AD204854J - Technical Exhibit D - Asbestos Survey.pdf

PDF 398 KB Posted

Attached to
Repair Building 41011 Federal contract opportunity
Solicitation number
W91151-24-B-0002
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood

About this file

This document is an asbestos survey report for Building 41011 at Fort Hood, Texas. The survey was conducted by Radian International LLC under contract with the U.S. Army Corps of Engineers to identify and locate all friable and non-friable suspect asbestos-containing materials (SACM), evaluate their condition, conduct risk assessments, and provide abatement cost estimates. The report details the physical inspections, bulk sampling and analysis, and findings for Building 41011. It identifies several homogeneous areas containing asbestos-containing materials (ACM) and presumed ACM (PACM), including ceiling tiles, caulking, cementitious board, and roof penetration mastics. Risk assessments were performed, and abatement cost estimates range from $329 for repairs to $701,293 for full abatement and replacement. The report provides detailed information on the condition, quantities, and recommended response actions for the identified ACM and PACM.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASBESTOS SURVEY REPORT

BUILDING 41011

FORT HOOD, TEXAS

Submitted to:

U.S. Army Corps of Engineers, Fort Worth District

For:

U.S. Army Corps of Engineers, Tulsa District

Prepared by:

Radian International LLC

8501 N. Mopac Blvd.

P.O. Box 201088

Austin, Texas 78720-1088

September 1997

Asbestos Survey, Fort Hood, Texas ii September 1997

Building 41011 f_41011.doc

Table of Contents

1.0 INTRODUCTION

1.1 Physical Inspections

1.2 Bulk Sampling and Analysis

1.3 Sample Numbering Scheme

2.0 FACILITY DESCRIPTION

3.0 DISCUSSION OF RESULTS

4.0 RISK ASSESSMENT

5.0 ABATEMENT COST ESTIMATES

APPENDIX A: HOMOGENEOUS AREAS AND DETAILED ANALYTICAL RESULTS

FOR BUILDING 41011 SURVEY

APPENDIX B: BUILDING 41011 FLOOR PLAN

APPENDIX C: REPRESENTATIVE PHOTOGRAPHS OF ACM AND PACM IN

BUILDING 41011

APPENDIX D: RISK ASSESSMENT METHODOLOGY AND DATA FOR BUILDING

41011

List of Figures

B-1 Building 41011 Floor Plan--First Floor ..................................................................... B-1

B-2 Building 41011 Roof Plan ......................................................................................... B-2

List of Tables

3-1 Summary of ACM and PACM in Building 41011

4-1 Priority Rating Table for Recommended Response Actions

4-2 Building 41011 Risk Assessment Results

5-1 Building 41011 Abatement and Replacement Cost Estimates

5-2 Building 41011 Repair Cost Estimates

A-1 Building 41011 Summary of Homogeneous Areas ................................................... A-1

A-2 Building 41011 Asbestos Survey Analytical Results ................................................. A-2

B-1 Inspector, Risk Assessor, and Laboratory Licenses for Building 41011 ................... B-3

D-1 Damage/Risk Values for Inspection Observations .................................................... D-2

D-2 Exposure Values for Inspection Observations ........................................................... D-2

D-3 Damage/Risk Observations for ACM and PACM in Bldg. 41011 ............................ D-3

D-4 Exposure Observations for ACM and PACM in Bldg. 41011 ................................... D-3

Asbestos Survey, Fort Hood, Texas iii September 1997

List of Photographs (Appendix C)

Photo 41011-1-C: 2x4 holed ceiling tile (white); Classroom #1

Photo 41011-1-G: Building caulkings and putties; at windows and doors

Photo 41011-1-H: Cementitious board; on overhang of building exterior

Photo 41011-1-I: Mastic; on down spout exterior of building

Photo 41011-R-B: Roof penetration mastics

Asbestos Survey, Fort Hood, Texas iv September 1997

Acronyms and Abbreviations

ACM Asbestos-containing material

Act. Actinolite

Am. Amosite

Anth. Anthophyllite

Cell. Cellulose

Chry. Chrysotile

COR Contracting Officer’s Representative

Croc. Crocidolite

D Damage/risk factor

DS Dispersion staining

E Exposure factor

EPA United States Environmental Protection Agency

Fib. Fiberglass

GRADE Air Force Guidance for Rating Damage and Exposure

ID Identification

LLC Limited liability company m Meter m2 Square meter

M.W. Mineral wool

N/A Not analyzed

NA Not applicable

ND Not detected

O&M Operations and maintenance

PACM Presumed asbestos-containing material

PLM Polarized light microscopy

QA Quality assurance

QC Quality control

R Risk rating

RPD Relative percent difference

SACM Suspect asbestos-containing material

SWD Southwest Division (Laboratory)

Syn. Synthetics

T Total

TDH Texas Department of Health

Trem. Tremolite

TSI Thermal systems insulation

USACE United States Army Corps of Engineers

Asbestos Survey, Fort Hood, Texas September 1997

1.0 INTRODUCTION

Radian International LLC, under contract with the United States Army Corps of Engineers

(USACE), Contract DACA56-94-D-0015, performed a facility-wide asbestos survey at Fort

Hood, Texas, to meet the following project objectives:

Identify and locate, to the extent possible, all friable and non-friable suspect asbestos-containing materials (SACM);

Evaluate the condition of the SACM, collecting sufficient data to perform a risk assessment and to prioritize materials for appropriate response actions;

Collect and analyze bulk material samples in order to quantify, in metric units, SACM which contain greater than 1% asbestos;

Identify and quantify material which is presumed to contain asbestos;

Conduct risk assessments for all asbestos-containing materials (ACM) and presumed

ACM (PACM);

Conduct air monitoring where necessary according to risk assessment models; and

Prepare an Operations and Maintenance (O&M) program (under separate cover) for all

ACM and PACM.

The survey included base buildings and approximately 10% of the family housing buildings at

Fort Hood. Mr. Emmet Gray, Directorate of Public Works, is the post contact for this project.

This report presents the findings from the asbestos survey at Building 41011.

1.1 Physical Inspections

Survey teams visually inspected the accessible areas of the interior and exterior of each building, including interior and exterior rooms, mechanical spaces, storage areas, crawl spaces, attics, and roofs, to identify appropriate homogeneous areas (i.e., unique SACM or PACM). A reasonable effort was made by the survey team to gain access to inaccessible areas. If access could not be gained, the survey team made assumptions regarding the presence and quantity of SACM based on the visual inspection of the remainder of the building and interviews with the building occupants.

The following steps were taken to complete physical inspections.

1. Obtain a copy of the building floor plan.

2. Perform an initial building walk-through.

a) Note fire doors/walls on the floor plan.

b) Identify homogeneous areas.

c) Identify locations of friable and non-friable SACM and PACM. PACM is defined as SACM which could be visually identified but which were inaccessible for sampling, or were not sampled at the client’s request.

d) Note the type, estimated quantity, description, friability, and physical damage of each SACM and PACM. Mark location(s) of SACM and PACM on the floor plan and take one color photograph of each homogeneous area to show materials and conditions present at the time of the survey.

e) Define the bulk sample locations.

1.2 Bulk Sampling and Analysis

Homogeneous materials were categorized by the survey teams as surfacing materials, thermal systems insulation (TSI), or miscellaneous materials. Building age, use, and size were taken into consideration, along with building materials, when determining sample locations. Three bulk samples were obtained from each SACM within each building surveyed. Homogeneous areas categorized as PACM were not sampled. Where applicable, bulk samples were collected from all material layers (e.g., roofing and flooring materials). Samples were collected by cutting, scraping, and/or coring. The following procedures were used during bulk sample collection:

1. Mark sample locations on the floor plan using a unique identification number.

2. Record SACM sample information on a field data sheet, including:

a) Building number and room number/area description;

b) Typical occupancy and population;

c) SACM description (e.g., pipe insulation, 9x9 brown floor tile, etc.);

d) Estimated quantity of SACM (i.e., area or length);

e) Friability;

f) Physical damage;

g) Potential for damage or disturbance during maintenance;

h) Potential cause of damage or disturbance; and

i) Unique sample identification number.

3. Take one color photograph from each homogeneous area to show materials and conditions present at the time of the survey.

4. Repair any damage caused by sampling using sealants and methods approved by the

Contracting Officer’s Representative (COR).

Samples were analyzed by RJ Lee Group, Inc. laboratory in Houston, Texas, using polarized light microscopy (PLM) coupled with dispersion staining (DS) in accordance with the Environmental

Protection Agency (EPA)-approved method USEPA 600/R-93/116: “Method for Determination of Asbestos in Bulk Building Samples.” In accordance with the Scope of Work dated 20 August

1996, point-counting was not performed. In order to meet quality assurance/quality control

(QA/QC) requirements, triplicate samples were collected from 5% of the sample locations for the overall project. Two of the samples, the normal and duplicate samples, were analyzed by the RJ

Lee Group laboratory. The third sample is the QA sample that was sent to the USACE

Southwestern Division Laboratory (SWD) in Dallas, Texas.

1.3 Sample Numbering Scheme

Unique identification numbers were assigned to each sample using the following numbering scheme:

aaaaa-b-c-xd, where:

aaaaa identifies the five-digit building number;

b identifies the subdivision within that building;

c identifies the homogeneous area;

x identifies the sample type, where:

0 = normal sample

8 = field duplicate (QC sample)

9 = QA sample d identifies the sample number (1,2, or 3)

[Note: “b-c” represents the unique homogeneous area identification (ID) for a particular building. When necessary, “e” is used by the laboratory to identify additional layers of material not separated in the field (e.g., tile and mastic associated with flooring materials)].

2.0 FACILITY DESCRIPTION

Building 41011, encompassing an area of 6136 sq ft, is a Battalion Headquarters Building built in

1969. A building floor plan is presented in Appendix B.

3.0 DISCUSSION OF RESULTS

Building 41011 was inspected during November 1996. During this inspection, 11 homogeneous areas were identified and 24 normal samples were collected. Table 3-1 presents a summary of

ACM and PACM identified during the survey of Building 41011. Appendix A contains a detailed table of homogeneous area descriptions for all SACM and PACM, and PLM analytical results for samples collected in Building 41011. Sample and photograph locations are presented in the Building 41011 floor plan (see Appendix B). Table B-1 contains information regarding inspector, risk assessor, and laboratory licenses for this building survey. Appendix C contains representative photographs of each ACM and PACM identified in Building 41011.

Table 3-1

Summary of ACM and PACM in Building 410111

Homogeneous Area Area/Length Physical ACM

ID Description & Location Estimate Units Damage Friability Type

1-C 2x4 holed ceiling tile (white); Classroom #1 226.77 m2 None None ACM

1-G Building caulkings and putties; at windows and doors

0.57 m2 Minimal None PACM

1-H Cementitious board; on overhang of building exterior

2,281.04 m2 None None PACM

1-I Mastic; on down spout exterior of building 0.74 m2 Minimal None PACM

R-B Roof penetration mastics 1.86 m2 High Low ACM 1 A complete list of homogeneous areas and detailed analytical results are presented in Appendix A. Sample and photograph locations are shown on the building floor plan in Appendix B. Photographs are shown in Appendix C.

m2 = Square meter

Homogeneous areas 1-C, 1-G, 1-H, 1-I, and R-B were identified as containing ACM or PACM.

The risk assessment and abatement cost estimates for these materials are further discussed in

Sections 4 and 5. All areas of the building were accessible to the inspection team. No interior or incoming electrical wiring was observed during the building inspection.

A field duplicate (QC) sample was collected at location 41011-1-A-01. The results of analysis for the QC sample indicated asbestos levels less than 1% (non-detect). These results are consistent with the normal sample, which also indicated that asbestos was not measured above 1 percent.

4.0 RISK ASSESSMENT

A risk assessment was conducted for each homogeneous area containing ACM or PACM identified within the building using a modified version of the Air Force Guidance for Rating and

Assessing Damage and Exposure (GRADE) evaluation system. This system employs an algorithm that assists the risk assessor in assigning priorities to various situations identified during the inspection. The GRADE system divides the risk into two categories: damage/risk factors (D) and exposure factors (E). These factors are summed and placed in the following equation:

R = 12.0324 - [(0.1683 x D) + (0.1693 x E)].

Table 4-1 was used to establish a priority rating for each homogeneous area, based on the risk rating or “R” value.

Table 4-1

Priority Rating Table for Recommended Response Actions

Risk Rating (R) Priority Recommended Response Action

R < 6 1 Immediate removal/repair

6 R < 8 2 Planned removal/repair; place in O&M program in interim 1

8 R < 10 3 Place in O&M program

R 10 4 No action required; place in O&M program as a precaution 1 If material is repaired, it will remain in the O&M program until it is removed.

O&M = Operations and maintenance

R = Risk Rating

Risk assessments for the homogeneous areas identified as ACM or PACM in Building 41011 are provided in Table 4-2. Appendix D contains a summary of field observations used to determine damage/risk factors (D) and exposure factors (E). The methodology used to determine these factors is also provided in Appendix D. No air sampling was required in this building based on risk assessment models.

Table 4-2

Building 41011 Risk Assessment Results

Homogeneous Area ACM Risk

ID Description & Location Type Rating (R) Priority

1-C 2x4 holed ceiling tile (white); Classroom #1 ACM 10.17 4a

1-G Building caulkings and putties; at windows and doors PACM 9.5 4a

1-H Cementitious board; on overhang of building exterior PACM 10.34 4a

1-I Mastic; on down spout exterior of building PACM 9.16 4a

R-B Roof penetration mastics ACM 9.16 3 a Priority rating is 4 because material is not friable.

5.0 ABATEMENT COST ESTIMATES

Abatement cost estimates are based on professional experience and costs from 1996 Fort Hood asbestos abatement contracts. Cost estimates were developed using the unit costs for abatement of the general category of material and the estimated area of identified ACM determined during the survey. Unit rates for abatement include labor, materials, equipment, overhead, insurance, and profit. Abatement unit rates do not include costs for design, air sampling, materials replacement, or off-site disposal. Total costs do not include contract administration costs.

Cost estimates were developed using the assumption that all materials within a building would be abated concurrently. In addition, costs are based on the assumption that all ACM which is friable or which has the potential to become friable during demolition will require removal. Detailed cost estimates for abatement, replacement, and repair of ACM in Building 41011 are presented in

Tables 5-1 and 5-2.

Table 5-1

Building 41011 Abatement and Replacement Cost Estimates

Homogeneous Area Area/Length Unit Cost for Total Cost

ID Description & Location Estimate Units Abatement ($)

1-C 2x4 holed ceiling tile (white); Classroom #1 226.77 m2 $10.76/m2 $2,440

1-G Building caulkings and putties; at windows and doors 0.57 m2 $107.60/m2 $61

1-H Cementitious board; on overhang of building exterior 2,281.04 m2 $18.83/m2 $42,952

1-I Mastic; on down spout exterior of building 0.74 m2 $107.60/m2 $80

R-B Roof penetration mastics 1.86 m2 $53.80/m2 $100

Subtotal $45,633

Design Fee (6%) $2,738

Air Monitoring Cost (10%) $4,563

Materials Replacement $643,335

Off-site Disposal Cost $5,024

TOTAL ESTIMATED ABATEMENT COST $701,293

Table 5-2

Building 41011 Repair Cost Estimates

Homogeneous Area

Approximate

Damaged

Area/Length

Unit Cost for

Total Cost

ID Description & Location Estimate Units Repair ($)

1-C 2x4 holed ceiling tile (white); Classroom #1 3 m2 $10.76/m2 $32

1-G Building caulkings and putties; at windows and doors 0.57 m2 $107.60/m2 $61

1-H Cementitious board; on overhang of building exterior 3 m2 $18.83/m2 $56

1-I Mastic; on down spout exterior of building 0.74 m2 $107.60/m2 $80

R-B Roof penetration mastics 1.86 m2 $53.80/m2 $100

Subtotal $329

Design Fee (6%) $20

Air Monitoring Cost (10%) $33

Materials Replacement $986

Off-site Disposal Cost $21

TOTAL ESTIMATED REPAIR COST $1,389

APPENDIX A

HOMOGENEOUS AREAS AND DETAILED ANALYTICAL RESULTS FOR

BUILDING 41011 SURVEY

A-1

Table A-1

Building 41011 Homogeneous Areas 1

Homogeneous Area ACM

ID Description & Location Type 2

1-A 12x12 floor tile (white); throughout building excluding bathroom None

1-B Stair tread (brown); stage area in Classroom #1 None

1-C 2x4 holed ceiling tile (white); Classroom #1 ACM

1-D 2x4 fissured ceiling tile; throughout building excluding Classroom #1 None

1-E Wallboard; throughout entire building on interior walls None

1-F Cove molding (brown); office areas None

1-G Building caulkings and putties; at windows and doors PACM

1-H Cementitious board; on overhang of building exterior PACM

1-I Mastic; on down spout exterior of building PACM

R-A Built-up roofing materials None

R-B Roof penetration mastics ACM 1 Sample and photograph locations are shown on the building floor plan in Appendix B. Photographs of PACM and

ACM are shown in Appendix C.

2 ACM types include:

ACM = Materials containing >1% asbestos;

None = Materials containing 1% asbestos; and

PACM = Materials presumed to contain >1% asbestos.

ACM = Asbestos-containing material

ID = Identification

PACM = Presumed asbestos-containing material

Table A-2

Building 41011 Asbestos Survey Analytical Results1

Homogeneous Area Asbestos Results (%) Other Fibrous Materials Results (%)

Area

ID

Sample ID

Layer

Layer Description

(from Laboratory)

Total

Act

Am

Anth

Chry

Croc

Trem

Cell

Fib

M.W.

Synth

ACM

Type

1-A 41011-1-A-01 a Tan Floor Tile ND ND ND ND ND ND ND ND ND ND ND None

41011-1-A-01 b Tan Mastic ND ND ND ND ND ND ND ND ND ND ND None

41011-1-A-01 NA Total ND None

41011-1-A-02 a Tan Floor Tile ND ND ND ND ND ND ND ND ND ND ND None

41011-1-A-02 b Tan Mastic ND ND ND ND ND ND ND ND ND ND ND None

41011-1-A-02 NA Total ND None

41011-1-A-03 NA White Floor Tile ND ND ND ND ND ND ND ND ND ND ND None

41011-1-A-81 a White Floor Tile ND ND ND ND ND ND ND 1 ND ND ND None

41011-1-A-81 b Yellow Mastic ND ND ND ND ND ND ND 1 ND ND ND None

41011-1-A-81 NA Total ND None

1-B 41011-1-B-01 a Brown Kickstrip ND ND ND ND ND ND ND ND ND ND ND None

41011-1-B-01 b Tan Mastic ND ND ND ND ND ND ND ND ND ND ND None

41011-1-B-01 NA Total ND None

41011-1-B-02 a Brown Kickstrip ND ND ND ND ND ND ND ND ND ND ND None

41011-1-B-02 b Tan Mastic ND ND ND ND ND ND ND ND ND ND ND None

41011-1-B-02 NA Total ND None

41011-1-B-03 a Brown Kickstrip ND ND ND ND ND ND ND ND ND ND ND None

41011-1-B-03 b Tan Mastic ND ND ND ND ND ND ND ND ND ND ND None

41011-1-B-03 NA Total ND None

1-C 41011-1-C-01 NA Tan Clg Tile 2.00 ND ND ND 2 ND ND ND ND 80 ND ACM

41011-1-C-02 NA Tan Clg Tile 2.00 ND ND ND 2 ND ND ND ND 80 ND ACM

41011-1-C-03 NA Tan Clg Tile 2.00 ND ND ND 2 ND ND ND ND 80 ND ACM

1-D 41011-1-D-01 NA Tan Clg Tile ND ND ND ND ND ND ND 35 ND 50 ND None

41011-1-D-02 NA Tan Clg Tile ND ND ND ND ND ND ND 35 ND 50 ND None

41011-1-D-03 NA Tan Clg Tile ND ND ND ND ND ND ND 35 ND 50 ND None

1-E 41011-1-E-01 a White Plaster ND ND ND ND ND ND ND 2 ND ND ND None

41011-1-E-01 b Tan Paper ND ND ND ND ND ND ND 100 ND ND ND None

41011-1-E-01 c Tan Paint ND ND ND ND ND ND ND ND ND ND ND None

41011-1-E-01 NA Total ND None

41011-1-E-02 a White Plaster ND ND ND ND ND ND ND 2 ND ND ND None

41011-1-E-02 b Tan Paper ND ND ND ND ND ND ND 100 ND ND ND None

41011-1-E-02 c Joint Comp ND ND ND ND ND ND ND ND ND ND ND None

41011-1-E-02 d Tan Paint ND ND ND ND ND ND ND ND ND ND ND None

41011-1-E-02 NA Total ND None

41011-1-E-03 a White Plaster ND ND ND ND ND ND ND 2 ND ND ND None

41011-1-E-03 b Tan Paper ND ND ND ND ND ND ND 100 ND ND ND None

41011-1-E-03 NA Total ND None

Homogeneous Area Asbestos Results (%) Other Fibrous Materials Results (%)

ID

Sample ID

Layer

Layer Description

(from Laboratory)

Total

Act

Am

Anth

Chry

Croc

Trem

Cell

Fib

M.W.

Synth

ACM

Type

1-F 41011-1-F-01 a Brown Kickstrip ND ND ND ND ND ND ND ND ND ND ND None

41011-1-F-01 b Tan Mastic ND ND ND ND ND ND ND ND ND ND ND None

41011-1-F-01 c Tan Paper ND ND ND ND ND ND ND 100 ND ND ND None

41011-1-F-01 NA Total ND None

41011-1-F-02 a Brown Kickstrip ND ND ND ND ND ND ND ND ND ND ND None

41011-1-F-02 b Tan Mastic ND ND ND ND ND ND ND ND ND ND ND None

41011-1-F-02 c Tan Paper ND ND ND ND ND ND ND 100 ND ND ND None

41011-1-F-02 NA Total ND None

41011-1-F-03 a Brown Kickstrip ND ND ND ND ND ND ND ND ND ND ND None

41011-1-F-03 b Tan Mastic ND ND ND ND ND ND ND ND ND ND ND None

41011-1-F-03 c Tan Paper ND ND ND ND ND ND ND 100 ND ND ND None

41011-1-F-03 NA Total ND None

R-A 41011-R-A-01 a Black Layered Tar ND ND ND ND ND ND ND 30 ND ND ND None

41011-R-A-01 b Brn Fbrs Backing ND ND ND ND ND ND ND 85 ND ND ND None

41011-R-A-01 NA Total ND None

41011-R-A-02 NA Black Tar ND ND ND ND ND ND ND 35 ND ND ND None

41011-R-A-03 NA Black Tar ND ND ND ND ND ND ND 45 ND ND ND None

R-B 41011-R-B-01 a Black Tar 7.00 ND ND ND 7 ND ND 15 ND ND ND ACM

41011-R-B-01 b Silver Paint 10.00 ND ND ND 10 ND ND 2 ND ND ND ACM

41011-R-B-01 NA Total 7.15 ACM

41011-R-B-02 a Black Tar 12.00 ND ND ND 12 ND ND 10 ND ND ND ACM

41011-R-B-02 b Gray Frit ND ND ND ND ND ND ND 1 ND ND ND None

41011-R-B-02 NA Total 10.8 ACM

41011-R-B-03 NA Black Tar 15.00 ND ND ND 15 ND ND 10 ND ND ND ACM 1 Sample and photograph locations are shown on the building floor plan in Appendix B. Photographs of ACM and PACM are shown in Appendix C. If a sample contained multiple layers, all layers were analyzed separately. If any layer of a sample from a homogeneous area contained >1% asbestos, than that homogeneous area was classified as ACM. Totals (weighted composite average percent asbestos) are provided for samples with all layers containing >1% asbestos.

Act. = Actinolite

Am. = Amosite

Anth. = Anthophyllite

Cell. = Cellulose

Chry. = Chrysotile

Croc. = Crocidolite

Fib. = Fiberglass

ID = Identification

M.W. = Mineral wool

NA = Not applicable (sample contained single layer)

ND = Not detected (<1% asbestos)

Synth. = Synthetics

T = Total

Trem. = Tremolite

APPENDIX B

BUILDING 41011 FLOOR PLAN

Asbestos Survey, Fort Hood, Texas B-3 September 1997

Table B-1

Inspector, Risk Assessor, and Laboratory Licenses for Building 41011

Building and Analytical Laboratory Building Inspector/Risk Assessor Date

Homogeneous

Area ID1

Name

TDH

License #

License

Exp. Date

Name

TDH

License #

License

Exp. Date

Inspected/

Sampled

41011-1-A RJ Lee Group 30-0051 02/26/97 Jody Bass 60-1096 10/9/97 11/1/96

41011-1-B RJ Lee Group 30-0051 02/26/97 Jody Bass 60-1096 10/9/97 11/1/96

41011-1-C RJ Lee Group 30-0051 02/26/97 Jody Bass 60-1096 10/9/97 11/1/96

41011-1-D RJ Lee Group 30-0051 02/26/97 Jody Bass 60-1096 10/9/97 11/1/96

41011-1-E RJ Lee Group 30-0051 02/26/97 Jody Bass 60-1096 10/9/97 11/1/96

41011-1-F RJ Lee Group 30-0051 02/26/97 Jody Bass 60-1096 10/9/97 11/1/96

41011-1-G NA NA NA Jody Bass 60-1096 10/9/97 11/1/96

41011-1-H NA NA NA Jody Bass 60-1096 10/9/97 11/1/96

41011-1-I NA NA NA Jody Bass 60-1096 10/9/97 11/1/96

41011-R-A RJ Lee Group 30-0051 02/26/97 Dave Stoetzel 60-1100 10/15/97 11/13/96

41011-R-B RJ Lee Group 30-0051 02/26/97 Dave Stoetzel 60-1100 10/15/97 11/13/96 1 The sampling information (including laboratory, inspector, risk assessor, and sample date) is the same for all samples associated with a particular homogeneous area. Unique sample identification numbers were assigned to each sample using the following sample numbering scheme:

aaaaa-b-c-xd, where:

aaaaa identifies the five-digit building number;

b identifies the subdivision within that building;

c identifies the homogeneous area;

x identifies the sample type, where:

0 = normal bulk material sample

6 = normal personnel air monitoring sample

7 = normal environmental air monitoring sample

8 = field duplicate bulk material (QC sample)

9 = QA bulk material sample d identifies the sample number (1, 2, or 3);

[Note: “b-c” represents the unique homogeneous area ID for a particular building.]

ID = Identification

NA = Not applicable. (PACM was not sampled.)

PACM = Presumed asbestos-containing material

QA = Quality assurance

QC = Quality control

TDH = Texas Department of Health

APPENDIX C

REPRESENTATIVE PHOTOGRAPHS OF ACM AND PACM IN BUILDING

41011

APPENDIX D

RISK ASSESSMENT METHODOLOGY AND DATA FOR BUILDING 41011

Asbestos Survey, Fort Hood, Texas D-1 September 1997

Appendix D

Risk Assessment Data and Methodology

A risk assessment was conducted for each homogeneous area containing ACM or PACM identified within the building using a modified version of the Air Force Guideline for

Rating and Assessing Damage and Exposure (GRADE) evaluation system. This system employs an algorithm that assists the risk assessor in assigning priorities to various situations identified during the inspection. The GRADE system divides the risk into two categories: damage/risk factors (D), and exposure factors (E). These factors are summed and used in the following equation:

R = 12.0324 - [(0.1683 x D) + (0.1693 x E)];

Where D = the sum of the values for the following damage/risk observations:

Material type

Potential for contact

Physical damage

Water damage

Potential for damage by repair/maintenance activities

Asbestos content;

And E = the sum of the values for the following exposure observations:

Area of damaged material

Material friability

Population

Activity/vibration

Ventilation

Air movement

Floors

Walls

Barriers

A further breakdown of the values for the subunits under each category is provided in

Tables D-1 and D-2. Summaries of the inspection observations for damage/risk and exposure for the ACM and PACM in Building 41011 are presented in Tables D-3 and D-

4.

Table D-1

Damage/Risk Values for Inspection Observations 1

Material Type

Potential for Contact

Physical

Damage

Water Damage

Potential for Damage by

Repair/Maintenance Activities

Asbestos Content

Surfacing (4) <10 ft, Low (2) None (0) No (0) None (0) >1-30% (1)

TSI, Ventilation (3) <10 ft, Medium (5) Minimal (2) Yes (3) Low (1) >30-50% (3)

TSI, Other (1) <10 ft, High (8) Low (3) Moderate (2) >50% (5)

Misc., Damaged (1) >10 ft, Low (0) Moderate (4) High (3)

Misc., Undamaged (0) >10 ft, Medium (3) High (5)

>10 ft, High (5) 1 The value assigned to each category is shown in italics.

TSI = Thermal systems insulation

Table D-2

Exposure Values for Inspection Observations 1

Area of

Damaged

Material

(m or m2)

Friability

Population

Activity/

Vibration

Interior

Ventilation

Air

Movement

Floors

<3 (0) None (0) None (0) Low (0) None (0) None (0) Smooth (1) Smooth (1) Permanent (1)

3-30 (1) Low (0) 1-9 (1) Occasional (2) Return Only (2) Perceptible (2) Rough, Seamed (2) Moderate (2) Semipermanent (2)

31-300 (2) Moderate (2) 10-200 (2) Constant (5) Supply Only (5) Turbulent (5) Carpet (4) Pitted (3) Minimal (3)

>300 (3) High (5) 201-500 (3) Supply & Return (7) Rough (4) None (4)

501-1,000 (4)

>1,000 (5) 1 The value assigned to each category is shown in italics.

Table D-3

Summary of Damage/Risk Observations for ACM and PACM in Building 41011

Material Type

Potential for

Contact

Physical Damage

Water

Damage

Potential for Damage by

Repair/Maintenance Activities

Asbestos

Content

41011-1-C Misc., Undamaged (0) <10 ft, Low (2) None (0) No (0) None (0) 1-30% (1)

41011-1-G Misc., Damaged (1) <10 ft, Low (2) Minimal (2) No (0) Low (1) PACM (1)

41011-1-H Misc., Undamaged (0) <10 ft, Low (2) None (0) No (0) None (0) PACM (1)

41011-1-I Misc., Undamaged (0) <10 ft, Low (2) Minimal (2) No (0) None (0) PACM (1)

41011-R-B Misc., Damaged (1) >10 ft, Low (0) High (5) No (0) Low (1) 1-30% (1)

Table D-4

Summary of Exposure Observations for ACM and PACM in Building 41011

Area of

Damaged

(m or m2)

Friability

Population

Activity

Ventilation

Air

Movement

Floors

41011-1-C < 3 (0) None (0) 10-200 (2) Low (0) None (0) None (0) Smooth (1) Smooth (1) None (4)

41011-1-G < 3 (0) None (0) 10-200 (2) Low (0) None (0) None (0) Smooth (1) Smooth (1) None (4)

41011-1-H < 3 (0) None (0) 1- 9 (1) Low (0) None (0) None (0) Smooth (1) Smooth (1) None (4)

41011-1-I < 3 (0) None (0) 1- 9 (1) Low (0) None (0) None (0) Carpet (4) Pitted (3) None (4)

41011-R-B 3-30 (1) Low (0) 10-200 (2) Low (0) None (0) None (0) Smooth (1) Smooth (1) None (4)

File details come from the government source that posted it. Updated .