W911KB-15-R-0024_AM_2.pdf

PDF 748 KB Posted

Attached to
St Paul Harbor Breakwater Repairs and Maintenance Dredging, Saint Paul Island, Alaska
Solicitation number
W911KB-15-R-0024
Issued by

About this file

AMENDMENT 2 WITH REPLACEMENT SECTIONS 00 22 11 01 19 40 35 20 23 AND SUBMITTAL REGISTER

View the file

Other files

File Type Posted
W911KB-15-R-0024-0004.pdf PDF
W911KB-15-R-0024_Amendment__3.pdf PDF
15R0024-0001.pdf PDF
RFP_W911KB-15-R-0024.pdf PDF
SPECS-SPH012-RFP.pdf PDF
DRWGS-SPH012-RFP.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PROJECT TITLE/LOCATION: St Paul Harbor Breakw ater Repairs and Maintenance Dredging, St Paul Island, Alaska

PROPOSAL DUE DATE remains 25 August 2015, 2:00 PM Alaska Time.

Proposals shall be submitted in accordance w ith Section 00 21 00, Paragraph 1.10 Proposal Submittals.

This Amendment provides changes to the solicitation as indicated on page 2 of this document.

YOU ARE REQUIRED TO ACKNOWLEDGE RECEIPT OF THIS AMENDMENT ON THE REVERSE SIDE OF THE STANDARD FORM 1442.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Jul-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB-15-R-0024

X 9B. DATED (SEE ITEM 11)

24-Jul-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Jul-2015

CODE

U.S. ARMY ENGINEER DISTRICT, AK

CEPOA-CT (W911KB)

PO BOX 6898

JBER AK 99506-0898

W911KB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911KB-15-R-0024

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 MODIFICATION CONTINUATION PAGE

AMENDMENT #2

The following drawings are substituted for the superseded drawings:

NONE

The following revised documents are substituted for the superseded documents. The identifier “AM#02” appears before and after new and/or revised material and replacement pages are provided, except as noted:

- Section 00 22 11, Paragraphs:

13.1 13.1.5

13.2 (c) and (d)

- Section 01 19 40.00 29, Paragraph 1.13

- Section 35 20 23, Paragraphs:

1.2 3.1 3.3.2 3.4.1 3.4.2

The following documents/drawings are deleted:

NONE

The following documents are added:

- Section 01 45 04.00.29, Attachment 1: Submittal Register

The following revisions are incorporated:

NONE

Other:

NONE

Section 00 22 11 Page 1

SECTION 00 22 11

SELECTION PROCEDURES

PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA AND BASIS OF AWARD

ONE STEP - - LOWEST PRICE/TECHNICALLY ACCEPTABLE

1.0 OVERVIEW

2.0 BASIS FOR AWARD

3.0 GENERAL INSTRUCTIONS

4.0 PROPOSAL INFORMATION AND RELATED EVALUATION FACTORS

5.0 VOLUME 1 – TAB A - FACTOR 1, SUBFACTOR 1: EQUIPMENT

6.0 VOLUME 1 – TAB B - FACTOR 1, SUBFACTOR 2: SURVEYOR QUALIFICATIONS

7.0 VOLUME 1 – TAB C - FACTOR 1, SUBFACTOR 3: SPECIALIZED EXPERIENCE

8.0 VOLUME 1 – TAB D - FACTOR 1, SUBFACTOR 4: SCHEDULE

9.0 VOLUME 1 - TAB E - FACTOR 2: PAST PERFORMANCE

AM01…10.0 VOLUME 2 – TAB A – FACTOR 3: SMALL BUSINESS PARTICIPATION

PLAN...AM01

11.0 VOLUME 2 – TAB B – FACTOR 4: STANDARD FORM 1442, PROPOSAL DATA SHEET,

AND CONTRACT LINE ITEM SCHEDULE

12.0 VOLUME 2, TAB C – REQUIRED PRE-AWARD INFORMATION

13.0 VOLUME 2, TAB D – SMALL BUSINESS SUBCONTRACTING PLAN

14. 0 EVALUATION PROCEDURES

ATTACHMENTS

1 - PROPOSAL DATA SHEET

2 - COMPANY SPECIALIZED EXPERIENCE FORM (PRIME CONTRACTOR)

3 – PAST PERFORMANCE QUESTIONNAIRE

4 – SMALL BUSINESS PARTICIPATION PLAN

5 - SMALL BUSINESS SUBCONTRACTING PLAN FORMAT

Section 00 22 11 Page 2

1.0 OVERVIEW

1.1. Interested firms (here after referred to as Offerors) shall submit proposals demonstrating their capability to successfully execute the construction contract resulting from this solicitation. The

Government will evaluate the proposals in accordance with the criteria described herein.

1.2 This is a lowest price technically acceptable source selection for the Saint Paul Harbor, Pribilof

Islands, Breakwater Repair and Maintenance Dredging. The project is for the repair of the detached breakwater, construction of scour protection, and maintenance dredging and disposal of sands and gravels in the Saint Paul Harbor. The Government will evaluate proposals in accordance with the criteria described herein, and award a firm fixed price contract to the responsible offeror, whose proposal conforms with all the terms and conditions of the solicitation and whose proposal is determined to represent the overall best value to the Government utilizing procedures in accordance FAR PART 15.101-

2 Lowest Price Technically Acceptable Source Selection Process. The lowest price technically acceptable source selection process is appropriate when best value is expected to result from selection of the technically acceptable proposal with the lowest evaluated price.

2.0 BASIS FOR AWARD

2.1 The Contracting Officer will award a firm fixed price contract to the responsible Offeror whose proposal the Source Selection Authority has determined conforms to the solicitation, is fair and reasonable, and offers the “best value” to the Government, considering all non-price factors described herein, and price.

A. The evaluation factors and sub-factors that establish the requirements of acceptability shall be set forth in the solicitation.

B. Proposals are evaluated for acceptability but not ranked using the non-cost/price factors.

C. Exchanges may occur (see FAR PART 15.306).

A firm-fixed-price construction contract will be awarded to the Offeror who submits a proposal which has the lowest price and is found to be technically acceptable.

3.0 GENERAL INSTRUCTIONS

3.1. Proposals should be submitted initially on the most favorable terms from a price and technical standpoint. Do not assume offerors will be contacted or afforded an opportunity to clarify, discuss or revise their proposals. In accordance with FAR 52.215-1, Para. (f)(4), the Government intends to evaluate proposals and award a contract without discussions with Offerors (except clarifications as described in

FAR 15.306(a)). Therefore, the Offeror’s initial proposal should contain the Offeror’s best terms from a cost or price and technical standpoint.

Section 00 22 11 Page 3

3.2 Submit proposal in a tabbed, three-ring binder. Page limitation for Volume 1 is 30 pages (not including Past Performance Questionnaires/Evaluations). Note that the Government will not evaluate any material that exceeds the page limits. Volume 2 has no page limitation.

4.0 PROPOSAL INFORMATION AND RELATED EVALUATION FACTORS

Location Factor Number Description Rating

Factor 1 Technical Acceptable/Unacceptable

Volume 1, Tab A Factor 1

Subfactor 1

Equipment Acceptable/Unacceptable

Volume 1, Tab B Factor 1

Subfactor 2

Surveyor Qualifications Acceptable/Unacceptable

Volume 1, Tab C Factor 1

Subfactor 3

Specialized Experience Acceptable/Unacceptable

Volume 1, Tab D Factor 1

Subfactor 4

Schedule

Volume 1, Tab E Factor 2 Past Performance Acceptable/Unacceptable

Location Factor Number Description Relative Importance

Volume 2, Tab A Factor 3 Small Business Participation Plan Acceptable/Unacceptable

Volume 2, Tab B Factor 4 Price (Standard Form 1442, Proposal Data

Sheet Contract Line Item Schedule)

Lowest Price

Volume 2, Tab C N/A Required Pre-Award Information Not Rated

AM01…Volume 2, Tab D

N/A Small Business Subcontracting Plan Scored in accordance with

AFARS, Appendix DD…AM01

Section 00 22 11 Page 4

5.0 VOLUME 1 – TAB A - FACTOR 1, SUBFACTOR 1: EQUIPMENT

5.1. Submission Requirements:

5.1.1. Submit a list of equipment, meeting the requirements listed below, which is to be used for transporting and placing rock, and for dredging and transporting the dredged material to the disposal site.

Include the make, model, year and size of equipment as applicable.

• Excavator with minimum 40 foot reach and with a 2 cubic yard rock bucket.

• Crane, 150 ton minimum.

• Deck barge for transporting equipment and rock to and from the detached breakwater.

• Scow with 500 cubic yard minimum capacity.

• Tug boat, 750 horsepower minimum.

• Two dump trucks, 15 cubic yards minimum.

• Loader with a 3 cubic yard bucket or larger.

5.2. Evaluation Criteria:

5.2.1. The Government will evaluate the submitted equipment list against the list shown. To be acceptable, 6 of the 7 types of equipment shall meet or exceed the standards in the list in paragraph 5.1.1.

6.0 VOLUME 1- TAB B - FACTOR 1, SUBFACTOR 2: SURVEYOR QUALIFICATIONS

6.1. Submission Requirements:

6.1.1. The offeror shall submit the following:

• The name of the independent hydrographic survey firm to be used on the project.

