W911KB-16-R-0003
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to change the type of contract from an IDIQ SATOC (Single Aw ard Task Order) to an IDIQ MATOC (Multiple Aw ard Task Order Contract).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 36
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 20-May-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB-16-R-0003
X 9B. DATED (SEE ITEM 11)
04-May-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-May-2016
CODE
U.S. ARMY ENGINEER DISTRICT, AK
CEPOA-CT (W911KB)
PO BOX 6898
JBER AK 99506-0898
W911KB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 11 00 - STANDARD FORM (SF) 1442
The required response date/time has changed from 06-Jun-2016 03:00 PM to 10-Jun-
2016 03:00 PM.
SECTION 00 11 01 - CLIN SCHEDULE
Global Changes
CLIN 0001 -- CLIN 0003
The CLIN extended description has changed from Firm Fixed Price Indefinite Delivery Indefinite Quantity (IDIQ) to support execution of small construction contract for the maintenance, renovation, and alteration of petroleum, oil, lubricants (POL) related structures for the U.S. Army Engineer District, Alaska in various locations in Alaska (primarily), but also potentially throughout the US Pacific Command (USPACOM) Area of Responsibility (AOR). Period of Performance: Task orders for the Base Period may be awarded up to 3 years after date of contract award.The contractor shall perform a broad range of maintenance, repair and minor construction work on various types of projects primarily involved in the maintenance, repair, upgrade, or alteration of existing POL storage facilities, distribution systems, and POL support facilities. Task orders awarded are subject to the maximum burdened labor rates set forth in the contract. to Firm Fixed Price Indefinite Delivery Indefinite Quantity (IDIQ) to support execution of small construction contract for the maintenance, renovation, and alteration of petroleum, oil, lubricants (POL) related structures for the U.S. Army Engineer District, Alaska in various locations in Alaska (primarily), but also potentially throughout the US Pacific Command (USPACOM) Area of Responsibility (AOR). Period of Performance: Task orders for the Base Period may be awarded up to 3 years after date of contract award.The contractor shall perform a broad range of maintenance, repair and minor construction work on various types of projects primarily involved in the maintenance, repair, upgrade, or alteration of existing POL storage facilities, distribution systems, and POL support facilities. Task orders awarded are subject to the maximum burdened labor rates set forth in the contract.CUMULATIVE AMOUNT OF TASK ORDERS AWARDED
UNDER ALL CONTRACTS IN THE IDIQ MATOC POOL SHALL NOT EXCEED $45 MILLION FOR THE
LIFE OF THE CONTRACT INCLUDING ANY OPTION PERIOD(S).Awarded Contracts will share an estimated capacity of $45 Million for this CLIN however the Government reserves the right to move unused capacity between CLINs/performance periods as required by operational necessity..
SECTION 00 21 00 - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
The following have been added by full text:
52.216-27 SINGLE OR MULTIPLE AWARDS. (OCT 1995)
The Government may elect to award a single delivery order contract or task order contract or to award multiple delivery order contracts or task order contracts for the same or similar supplies or services to two or more sources under this solicitation.
(End of provision)
The following have been modified:
INSTRUCTIONS
INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
1.0 GENERAL INFORMATION
1.1 GENERAL DESCRIPTION OF WORK
1.2 TYPE OF CONTRACT AND CONTRACT COST LIMITATION
1.3 GOVERNMENT SECURITY REQUIREMENTS
1.4 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS
1.5 OFFEROR QUESTIONS AND COMMENTS
1.6 SMALL BUSINESS SIZE STANDARD/NAICS CODE
1.7 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
1.8 PRE-PROPOSAL CONFERENCE
1.9 ACCURACY IN PROPOSALS
1.10 PROPOSAL SUBMITTALS
1.11 PROPOSAL FORMAT
1.12 JOINT VENTURE AND LLC PROPOSAL REQUIREMENTS
1.13 BUY AMERICAN ACT FOR CONSTRUCTION MATERIALS
1.14 SOLICITATION PROVISIONS
1.15 VETERANS EMPLOYMENT EMPHASIS FOR USACE CONTRACTS
1.0 GENERAL INFORMATION
1.1. GENERAL DESCRIPTION OF WORK
The contract is for a broad range of Construction, Renovation and/or Repair of various POL facilities and infrastructure. Typical types of services to be provided may include projects primarily involved in the maintenance, repair, upgrade, or alteration of existing POL storage facilities, distribution systems, and POL support facilities. In addition to furnishing construction services, work could include design services, such as, preparation of plans, specifications, design analysis, and cost estimates for construction for repair/renovation, new construction projects, or engineering studies. The work may be located anywhere within US Government controlled bases and installations within PACOM. However, work will primarily be on Fort Greely, Fort Wainwright, Joint Base Elmendorf-Richardson (JBER), Clear Air Force Station, Eielson Air Force Base, and other US military bases in Alaska. The contract will be an indefinite-delivery indefinite-quantity (IDIQ) Multiple Award Task Order Contract (MATOC). Total MATOC capacity will be $45 Million. During the contract period, the U.S. Army Corps of Engineers (USACE) will identify the scope of construction work required to