEET):$0
Travel Rates (PROVIDE RATES FOR BASE AND OPTION YEARS)
BaseUOMOption 1UOMOption 2UOM
Year 1-3Year 4Year 5
(Mar 2016 - Feb 2019)(Mar 2019 - Feb 2020)(Mar 2020 - Feb 2021)
RateRateRate
Notes:
UOM - Unit of Measure
Base and Option time periods are estimated and will be based on actual award dates.
** Included in Lodging

Equipment

EQUIPMENT COSTS

Units

Unit Cost Number Total Cost

TOTAL $0.00

Equipment and Materials
BaseUOMOption 1UOMOption 2UOM
Year 1-3Year 4Year 5
(Apr 2016 - Mar 2019)(Apr 2019 - Mar 2020)(Apr 2020 - Mar 2021)
RateRateRate

LaborRates

LABOR RATES
HA Quality Assurance Services -- Bangladesh
Labor
Labor CategoryBaseUOMOption 1UOMOption 2UOM
Year 1-3Year 4Year 5
(Mar 2016 - Feb 2019)(Mar 2019 - Feb 2020)(Mar 2020 - Feb 2021)
RateRateRate
COMPLETE FOR EACH CATEGORY PLANNEDhrhrhr
hrhrhr
hrhrhr
hrhrhr
hrhrhr
hrhrhr
hrhrhr
hrhrhr
hrhrhr
hrhrhr
hrhrhr
hrhrhr
hrhrhr
hrhrhr
hrhrhr
hrhrhr
hrhrhr
Notes:
UOM - Unit of Measure
Base and Option time periods are estimated and will be based on actual award dates.
* In Overhead

File details come from the government source that posted it. Updated .