Control No. POA 14-46
11 August 2014
JUSTIFICATION AND APPROVAL
FOR OTHER THAN FULL AND OPEN COMPETITION
1. CONTRACTING AGENCY: U.S. Army Corps of Engineers, Alaska District, Contracting Division, 2204 3rd Street - Post Office Box 6898, Joint Base Elmendorf- Richardson (JBER), Alaska 99506-0898.
2. DESCRIPTION OF ACTION: The action being approved is a modification to Firm-Fixed Price Contract No. W911KB-14-D-0007 Task Order 0001, awarded to BSI-TLI J.V. under competitive task order ordering procedures, for the remediation at Cape Kudugnak on Atka Island. It is noted that the Atka Cape Kudugnak FUDS property is a former long range ratio site located on Atka Island, 1,100 miles southwest of Anchorage, and approximately 110 miles northeast of Adak, Alaska in the Andranof Island group of the Aleutian Islands (very remote project site). The period of performance will remain unchanged under the current contract. The same terms and conditions under the current contract will be applicable to this modification.
3. DESCRIPTION OF SUPPLIES/SERVICES: The existing contract to be modified is for environmental remediation at Cape Kudugnak, Atka Island. This request is for a modification of the subject contract to add an additional 375 tons of POL-contaminated soil quantity for excavation, packaging, transportation, and disposal. The dollar value of the proposed action is $605,028.75 (375 tons at $1,613.41/ton).
4. AUTHORITY CITED: Federal Acquisition Regulation (FAR) 16.505(b)(2)(i)(C) – Modification to the subject order must be issued in the interest of economy and efficiency because it is a logical follow-on modification to an order already issued under the contract, in consideration that all awardees were given fair opportunity to be considered for the original task order.
5. REASON FOR AUTHORITY CITED: Pursuant to FAR 16.505(b)(2)(i)(C) - in the interest of economy and efficiency, this is a logical follow-on requirement which is available from the incumbent contractor – as the services are determined to be available only from the original source in the case of follow-on contracts for the continued provision of specialized services when award to another source would result in substantial duplication of cost or unacceptable delays in fulfilling the agency's requirements (interest of economy and efficiency).
a. The four current ERS MATOC contract holders were afforded fair opportunity to be considered for the original requirement and a Request for Proposal (RFP) was issued on 27 November 2013 with proposals due on 13 December 2013. After evaluation and price analysis, it was determined that BSI-TLI (J.V) submitted the lowest price of the four (4) technically acceptable proposals, and was determined to be the Lowest Priced Technically Acceptable proposal. Contract award was made to BSI- TLI (J.V) on 24 December 2014 for $2.59 million (Contract No. W911KB-14-D-0007 T.O 0001).
b. The contact was awarded to BSI-TLI J.V.; the bid schedule includes, among other items, line item costs for mobilization/demobilization and several remedial field activities.
c. A modification was processed on 11 July 2014 to exercise CLIN 0011 for the maximum quantity of 200 tons for $322,682.
d. The subject modification is to add an additional 375 tons of POL-contaminated soil for excavation, packaging, transportation, and disposal. This will be at the same unit price of CLIN 0011 which is $1,613.41 per ton of POL-contaminated soil. See modification notes (attached) for specific modification breakdown.
e. By addressing the additional quantity of POL-contaminated soil, a second mobilization and demobilization cost is eliminated. This will save the Government a minimum of $800,000.00.
6. EFFORTS TO OBTAIN COMPETITION: As the contractor is currently mobilized to Cape Kudugnak on Atka Island and has constructed a road to the site for conducting the remedial action, they are the only contractor authorized to access the project site (environmental regulations require use of specialized transport methods – the road constructed by BSI-TLI must be used for the required remediation efforts). Currently BSI-TLI is the only contractor in the area that can conduct the additional contaminated soil removal work before the barge arrives in late August for demobilization.
7. ACTIONS TO INCREASE COMPETITION: The Alaska District will have the potential for future work at Atka Island and plans to compete any new project requirements between the preselected MATOC contractors under the Environmental Remediation Services (ERS) IDIQ contract.
8. MARKET SURVEY: This Justification and Approval will be posted on FedBizOps prior to remediation. This is for award of a modification to an existing task order contract. This proposed action would not incur materially different work than is contained in the contract, would add work (quantity) that is in proximity to the ongoing work, would save the Government a minimum of $800,000.00, has a willing and engaged partner in the current contractor, and is in the best financial and performance risk interests of the Government.
9. INTERESTED SOURCE: Any sources that indicate interest because of this solicitation will be evaluated.
10. OTHER FACTORS:
a. Procurement History: Not applicable.
b. Acquisition Data Availability: Not applicable.
c. Unusual and Compelling Urgency: Not applicable.
d. Subcontracting Competition: Not applicable.
ITEM NO SUPPLIES/SERVICES QUANTITY
0010 5 OPTION Option 2 Regulated CONHTRW
FFP
UNIT
Each
UNIT PRICE
$2,051.11
Remove, process, handle and off.<>ite dispose of 5001b of regulated CONHTRW.
This option may be exercised up to 5 times (2500 lbs).
FOB: Destination
MILSTRIP: WCIJUW33466974
PURCHASE REQUEST NUMBER: WC1JUW33466974
ITEM NO SUPPLIES/SERVICES
OPTION Option 3 Add! POL Soil
FFP
QUANTITY
UNIT
Each
NETAMT
UNIT PRICE
$1,613.41
Excavate, process handle and offsite dispose of an additional ton of POL contaminated soil. This option may be exercised up to 200 times (200 tons).
FOB: Destination
MILSTRIP: WCIJUW33466974
PURCHASE REQUEST NUMBER: WCIJUW33466974
NETAMT
W911KB-14-D-0007
AMOUNT
$10,255.55
$10,255.55
AMOUNT
$322,682.00
$322,682.00
J4CT9ARG
Typewritten Text
J4CT9ARG
Typewritten Text
J4CT9ARG
Cross-Out
J4CT9ARG
Typewritten Text 575 (add 375)
J4CT9ARG
Cross-Out
J4CT9ARG
Typewritten Text $927,710.75 (+$605,028.75 for the additional 375 units)
J4CT9ARG
Typewritten Text Contract Summary: MOD 03 -Current Funding: $2,908,139.96 -Funds via Mod 03: +$605,028.75 -Total Contract Funding: $3,513,168.41
J4CT9ARG
Typewritten Text
J4CT9ARG
Typewritten Text
J4CT9ARG
Typewritten Text
J4CT9ARG
Typewritten Text Note: Modification 03 will increase the quantity of Option CLIN 0011 from 200 units to 575 units - at the negotiated unit price of $1,613.41 - obligating funds in the amount of $605,028.75 for the additional 375 units
J4CT9ARG
Typewritten Text
J4CT9ARG
Typewritten Text
J4CT9ARG
Typewritten Text
J4CT9ARG
Typewritten Text
J4CT9ARG
Typewritten Text
| JA_14-1_Atka_Cape_Kudugnak _Final_ |
| Draft Mod Notes - W911KB-14-D-0007-0002 |
File details come from the government source that posted it. Updated .