each specific job, negotiate a price and performance time of each job, and issue task orders to the contractor to complete the work. The task orders may include fuel containment, transport, delivery, storage, and dispensing systems as well as conversion of fuel type. Services incidental to the overall project may also require API 653 tank inspection, piping system evaluation in accordance with API 570, pipe stress analysis, hydraulic and dynamic transient surge analysis, pressure testing, and internal pipeline inspection services. Projects may include but not be limited to, above and below ground storage tanks, hydrant systems, fuel distribution pump houses, truckfill stands, piping, valves, trenching, primary and secondary spill containment, SCADA systems, and pipeline/tank leak detection systems, and may be fully designed or Design-Build. The contractor will be required to furnish all materials, equipment, and personnel necessary to manage and accomplish the job
1.2. TYPE OF CONTRACT AND CONTRACT COST LIMITATION
This is a firm-fixed price IDIQ MATOC for the small projects with requirements specified in individual task orders. The contract is effective for a base period of three (3) years after receipt of Notice of Award. At the discretion of the Government, two (2) one-year option periods may be exercised. The total aggregate contract capacity, shared among all MATOC awardees, shall not exceed $45 Million (M).
1.3. GOVERNMENT SECURITY REQUIREMENTS
The Offeror(s) must ensure that ALL mail sent to the Alaska District, USACE, either pre-award of contract or post-award, has a return mailing address on the outside of the envelope, package, box, etc. ANY MAIL addressed to the U.S. Army Corps of Engineers, including but not limited to bids, modifications to bids, proposals, revised proposals, bonds, correspondence, etc., will be REJECTED by the U.S. Army Corps of Engineers mail room facility located at 2204 3rd St, Joint Base Elmendorf-Richardson (JBER), AK 99506, if it does not contain a return mailing address. There will be no exceptions.
1.4. COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS
Copies of the solicitation and amendments are available by INTERNET ACCESS ONLY. All solicitation documents will be posted to the Government’s Federal Business Opportunities website at: https://www.fbo.gov. It shall be the contractor’s responsibility to check the websites for any amendments. The offeror shall submit in a proposal all requested information specified in this solicitation. There will be no public opening of proposals received as a result of this solicitation. A list of interested vendors (potential offerors and subcontractors) is available on the Federal Business Opportunities web site (registration required) at https://www.fbo.gov via Quick Search (Solicitation No: W911KB-16-R-0003).
1.5. OFFEROR'S QUESTIONS AND COMMENTS
Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet (at http://www.projnet.org/) no later than 10 calendar days prior to the proposal due date. To submit and review bid inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment/question will receive an acknowledgement of their comment/question via email, followed by an answer to the comment/question after it has been processed by our technical team. Offerors are requested to review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry. All timely questions and approved answers will be made available through ProjNet.
Approved answers to all timely questions will also be posted as an amendment to the solicitation in the form of a report generated from ProjNet as soon as the comment/question entering period is over and all answers are finalized. In case of any conflicts between answers in ProjNet and the solicitation, the solicitation governs and any revisions to the solicitation will be made by formal amendment.
The Solicitation Number is: W911KB-16-R-0003
The Bidder Inquiry Key is: FXH9ZA-3GNM5Q
Specific Instructions for ProjNet Bid Inquiry Access:
1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
2. Identify the Agency. This should be marked as USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Email. Enter the email address you would like to use for communication.
5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret
Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Specific Instructions for Future ProjNet Bid Inquiry Access:
1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.
2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
3. Identify the Agency. This should be marked as USACE.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Email. Enter the email address you used to register previously in ProjNet.
6. Click Continue. A page will then open asking you to enter the answer to your
Secret Question.
7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
1.6. SMALL BUSINESS SIZE STANDARD/NAICS CODE
See Standard Form (SF) 1442 for the small business size standard/NAICS code.
1.7. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
This Request for Proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.
1.8. PRE-PROPOSAL CONFERENCE / SITE VISIT
The Government does not intend to hold a pre-proposal conference, but retains the option to schedule one at a later date. A site visit is not presently scheduled and will be specified for each individual task order; see Clause 52.236-27 (Site Visit – Construction) Alt I, in Section 00 72 00.
1.9. ACCURACY IN PROPOSALS
Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments). The penalty for making false statements is prescribed in 18 U.S.C.
1001.
1.10. PROPOSAL SUBMITTALS
Offerors must mail or deliver proposals to be received no later than the date and time stated on the SF 1442 or subsequent solicitation amendment. Modifications to pricing (Volume II, Tab A) may be emailed to the Contract Specialist/Contracting Officer susan.salaj@usace.army.mil/timothy.l.clapp@usace.army.mil); however, Offerors must ensure that any pricing modifications reach the inbox of the personnel noted in this paragraph no later than the date and time established for receipt of proposals. Questions concerning proposal receipt can be directed to the Contract Specialist/Contracting Officer listed in the solicitation.
Offerors are advised to plan accordingly. No arrangements will be made by the Government to assist in proposal delivery. Day-pass procedures will not be used for proposal delivery purposes nor are there proposal pick-up services. No base escort services will be provided. It is incumbent on the Offeror to plan for unanticipated delays in delivery of proposals. Due to heightened security at Government installations, visitors to Joint Base Elmendorf-Richardson (JBER) must use the Boniface Gate or Fort Richardson Gate (Visitor Centers). All vehicle occupants are required to wear seatbelts. Hand-held cell phone usage by vehicle operators while driving on base/post is prohibited. Violators will lose their Base/Post driving privileges for these offenses. For proposals hand-delivered or through delivery services (such as DHL, UPS or FedEx), delivery must be by person, courier or delivery service with active base access. Proposals will be received no later than the date and time stated on the SF1442 or subsequent solicitation amendment at:
Mailing Address:
U.S. Army Corps of Engineers, Alaska District ATTN: CEPOA-CT (Susan Salaj, Rm 30) PO Box 6898 Joint Base Elmendorf-Richardson (JBER), Alaska 99506-0898
Physical Address:
U.S. Army Corps of Engineers, Alaska District ATTN: CEPOA-CT (Susan Salaj) 2204 3rd Street, Room 30 Joint Base Elmendorf-Richardson (JBER), Alaska 99506
Proposals will be accepted in Room 30 during USACE Alaska District business hours (7:30 AM to 4:30PM) Monday through Friday, excluding holidays, but not later than the date and time stated on the SF1442 or subsequent solicitation amendment. Proposers are advised that the USACE Alaska District building has limited access. Only the main door (in front of the building, under the U.S. Army Corps of Engineers red flag facing Talley Avenue) and the atrium doors (the tan addition to the main building located on Third Street/Fairchild Avenue) are open to individuals without a building pass. Room 30 is located in the basement of Building 2204;
turn right if using the center stairs or elevator. There is a date/time stamp located at the front desk in Room 30 and is the official clock used for proposal receipt. NOTE: Facsimile proposals or modifications will NOT be accepted.
The packaging that contains the Proposals shall be marked:
”Proposals for Solicitation Number: W911KB-16-R-0003, DO NOT OPEN”
1.11. PROPOSAL FORMAT
(a) Written materials: 8 ½” x 11” format, using 10 point or larger font size, in bound volumes, using 3-ring binders. Each bound volume will contain a Title Sheet on the cover for ready identification of the proposal and a full table of contents, separated by Tabs, as prescribed herein. Within each Tab, it is recommended that the proposal information be presented in the same relative format as the submission requirements are listed, and the paragraph number from the submission requirements be used in the heading for the respective section/paragraph where the information is being provided.
(i) The prime, consortium, or joint venture’s name, address, a signature of the official that can bind the firm and a telephone number shall appear in the lower left corner of the title page of any document/volume to be evaluated.
(ii) Volume number, section and date submitted shall appear in the bottom right corner of each page (along with the revision number for the amended page, if necessary).
Page numbering shall re-start with each Tab. The Government will not evaluate any material exceeding the page limitations stated in the RFP.
(b) Drawing sheets: Use 11” x 17” for half size drawings.
(c) Electronic Format: Provide CD in searchable, bookmarked, read-only format
(preferably PDF format). Consolidate the tabs under each volume into one (1) PDF file, except that catalog data may be in a separate PDF file. All price breakdown information to aide in the price evaluation shall be submitted in Excel format.
(d) Number of copies: Submit one (1) original and three (3) copies of printed matter
(Bound Volumes), as well as, one (1) CD. For Pro Forma information required in Volume II, submit the original and three (3) copies and one (1) separate CD.
(e) The successful contractor shall provide one (1) searchable, bookmarked, read-only electronic (PDF format) copy of the entire Volumes I and II and one (1) copy of all CADD files.
1.12. JOINT VENTURE AND LLC PROPOSAL REQUIREMENTS
(a) Types of Firms: Firms with status as an 8(a) in accordance with FAR 19, organized as construction contractors that have associated specifically for this project.
(a) Joint Ventures (JV): Joint Venture Agreements – 8(a) Joint Ventures (as defined in FAR
19.1403) are allowable. The 8(a) Joint venture Agreement (JVA) and all supporting documents (i.e., tax returns, financial statements, narratives, checklists, etc.) must be submitted as soon as possible to SBA, 420 L Street Suite 300, Anchorage, AK 99501 for approval but no less than twenty (20) working days prior to the scheduled date for contract award. If you are contemplating a joint venture on this project, you must advise your assigned Business Opportunity Specialist (BOS) in writing as soon as possible. The joint venture must be approved by SBA prior to contract award. Incomplete packages will be returned without action.
(b) Offerors organized as an 8(a) Joint Venture must complete the following:
(i) Obtain a Tax Identification Number (TIN) as an 8(a) Joint venture.
(ii) Prepare the Reps/Certs as an 8(a) Joint venture (For example, provide the TIN of the joint venture. Do not use a TIN from one of the parties of the joint venture.)
(iii)All parties to the 8(a) Joint venture must sign the proposal.
(c) All 8(A) Joint venture offerors are advised that if they are the successful offeror, they must be registered in the System for Award Management (SAM) as an 8(A) Joint venture. We advise that they begin this process when they prepare their proposal in order to ensure this registration is in place should they be selected for the award. “Lack of registration in the SAM database will make an offeror ineligible for award.” (Reference Solicitation Clause 52.204-99, System for Award Management Registration).
(d) Offerors shall submit a list of the names and telephone numbers(s) of persons authorized to conduct negotiations in their proposals and provide a completed Certificate of Corporate Principal. An 8(A) Joint venture (JV) must submit a copy of the 8(A) Joint venture Agreement and an LLC must submit a copy of the article of organization. JV’s and LLC’s must provide evidence that the person(s) signing the offer has the authority to bind the organization.
1.12.1 Limited Liability Companies (LLC). When submitting your proposal, provide the Certificate of Organization, Articles of Organization and the Operating Agreement. This information is used to verify the ability of members to bind the organization. On SF 25 and 25A, Bonds, where it requests “State of Incorporation,” the LLC should instead put the “State of Organization.” In the Principal’s signature block, the signatory shall indicate whether he or she is signing as a member, manager, or both. Instead of a “Corporate Seal” attach the Certificate of Formation or Certificate of Organization, as appropriate, which should indicate the signatory’s authority to bind the LLC.
1.13. BUY AMERICAN ACT FOR CONSTRUCTION MATERIALS
Your attention is invited to Clause 52.225-10, Notice of Buy American Act Requirement- Construction Materials. You are advised to inform your potential subcontractors and suppliers of the Buy American Act requirements contained in this solicitation. Subparagraph (b) of the clause provides instructions for pre-award determinations as follows: “Requests for determinations of inapplicability.” An offeror requesting a determination regarding the inapplicability of the Buy American Act should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the FAR Clause 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American Act before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.” In accordance with FAR Part 25 Foreign Acquisition, Subpart 25.205 entitled Post Award determinations, subparagraph (a), if a contractor requests a determination regarding the inapplicability of the Buy American Act after contract award, the contractor must explain why it could not request the determination before contract award or why the need for such determination otherwise was not reasonably foreseeable.
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm Fixed Price Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) contract resulting from this solicitation.
(End of provision)
SECTION 00 22 10 - PHASE 1 DESIGN BUILD SELECTION PROCEDURES
SECTION 00 22 10
SECTION 00 22 10
PHASE 1 PROPOSAL SUBMISSION REQUIREMENTS
EVALUATION CRITERIA
1.0 OVERVIEW
1.1. This is Phase 1 of a 2 Phase Indefinite-Delivery Indefinite-Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) RFP. The contract awardee will be eligible to propose on task orders for projects, fully designed or Design-Build, at locations within PACOM primarily at various military installation locations in Alaska.
