- Rental of crane with operator for gate inspections at the Chena Project Moose Creek Dam, North Pole, Alaska
- Solicitation number
- W911KB-15-T-0002
About this file
Solicitation Amendment W911KB-15-T-0002-0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911KB-15-T-0002-0002.pdf | ||
| W911KB-15-T-0002.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
A. The follow ing pages are hereby superceded by the attached revised pages and addendums to the solicitation.
B. Page 1, SF1449, revised Scope of Work - all pages, Q&A (2 pages), and revised Attachment 6, Specification 01 35 26 Governmental Safety Requirements and new Attachment 9, SK-1 Crane Requirements Sketch Amendment 0001. See Summary of Changes for detailed information.
C. The closing time for receipt of quotations is hereby extended to 2:00 p.m. Alaska Time, 10 April 2015.
Point of contact for this amendment is Mr. Woods 907-753-2547.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 23
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-Apr-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB-15-T-0002
X 9B. DATED (SEE ITEM 11)
03-Feb-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Apr-2015
CODE
U.S. ARMY ENGINEER DISTRICT, ALASKA
CEPOA-CT-SP
PO BOX 6898
JBER AK 99506-0898
W911KB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911KB-15-T-0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 02-Apr-2015 02:00 PM to 10-Apr-2015 02:00 PM.
The following have been added by full text:
STATEMENT OF WORK
Hydraulic Steel Structures (HSS) Gate Inspection
CHENA RIVER LAKES FLOOD CONTROL PROJECT
With Amendment 1 March 30, 2015
1. DESCRIPTION OF WORK
The Contractor shall assist the Government to perform hydraulic steel structures inspections of 4 operating gates (gates 1-4), 2 emergency gates (gates 5 and 6), 2 fish ladder gates, and 2 fishway gates at the Chena River Lakes Flood Control Project. There are three rows of slots across the width of the outlet works (upstream, operating gate, and downstream) and the slots are numbered from 1 to 4 from south to north. Attachment 1 is the Moose Creek Dam Control Works Vicinity map.
Task 1: Gate Lifting, Inspection, and Lowering -- provide a crane with operator, lift supervisor, rigger/signalman, two laborers, forklift, and scissor lift to perform the gate inspections. The Government will perform the actual inspection of the gates once secured and the cover plates are removed. See Attachment 2 PHOTOS FOR 2015 HSS INSPECTION SOW to assist with visualization of the statement of work.
Task 2: Provide all materials, labor and equipment as identified and required for installation of new operational gate dogging bars as shown in Attachment 3 NEW DOGGING BAR SKETCH SK-1. This task applies only to the four operational gates, which are gates 1-4.
Task 3: Perform Ultrasonic Testing (UT) of the full width (approximately 30 feet) of the double-bevel groove weld that joins the upper and lower portions of the downstream 15/16” thick ASTM A36 steel skin plates on gates 1 through 4 and gate
6. This groove weld was performed in the field to join the upper and lower halves of the gates which were fabricated offsite.
The timeliness and thoroughness of the work under this contract are essential to maintain proper flows through the dam and navigation on the Chena River. The contractor shall furnish all labor, supervision, equipment, materials, supplies, transportation, fuel and other items necessary to accomplish this Statement of Work.
The Moose Creek Dam (MCD) is part of the Chena River Lakes Flood Control Project, and is located 18 miles east of Fairbanks, Alaska, near the community of North Pole.
Task 1 – Gate Lifting, Inspection, and Lowering The contractor shall provide a crane meeting the requirements of Section 3, below.
The crane will be operated by the Contractor while on the concrete deck of the project control works to lift, turn, and lower gates for inspections. This deck has areas with restricted allowable loads so the contractor shall expect close coordination and restrictions on crane/outrigger placement. Allowable loads for the control works deck are shown in Attachment 4.
The Chena Project Manager, in consultation with the Contractor, will designate a staging area for the crane adjacent to the Control Works. For tracked cranes, asphalt roads are off limits and the control works concrete deck will require protection using a minimum 1 inch thick wood plate or equivalent.
The Contractor shall also provide a crane operator, crane rigger/signalman, lift supervisor and 2 laborers with the qualifications stated in Section 2.
Contractor Work tasks generally include:
Installing deck protection for any outriggers or tracked equipment use.
Removing and replacing operating gate and downstream hatch covers using the Government furnished 4-legged sling with hooks. See Photo 2 in Attachment 2. Note that this is not the same 4-legged sling that is associated with the emergency and operating gates.
Crane rigging using: the Government furnished 4-legged sling and spreader bar for the two emergency gates (gates 5 and 6); the Government furnished 4-legged sling for the four operating gates (gates 1-4); and using appropriate Contractor provided rigging for the remainder of the gates. Government furnished shackles and “C-clips” as shown in Photos 18 and 24 of Attachment 2 will also be available and may be used for rigging the four small gates associated with the fish ladder and fishway.
Lifting and lowering the 4 operating gates, 2 emergency gates, 2 fishway gates, 1 fish ladder gate and 2 fish ladder bulkheads for the hydraulic steel structures inspection. Note that the fish ladder bulkheads stored on the ground to the north of the control works structure.
Provide all materials, labor and equipment as identified and required for installation of new operational gate dogging bars as shown in Attachment 3 NEW DOGGING BAR SKETCH SK-1. This task applies only to the four operational gates, which are gates 1-4.
Dogging and stabilizing gates, the operating gates will remain in their slots.
All other gates will be removed from their slots, laid down and turned over for inspection, and returned when completed. The Contractor shall provide appropriate dunnage for all gates that are to be laid down.
Removing operating and emergency gate orifice plates using Contractor provided rigging when plates are in a vertical orientation. The Government furnished 4-legged sling with hooks will be available and may be used for removal of the orifice plates when they are in a horizontal orientation.
Removing and reinstalling 5/8-11 UNC, 1 ¼” long flat head, stainless steel socket head (3/8”) cap screws on the orifice plates, and applying Contractor provided anti-seize compound to all fasteners prior to replacement . Torque bolts to 60 ft.-lbs. Note that the bottom row of orifice plate bolts on the operating gates will be approximately one foot below the deck surface when the gates are supported on the new dogging bars. The Contractor shall provide the necessary hand tools to remove these bolts in this orientation and shall take the necessary precautions to assure that these bolts are not dropped in the river below.
Remove built up dirt and debris from the gate interiors once the orifice plates are removed; water may not be used in the cleaning process. Preferred cleaning methods are by using shop vacuums, brooms, brushes, and shovels. For the upper levels of the gate cavities this cleaning work shall be performed using the scissor lift. Clean sand and woody debris may be dumped down the gate slot into the river below.
Emergency Gate Test to include lowering and raising Emergency Gate 6, which is in downstream slot no. 3. Steps include:
1. Inspecting the master link, 4-legged sling, and spreader bar rigging that is stored on the gate.
2. Retrieve the rigging with the contract crane and attach same to the lifting eyes provided on the gate
3. Lift and lower the gate as necessary with the crane while the dogging hardware is removed
4. Lower the gate to the bottom of the slot while watching the weight limits on the crane. Note that this appears to require lowering the hook block into the gate slot. If this is an unsafe condition, steps 5 and 6 below are not required.
5. Determine if it is possible to disconnect the Master Link from the crane’s hook block after the gate is lowered all the way. Rigging would be lowered to the top of the gate so it can be retrieved later; it doesn’t have to be disconnected from the gate.
6. Hoist the gate from the bottom of the slot and record the maximum load on the crane.
7. Reinstall the gate with dogging hardware. Note that this Emergency Gate Test may be done in concert with the inspection of this gate which may be completed prior to this step being completed.
The Government will perform the following tasks:
Disconnection and reconnection of electrical devices.
Disconnection and reconnection of the hydraulic equipment.
Removal and reinstallation of gate dogging devices with the exception of the new operating gate dogging bars.
Removing and reinstalling operating gate hold down hardware.
Inspections of the exterior of the gates and the interior once the orifice plates are removed.
Determining if the emergency gate test can be performed given the water level.
Each operating gate has overall dimensions that are approximately 29 feet wide, 28 feet-8 inches tall, and 4 feet-8 inches thick (at the thickest point which is the “ears” on the support beam, the actual gate is about 2’-3” thick) and with rigging (for the Government’s 90-ton crane weigh) about 97,000 pounds.
Below is a table of Gate weights:
Gate Name Weight* (pounds)
North Fishway Gate 11,900 South Fishway Gate 12,100 Fish Ladder Gate (estimated weight) 12,000 Fish Ladder Bulkhead Gate 1 8,000 Fish Ladder Bulkhead Gate 2 8.900 Gate 1 – Operating Gate with Hydraulics 94,000 Gate 2 – Operating Gate with Hydraulics 91,350 Gate 3 – Operating Gate with Hydraulics 91,800 Gate 4 – Operating Gate with Hydraulics 92,500 Gate 5 – Emergency, Non-hydraulic, 2 piece
70,000
Gate 6 – Emergency, Non-hydraulic 72,000 Spreader Bar 1,700 Typical Hatch Cover 4,000 Gate Orifice Plates 1,500
Note: All gate weights are from the USACE Inspection Report “Hydraulic Structures (HSS) Inspection” dated April 2010 unless noted otherwise
Task 2 Operating Gate Dogging Bars Provide all materials, labor and equipment as identified and required for installation of new operational gate dogging bars as shown in Attachment 3 NEW DOGGING BAR SKETCH SK-1. This task applies only to the four operational gates, which are gates 1-4. All dogging bars, bearing plates, and shim plates shall be turned over to the Government upon completion of the contract.
Task 3 Ultrasonic Testing Perform Ultrasonic Testing (UT) of the full width (28’ 9 ¼”) of the double-bevel groove weld that joins the upper and lower portions of the downstream 15/16” thick ASTM A36 steel skin plates on gates 1 through 4 and gate 6. This groove weld was performed in the field to join the upper and lower halves of the gates which were fabricated offsite. UT testing shall be performed in accordance with Clause 6 of AWS D1.5M/D1.5:2010 Bridge Welding Code for a joint subject to tensile stress.
The presence of the US Army Corps of Engineer’s vinyl paint system 3 is a known variation from the standards included in Part C of Clause 6 and such variation is acceptable to the Government.
The Contractor shall provide a written report of the Ultrasonic Testing performed. As a minimum the report shall describe personnel, procedures, and findings from the testing. All field data collected and field notes shall be attached.
2. PERSONNEL QUALIFICATIONS
Cranes may only be operated by qualified operators. Operators must meet the requirements of EM 385-1-1 (current version). All crane operators must be properly trained, certified, and medically cleared to operate the Contractor’s crane.
Crane Operator Qualifications are as follows:
o Current crane operator medical physical in accordance with EM 385-1-1 (Blank Form in Attachment 5).
o Current Class A Commercial Drivers License.
o Valid National Commission for the Certification of Crane Operators (NCCCO) certification or equivalent for operating lattice boom cranes.
Rigger/Signalman Qualifications are as follows:
o Training from a certified training institute.
Lift Supervisor Qualifications are as follows:
o Meets the training requirements of the Rigger, above.
Operators of forklifts or power industrial trucks are as follows:
o Licensed in accordance with OSHA.
All Contractor personnel on the Chena River Lakes Project site shall have personal safety items that meet the requirements described in EM 385-1-1, to include as a minimum, a hard hat, safety-toed boots, work gloves, hearing protection, eye protection and high visibility vests. The Contractor’s Accident Prevention Plan will detail these requirements.
3. EQUIPMENT
Crane: The Contractor shall provide and operate a tracked or rubber-tired crane with the following operating parameters: lift a 50 ton gate with rigging and maneuver the load within a 29 foot diameter by 32 foot tall vertical cylinder with a hook height of 50 feet. Amendment 0001: See Attachment 9, SK-2 Crane Requirements Sketch, which details these crane lifting requirements. Amendment 0001.
Provide a certificate of compliance for each crane entering an activity under this contract. State within the certificate that the crane and rigging gear meet OSHA regulations (with the Contractor citing which OSHA regulations are applicable, e.g.
cranes used in construction, demolition or maintenance comply with 29 CFR 1926 and USACE EM 385-1-1 Section 16 and Appendix I. Certify on the Certificate of Compliance that the crane operators are qualified and trained in the operation of the crane to be used. Also certify that all of the crane operators have been trained in the proper use of all safety devices. Post certificates on the crane.
Fork lift : The Contractor shall provide a rubber tired fork lift, Ingersoll-Rand VR-90B or equivalent, with operator for use in removing and replacing the regulating gate orifice plates once the gates are either dogged off in the slot or laid down for inspection.
Scissor lift: The contractor shall provide a scissors-type lift capable for use on the concrete deck and lifting two inspectors the height of the gate (24 feet) once dogged off in the slot. The scissors lift is only required during the operating gate inspection and shall also be used by the Contractor for gate cavity cleaning.
Service Truck: The contractor shall provide a service truck with air tools and equipment suitable for the tasks in this scope of work.
4. SAFETY
The Contractor shall prepare an Accident Prevention Plan and Lift Plan which meet the requirements of the current version of EM385-1-1. In addition, the Contractor shall prepare a lift plan for each lift. Attachment 6 to this Scope of Work is Specification 01 35 26, Government Safety Requirements, which the Contractor shall use as a guide in preparing the plans and executing this Scope of Work.
Contractor Accident Prevention Plan: The Contractor’s Accident Prevention Plan shall be prepared and submitted to the Chena Project Manager as indicated in the schedule below. Work may not start until the plan (or updates) are accepted by the Chena Project Manager.
The Contractor shall follow the format in the latest edition of EM 385-1-1 “US Army Corps of Engineers Safety and Health Requirements Manual” Appendix A in preparing the Accident Prevention Plan. Activity Hazard Analysis (AHA’s) will be included for all crane tasks. This plan shall also provide a field personnel employee listing and contact information, methods for emergency communications in the field, an emergency contact list, first aid preparedness, equipment fueling procedures, spill clean-up procedures and contractor furnished supplies, fire suppression and public safety considerations.
5. GOVERNMENT FURNISHED PROPERTY
The Government has a limited amount of rigging equipment available for use. A list of Government furnished property is shown in Attachment 7 with supporting drawings in Attachment 8.
This property will be furnished at the project site compound. The Contractor shall accept delivery and transport the property to the job site at his own expense, unless property has previously been moved by the government to the job site. When the property is accepted, the Contractor shall verify its quantity and condition, and acknowledge receipt in writing to the Chena Project Manager. The Contractor shall also report in writing to the Chena Project Manager, within 24 hours of acceptance, any damage to or shortage of the property received.
6. SCHEDULE AND PRE-WORK CONFERENCE
Hours of work: Work days shall be from 8AM to 8 PM. Work weeks shall be Monday thru Saturday.
The crane operator and rigger/signalman shall not work more than 12 hours in any 24 hour period including time worked at other locations. The Contractor shall ensure the crane operators and riggers/signalmen furnished shall have a minimum of 8 consecutive hours of rest in each 24-hour period.
Performance Period: The period of performance at the project site is between June 8 and June 13, 2015, with the additional days of June 15 through June 18 if needed.
Pre-work Plans: The Accident Prevention and Lift Plan will be delivered to the Chena Project Manager by May 1, 2015. The Government will review the plan and provide comments by May 13, 2015. The Contractor shall incorporate the comments and provide a final by May 22, 2015.
Pre-work Conference: All Contractor personnel scheduled to work at the Moose Creek Dam shall meet with the Chena Project Manager on or before June 2, 2015 to review contract requirements and discuss the Contractor’s Accident Prevention Plan and Lift Plan. The date and time will be mutually agreed to between the Contractor and the Chena Project Manager. This meeting will occur after the Contractor’s Final Accident Prevention Plan and Lift Plan is accepted by the Government.
Below is a summary of the schedule:
Task Start Date End Date Accident Prevention Plan & Lift Plan – Draft May 1, 2015 Accident Prevention Plan & Lift Plan– Receipt of Comments
May 13, 2015
Accident Prevention Plan & Lift Plan – Final May 22, 2015 Pre-Work Conference, on or before June 2, 2015 Field Work – Clins 1, 2 and 3 June 8, 2015 June 13, 2015 Field Work – Clin 4 June 15, 2015 June 18, 2015 Ultrasonic Testing Report June 26, 2015
7. PAYMENT
Payment will be made for the actual work performed as listed in the bid schedule. A daily report will be provided to the Chena Project Office Manager, signed by the Contractor.
The items in the Bid Schedule are defined as follows:
o Clin 1 is the job mobilization; job demobilization; and equipment, labor, material, and supervision to meet the requirements of Task 1 for 6 consecutive 12 hour days.
o Clin 2 is providing a new gate dogging bar and gate modifications meeting the requirements of Task 2.
o Clin 3 is the ultrasonic testing services and report meeting the requirements of Task 3.
o Clin 4 is the equipment, labor, material and supervision to perform the inspection described in Clin 1 for up to 4 additional 12 hour days. Payment will be made for only the number of additional days used. This is an optional clin.
The Contractor’s work shall be accomplished with thoroughness and skill, and the Contractor shall be cognizant of the serious difficulties that could result from defective work. Therefore, it shall be the Contractor’s responsibility to thoroughly check each phase of work and guarantee its safety, timeliness and thoroughness.
Any damage to the Government furnished property shall be immediately reported to the Chena Project Manager and in accordance with the Contractor’s Accident Prevention Plan.
The Contractor shall at all times exercise diligence and care to protect, and preserve all materials, supplies, and equipment of every description in performance of all work under this contract. Daily routine operator maintenance of equipment is the responsibility of the Contractor to be performed in cooperation with Project personnel on site. All reasonable requests by the Chena Project Manager to enclose, secure, or specially protect such property shall be complied with under this contract. If the Contractor fails to comply with the Chena Project Managers request, certain materials, equipment, supplies, and work performed may be protected by the government and the costs thereof be charged to the Contractor to be deducted from any payment due the Contractor.
8. TECHNICAL POINT OF CONTACT
US ARMY CORPS OF ENGINEERS
CHENA FLOOD CONTROL PROJECT
ATTN: CEPOA-CO-OP (Mr. Tim Feavel, 907 488 2748) PO Box 55270 North Pole, AK 99705
9. BASIS OF AWARD
This contract will be awarded to the offeror with the lowest price for the total of bid times 1 through 4, and submits a technically acceptable proposal.
The Contractor’s proposal shall include the following items:
For at least one crane operator:
a. Valid National Commission for the Certification of Crane Operators (NCCCO) certification or equivalent for operating lattice boom cranes.
b. Current crane operator medical physical in accordance with EM 385-1-1 (Blank Form attached.)
c. Current Class A Commercial Drivers License.
For at least one rigger/signalman:
a. Training certificate from a certified training inst For at least one Lift Supervisor
a. Meets the training requirements of the Rigger, above.
For the crane:
a. Certificate of Compliance stating the crane and rigging gear meet applicable OSHA regulations.
Proposals will be rated as either “acceptable” or “not acceptable” based on the contractor’s demonstration of providing the properly completed certificates as indicated above
ATTACHMENT 1
MOOSE CREEK DAM (MCD) CONTROL WORKS VICINITY
ATTACHMENT 2
PHOTOS FOR 2015 HSS INSPECTION SCOPE OF WORK
ATTACHMENT 3
NEW DOGGING BAR SKETCH SK-1
ATTACHMENT 4
CONTROL WORKS DECK ALLOWABLE LOADS
ATTACHMENT 5
CRANE OPERATOR MEDICAL CLEARANCE FORM
Crane Operator Medical Clearance (This form is for physicians guidance and verification of U.S. Army Corps of Engineers crane operator physical qualification/examination requirements and does not replace any of the crane operator requirements in EM 385-1-1)
Date of Examination: ____________________ Crane Company/Employer Name: Phone:
This is to certify that _________________________ was administered a physical examination and meets the Crane Operator Physical Qualification/Examination Requirements set forth in the U.S. Army Corps of Engineers EM 385-1-1 (September 2008), Section 16.
MD DO
Physician’s Signature and Title (Must be a MD or
DO)
Name (Print) and Phone No.
Note: A DOT Medical Examiners Certificate in accordance with the Federal Motor Carrier Regulation (49 CFR 391.41-391.49) does not meet the EM 381-1-1 crane operator physical requirements.
EM 385-1-1 Crane Operator Physical Qualification/Examination Requirements:
a. Operators shall have a current physician's certification, dated within the past 2 years, that states the operator meets the following physical qualifications:
(1) Vision of at least 20/30 Snellen in one eye and 20/50 in the other, with or without corrective lenses;
(2) Normal depth perception and field of vision;
(3) Ability to distinguish colors, regardless of position;
(4) Adequate hearing, with or without hearing aid, for the specific operation;
(5) Sufficient strength, endurance, agility, coordination, manual dexterity, and speed of reaction to meet the demands of equipment operation;
(6) No tendencies to dizziness or similar undesirable characteristics; and
(7) Has a negative result for substance abuse test.
b. Evidence of physical defects, emotional instability that could render a hazard to the operator, others, or safe operation of the equipment, or evidence that the operator is subject to seizures or loss of physical control shall be sufficient reason for disqualification. In such cases, specialized medical tests may be required to evaluate these conditions and determine their impact.
c. All contractor crane/derrick operators shall participate in a drug testing program and have a negative result for a substance abuse test. The level of testing will be in accordance with standard practices for industry or by the agency’s random drug testing program. This test will be confirmed by a recognized laboratory service.
Comments:
Note: Crane operators must refer to the EM 385-1-1 for all crane operator qualification requirements.
ATTACHMENT 6
SPECIFICATION 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
ATTACHMENT 7
GOVERNMENT FURNISHED EQUIPMENT/PROPERTY SCHEDULE
o 4 Legged Sling with 2 ¾ inch master link as shown on Sheet M-28 of the Control Gates Operations and Maintenance Manual and Attachment 2.
o Spreader Bar fabricated from 8 inch, Schedule 40 pipe (ASTM A120) as shown on Sheet M-28 of the Control Gates Operations and Maintenance Manual and Attachment 8.
o 4 Legged Sling with Hooks for gate slot cover plate and horizontal orientation orifice plate removal. See Photos 2 and 20 of Attachment 2.
o Shackles and “C-clips” as shown in Photos 18 and 24 of Attachment 2.
o Manual “Control Gates Operations and Maintenance Manual, Moose Creek Dam, January 1990” in a PDF electronic format.
ATTACHMENT 8
PERTINENT PAST CONTRACT DRAWINGS
Note that prior to the gate modifications completed in accordance with the 1988 solicitation identified as DACW85-88-B-0004 the operating gates were installed in the reverse orientation with what is now the downstream face facing upstream. This should be taken into account when viewing earlier contract drawing such as those from the 1976 solicitation identified as DACW85-76-B-0013.
Amendment 0001 ATTACHMENT 9
SK-2 Crane Requirements Sketch Amendment 0001
April 1, 2015 Pre-Proposal Call Notes, Solicitation W911KB-15-T-0002
Q1. Must all the items on the Bid Schedule be completed?
R1. Yes, the entire bid schedule must be completed; subcontractors may be used to perform tasks on the bid schedule.
Q2. Has the gate dogging procedure been done before?
R2. No; the procedure used to install the gates was explained but cannot due to safety concerns.
Q3. What is the purpose of the bearing plates?
R3. Load distribution of the dogging bar on the concrete.
Q4. What is the curing time for the zinc vinyl paint shown on Sketch 1?
R4. Paint is expected to be a spray-can type zinc galvanized touch up paint that dries quickly.
Q5. Will the Contractor’s crane be sitting directly next to each gate as shown in Attachment 7?
R5. The Contractor shall The Contractor shall use Attachment 4 Control Works Deck Allowable Loads and the particulars of his crane to determine the best location to place the crane for each gate lift. The photos in Attachment 7 are also helpful in understanding that the perimeter of the control works deck has handrails in place, which could also limit the crane placement. The particulars of crane placement are left to the Contractor.
Q6. If not what will the crane radius be?
R6. This shall be determined by the Contractor, based on the allowable deck loads and the particulars of his crane.
Q7. Can our rigger/signalman be the lift supervisor?
R7. No, the lift supervisor is separate from the rigger/signalman.
Q8. Is the lift for the 50ton gate going to have a maximum radius of 29’ from the center pin of the crane to the center of the gate?
R8. No. The first paragraph of Section 3 of the Scope of Work sets the lifting parameters. The Contract requires being able to lift a 50 ton vertical cylinder that is 29 feet in diameter, and 32 feet tall, with a hook height of 50 feet.
The first paragraph of Section 3. EQUIPMENT is revised to add:
"See Attachment 9, SK-2 Crane Requirements Sketch, which clarifies these crane lifting requirements."
Q9. Does this project have a strict start date?
R9. Yes, see page 10 of the .pdf file “W911KB-15-T-0002”, Section 6 of the scope of work, which states: Performance Period: The period of performance at the project site is between June 8 and June 13, 2015 with the additional days of June 15 through June 18 if needed.
Q10. If not how much flexibility will there be?
R10. At this time, the dates are not flexible.
Q11 May we have a 10 day extension?
R 11. The proposal due date will be changed to April 10.
Other changes:
The manual noted in Attachment 7, “Control Gates Operations and Maintenance Manual, Moose Creek Dam, January 1990” is provided.
(End of Summary of Changes)
RFP CHENA ASPHALT AND EAST CUTOFF DIKE REPAIRS CHL009
NORTH POLE, ALASKA
SECTION 01 35 26
GOVERNMENTAL SAFETY REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)
ASSE/SAFE A10.34 (2001; R 2012) Protection of the Public on or Adjacent to Construction Sites
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 51B (2009; TIA 09-1) Standard for Fire Prevention During Welding, Cutting, and Other Hot Work
NFPA 70E (2012; Errata 2012) Standard for Electrical Safety in the Workplace
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1926 Safety and Health Regulations for Construction
29 CFR 1926.16 Rules of Construction
1.2 DEFINITIONS
a. High Visibility Accident. Any mishap which may generate publicity or high visibility.
b. Medical Treatment. Treatment administered by a physician or by registered professional personnel under the standing orders of a physician. Medical treatment does not include first aid treatment even through provided by a physician or registered personnel.
c. Recordable Injuries or Illnesses. Any work-related injury or illness that results in:
(1) Death, regardless of the time between the injury and death, or the length of the illness;
(2) Days away from work (any time lost after day of injury/illness onset);
Section 01 35 26 Page 1 Revised March 25, 2015
(3) Restricted work;
(4) Transfer to another job;
(5) Medical treatment beyond first aid;
(6) Loss of consciousness; or
(7) A significant injury or illness diagnosed by a physician or other licensed health care professional, even if it did not result in
(1) through (6) above.
d. "USACE" property and equipment specified in USACE EM 385-1-1 should be interpreted as Government property and equipment.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
Government acceptance, as defined in EM 385-1-1, is required for submittals with a "G, A" designation.
SD-01 Preconstruction Submittals
Accident Prevention Plan (APP); G
Activity Hazard Analysis (AHA); G
SD-06 Test Reports
Notifications and Reports
Submit reports as their incidence occurs, in accordance with the requirements of the paragraph, "Notifications and Reports."
Accident Reports
SD-07 Certificates
Hot work permit
1.4 REGULATORY REQUIREMENTS
In addition to the detailed requirements included in the provisions of this contract, comply with the most recent edition of USACE EM 385-1-1, and all applicable federal, state, and local laws, ordinances, criteria, rules and regulations. Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting work.
Where the requirements of this specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements govern.
Section 01 35 26 Page 2
1.5 SITE QUALIFICATIONS, DUTIES AND MEETINGS
1.5.1 Personnel Qualifications
1.5.1.1 Site Safety and Health Officer (SSHO)
The SSHO must meet the requirements of EM 385-1-1 section 1 and ensure that the requirements of 29 CFR 1926.16 are met for the project. Provide a Safety oversight team that includes a minimum of one (1) person at each project site to function as the Site Safety and Health Officer (SSHO). The SSHO or an equally-qualified Designated Representative/alternate shall be at the work site at all times to implement and administer the Contractor's safety program and government-accepted Accident Prevention Plan. The SSHO's training, experience, and qualifications shall be as required by EM 385-1-1 paragraph 01.A.17, entitled SITE SAFETY AND HEALTH OFFICER (SSHO), and all associated sub-paragraphs.
A Competent Person shall be provided for all of the hazards identified in the Contractor's Safety and Health Program in accordance with the accepted Accident Prevention Plan, and shall be on-site at all times when the work that presents the hazards associated with their professional expertise is being performed. Provide the credentials of the Competent Persons(s) to the the Contracting Officer for acceptance in consultation with the Safety Office.
1.5.1.1.1 Contractor Quality Control (QC) Person:
The Contractor Quality Control Person can be the SSHO on this project.
1.5.2 Personnel Duties
1.5.2.1 Site Safety and Health Officer (SSHO)
The SSHO shall:
a. Conduct daily safety and health inspections and maintain a written log which includes area/operation inspected, date of inspection, identified hazards, recommended corrective actions, estimated and actual dates of corrections. Attach safety inspection logs to the Contractors' daily quality control report.
b. Conduct mishap investigations and complete required reports. Maintain the OSHA Form 300 and Daily Production reports for prime and sub-contractors.
c. Maintain applicable safety reference material on the job site.
d. Attend the pre-construction conference, pre-work meetings including preparatory inspection meeting, and periodic in-progress meetings.
e. Implement and enforce accepted APPS and AHAs.
f. Maintain a safety and health deficiency tracking system that monitors outstanding deficiencies until resolution. Post a list of unresolved safety and health deficiencies on the safety bulletin board.
g. Ensure sub-contractor compliance with safety and health requirements.
h. Maintain a list of hazardous chemicals on site and their material
Section 01 35 26 Page 3 safety data sheets.
Failure to perform the above duties will result in dismissal of the superintendent, QC Manager, and/or SSHO, and a project work stoppage.
The project work stoppage will remain in effect pending approval of a suitable replacement.
1.5.3 Meetings
1.5.3.1 Preconstruction Conference
a. Contractor representatives who have a responsibility or significant role in accident prevention on the project shall attend the preconstruction conference. This includes the project superintendent, site safety and health officer, quality control supervisor, or any other assigned safety and health professionals who participated in the development of the APP (including the Activity Hazard Analyses (AHAs) and special plans, program and procedures associated with it).
b. Discuss the details of the submitted APP to include incorporated plans, programs, procedures and a listing of anticipated AHAs that will be developed and implemented during the performance of the contract. This list of proposed AHAs will be reviewed at the conference and an agreement will be reached between the Contractor and the Contracting Officer's representative as to which phases will require an analysis.
In addition, establish a schedule for the preparation, submittal, review, and acceptance of AHAs to preclude project delays.
c. Deficiencies in the submitted APP will be brought to the attention of the Contractor at the preconstruction conference, and the Contractor shall revise the plan to correct deficiencies and re-submit it for acceptance. Do not begin work until there is an accepted APP.
1.6 ACCIDENT PREVENTION PLAN (APP)
Use a qualified person to prepare the written site-specific APP. Prepare the APP in accordance with the format and requirements of USACE EM 385-1-1 and as supplemented herein. Cover all paragraph and subparagraph elements in USACE EM 385-1-1, Appendix A, "Minimum Basic Outline for Accident Prevention Plan". Specific requirements for some of the APP elements are described below. The APP shall be job-specific and address any unusual or unique aspects of the project or activity for which it is written. The APP shall interface with the Contractor's overall safety and health program.
Include any portions of the Contractor's overall safety and health program referenced in the APP in the applicable APP element and made site-specific.
The Government considers the Prime Contractor to be the "controlling authority" for all work site safety and health of the subcontractors.
Contractors are responsible for informing their subcontractors of the safety provisions under the terms of the contract and the penalties for noncompliance, coordinating the work to prevent one craft from interfering with or creating hazardous working conditions for other crafts, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out. The APP shall be signed by the person and firm (senior person) preparing the APP, the Contractor, the on-site superintendent, the designated site safety and health officer, the Contractor Quality control Manager, and any designated CSP or CIH.
Submit the APP to the Contracting Officer 15 days after NTP. Work cannot proceed without an accepted APP.
Section 01 35 26 Page 4
Once accepted by the Contracting Officer, the APP and attachments will be enforced as part of the contract. Disregarding the provisions of this contract or the accepted APP will be cause for stopping of work, at the discretion of the Contracting Officer, until the matter has been rectified.
Once work begins, changes to the accepted APP shall be made with the knowledge and concurrence of the Contracting Officer, project superintendent, SSHO and quality control manager. Should any severe hazard exposure, i.e. imminent danger, become evident, stop work in the area, secure the area, and develop a plan to remove the exposure and control the hazard. Notify the Contracting Officer within 24 hours of discovery.
Eliminate/remove the hazard. In the interim, take all necessary action to restore and maintain safe working conditions in order to safeguard onsite personnel, visitors, the public (as defined by ASSE/SAFE A10.34,) and the environment.
Copies of the accepted plan will be maintained at the Contracting Officer's office and at the job site.
Continuously review and ammend the APP, as necessary, throughout the life of the contract. Incorporate unusual or high-hazard activities not identified in the original APP as they are discovered.
1.7 ACTIVITY HAZARD ANALYSIS (AHA)
The Activity Hazard Analysis (AHA) format shall be in accordance with USACE EM 385-1-1, Section 1. Submit the AHA for review at least 15 calendar days prior to the start of each phase. Format subsequent AHAs as amendments to the APP. The analysis should be used during daily inspections to ensure the implementation and effectiveness of the activity's safety and health controls.
The AHA list will be reviewed periodically (at least monthly) at the Contractor supervisory safety meeting and updated as necessary when procedures, scheduling, or hazards change.
Develop the activity hazard analyses using the project schedule as the basis for the activities performed. Any activities listed on the project schedule will require an AHA. The AHAs will be developed by the contractor, supplier or subcontractor and provided to the prime contractor for submittal to the Contracting Officer.
1.8 DISPLAY OF SAFETY INFORMATION
Within one calendar day(s) after commencement of work, erect a safety bulletin board at the job site. Where size, duration, or logistics of project do not facilitate a bulletin board, an alternative method, acceptable to the Contracting Officer, that is accessible and includes all mandatory information for employee and visitor review, shall be deemed as meeting the requirement for a bulletin board. Include and maintain information on safety bulletin board as required by EM 385-1-1, section 01.A.06. Hot work permits are also required to be posted.
1.9 SITE SAFETY REFERENCE MATERIALS
Maintain safety-related references applicable to the project, including those listed in the article "References." Maintain applicable equipment manufacturer's manuals.
Section 01 35 26 Page 5
1.10 EMERGENCY MEDICAL TREATMENT
Contractors will arrange for their own emergency medical treatment.
Government has no responsibility to provide emergency medical treatment.
1.11 NOTIFICATIONS and REPORTS
1.11.1 Accident Notification
Notify the Contracting Officer as soon as practical, but no more than four hours after any accident meeting the definition of Recordable Injuries or Illnesses or High Visibility Accidents, property damage equal to or greater than $2,000, or any weight handling equipment accident. Within notification include contractor name; contract title; type of contract;
name of activity, installation or location where accident occurred; date and time of accident; names of personnel injured; extent of property damage, if any; extent of injury, if known, and brief description of accident (to include type of construction equipment used, PPE used, etc.).
Preserve the conditions and evidence on the accident site until the Government investigation team arrives on-site and Government investigation is conducted.
1.11.2 Accident Reports
a. Report all accidents as soon as possible and follow up with a POD Form 265-R within 24 hours. Conduct an accident investigation for recordable injuries and illnesses, for Medical Treatment defined in paragraph DEFINITIONS, property damage accidents resulting in at least $20,000 in damages, and near misses as defined in EM 385-1-1, to establish the root cause(s) of the accident. Complete the applicable The Contracting Officer will provide copies of any required or special forms.
c. Conduct an accident investigation for any weight handling equipment accident (including rigging gear accidents) to establish the root cause(s) of the accident, complete the WHE Accident Report (Crane and Rigging Gear) form and provide the report to the Contracting Officer within 30 calendar days of the accident. Do not proceed with crane operations until cause is determined and corrective actions have been implemented to the satisfaction of the contracting officer. The Contracting Officer will provide a blank copy of the accident report form.
1.12 HOT WORK PERMIT
Submit and obtain a written permit prior to performing "Hot Work" (welding, cutting, etc.) or operating other flame-producing/spark producing devices, from the local fire department having jurisdiction over the project site.
CONTRACTORS ARE REQUIRED TO MEET ALL CRITERIA BEFORE A PERMIT IS ISSUED.
Provide at least two (2) twenty (20) pound 4A:20 BC rated extinguishers for normal "Hot Work". All extinguishers shall be current inspection tagged, approved safety pin and tamper resistant seal. It is also mandatory to have a designated FIRE WATCH for any "Hot Work" done at this activity. The Fire Watch shall be trained in accordance with NFPA 51B and remain on-site for a minimum of 30 minutes after completion of the task or as specified on the hot work permit.
When starting work in the facility, require personnel to familiarize
Section 01 35 26 Page 6 themselves with the location of the nearest fire alarm boxes and place in memory the emergency local fire department Fire Division phone number. ANY
FIRE, NO MATTER HOW SMALL, SHALL BE REPORTED TO THE RESPONSIBLE FIRE
DEPARTMENT IMMEDIATELY.
1.13 FACILITY OCCUPANCY CLOSURE
Streets, walks, and other facilities occupied and used by the Government shall not be closed or obstructed without written permission from the Contracting Officer.
1.14 SEVERE STORM PLAN
In the event of a severe storm warning, the Contractor must:
a. Secure outside equipment and materials and place materials that could be damaged in protected areas.
b. Check surrounding area, including roof, for loose material, equipment, debris, and other objects that could be blown away or against existing facilities.
c. Ensure that temporary erosion controls are adequate.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
3.1 CONSTRUCTION AND OTHER WORK
3.1.1 Hazardous Material Exclusions
Notwithstanding any other hazardous material used in this contract, radioactive materials or instruments capable of producing ionizing/non-ionizing radiation (with the exception of radioactive material and devices used in accordance with USACE EM 385-1-1 such as nuclear density meters for compaction testing and laboratory equipment with radioactive sources) as well as materials which contain asbestos, mercury or polychlorinated biphenyls, di-isocynates, lead-based paint are prohibited. The Contracting Officer, upon written request by the Contractor, may consider exceptions to the use of any of the above excluded materials. Low mercury lamps used within fluorescent lighting fixtures are allowed as an exception without further Contracting Officer approval.
Notify the Radiation Safety Officer (RSO) prior to excepted items of radioactive material and devices being brought on base.
3.1.2 Unforeseen Hazardous Material
The design should have identified materials such as PCB, lead paint, and friable and non-friable asbestos and other OSHA regulated chemicals (i.e.
29 CFR Part 1910.1000). If material, not indicated, that may be hazardous to human health upon disturbance during construction operations is encountered, stop that portion of work and notify the Contracting Officer immediately. Within 14 calendar days the Government will determine if the material is hazardous. If material is not hazardous or poses no danger, the Government will direct the Contractor to proceed without change. If material is hazardous and handling of the material is necessary to
Section 01 35 26 Page 7 accomplish the work, the Government will issue a modification pursuant to "FAR 52.243-4, Changes" and "FAR 52.236-2, Differing Site Conditions."
3.2 PRE-OUTAGE COORDINATION MEETING
Apply for utility outages at least 30 days in advance. As a minimum, the request should include the location of the outage, utilities being affected, duration of outage and any necessary sketches. Special requirements for electrical outage requests are contained elsewhere in this specification section. Once approved, and prior to beginning work on the utility system requiring shut down, attend a pre-outage coordination meeting with the Contracting Officer and the Public Utilities representative to review the scope of work and the lock-out/tag-out procedures for worker protection. No work will be performed on energized electrical circuits unless proof is provided that no other means exist.
3.3 CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT)
Ensure that each employee is familiar with and complies with these procedures and USACE EM 385-1-1, Section 12, Control of Hazardous Energy.
3.4 FALL HAZARD PROTECTION AND PREVENTION PROGRAM
Establish a fall protection and prevention program, for the protection of all employees exposed to fall hazards. Within the program include company policy, identify responsibilities, education and training requirements, fall hazard identification, prevention and control measures, inspection, storage, care and maintenance of fall protection equipment and rescue and evacuation procedures.
3.4.1 Training
Institute a fall protection training program. As part of the Fall Hazard Protection and Prevention Program, provide training for each employee who might be exposed to fall hazards.