PX920441P - Technical Exhibit D - Dominion Energy RFP.pdf

PDF 193 KB Posted

Attached to
Repair and Replace HVAC Bldg 48830 and 91071-Bid Abstract
Solicitation number
W91151-22-B-0013
Issued by

About this file

This document contains a notification of project cost and scope of work from Dominion Privatization Texas, LLC to the Directorate of Public Works at Fort Hood, Texas. Dominion Privatization Texas, LLC provided a firm fixed price proposal of $5,142.80 to install a new natural gas meter and electronic reader to accommodate additional natural gas load added to Building B48830 at Fort Hood, as required by Request for Proposal #354 to increase natural gas capacity. The proposal includes material, equipment, and labor costs. Upon notification of project completion, the operations and maintenance fixed monthly service charge in Contract SP060016C8312 will be modified by $20.49, split between recurring and non-recurring facility charges. Questions regarding the proposal should be directed to the specified Dominion Energy Natural Gas Superintendent.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Dominion Privatization Texas, LLC 49011 Santa Fe Ave, Fort Hood, TX 76544

The above pricing is valid for 90 days from the date of this quote.

All services will be provided during Dominion's normal work hours.

Contract authorization and installation of equipment for service cable termination at the customer facility are required prior to releasing and scheduling this project for construction.

RFP #354: Increase NG Capacity at B48830

June 6, 2022

NOTIFICATION OF PROJECT COST

Contract No. SP‐0600‐16‐C‐8312 Fort Hood, Texas – Natural Gas

RFP #354: Increase NG Capacity at B48830

Fort Hood DPW:

In response to RFP 354, Dominion Privatization Texas, LLC (DOM) has determined the Firm‐ Fixed Price proposal for the project requirements to be: $5,142.80

This proposal is for DOM to provide material, equipment, and labor for the Scope of Work as described: Install new natural gas meter and electronic reader to accommodate additional natural gas load added to B48830.

Work for this proposal will be conducted in coordination with the third party contracted for this project. Third party payment to DOM has been authorized by the UP contract COR.

Authorization for an adjustment to the Operations and Maintenance fixed monthly service charge to be modified into Contract SP0600‐16‐C‐8312, in the amount of $20.49, will be provided upon notification of project completion. Additional Facilities Charge is split between R&R and O&M as follows:

Distribution Facilities Charge R&R = $13.99 / Month Distribution Facilities Charge O&M = $6.50 / Month

Questions regarding this proposal should be addressed to the Dominion Energy Natural Gas Superintendent Bryan Pethtel at 330.603.5637 or Bryan.R.Pethtel@dominionenergy.com.

Contractual questions should be addressed to the Utilities Privatization COR, Sean Goodwin at sean.d.goodwin2.civ@mail.mil.