1.1.1 The Government contemplates awarding up to three (3) multiple awards contracts from this solicitation; however, reserves the right to award more, less, or none at all. This requirement is being competed as an 8a Small Business Set-Aside under the North American Industry Classification System (NAICS) Code 237120 (Oil and Gas Pipeline and Related Structures Construction), which has a size standard of $36.5 Million in average annual receipts. The resultant contract(s) awarded from this solicitation will constitute IDIQ contracts as defined in FAR 16.504. Task orders will be awarded against the basic IDIQ contract(s) using the fair opportunity procedures discussed in FAR 16.505 in addition to the competitive source selection procedures identified in Section 803 of Public Law 107-107 implemented in DFARS 216.505-70 and Public Law 110-181, Section 843. In accordance with FAR 16.505 and DFARS 216.505- 70(c), all awardees in a MATOC pool will be afforded fair opportunity to be considered for award of each order exceeding $150K unless an exception described in FAR 16.505(b)(2) applies. Task orders will be firm-fixed price (FFP).This solicitation is for one (1) three-year base period, with two (2) one-year option periods.
1.1.2 The total shared capacity for the contemplated 8a Small Business IDIQ MATOC award is $45 Million. This capacity will be shared among all MATOC awardees.
1.1.3 The ordering period shall commence upon the date of contract award and may continue for a base period of three (3) years and an additional period of 2 years if all options are exercised.
Per FAR 52.216-19, Order Limitations, a minimum order amount of $5,000.00 and maximum order amount of $5 Million per single order have been established for this MATOC.
1.2 In Phase 1 of the 2 Phase selection procedure, interested firms or joint venture entities (referred to as “Offerors”) submit certain specified performance capability proposals, demonstrating their capability to successfully execute the task orders resulting from this solicitation. The Government will evaluate performance capability proposals in accordance with the criteria described herein and intends to select up to five (5) of the Phase 1 Offerors to compete in Phase 2 for an IDIQ Multiple award contract and the Seed task order described in Section 00 22 20.
1.2.1 In Phase 2, the most highly qualified Offerors will submit proposals in accordance with Section 00 22 20.
1.2.2 The most highly qualified Offerors selected to participate in Phase 2 will be announced by special notice or synopsis to the Federal Business Opportunities website (www.fbo.gov).
2.0 GENERAL INSTRUCTIONS
2.1 Firms formally organized as design-build entities, design firms and construction contractors that have associated specifically for this IDIQ, consortia of firms or any other interested parties may submit proposals. Associations may be as joint ventures or as key subcontractors. Any legally organized Offeror may submit a proposal. To qualify for Phase 2, the Offeror or Offerors subcontractor(s) must have professional architects and engineers, registered in the appropriate technical discipline and the requirements specified in the Contract Clause 52.236-25, “Requirements for Registration of Designers,” must be met. All designs must be under the direct supervision of appropriately licensed professionals for each discipline involved.
2.2 Submit the Phase 1 proposal in tabbed, three-ring binder. Note that the Government will not evaluate any material that exceeds the indicated page limits. PHASE 1 DOES NOT
INVOLVE PRICING SUBMISSION.
3.0 PHASE 1 PROPOSAL INFORMATION AND RELATED EVALUATION FACTORS,
SUBFACTORS AND ELEMENTS
1.1. Location 1.2. Factor
Number
1.3. Description 1.4. Relative
Importance
1.5. Tab A 1.6. 1.7. SF 1442 and
Proposal Data Sheet
1.8. N/A
1.9. Tab B 1.10. Factor
1.11. Experience 1.12. 1st (Most
Important Factor)
1.13. Tab C 1.14. Factor
1.15. Past Performance 1.16. 2nd (Slightly
less important than
Factor 1)
1.17. Tab D 1.18. Factor
1.19. Organization &
Management
1.20. 3rd (Slightly less important than
Factor 2)
4.0 TAB A – STANDARD FORM 1442 AND PROPOSAL DATA SHEET
4.1 Submit the SF1442, completed and signed by a person authorized by the Offeror. Include the completed proposal data sheet (see Attachment 1, provided at the end of this Section). Also include joint venture agreement or LLC Certification of Organization, Articles of Organization and the Operating Agreement, if applicable (see 00 21 00, Para 1.12).
5.0 TAB B – FACTOR 1 – EXPERIENCE
5.1 SUBMISSION REQUIREMENTS
5.1.1. The prime contractor and designer of record design firms for POL mechanical design systems shall each demonstrate recent, relevant experience on similar construction, design-build, and repair of POL facilities using Company Specialized Experience - Construction Or Prime Contractor – (Attachment 2) and Company Specialized Experience – Design Firm Or In-House Design Capability – (Attachment 3) at the end of the section (no more than 2 pages per project).
Offerors may identify state and local government and private contracts that are similar to the Government’s requirements. If the Offeror is a joint venture, each firm of the joint venture shall provide information demonstrating experience relevant to their role on this project. Submit projects that are currently well underway (designed and at least 50% construction progress completed) or completed and turned over no longer than five (5) years preceding the date of this solicitation. An Offeror may receive credit for relevant experience under a previous business arrangement (joint venture for example) if the Offeror demonstrates that their role on the submitted project is relevant to their role on this project. The Offeror shall select the design firm(s). Design firms may list projects of prime contracts they have worked for or projects directly contracted with government, private or commercial customers. If projects were design-build, so identify them. Submit no more than three (3) projects for the prime contractor. Submit no more than six (6) projects total for the design firms and no more than three (3) projects for any individual design firm.
5.1.2 Provide one (1) page consolidated list of submitted projects for prime contractor and design firms to include a matrix that identifies the Specialized Experience projects and the firms that worked on each (teaming).
5.2 EVALUATION CRITERIA:
5.2.1. The Government will evaluate the extent of recent, related experience of the prime contractor and subcontractors as relevant to their role on this project. The Government may place greater importance on demonstrated design build construction experience and renovation experience by the prime or key subcontractor depending on relevancy. For the prime contractor, the Government may place greater importance on projects performed as a prime contractor than as a subcontractor, depending upon overall role and relevancy considerations. In assessing relevancy of Specialized Experience, the relevancy ratings included under the Past Performance evaluation factor will be utilized.
5.2.2 Relevant experience includes:
Federal Government project experience will be rated inherently more important than non- Federal Government (i.e. Commercial and/or local government) project experience. Additional consideration will be given to prior federal government project experience. Some examples of relevancy to this solicitation may include, but not be limited to:
a. Experience with design-build and design-bid- build construction of/or repair of fuel systems, above ground storage tanks, bulk storage tanks, filter separators, or other POL components or systems.
b . Experience with concurrent work in remote locations; Alaska and/or the Pacific with commensurate logistics challenges including no local support.
c . Experience with API 653 & API 570 as well as UFC 3-460-01 & 3-460-03 and the new
UFGS 09 97 13.15
d . Experience with POL coating repairs (internal & external) e . Experience with cathodic protection systems f . Experience with POL mechanical safety and electronic safety systems g . Experience with State of Alaska Department of Environmental Conservation and EPA tank closeouts h . Experience with Government contract administration tools (scheduling software, QCS, etc.)
6.0 TAB C – FACTOR 2 - PAST PERFORMANCE
6.1. SUBMISSION REQUIREMENTS:
6.1.1 For all contracts identified in Factor 1, a Past Performance Questionnaire must be completed and submitted. The Offeror shall complete Part I of the Past Performance Questionnaire and e-mail the questionnaire to both the Government contracting activity and technical representative responsible for the past/current contract. The POCs shall be instructed to electronically complete Part II of the questionnaire and e-mail the entire questionnaire to the Contracting Office no later than the proposal due date, to Tim Clapp via email at Timothy.L.Clapp@usace.army.mil and Susan Salaj at susan.salaj2@usace.army.mil. The Offeror shall e-mail to the Contracting Officer a list of all the POC’s who were sent a questionnaire. The Government must receive this list no later than the proposal due date. The POC List shall be submitted in Word for Windows Table Format to include the following fields: Solicitation Number; Company Name; Contract Number;
Government Agency; POC Last Name, First Name; POC Title; POC Telephone Number; POC E-mail Address; and Date E-Mail to POC (month/day).
6.1.2 Projects cited shall be currently well underway (fully designed and at least 50% construction progress completed) or completed and turned over within five (5) years preceding the date of this solicitation. The Government may contact and interview the points of contact and reserves the right to review data from Contractor Performance Assessment Reporting Systems (CPARS) or other agency performance databases on projects determined to be recent and relevant as defined above. Team members are encouraged to briefly provide information on problems encountered on identified or other contracts and the corrective action taken.
6.1.3 In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may be include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.
6.1.4 An Offeror will not receive credit for past performance of a parent, sister or other affiliated company if the Offeror fails to demonstrate what resources of the parent, sister or other affiliated company will be provided or relied upon or fails to demonstrate the existence of a contractual or meaningful relationship with the parent, sister or other affiliated company. An Offeror may receive credit for relevant past performance under a previous business arrangement (joint venture for example) if the Offeror demonstrates that their role on the submitted project is relevant to their role on this project
6.2. EVALUATION CRITERIA:
6.2.1. The Government will first assess and rate the relevancy of recent projects accomplished by the Offeror to the scope of this contract for overall application to the performance confidence assessment ratings described hereinafter. The projects will include those submitted under Factor
1. This rating is not a separate proposal rating but is only used in developing overall past performance confidence assessment rating assigned to the Past Performance Factor. The past performance relevancy ratings are described below:
Very Relevant Present / past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant
Present / past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant Present / past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present / past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
6.2.2. The Government will next consider how well the Offeror performed on the contracts. The Government will consider the currency and relevance of the information, source of the information, context of the data, and general trends in contractor performance. With respect to relevancy, past performance on projects with more relevance will typically be a stronger predictor of future success and have more influence on the past performance confidence assessment rating than past performance on projects of lesser relevance. Owners/references may be asked to comment on items such as quality of design or construction, timeliness, management of the work subcontractor management, including timely payment to subs or suppliers, safety, relations between owner and designer or contractor, level of support for such things as as-built documentation, O&M manuals, training, correcting design or construction errors, warranty work, etc. (see the PPQ form at Attachment 4). The Government will target areas covered in the requirements of this proposal including records of conforming to quality, schedule, cost control, customer satisfaction, level of support for such things as as-built documentation, O&M manuals, training, problem resolution for design or construction errors, warranty work, and safety. The Government places a higher value on projects, which provided particularly difficult or unique challenges and the innovative methods the contractor used to resolve problems successfully. The rating for this factor will be expressed as a degree of confidence in the Offeror’s ability to successfully accomplish the contract requirements. The rating system used for the performance confidence assessment is described below.
Performance Confidence Assessment:
Each Offeror will be assigned one of the following ratings:
Substantial Confidence: Based on the Offeror’s recent/relevant performance record, the Government has a high expectation that the Offeror will successfully perform the required effort.
Satisfactory Confidence: Based on the Offeror’s recent/relevant performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort.
Limited Confidence: Based on the Offeror’s recent/relevant performance record, the Government has a low expectation that the Offeror will successfully perform the required effort.
No Confidence: Based on the Offeror’s recent/relevant performance record, the Government has no expectation that the Offeror will be able to successfully perform the required effort.
Unknown Confidence (Neutral): No recent/relevant performance record is available or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.
6.2.3. Each entity (firm) will be rated on its own performance or that of its predecessor, if relevant. Past performance of a parent, sister or other affiliated company will not be considered if the Offeror fails to demonstrate what resources of the parent, sister, or other affiliated company will be provided or relied upon or fails to demonstrate the existence of a contractual or meaningful relationship with the parent, sister or other affiliated company. Past performance under a previous business arrangement will not be considered relevant if the Offeror’s role on the project is not considered relevant. If the Government does not obtain past performance information for the projects identified by the Offeror and cannot establish a past performance record for the Offeror through other sources, past performance will be rated neither favorably nor unfavorably. The performance confidence assessment will be considered “Unknown Confidence (Neutral)”.
7.0 TAB D – FACTOR 3 - ORGANIZATION AND MANAGEMENT
7.1. SUBMISSION REQUIREMENTS:
7.1.1. Provide a narrative and organizational chart that describes the Offeror’s organization and the items below. Limit the narrative to five (5) pages or less and the organizational chart to one 11” x 17” page.
7.1.2. Organization: Describe what firms will be utilized, their roles and responsibilities and any contractual arrangements that have been established. Clearly describe any teaming or joint venture arrangements, including a clear description of each firm’s roles and responsibilities on the project. The Offeror shall document unequivocal teaming arrangements with its design firms(s) (see Attachment 5). Include a simple organizational chart, illustrating the organization, including the name, position title and job location of key personnel. Identify the design firm(s) chosen for the project, if not to be self-performed. Describe the proposed management structure for the team, describing how the design and construction process will be managed and the authorities and the delegations of authority within the team. Resumes of individual team members are not required.
7.1.4. Team Approach. Describe how the Contractor is able to develop relationships to work cooperatively with Liquid Fuel Management personnel, BOS contractor personnel, and adequately coordinate site arrival notices, base access, work schedules and system closures at military installations. Contactor has demonstrated a team approach to work and is able to coordinate with site personnel and other contractors in order to complete task orders with little conflict. Contractor is willing to provide construction expertise and problem solve when presented with differing conditions in the field or a technical problem.
7.1.5. Technical Approach for Construction. The Government places a higher value on an offer that provides proposed methods to streamline construction, manage labor and other resource constraints in an effort to reduce costs and support an aggressive schedule, including such things as fast-tracking. The Government will also consider whether the approach reduces on-site craft labor and susceptibility to inclement weather delays.
7.1.6. Planning and Scheduling. Describe how the contractor integrates planning and scheduling across their entire team including subcontractors. The Government will evaluate the Offeror’s scheduling capabilities to manage a construction schedule. Contractor must demonstrate a willingness to work with tight deadlines so that when tank or fuel system repairs are required the out of service time for tanks or fuel systems is minimized. Contractor must demonstrate the ability to schedule critical interior tank work and complete it quickly and then complete non-critical exterior work once the tanks are put back online.
7.1.7. Quality Control. The Government will evaluate the Offeror’s capabilities and understanding of the contractually required quality control processes for construction. The Government will evaluate the adequacy of the staffing plan to cover all required tasks and responsibilities.
7.1.8. Site Safety. The Government will evaluate the Offeror’s capability and understanding of the contractually required safety control processes for construction.
7.2. EVALUATION CRITERIA:
7.2.1. Government will evaluate the responsibilities and lines of authority between the construction firm, design firm, and key subcontractors. The Government will evaluate the Offeror’s approach to design coordination and review and the Offeror’s approach to support during design, construction and after project turnover. The Offeror is required to select and commit to design firms to achieve an “acceptable” rating. Joint venture participant’s contribution to the organization should be commensurate with their skills and background.
7.2.2. Self-Performed Work: The Government will evaluate the Offeror’s resources to determine if it has the capability to self-perform the required 15% of the project at minimum, in accordance with public policy to assure adequate interest in and supervision of all work.
8.0. PHASE 1 OVERALL RATING
8.1. In addition to individual factor ratings, the Government will assign an overall rating for the Phase 1 proposal.
9.0. PHASE 1 EVALUATION PROCEDURES
9.1. SOURCE SELECTION EVALUATION BOARD (SSEB)
9.1.1. The SSEB evaluation will be based on the content of the proposal, proposal corrections and any information obtained from other sources, e.g. past performance information. The SSEB will not consider any proposal information incorporated by reference, except as expressly allowed by this solicitation.
9.2. EVALUATION
9.2.1. The SSEB will evaluate the proposals and assign a consensus rating for each evaluation factor and sub-factor. Offerors are cautioned to put forth their best efforts for the Phase 1 submission, and to furnish all information clearly to allow the Government to determine their performance capability. Offerors should not assume that they will have an opportunity to clarify or correct anything in their proposal after submitting it in response to Phase 1.
9.2.2. The Government reserves the right to allow proposal corrections, if deemed necessary to determine the most highly qualified Offerors to shortlist for Phase 2.
9.2.3. The Contracting Officer, taking into account the SSEB consensus ratings, will select up to 3 (three) of the most highly qualified Offerors to Phase 2.
9.3. DEFINITIONS
9.3.1. Significant Strength is an aspect of an Offeror’s proposal that has appreciable merit or appreciably exceeds specified performance or capability requirements in a way that will be appreciably advantageous to the Government during contract performance.
9.3.2. Strength is an aspect of an Offeror’s proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.
9.3.3. Weakness means a flaw in the proposal that increases the risk of unsuccessful contract performance (see FAR 15.001).
9.3.4. Significant Weakness in a proposal is a flaw that appreciably increases the risk of unsuccessful contract performance (see FAR 15.001).
9.3.5. Deficiency is a material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level (see FAR 15.001).
9.4. EVALUATION AND RATING SYSTEM
9.4.1. General: The Government will review the proposals and rate the quality of each evaluation factor and subfactor (if any). The SSEB will rate each proposal against the specified evaluation criteria in the Solicitation requirements and will compare proposals. After all proposals are rated by the SSEB, the Contracting Officer will compare the ratings and relative advantages and disadvantages of proposals against each other in order to determine which Offerors are the most highly qualified under Phase 1 to a participation in Phase 2.
9.4.2. Review Write-Up: The Government will support each rating with a narrative, separately listing all strengths or advantages, weaknesses or disadvantages, deficiencies, and required clarifications.
9.4.3. Rating System: After listing proposal strengths, weaknesses and deficiencies, the SSEB will assign an adjective rating of “Outstanding”, “Good”, “Acceptable”, “Marginal”, or “Unacceptable” to each factor and subfactor (except the Past Performance Factor), which reflect the Government's confidence in each Offeror's ability, as demonstrated in its proposal, to perform the requirements stated in the RFP. The adjectival ratings shall be assigned, using the following criteria, which incorporate a proposal risk assessment:
9.4.3.1. Outstanding: Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low.
9.4.3.2. Good: Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses.
Risk of unsuccessful performance is low.
9.4.3.3. Acceptable: Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate.
9.4.3.4. Marginal: Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high.
9.4.3.5. Unacceptable. Proposal does not meet requirements and contains one or more deficiencies. Proposal is unawardable.
ATTACHMENT 1
PROPOSAL DATA SHEET
1. Name of Solicitation:
2. Name of Firm:
Address:
Phone:
Fax:
E-ma…