TE H Periodic Hydraulic Test Checklist.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Elevator Maintenance and Repair
Solicitation number
W9115124R0025_OCT24
Issued by

About this file

This document is a Periodic Hydraulic Test Checklist for an elevator system. It details the requirements for performing periodic hydraulic tests on a building's elevator system in accordance with Performance Work Statement (PWS) 5.10.

The checklist covers the required Category One (12 month) and Category Five (60 month) tests, including evaluating the relief valve setting, system pressure, normal and final terminal stopping devices, governors, safeties, oil buffers, firefighter's emergency operation, standby or emergency operation, door system power operations, emergency terminal speed limiting device, emergency terminal stopping device, and low oil protection operation. It also requires inspecting flexible hose & fitting assemblies and pressure switches. The technician must document their findings and sign the checklist.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TE I

TECHNICAL EXHIBIT H
PERIODIC HYDRAULIC TEST CHECKLIST
BUILDING NUMBER: BUILDING CONTACT:
TECHNICIAN NAME: DATE:
TIME IN: TIME OUT: TOTAL HOURS:
ELEVATOR SYSTEM NUMBER
HYDRAULIC ELEVATOR IAW PWS 5.10 CHECK LIST PERIODIC TEST REQ. CATEGORY ONE (12 MONTHS)
WITHOUT SAFETIES, GOVERNORS, AND OIL BUFFERS
RELIEF VALVE SETTING & SYSTEM PRESSURE TEST
CYLINDER
ADDITIONAL TEST
(a )NORMAL & FINAL TERMINAL STOPPING DEVICES
(b) GOVERNORS
(c) SAFETIES
(d) OIL BUFFERS
(e) FIREFIGHTER'S EMERGENCY OPERATION
(f) STANDBY OR EMERGENCY OPERATION
(g) POWER OPERATIONS OF DOOR SYSTEM
(h) EMERG. TERMINAL SPEED LIMITING DEVICE AND EMERG. TERMINAL STOPPING DEVICE
(I) LOW OIL PROTECTION OPERATION
FLEXIBLE HOSE & FITTING ASSEMBLIES
PRESSURE SWITCHES
HYDRAULIC ELEVATOR IAW PWS 5.10 CHECK LIST PERIODIC TEST REQ. CATEGORY FIVE (60 MONTHS)
GOVERNORS,SAFETIES,OIL BUFFERS WERE PROVIDED
COATED ROPES
WIRE ROPE FASTENINGS
COMMENTS:
TECHNICIAN SIGNATURE: DATE: