AM2.pdf
PDF 130 KB Posted
- Solicitation number
- W911KB-13-B-0003
About this file
Amendment 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FRONTEND SPECS-AM2.pdf | ||
| AM1Mooring.pdf | ||
| W911KB-13-B-0003_Specs DWGS.pdf | ||
| W911KB-13-B-0003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Subject Solicitation Mooring Points Phase III - Kuskokw im River, Alaska. See Summary of Changes for further details, page 2.
a. Attached is the Minutes of the Pre-Preprosal conference w ith Questions and Answ ers.
b. The proposal due date remains unchanged.
b. All other aspects of this solicitation remain the same.
POC for this action is Michael Suprenant @ 907-753-2555.
1. CONTRACT ID CODE PAGE OF PAGES
1 17
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Jun-2013
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB-13-B-0003
X 9B. DATED (SEE ITEM 11)
24-May-2013
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Jun-2013
CODE
U.S. ARMY ENGINEER DISTRICT, AK
CEPOA-CT (W911KB)
PO BOX 6898
JBER AK 99506-0898
W911KB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911KB-13-B-0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 73 46 - WAGE DETERMINATIONS SCHEDULES
The following have been deleted:
SECTION SF 30 - BLOCK 14 MODIFICATION CONTINUATION PAGE
The following have been added by full text:
The following items are applicable to this amendment:
Summary of changes for Amendment 0002:
1. Proposal due date remains unchanged.
2. Attached are the Minutes to the Pre‐Proposal Conference and Questions and Answers (Attachment 1).
3. Replaced Wage Determination AK1 dated 01/04/2013 with updated Wage Determination AK1 dated 06/07/2013. (Attachment 2)
4. The entire solicitation has been replaced in its entirety to remove draft water mark that was inadvertently included. (Attachment 3).
5. The following specification has been changed.
SECTION 00 72 00, CONTRACT CLAUSES: FAR Clause 52.231-5000 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE MAR 1995) -- EFARS has been deleted from SECTION 00 72 00. This clause has been converted to a Special Contract Requirement (SCR-CW070) Equipment Ownership and Operating Expense Schedule in SECTION 00 73 00.00 29.
(End of Summary of Change)
ATTACHMENT 1
Pre-Proposal Conference Meeting Minutes
Solicitation W911KB-13-B-0003 Mooring Pts Phase III, Kuskokwim River, Alaska
Regulatory
1600 C St, Anchorage, AK.
June 6, 2013
A pre-proposal conference was held at the Army Corps of Engineers - Alaska District Regulatory Office, located at 1600 A Street, Suite 110, Anchorage, AK on Friday, 6 June 2013 at 13:00 p.m.
The following people attended:
Name Company/Organization
Christine Dale USACE, Alaska District Michael Suprenant USACE, Alaska District Melanie Peterson USACE, Alaska District Merlin Peterson USACE, Alaska District James Rajek USACE, Alaska District
Contractors
Chris Schimschat STG Inc Gary Matthews STG Inc Julie Leonard STG Inc
Contractor Via Telephone
John Mcamis J.E. Mcamis
The purpose of the meeting was the pre-proposal conference for the Mooring Points Phase III Kuskokwim River. At the conference, the scope and details of the Solicitation were discussed.
Then Contractors were invited to provide any comments or questions on the solicitation, specifications, and drawings that were issued on www.fbo.gov on May 24, 2013.
The following are the minutes and questions and answers based off the questions asked during the meeting:
Minutes to the Meeting
1. Introductions were conducted for the Mooring Points Phase III Kuskokwim River Pre-proposal Conference.
2. Contractors were reminded the Bid opening would be held on June 24, 2013 2:00 p.m. at the USACE District.
3. Reference Section 00 21 00 – INSTRUCTIONS, CONDITIONS, AND NOTICES TO
OFFERORS, PARA 9, FASCIMILE BIDS:
Bid bonds are required. Email and fax bids will be accepted at time of bid opening;
however, originals will be required for the apparent low bidder after bid opening.
4. It is the responsibility of the Contractor to ensure all pages are received on time if bid is faxed or e-mailed to the Contracting Office.
5. Went over the requirements to access on JBER. If Contractor does not have access to base then the Contractor will need to call in accordance with Section 00 21 00 –
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS, PARA 8 ACCESS
TO JBER. Reminded Contractors of the availability to call in on the conference line on day of bid opening which is provided in the solicitation.
6. Contractor needs to ensure SAM website is current.
7. The Contractors were informed that this solicitation consisted of placement of 21 mooring points at 8 locations.
QUESTIONS AND ANSWERS
QUESTION 0002-01: Verify that the first page of the solicitation has the correct date due for bids.
RESPONSE 0002-01: Yes, the bid opening date is 24 June 2013 at 2:00 p.m., Alaska time.
QUESTION 0002-02: Does the barge need to meet Coast Guard regulations?
RESPONSE 0002-02: Yes, the barge needs to meet Coast Guard regulations. The USCG equivalent requirements are referenced in EM 385-1-1 in sections 5, 6, 9, 11, 16, 19, and 29.
QUESTION 0002-03: Is the completion date in the solicitation correct?
RESPONSE 0002-03: Yes, FAR Clause 52.211-10 COMMENCEMENT, PROSEUTION, AND COMPLETION OF WORK (APR 1984) states the contractor shall complete the entire work, ready for use not later than October 30, 2014.
QUESTION 0002‐04: FACSIMILE BIDS - states facsimile bids and/or email bids will be accepted. but then states only bid guarantees that will be accepted by facsimiles is a bid bond at bid opening, will the bid bond be accepted via email as well?
RESPONSE 0002-04: Yes Bid Bonds will be accepted via e-mail.
QUESTION 0002-05: Does this mean Bid Opening Date is now 24JUN 2013 as well instead of the 20 JUN 2013 as stated on the SF1442? Also, in the specs SF 1442 is stamped DRAFT, are we to use this sheet even though it states DRAFT?
RESPONSE 0002-05: Yes opening date is 24 June 2013. The non draft SF 1442 is now on Fed Biz
OPPS.
WAGE DETERMINATION
ATTACHMENT 2
General Decision Number: AK130001 01/04/2013 AK1
Superseded General Decision Number: AK20120001
State: Alaska
Construction Types: Building and Heavy
Counties: Alaska Statewide.
BUILDING AND HEAVY CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)
Modification Number Publication Date 0 01/04/2013
ASBE0097-001 01/01/2012
Rates Fringes
Asbestos Workers/Insulator (includes application of all insulating materials protective coverings, coatings and finishings to all types of mechanical systems).........................$ 33.58 17.92
ASBE0097-002 01/01/2012
Rates Fringes
HAZARDOUS MATERIAL HANDLER
(includes preparation, wetting, stripping, removal scrapping, vacuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 33.58 17.92
BOIL0502-002 07/01/2011
Rates Fringes
BOILERMAKER......................$ 42.70 24.86
BRAK0001-002 07/01/2011
Rates Fringes
Bricklayer, Blocklayer, Stonemason, Marble Mason, Tile Setter, Terrazzo Worker.....$ 37.39 17.60 Tile & Terrazzo Finisher.........$ 31.78 17.60
CARP1501-001 09/01/2011
Rates Fringes
MILLWRIGHT.......................$ 33.89 18.23
CARP2520-003 07/01/2010
Rates Fringes
Diver Stand-by....................$ 39.80 18.73 Tender......................$ 38.80 18.73 Working.....................$ 79.60 18.73 Piledriver Carpenter...................$ 35.49 18.73 Piledriver; Skiff Operator and Rigger..................$ 34.49 18.73 Sheet Stabber...............$ 35.49 18.73 Welder......................$ 41.05 18.73
DEPTH PAY PREMIUM FOR DIVERS BELOW WATER SURFACE:
50-100 feet $1.00 per foot 101 feet and deeper $2.00 per foot
ENCLOSURE PAY PREMIUM WITH NO VERTICAL ASCENT:
5-50 FEET $1.00 PER FOOT/DAY
51-100 FEET $2.00 PER FOOT/DAY
101 FEET AND ABOVE $3.00 PER FOOT/DAY
SATURATION DIVING:
The standby rate applies until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. the diver rate shall be paid for all saturation hours.
WORK IN COMBINATION OF CLASSIFICATIONS:
Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.
CARP4059-001 09/01/2011
Rates Fringes
CARPENTER
Carpenter...................$ 35.49 20.38 Lather/Drywall Applicator...$ 35.49 20.38
ELEC1547-004 04/01/2012
Rates Fringes
CABLE SPLICER....................$ 39.77 3%+$21.93
Electrician;Technician...........$ 38.02 3%+$21.93
ELEC1547-005 04/01/2012
Line Construction
Rates Fringes
CABLE SPLICER....................$ 49.92 3%+$24.08
Linemen (Including Equipment Operators, Technician)...........$ 48.17 3%+24.08 Powderman........................$ 46.17 3%+$24.08
TREE TRIMMER.....................$ 33.62 3%+$18.58
ELEV0019-002 01/01/2012
ELEVATOR MECHANIC................$ 49.035 23.535+a+b
FOOTNOTE: a. Employer contributes 8% of the basic hourly rate for over 5 year's service and 6% of the basic hourly rate for 6 months to 5 years' of service as vacation paid credit. b. Eight paid holidays:
New Year's Day; Memorial Day; Independence Day;
Labor Day; Veteran's Day; Thanksgiving Day; Friday after Thanksgiving and Christmas Day
ENGI0302-002 01/01/2012
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 37.43 19.00
GROUP 1A....................$ 39.19 19.00
GROUP 2.....................$ 36.66 19.00
GROUP 3.....................$ 35.94 19.00
GROUP 4.....................$ 29.73 19.00
TUNNEL WORK
GROUP 1....................$ 41.17 19.00
GROUP 1A...................$ 43.11 19.00
GROUP 2....................$ 40.33 19.00
GROUP 3....................$ 39.53 19.00
GROUP 4....................$ 32.70 19.00
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt Roller; Back Filler; Barrier Machine (Zipper); Batch Plant Operator: Batch and Mixer over 200 yds.; Beltcrete with power pack and similar conveyors;
Bending Machine; Boat Coxwains; Bulldozers; Cableways, Highlines and Cablecars; Cleaning Machine; Coating Machine;
Concrete Hydro Blaster; Cranes-45 tons and under or 150 foot boom and under (including jib and attachments): (a) Shovels, Backhoes, excavators with all attachments, Draglines, Clamshells; Gradalls-3 yards and under; (b) Hydralifts or Transporters, all track or truck type,(c) Derricks; Crushers; Deck Winches-Double Drum; Ditching or Trenching Machine (16 inch or over); Drilling Machines, core, cable, rotary and exploration; Finishing Machine Operator, concrete paving, Laser Screed, sidewalk, curb and gutter machine; Helicopters; Hover Craft, Flex Craft, Loadmaster, Air Cushion, All Terrain Vehicle, Rollagon, Bargecable, Nodwell Sno Cat; Hydro Ax: Feller Buncher and similar; Loaders: Forklifts with power boom and swing attachment, Overhead and front end, 2 1/2 yards through 5 yards, Loaders with forks or pipe clamps, Loaders, elevating belt type, Euclid and similar types; Mechanics, Bodyman; Micro Tunneling Machine; Mixers: Mobile type w/hoist combination; Motor Patrol Grader; Mucking Machines:
Mole, Tunnel Drill, Horizontal/Directional Drill Operator, and/or Shield; Operator on Dredges; Piledriver Engineers, L. B. Foster, Puller or similar Paving Breaker; Power Plant, Turbine Operator, 200 k.w. and over (power plants or combination of power units over 300 k.w.); Sauerman-Bagley;
Scrapers-through 40 yards; Service Oiler/Service Engineer;
Sidebooms-under 45 tons; Shot Blast Machine; Spreaders, Blaw Knox, Cedarapids, Barber Greene, Slurry Machine;
Sub-grader (Gurries, C.M.I. and C.M.I. Roto Mills and similar types); Tack tractor; Truck mounted Concrete Pumps, Conveyor, Creter; Water Kote Machine; Unlicensed off road hauler; Welder; Electrical Mechanic, Camp Maintenance Engineer
GROUP 1A: Cranes-over 45 tons or 150 foot (including jib and attachments): (a) Shovels, backhoes,excavators with all attachments, draglines, clamshells-over 3 yards, (b) Tower cranes;Licensed Water/Waste Water Treatment Operator;
Loaders over 5 yds.;Certified Welder, Electrical Mechanic, Camp Maintenance Engineer, Mechanic (over 10,000 hours);
Motor Patrol Grader, Dozer, Grade Tractor (finish: when finishing to final grade and/or to hubs, or for asphalt);
Power Plants: 1000 k.w. and over; Quad; Screed; Sidebooms over 45 tons; Slip Form Paver C.M.I. and similar types;
Scrapers over 40 yards; Camera/Tool/Video Operator (Slipline).
GROUP 2: Batch Plant Operators: Batch and Mixer 200 yds. per hour and under; Boiler-fireman; Cement Hog and Concrete Pump Operator; Conveyors (except as listed in group 1);
Hoist on steel erection; Towermobiles and Air Tuggers;
Horizontal/Directional Drill Locator;Licensed Grade Technician; Loaders, Elevating Grader, Dumor and similar;
Locomotives: rod and geared engines; Mixers; Screening, Washing Plant; Sideboom (cradling rock drill regardless of size); Skidder; Trencing Machine under 16 inches; Waste/ Waste Water Treatment Operator.
GROUP 3: "A" Frame Trucks, Deck Winches: single power drum;
Bombardier (tack or tow rig); Boring Machine; Brooms-power;
Bump Cutter; Compressor; Farm tractor; Forklift, industrial type; Gin Truck or Winch Truck with poles when used for hoisting; Grade Checker and Stake Hopper; Hoist, Air Tuggers, Elevators; Loaders: (a) Elevating-Athey, Barber Green and similar types (b) Forklifts or Lumber Carrier (on construction job site) (c) Forklifts with Tower (d) Overhead and Front-end, under 2 1/2 yds. Locomotives:Dinkey (air, steam, gas and electric) Speeders; Mechanics (light duty); Mixers: Concrete Mixers and Batch 200 yds. per hour and under; Oil, Blower Distribution; Post Hole Diggers, mechanical; Pot Fireman (power agitated); Power Plant, Turbine Operator, under 300 k.w.; Pumps-water; Roller-other than Plantmix; Saws, concrete; Skid Steer with all attachments; Straightening Machine; Tow Tractor
GROUP 4: Rig Oiler/Assistant Engineer (if over 85 tons or 100 ft. boom);Parts and Equipment Coordinator; Swamper (on trenching machines or shovel type equipment); Spotter;
Steam Cleaner; Drill Helper.
FOOTNOTE: Groups 1-4 receive 10% premium while performing tunnel or underground work. Rig Oiler/Assistant Engineer shall be required on cranes over 85 tons or over 100 feet of boom.
IRON0751-003 08/01/2011
Ironworkers:
BRIDGE, STRUCTURAL,
ORNAMENTAL, REINFORCING
MACHINERY MOVER, RIGGER,
SHEETER, STAGE RIGGER,
BENDER OPERATOR.............$ 33.40 23.16
FENCE, BARRIER AND
GUARDRAIL INSTALLERS........$ 29.90 23.16
GUARDRAIL LAYOUT MAN........$ 30.64 23.16
HELICOPTER, TOWER...........$ 34.40 23.16
LABO0341-005 09/01/2012
Rates Fringes
Laborers: North of the 63rd Parallel & East of Longitude 138 Degrees
GROUP 1.....................$ 29.00 21.42
GROUP 2.....................$ 30.00 21.42
GROUP 3.....................$ 30.90 21.42
GROUP 3A....................$ 34.18 21.42
GROUP 3B....................$ 35.01 21.42
GROUP 4.....................$ 18.57 21.42
TUNNELS, SHAFTS, AND RAISES
GROUP 1....................$ 31.90 21.42
GROUP 2....................$ 33.00 21.42
GROUP 3....................$ 33.99 21.42
GROUP 3A...................$ 37.60 21.42
GROUP 3B...................$ 38.51 21.42
Laborers: South of the 63rd Parallel & West of Longitude 138 Degrees
GROUP 1.....................$ 29.00 21.42
GROUP 2.....................$ 30.00 21.42
GROUP 3.....................$ 30.90 21.42
GROUP 3A....................$ 34.18 21.42
GROUP 3B....................$ 35.01 21.42
GROUP 4.....................$ 18.57 21.42
TUNNELS, SHAFTS, AND RAISES
GROUP 1....................$ 31.90 21.42
GROUP 2....................$ 33.00 21.42
GROUP 3....................$ 33.99 21.42
GROUP 3A...................$ 37.60 21.42
GROUP 3B...................$ 38.51 21.42
LABORERS CLASSIFICATIONS
GROUP 1: Asphalt Workers (shovelman, plant crew); Brush Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke Setters, Hook Tender, Rigger, Signalman; Concrete Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;
Ditch Diggers; Dump Man; Environmental Laborer (asbestos (limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;
Flagman; Form Strippers; General Laborer; Guardrail Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;
Laborers (building); Landscape or Planter; Laying of Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or
Power Tools; Portable or Chemical Toilet Serviceman; Pump Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building and Erecting; Slurry Work; Stake Hopper; Steam Point or Water Jet Operator;
Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner
GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);
Culvert Pipe Laborer; Cured in place Pipelayer;
Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine Operator; Green Cutter (dam work); Gunnite Operator; Hod Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, chain saw operator, filer; Timberman
GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger and tree topper; High Scaler;
Multiplate; Slurry Seal Squeegee Man
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
GROUP 4: Final Building Cleanup
TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS
GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;
Tunnel Track Laborer
GROUP 2: Burning and Cutting Torch; Concrete Laborers;
Jackhammers; Nozzleman, Pumpcrete or Shotcrete.
GROUP 3: Miner; Retimberman
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers.
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.
PAIN1959-001 07/01/2011
NORTH OF THE 63RD PARALLEL
Rates Fringes
PAINTER
BRUSH/ROLLER PAINT OR WALL
COVERER.....................$ 29.17 18.47
TAPING, TEXTURING,
STRUCTURAL PAINTING,
SANDBLASTING, POT TENDER,
FINISH METAL, SPRAY,
BUFFER OPERATOR, RADON
MITIGATION, LEAD BASED
PAINT ABATEMENT, HAZARDOUS
MATERIAL HANDLER............$ 29.67 18.47
PAIN1959-002 07/01/2011
SOUTH OF THE 63RD PARALLEL
Rates Fringes
Painters:
Brush, Roller, Sign, Paper and Vinyl, Swing Stage, Hand Taper/Drywall, Structural Steel, and Commercial Spray............$ 26.98 18.22 Machine Taper/Drywall.......$ 28.18 18.22 Spray-Sand/Blast, Epoxy and Tar Applicator..........$ 29.48 16.22
PAIN1959-003 07/01/2011
NORTH OF THE 63RD PARALLEL
Rates Fringes
GLAZIER..........................$ 34.09 17.28
PAIN1959-004 07/01/2011
Rates Fringes
FLOOR LAYER: Carpet.............$ 30.52 12.39
PAIN1959-006 07/01/2011
SOUTH OF THE 63RD PARALLEL
Rates Fringes
GLAZIER..........................$ 34.09 17.23
PLAS0867-001 02/01/2012
Rates Fringes
PLASTERER
North of the 63rd parallel..$ 33.93 19.07
South of the 63rd parallel..$ 33.68 19.07
PLAS0867-004 02/01/2012
Rates Fringes
CEMENT MASON/CONCRETE FINISHER
North of the 63rd parallel..$ 33.68 19.07 South of the 63rd parallel..$ 33.43 19.07
PLUM0262-002 07/01/2012
East of the 141st Meridian
Rates Fringes
Plumber; Steamfitter.............$ 36.02 24.42
PLUM0367-002 08/01/2012
South of the 63rd Parallel
Rates Fringes
Plumber; Steamfitter.............$ 37.06 20.64
PLUM0375-002 07/01/2012
North of the 63rd Parallel
Rates Fringes
Plumber; Steamfitter.............$ 39.21 20.35
PLUM0669-002 04/01/2012
Rates Fringes
SPRINKLER FITTER.................$ 41.23 21.52
* SHEE0023-003 07/01/2012
South of the 63rd Parallel
Rates Fringes
Sheet Metal Worker...............$ 39.49 19.88
* SHEE0023-004 07/01/2012
North of the 63rd Parallel
Rates Fringes
Sheet Metal Worker...............$ 44.08 19.59
TEAM0959-003 09/01/2012
Rates Fringes
TRUCK DRIVER
GROUP 1.....................$ 38.27 17.56
GROUP 1A....................$ 39.54 17.56
GROUP 2.....................$ 37.01 17.56
GROUP 3.....................$ 36.19 17.56
GROUP 4.....................$ 35.61 17.56
GROUP 5.....................$ 34.85 17.56
GROUP 1: Semi with Double Box Mixer; Dump Trucks (including rockbuggy and trucks with pups) over 40 yards up to and including 60 yards; Deltas, Commanders, Rollogans and similar equipment when pulling sleds, trailers or similar equipment; Boat Coxswain; Lowboys including attached trailers and jeeps, up to and including 12 axles; Ready-mix over 12 yards up to and including 15 yards); Water Wagon (250 Bbls and above); Tireman, Heavy Duty/Fueler
GROUP 1A: Dump Trucks (including Rockbuggy and Trucks with pups) over 60 yards up to and including 100 yards; Jeeps (driver under load)
GROUP 2: Turn-O-Wagon or DW-10 not self-loading; All Deltas, Commanders, Rollogans, and similar equipment; Mechanics;
Dump Trucks (including Rockbuggy and Trucks with pups) over 20 yards up to and including 40 yards; Lowboys including attached trailers and jeeps up to and including 8 axles;
Super vac truck/cacasco truck/heat stress truck; Ready-mix over 7 yards up to and including 12 yards;
GROUP 3: Dump Trucks (including Rockbuggy and Trucks with pups) over 10 yards up to and including 20 yards; batch trucks 8 yards and up; Oil distributor drivers; Partsman;
Oil Distributor Drivers; Trucks/Jeeps (push or pull);
Traffic Control Technician
GROUP 4: Buggymobile; Semi or Truck and trailer; Dumpster;
Tireman (light duty); Dump Trucks (including Rockbuggy and Truck with pups) up to and including 10 yards; Track Truck Equipment; Stringing Truck; Grease Truck; Flat Beds, dual rear axle; Hyster Operators (handling bulk aggregate);
Lumber Carrier; Water Wagon, semi; Water Truck, dual axle;
Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame manufactured rating over 5 tons; Bull Lifts and Fork Lifts with Power Boom and Swing attachments, over 5 tons;
Front End Loader with Forks; Bus Operator over 30 passengers; All Terrain Vehicles; Boom Truck/Knuckle Truck over 5 tons; Foam Distributor Truck/dual axle;
Hydro-seeders, dual axle; Vacuum Trucks, Truck Vacuum Sweepers; Loadmaster (air and water); Air Cushion or similar type vehicle; Fire Truck/Ambulance Driver;
Combination Truck-fuel and grease; Compactor (when pulled by rubber tired equipment); Rigger (air/water/oilfield);
Ready Mix, up to and including 7 yards;
GROUP 5: Gravel Spreader Box Operator on Truck; Flat Beds, single rear axle; Boom Truck/Knuckle Truck up to and including 5 tons; Pickups (Pilot Cars and all light duty vehicles); Water Wagon (Below 250 Bbls); Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame, manufactured rating 5 tons and under; Bull Lifts and Fork Lifts (fork lifts with power broom and swing attachments up to and including 5 tons); Buffer Truck; Tack Truck; Farm type Rubber Tired Tractor (when material handling or pulling wagons on a construction project); Foam Distributor, single axle; Hydro-Seeders, single axle; Team Drivers (horses, mules and similar equipment); Fuel Handler (station/bulk attendant); Batch Truck, up to and including 7 yards;
Gear/Supply Truck; Bus Operator, Up to 30 Passengers;
Rigger/Swamper
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.
The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.
0000/9999: weighted union wage rates will be published annually each January.
Non-Union Identifiers
Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION