13-B-0002-0003.pdf

PDF 48 KB Posted

Attached to
W911KB-13-B-0002 Perryville Launch Ramp
Solicitation number
W911KB-13-B-0002
Issued by

About this file

Amendment 0003

View the file

Other files

File Type Posted
13-B-0002-0005.pdf PDF
W911KB-13-B-0002-0004.pdf PDF
boat.pdf PDF
water2.pdf PDF
manonshore.pdf PDF
AKV272-AM_2-PLANS.pdf PDF
blankshore2.pdf PDF
water1.pdf PDF
AKV272-AM_2-SPECS.pdf PDF
13-B-0002-0002.pdf PDF
trucks.pdf PDF
blankshore1.pdf PDF
13-B-0002-0001Perryville.pdf PDF
W911KB-13-B-0002-sol.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

a.The subject amendment incorporates clarif ications to the subject IFB. A summary of the amendment changes are located on page 2, Summary of Changes b.Perryville Launch Ramp IFB is extended to Monday, January 7, 2013, No Later Than 2:00p.m. (Alaska Time) c.Notice to Offeror: Please mark outside of envelope w hich offer is submitted to show acknow ledgement of subject matter. Reference block

13D of subject SF1442. Period of Government acceptance is from the latest offer date in Block 20C.

d.The Point of Contact for the subject amendment is Yolanda M. Ikner at (907) 753-2553 or yolanda.m.ikner@usace.army.mil

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Nov-2012

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB-13-B-0002

X 9B. DATED (SEE ITEM 11)

02-Nov-2012

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Nov-2012

CODE

U.S. ARMY ENGINEER DISTRICT, ALASKA

ATTN: CEPOA-CT( W911KB)

PO BOX 6898

JBER AK 99506-0898

W911KB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911KB-13-B-0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

CONTINUATION PAGE

Project Title: Perryville Launch Ramp Perryville, Alaska

Solicitation No.: W911KB-13-B-0002 (Amendment #0003)

This Amendment provides changes to the solicitation as indicated on the continuation page of this document.

NOTICE TO OFFERORS: Please mark outside of envelope in which offer is submitted to show amendments acknowledged. Acknowledge receipt of this amendment by signing and returning a copy of the SF30 with your proposal.

SUMMARY OF CHANGES

Amend 0003

a. The following dates are corrected.

Bid Due Date o Extended to January 7, 2013 o Bid Opening is January 8, 2013 o Call in date and Time:

January 8, 2013 at 2:00p.m. Alaska Time

Dial-in-Number:

1-888-675-2535

Access Code:

1328458

Participant Passcode:

b. Construction Completion Date

FAR Clause 52.211-10 Commencement, Prosecution, and Completion of

Work :

270 days from Notice to Proceed (NTP)

W911KB-13-B-0002

SUMMARY OF CHANGES

SECTION 00 72 00 - CONTRACT CLAUSES

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 270 days from NTP. The time stated for completion shall include final cleanup of the premises.

*The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.

(End of clause)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .