Amendment No. 0005 to Sol. No. W911KB-16-R-0004 EIE365 Flight Simulator

View the file

Other files for this federal contract opportunity

Other files attached to EIE365A F-35A Flight Simulator, newest first.
File Type Posted
A.02.01_AM_4_EIE365A_W911KB16R0004.pdf PDF
AM_3-SF30-SummaryChgs_EIE365A_W911KB16R0004.pdf PDF
EAL_Template_(NEW).xlsx XLSX spreadsheet
EIE365A_Amendment_2_Final.pdf PDF
EIE365A_Amendment_1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EIE365A

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PROJECT TITLE/LOCATION: EIE365A, F-35A Flight Simulator, Eielson AFB, Alaska.

PROPOSAL DUE DATE remains August 12, 2016, 2:00 PM Alaska Time. Proposals shall be submitted in accordance w ith Section 00 21 00.

This Amendment provides changes to the solicitation as indicated on page 2 of this document.

YOU ARE REQUIRED TO ACKNOWLEDGE RECEIPT OF THIS AMENDMENT ON THE REVERSE SIDE OF THE STANDARD FORM 1442.

1. CONTRACT ID CODE PAGE OF PAGES

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Aug-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB-16-R-0004

X 9B. DATED (SEE ITEM 11)

21-Jun-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Aug-2016

CODE

U.S. ARMY ENGINEER DISTRICT, AK

CEPOA-CT (W911KB)

PO BOX 6898

JBER AK 99506-0898

W911KB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911KB-16-R-0004

AM #5

SECTION SF 30 – BLOCK 14 MODIFICATION CONTINUATION PAGE

The following have been added by full text:

SUMMARY OF CHANGES

AMENDMENT #0005

• The following drawings are substituted for the superseded drawings:

NONE

• The following revised documents are substituted for the superseded documents. The identifier “AM#05” appears before and after new and/or revised material and replacement pages are provided, except as noted:

Section 00 11 01, Proposal Schedule revised – CLIN 0009 is eliminated from the revised Proposal Schedule. This revised Proposal Schedule must be used for price proposals.

NOTE: REVISIONS WITHIN THE FOLLOWING DOCUMENTS DO NOT

CONTAIN THE ABOVE REFERENCED IDENTIFIERS

NONE

• The following documents/drawings are deleted:

NONE

• The following documents are added:

NONE

• The following revisions are incorporated:

NONE

• Other:

NONE

END OF SUMMARY OF CHANGES

PS-1

PROPOSAL SCHEDULE

F-35A FLIGHT SIMULATOR

EIELSON AFB, ALASKA

BASE ITEMS

Item No. Description Estimated Quantity

Unit Unit Price Amount

0001 Construct F-35A Flight Simulator within the building 5-foot lines, Complete

1 Job $_________ $_________

0002 Construct site work and utilities beyond the building 5-foot lines, Complete

1 Job $_________ $_________

0003 Dispose of 4,000 Cubic Yards of POL Contaminated Soil including Construction of Holding Cells, Complete *

4,000 CY $_________ $_________

AM#3…0004 Remove asbestos containing insulation on water utilidor pipe. ****

18 FT $_________ $_________

0005 Remove asbestos containing insulation on steam and condensate pipe. ****

36 FT $_________ $_________

0006 Remove cement asbestos sewer pipe in the utilidor.

18 FT $_________ $_________

0007 Remove asbestos contaminated utilidor concrete. ****

8 CY $_________ $_________

Total of Base Items 0001 thru 0007 $_________

PS-2

OPTION ITEMS

Item No. Description Estimated Quantity

Unit Unit Price Amount

0008 Demolish abandoned Utilidors and abandoned Concrete foundations, complete. **

50 CY $_________ $_________

AM #5…

Dewater any groundwater above elevation 538’ to achieve DDC, complete.

1 FT

Total of Optional Items 0008 thru 0009 $_________

TOTALS

Total of Base and Optional Items 0001 thru 0008 $_________

...AM#5

Proposed Contract Duration: ____________________

* Work on CLIN 0003 shall be the cost for work identified in Specs 02 61 13 “Excavation and Handling of Contaminated Material” and Section 01 57 20.01 29 “Environmental Protection” that is additional to the requirements of the normal project excavation and the field screening identified in Section 31 09 20.00 29 “Field Screen Testing of Soils for POL Contamination”. For CLIN 0003, the Contractor shall keep a record of the amount of contaminated soil being excavated and disposed of. Upon completion, if the amount of contaminated soil excavated and disposed of is less than 4,000 cubic yards the Government will receive a credit based upon the unit price noted in base bid item 0003. If the amount of contaminated soil excavated and disposed of is more than 4,000 cubic yards the Government will pay for the additional cubic yards at the same unit price noted in base bid item 0003. SEE FAR CLAUSE 52.211-18, VARIATION

IN ESTIMATED QUANTITY.

** CLIN 0004 may be exercised throughout the contract period of performance. For CLIN 0004, the Contractor shall keep a record of the amount of utilidor and concrete foundations demolished and disposed of. Upon completion, if the amount of demolished and disposed of is less than 50 cubic yards the Government will receive a credit based upon the unit price noted in base bid item 0004. If the amount of utilidor and concrete foundations demolished and disposed of is more than 50 cubic yards the Government will pay for the additional cubic yards at the same unit price noted in base bid item 0004. SEE FAR CLAUSE 52.211-18, VARIATION IN ESTIMATED

QUANTITY.

AM #5… *** CLIN 0005 may be exercised throughout the contract period of performance, up to 3 times, not to exceed 3 feet above elevation 538’. …AM #5

AM#3…****Work on CLINs 0004-0007 shall be the cost for work identified in Specs 02 82 13.00 10 “Asbestos Abatement” and Section 01 57 20.01 29 “Environmental Protection”. For CLINs 0004-0007, the Contractor shall keep a record of the amount of asbestos containing material removed and disposed of. Upon completion, if the amount of asbestos containing material

PS-1

removed and disposed of is less than the quantity described above the Government will receive a credit based upon the unit price noted in Base Bid Items 0004-0007. If the amount of asbestos containing material removed and disposed of is more than the quantity described above the Government will pay for the additional quantity at the same unit price noted in Base Bid Items

0004-0007. SEE FAR CLAUSE 52.211-18, VARIATION IN ESTIMATED QUANTITY. …AM#3

EVALUATION OF OFFERS.

1. AWARD: Award will be made in accordance with Section 00 22 11 - EVALUATION

FACTORS FOR AWARD.

2. INCOMPLETE OFFERS: Failure to submit an offer on all items in the schedule constitutes an incomplete offer. Incomplete offers may be rejected. Lump sum or unit prices must be shown for each item within the schedule.

3. EXTENSIONS: All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.

4. SPECIAL CONDITION: If a modification to an offer based on unit prices is submitted which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the proposal schedule must be stated. If it is not stated, the offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the proposal schedule.

-- END OF PROPOSAL SCHEDULE --

EIE 365A Proposal Schedule_AM#5.pdf
BASE ITEMS
OPTION ITEMS
TOTALS