• Certificate of the independent Professional Land Surveyor (PLS) with both a valid license in the

State of Alaska and a current hydrographic certification from the American Congress of

Surveying and Mapping.

• A project list, including dates, demonstrating three documented years of experience in hydrographic surveying of navigable waters.

6.2. Evaluation Criteria:

6.2.1. The Government will evaluate the submitted surveyor’s qualifications against the list shown above. To be acceptable, all of the criteria in the list in Section 6.1.1 shall be met.

7.0 VOLUME 1- TAB C - FACTOR 1, SUBFACTOR 3: SPECIALIZED EXPERIENCE

7.1. Submission Requirements:

Section 00 22 11 Page 5

7.1.1 The offer shall submit 2 projects which demonstrate experience using mechanical equipment to selectively place breakwater rock. Projects shall be at least 50 % complete or completed within ten (10) years prior to the date of this solicitation. Utilize the PRIME CONTRACTOR SPECIALIZED

EXPERIENCE FORM (Attachment 2) at the end of the section.

The minimum requirement for this evaluation factor has been met when the offeror demonstrates experience, as a Prime Contractor, on two (2) projects which each meets all the below criteria for minimum acceptability:

• Use of mechanical equipment to place 10,000 cubic yards or more of core rock, “B” rock and

Armor stone.

• Transportation and placement of breakwater rock within a 0.5 foot tolerance.

• Project is currently underway (at least 50% completed) or completed no longer than ten (10) years preceding the date of this solicitation.

7.2. Evaluation Criteria:

7.2.1. The Government will evaluate the two submitted projects against the requirements listed in Section

7.1.1. To be acceptable, all of the criteria in the list in Section 7.1.1 shall be met.

8.0 VOLUME 1 – TAB D – FACTOR 1, SUB-FACTOR 4: SCHEDULE

8.1. Submission Requirements:

8.1.1 The offer shall submit a schedule showing when the work required by this contract shall be performed. The schedule shall include a bar-type Gantt chart and narratives describing the scope of work to be completed for each task listed on the schedule. The narratives shall include the pertinent equipment and personnel required to complete each task. The summary schedule shall be task oriented, indicating the number of calendar days, after notice to proceed, by which milestones are to be achieved. For schedule proposal purposes only, utilize a Notice to Proceed date of September 30, 2015. This date is solely to assist in evaluation of offeror’s proposals and shall not be construed as a contractual NTP date. The proposed project schedule shall not exceed the completion period stated in clause 52.211-10 of the solicitation.

The schedule shall include start and end dates for the following activities:

1. Mobilization of equipment and personnel

2. Pre-construction survey

3. Rock production

4. Breakwater rock placement

5. Post breakwater construction survey

6. Scour hole rock placement

Section 00 22 11 Page 6

7. Dredging activities

8. Post Dredge Survey

9. Final Survey of entire project

10. Demobilization

8.2.1. The Government will evaluate the submitted schedule against the list shown above. To be acceptable, 8 of the 10 criteria in the list in Section 8.1.1 shall be scheduled in accordance with the solicitation and have narratives which comply with the solicitation. A schedule that exceeds the contract performance period requirements stated in FAR 52.211-10 will be rated as “unacceptable.”

9.0 VOLUME 1 – TAB E – FACTOR 2: PAST PERFORMANCE

9.1. Submission Requirements:

9.1.1. Past performance refers to the quality of recent project experience from the owner's perspective.

Past performance evaluations or questionnaires shall be provided for at least two projects. For Federal projects, the offeror may rely on finalized CCASS or CPARS reports, otherwise the Past Performance

Questionnaire (PPQ) included as Attachment 3 to this section is provided for the offeror to submit to the client for each project. Previously completed PPQ’s may be submitted; however, ensure a current phone number and email address is provided for the client point of contact. Completed Past Performance

Questionnaires should be submitted with your proposal and may be duplicated for submission on future solicitations. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before the proposal closing date, the offeror should complete and submit with the proposal the first 2 pages of the

PPQ, which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Kimberly Tripp via email at kimberly.tripp@usace.army.mil prior to the proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

Projects cited shall be of a similar size, scope, or magnitude and currently well underway (at least 50% completed) or completed and turned over no longer than six (6) years preceding the date of this solicitation.

In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may be include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor

Performance Assessment Reporting Systems (CPARS), inquiries of owner representative(s), Federal

Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting

System (eSRS), and any other known sources not provided by the offeror. While the Government may mailto:kimberly.tripp@usace.army.mil

Section 00 22 11 Page 7 elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.

9.2. Evaluation Criteria:

9.2.1 Past Performance will be rated on an “Acceptable” or “Unacceptable” basis using the ratings and descriptions shown below.

Acceptable – Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown (see note below).

Unacceptable – Based on the offeror’s performance record, the Government has no reasonable expectation that the offeror will be able to successfully perform the required effort.

Note: An offeror without a record of relevant past performance or for whom information on past performance is not available or is so sparse that no meaningful past performance rating can be reasonably assigned will be determined to have ‘unknown’ past performance and shall not be evaluated favorably or unfavorably. Unknown past performance shall be considered “Acceptable”.

VOLUME 2 – SMALL BUSINESS PARTICIPATION, PRICE AND PRO FORMA

REQUIREMENTS

Submit the following information in a separate binder labeled: “Volume 2 – Small Business Participation, Price and Pro Forma Requirements.”

AM01…

10. VOLUME 2 – TAB A – FACTOR 3 - SMALL BUSINESS PARTICIPATION PLAN

10.1. Submission Requirements:

10.1.1 All offerors shall identify the extent to which Small Businesses (SBs), Veteran-Owned Small

Businesses (VOSBs), Service-Disabled Veteran-Owned Small Businesses (SDVOSBs), HUBZone Small

Businesses, Small Disadvantaged Businesses (SDBs), Woman-Owned Small Businesses (WOSBs) and

Historically Black Colleges/Universities or Minority Institutions (HBCU/MIs) would be utilized in the performance of this proposed contract. For small businesses, as defined by the North American Industry

Classification System (NAICS) Code applicable to this solicitation, the offeror shall identify their own participation as a SB, VOSB, SDVOSB, HUBZONE SB, SDB, WOSB, or HBCU/MI, and it will be considered in evaluating the proposed small business participation plan (use Attachment 4 - Small

Business Participation Plan).

10.1.2 Offerors must propose goals for Small Business Participation. Small business participation goals are to be an estimated percentage of total contract dollars (total proposed amount including options).

Section 00 22 11 Page 8

Provide an overall goal to be accomplished through collective small business participation from any type of small business, to include all small business programs, and propose individual goals for each small business program. The work to be performed directly by a small business prime offeror will be included the offeror’s Small Business Participation goal.

10.1.3 The offeror’s proposal must meet a mandatory minimum Total Small Business Participation goal

(all types of small business combined) of 15% of total proposed contract value including all options for this acquisition.

10.1.4 Goals for each of the following small business categories are recommended but are not mandatory:

Small Disadvantaged Business 5%

HUBZone Small Business 1%

Women Owned Small Business 1%

Service Disabled Veteran Owned SB 1%

Veteran Owned Small Business 2%

HBCU/MI Offeror’s best effort

10.2 Evaluation Criteria:

10.2.1 All Offerors (both large and small businesses) will be evaluated on the level of small business commitment that they demonstrate for the proposed acquisition.

10.2.2 A small business offeror also receives credit for their small business participation as a Prime

Contractor and can apply their dollar value when calculating percentages in all the applicable small business categories.

10.2.3 Small Business Participation Plans (from large and small businesses) will be evaluated for acceptability on the basis of the following evaluation criteria :

• The plan specifically identifies Small Business firms, as defined in FAR Part 19, proposed as subcontractors;

• If available, the offeror demonstrates acceptable past performance in complying with requirement of the clauses at FAR 52.219-8, Utilization of Small Business Concerns, and

52.219-9, Small Business Subcontracting Plan (large businesses only); and

• The proposed participation of SB firms in terms of total proposed contract dollars (including options) meets the mandatory minimum of 15% small business participation.…AM01

11.0 VOLUME 2 – TAB B – FACTOR 4: PRICE (STANDARD FORM 1442, PROPOSAL

DATA SHEET, AND CONTRACT LINE ITEM SCHEDULE)

11.1. Submission Requirements:

Section 00 22 11 Page 9

11.1.1. Submit the properly filled out and executed SF 1442, along with the CLIN Schedule, containing proposed line item and total pricing. See instructions in Section 00 21 00, “Instructions to Offerors.”

Submit the Proposal Data Sheet (Attachment 1).

11.1.2 HUBZONE CONTRACTORS: This RFP includes Contract Clause 52.219-4 regarding a 10% price evaluation preference for HUBZone small business concerns. HUBZone small business concerns electing to waive the evaluation preference shall submit a copy of clause 52.219-4 indicating such.

HUBZone small business concerns not waiving the evaluation preference shall submit a copy of their

SBA certification letter under this tab.

11.1.3. Supplemental Price Breakdown. If deemed necessary to evaluate the price proposals, the

Government will request a price breakdown of the Contract Line items in a sealed envelope marked

“Price Breakdown Information,” in Excel format. The Government will provide details on where and how to send the breakdown. This information will not be needed sooner than three (3) working days after the proposal submission due date. This information may be required for the initial proposal and, if requested, for any revised proposals. This information is not an opportunity for an offeror to revise its non-price or price proposal.

11.2. Evaluation Criteria:

11.2.1 Price will not be rated or scored, but will be evaluated for fairness and reasonableness through the use of a price analysis; comparison of proposed prices received in response to the solicitation and comparison of proposed prices with the independent government estimate. The price evaluators will also check for appearance of unbalanced line item prices. Offerors are cautioned to distribute direct costs, such as material, labor, equipment, subcontracts, etc., and to evenly distribute indirect costs, such as job overhead, home office overhead, bond, etc., to the appropriate contract line items. Both parties shall presume that field overhead costs through the proposed contract duration are inclusive in the offered price for the contract.

11.2.2 If deemed necessary, the supplemental price breakdown information will be used to assist the

Government in performing the price evaluations described above.

12.0 VOLUME 2, TAB C - REQUIRED PRE-AWARD INFORMATION

12.1 Submission Requirements:

Submit this information for the Contracting Officer’s determination of Offeror responsibility, which includes, but is not limited to the following:

(a) Joint Venture agreement or Limited Liability Company Certificate of Organization, Articles of

Organization and Operating Agreement, if applicable.

Section 00 22 11 Page 10

(b) A list of present commitments, including the dollar value thereof, and name of the organization under which the work is being performed. Include names and telephone numbers of personnel within each organization who are familiar with the prospective contractor’s performance.

(c) A certified statement listing: (1) each contract awarded within the preceding three (3) month period exceeding $1,000,000.00 in value with a brief description of the contract; and (2) each contract awarded within the preceding three (3) year period not already physically completed and exceeding $5,000,000.00 in value with a brief description of the contract. If the prospective contractor is a joint venture, each joint venture member will be required to submit the above defined certification.

(d) Competed Representations and Certifications included by full text in Section 00 45 00. List any changes to SAM (System for Award Management) in 52.204-8 for FAR Clauses and 252.204-

7007 for DFAR clauses. Provide for any certification where vendor indicated in SAM that certification would be provided with specific offer.

(e) One copy of the following information:

(1) Proof of Financial Ability (Most recent financial statement covering assets and liabilities)

(2) Number of years the firm has been in business

(3) Name, address and telephone number of firm’s bonding company

(4) Information showing offeror’s bondability for this project. Submit a letter from the prime contractor’s bonding company indicating the offeror’s ability to obtain performance and payment bonds in the amount of their proposal price.

(5) Name, address and telephone numbers of two credit/trade references.

12.2 Evaluation Criteria:

The Contracting Officer shall use this information in making an affirmative responsibility determination for award to the Successful Offeror, in accordance with FAR Part 9.

13. VOLUME 2 - TAB D – SMALL BUSINESS SUBCONTRACTING PLAN

13.1 Submission Requirements: (This requirement applies to large businesses only)

AM#2…

13.1.2 Separate and distinct from the Small Business Participation Plan, Large business offerors must also submit a Subcontracting Plan, as required by FAR 52.219-9, under Volume 2, Tab D. Large businesses will not be eligible for award if they fail to submit an acceptable Subcontracting Plan. The

Subcontracting Plan will be based on subcontracted dollars rather than total contract dollars. but shall reflect and be consistent with the commitments to small business firms outlined in the Small Business

Section 00 22 11 Page 11

Participation Plan (i.e., dollars proposed in Small Business Participation Plan shall match the dollars included in the Small Business Subcontracting Plan)….AM#2

13.1.3. If the Offeror proposing on this solicitation is a large business concern, in accordance with the definition as identified in FAR Clause 52.219-1, “SMALL BUSINESS PROGRAM

REPRESENTATION”, the firm must submit a small business subcontracting plan in accordance with

FAR Clause 52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN and DFARS 252.219-7003, “SMALL BUSINESS SUBCONTRACTING PLAN” (see Section 00 72 00 of this solicitation for the full Clauses) .

13.1.4. The Small Business Subcontracting Plan shall be thorough, complete, and in accordance with

AFARS Appendix DD and FAR Clause 52.219-9, as it will be incorporated into the contract upon award of the contract to the Offeror, if acceptable and upon final approval of the Contracting Officer. The Small

Business Subcontracting Plan format at Attachment 5 may be utilized.

13.1.5. The Plan shall include a description of the types of services the firm proposes to subcontract with small business (SB), small disadvantaged business (SDB) (to include historically black colleges and universities/minority institutions (HBCU/MI)), woman-owned small business (WOSB), HUBZone business, veteran-owned small business (VOSB) and service-disabled veteran-owned small business

(SDVOSB), along with the proposed dollars and percentages Subcontracting. Note: The dollar amounts must match the dollars proposed in Small Business Participation Plan.

13.2 Evaluation Criteria:

The Government will evaluate the Plan in accordance with the rating scheme in Army FAR Supplement

(AFARS) Appendix DD and with the requirements of FAR Clause 52.219-9. Offerors are encouraged to review AFARs Appendix DD for how the subcontracting plan will be scored. To be acceptable, subcontracting plans must score a minimum of 70 points under the AFARS evaluation system.

Evaluations will consider the following:

(a) The Plan must adequately address the required statutory elements (SB and SDB).

(b) The Plan must provide sufficient information to enable the Contracting Officer to answer affirmatively questions A through H of Appendix DD, Part 2, number 8, (Army FAR Supplement

19.705).

AM#2…

(c) Subcontracting Plans shall reflect and be consistent with the commitments offered in the Small

Business Participation Plan. In accordance with DFARS 215.304(c), when an evaluation assess the extent that small businesses and HBCUs are specifically identified in proposals, the small businesses and HBCUs considered in the evaluation shall be listed in any subcontracting plan submitted.

Section 00 22 11 Page 12

(d) As part of the subcontracting plan evaluation, the Government will also review information submitted or obtained for Volume 2, Tab A, Small Business Participation Plan, to evaluate the

Offerors past performance in establishing realistic yet challenging goals, and in achieving them.

…AM#2

14. EVALUATION PROCEDURES

14.1. SOURCE SELECTION EVALUATION BOARD (SSEB)

14.1.1. The Source Selection Evaluation Board (SSEB) will be established to conduct the evaluation of proposals received in response to this solicitation. The SSEB will evaluate the proposals and assign a consensus rating for each evaluation factor and subfactor, utilizing the acceptable/unacceptable ratings described below, except for past performance which has its own acceptable/unacceptable ratings. The

SSEB will not consider any information incorporated by reference, except as expressly allowed by this solicitation.

14.2. EVALUATION

14.2.1. The SSEB will evaluate the proposals and assign a consensus rating for each evaluation factor and subfactor.

14.2.2. The Government intends to award without discussions. Offerors are cautioned to put forth their best efforts, and to furnish all information clearly to allow the Government to evaluate proposals.

Offerors should not assume that they will have an opportunity to clarify or correct anything in their proposal after submitting it.

14.2.3. A “Competitive Range” will be established in the event that the Government decides that discussions with offerors are required or are considered to be in the Government’s best interests.

14.2.4. If discussions are held, the Government may engage in a broad give and take with those offerors in the competitive range, in accordance with FAR 15.306(d). During discussions, the Government may ask the Offeror to further explain its proposal and to answer questions about it.

14.2.5. Upon conclusion of discussions, offerors will be afforded an opportunity to submit their proposal revisions for final evaluation and selection.

14.3 EVALUATION RATING SYSTEM

14.3.1 General: The Government will review the proposals against the minimum requirements stated in the solicitation. The Government will support each rating with a narrative that clearly states how the proposal met or did not meet the factor or sub-factor criteria as well as any required clarifications.

14.3.2 Rating System: After determining whether the criteria has been met, the Government will assign a rating of “Acceptable” or “Unacceptable” to each factor and sub-factor.

Ratings: The following ratings will be used in the evaluation of all factors and sub-factors except past performance.

Section 00 22 11 Page 13

Acceptable (A): The proposal clearly meets the minimum requirements of the solicitation.

Unacceptable (U): The proposal does not clearly meet the listed requirements of each subfactor.

SECTION 00 22 11 - ATTACHMENT 1

PROPOSAL DATA SHEET

(1) Name of Solicitation: St. Paul Breakwater Repairs and Maintenance Dredging, St. Paul Harbor, St.

Paul Island, Alaska

(2) Name of Firm:

Address:

Phone: Fax:

E-mail:

DUNS #: (used for accessing the Contractor Performance Assessment Reporting System (CPARS)

Database):

Also provide any other assigned number that identifies the member firm(s) in the CPARS database. If a separate DUNS has been created for a joint venture (J-V) it must also be submitted. Provide a DUNS number for each company identified in any proposed Contractor-subcontractor association of firms. If the firm is a joint venture or contractor-subcontractor association of firms, list the individual firms and briefly describe the nature of the association. Provide DUNS for each.

Firm 1:

Firm 2:

Firm 3:

Nature of Association:

(3) AUTHORIZED NEGOTIATORS. FAR 52.215-11

The Offeror represents that the following persons are authorized to negotiate on its behalf with the

Government in connection with this Request for Proposals (RFP).

[List names, titles, and telephone number of the authorized negotiator.]

Name of Person Authorized to Negotiate:

Negotiator's Address:

Negotiator's Telephone:

Negotiator’s E-mail:

Section 00 22 11 Page 14

SECTION 00 22 11 - ATTACHMENT 2

COMPANY SPECIALIZED EXPERIENCE (PRIME CONTRACTOR)

Provide the following information to show examples of projects your company constructed within the last ten (10) years indicating experience with projects of similar type and scope. Use one form per project.

a Type of Facility Represented __________________________________________________________ b Your Firm’s Name __________________________________________________________________ c Name of Project (include Federal Contract Number if applicable)______________________________ d Location of Project__________________________________________________________________ e Owner ____________________________________________________________________________ f General Scope of Construction Project ___________________________________________________ g Your Role (Prime, Joint Venture, or Subcontractor, etc.) and Work Your Company Self-Performed :

h Construction Cost ___________________________________________________________________ i Extent and Type of Work You Subcontracted Out __________________________________________ j Dates Construction: Began___________________ Completed______________ k Your Performance Evaluation by Owner, if known

Section 00 22 11 Page 15 l Were You Terminated or Assessed Liquidated Damages? ___________________________________

(If either is “Yes”, attach an Explanation) m Owner’s Point of Contact for Reference (Name and Company) n Current Telephone Number of Reference POC_____________________________________________ o Current Email Address of Reference POC ________________________________________________

Section 00 22 11 Page 16

SECTION 00 22 11 - ATTACHMENT 3

PAST PERFORMANCE QUESTIONNAIRE

INTENTIONALLY LEFT BLANK

Section 00 22 11 Page 17

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable

No information or did not apply to your contract

Rating will be neither positive nor negative.

Section 00 22 11 Page 18

NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0) CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Offeror Information Firm Being Evaluated: CAGE Code:

Address: DUNs Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

Section 00 22 11 Page 19

TO BE COMPLETED BY CLIENT

NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)

Contract Title:

Contract Location:

CLIENT INFORMATION (Client to complete following blocks) Client Information Name:

Title:

Phone Number:

Email Address:

Describe the client’s role in the project:

Date Questionnaire was completed (mm/dd/yy):

Client’s Signature:

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY:

a) Quality of technical data/report preparation efforts E VG S M U N

b) Ability to meet quality standards specified for technical performance E VG S M U N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance

E VG S M U N

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

E VG S M U N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

E VG S M U N

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract

E VG S M U N

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project? E VG S M U N

b) Contractor was reasonable and cooperative in dealing with your staff E VG S M U N

Section 00 22 11 Page 20

(including the ability to successfully resolve disagreements/disputes;

responsiveness to administrative reports, businesslike and communication)

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

E VG S M U N

d) Overall customer satisfaction E VG S M U N

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?

E VG S M U N

b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N

c) Government Property Control E VG S M U N

d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N

e) Utilization of Small Business concerns E VG S M U N

f) Ability to simultaneously manage multiple projects with multiple disciplines

E VG S M U N

g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes

E VG S M U N

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)

E VG S M U N

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)?

E VG S M U N

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client

E VG S M U N

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

E VG S M U N

d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section. Yes No

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

Yes No

f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below. Yes No

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment E VG S M U N

Section 00 22 11 Page 21 of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

b) Contractor complied with all security requirements for the project and personnel security requirements.

E VG S M U N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

E VG S M U N

b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N

c) Would you hire or work with this firm again? (If no, please explain below) Yes No

d) In summary, provide an overall rating for the work performed by this contractor.

E VG S M U N

Please provide responses to the questions above (if applicable) and/or additional remarks.

Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

END OF QUESTIONNAIRE

NOTE: USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE

AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE

COMPLETED QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL, AND MAY

DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE

SOLICITATIONS. CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES

DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED

DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC

INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL

INFORMATION ON THIS FORM.

Section 00 22 11 Page 22

AM01…

…AM01

Section 00 22 11 Page 23

SECTION 00 22 11 - ATTACHMENT 5

SMALL BUSINESS SUBCONTRACTING PLAN FORMAT

FIRM NAME ______________________________________ Sol. No. W911KB-15-R-0024

PROJECT TITLE St Paul Harbor Breakwater Repairs and Maintenance Dredging, St Paul, Alaska

I. Dollar Amounts :

Base Option

a. Total amount of contract $ ___________ $ ________________

b. Total estimated amount of planned subcontracting dollars $ ___________ $ ________________ (includes c., d., e. , f. , g. , and h. below)

c. Total dollars planned to be subcontracted to Small Business (SB) $ ___________ $ ________________

d. Total dollars planned to be subcontracted to Small Disadvantaged Business (SDB) $ ___________ $ ________________

e. Total dollars planned to be subcontracted to Women-Owned small business (WOSB)$ __________ $ ________________

f. Total dollars planned to be subcontracted to HUB-Zone small business $ _________ $ _________________

g. Total dollars planned to be subcontracted to Veteran-Owned small business (VOSB)$ __________ $ ________________

h. Total dollars planned to be subcontracted to Service Disabled Veteran-Owned small business (SDVOSB) $ ___________ $ _______________

Section 00 22 11 Page 24

II. Percentage goals (expressed in terms of percentage of total planned subcontracting dollars).

a. Percentage of contract to be subcontract (Ib divided by Ia) __________ % _____________ %

b. Percentage of subcontracting dollars to be subcontracted to Small Business (Ic divided by Ib) __________ % __________ %

c. Percentage of subcontracting dollars to be subcontracted to Small Disadvantaged Business (Id divided by Ib) __________ % __________ %

d. Percentage of subcontracting dollars to be subcontracted to Women-Owned small business (Ie divided by Ib) __________ % __________ %

e. Percentage of subcontracting dollars to be subcontracted to HUBZone small business.

(If divided by Ib) __________ % __________ %

f. Percentage of subcontracting dollars to be subcontracted to Veteran-Owned small business.

(Ig divided by Ib) __________ % __________ %

g. Percentage of subcontracting dollars to be subcontracted to Service-Disabled Veteran-Owned small business.

(Ih divided by Ib) __________ % __________ %

1. State your firm’s policy statement or evidence of internal guidance to company buyers recognizing commitment to Pub. L. 99-661, Section 1207, and Pub.L. 100-180, Section 806. Describe special emphasis placed on subcontracting with SDBs. Describe corporate and management commitment to meeting your subcontracting plan.

2. Describe your firm's efforts to broaden SB, SDB, WOSB, HUBZone SB, VOSB and SDVOSB active vendor base. Specifically describe your efforts in increasing subcontracts to SBs and SDBs for non-complex and general housekeeping supplies or services normally awarded to firms already in your firm's vendor base. Describe established plans to use competition restricted to SDBs and give details about how your firm will accomplish this.

Section 00 22 11 Page 25

3. Describe your firms "Outreach Efforts" to work with organizations to identify potential sources for items not traditionally awarded to SB, SDB, WOSB, HUBZone SB, VOSB and SDVOSB firms. And, your proposed plan to conduct reviews to determine the competence, ability, experience and capacity available in SB, SDB, WOSB, HUBZone SB, VOSB, and SDVOSB firms and to provide them technical assistance.

4. Describe supplies and services to be subcontracted and planned for subcontracting to SBs, SDBs, WOSBs, HUBZone SB, VOSB, and SDVOSB. Indicate intent to review major product/system components and key project elements of R&D, construction, service and spare parts contracts for subcontracting to each of the above elements. Specifically describe how your plan targets specific SBs, SDBs, WOSBs, HUBZone SB, VOSB, and SDVOSB for review to determine their competence, ability, experience and capacity and identifies specific components or major portions of the acquisition for consideration of the above elements. Describe your firm's intent to work with large business subcontractors for major subsystems or key project elements to ensure "flowdown" of this philosophy.

5. Describe your firm's efforts, based on results of efforts described in No. 3 and No. 4 above to ensure that opportunity to participate in acquisitions. Specifically, describe how the firm intends to evaluate its own SB, SDB, WOSB, HUBZone SB, VOSB, and SDVOSB award performance and program effectiveness against the established goals, both company-wide and for individual plan being negotiated.

Include SBs, SDBs, WOSBs, HUBZone SBs, VOSBs, and SDVOSBs by name as members of original team for providing major service or performing a significant portion of the effort. Additionally, how does your firm plan to establish long-range relationships with the above elements?

6. Your firms plan (in section I and II) will be evaluated on the development of percentage goals based on planned subcontracting which is challenging, yet realistic as stated in item # 6 of Appendix DD of the

AFARS.

7. Past performance to the extent your firm has historically been successful in establishing realistic, yet challenging, goals and achieving them will be evaluated. In cases where there has been no previous defense contract history, your firm will not be penalized.

8. Regulatory and statutory requirements described in # 8 of Appendix DD must be included in your firms subcontracting plan and will be evaluated accordingly. If any of the subject elements are not complied with, your plan will not be approved and will be returned to your office for revision before the contract can be awarded.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .