This document is an amendment to a solicitation for the construction of a new operations building at Shorthorn Airfield North Fort Hood, Texas.

The amendment provides responses to questions from industry regarding requirements, specifications, and drawings. Key details include confirmation that coordination will be required with utility providers American Water and Dominion Energy, and that a traffic control plan and temporary construction fence are required. The exterior of the building must match others in the area. Several specifications do not apply to this project, such as blast resistance requirements or whole building commissioning. Bidders must submit qualifications and past experience documentation. The pre-bid conference date is also provided, as are instructions for submitting bids electronically by specified deadlines to the Department of the Army via the DoD SAFE file sharing system.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0011492061 NH104169P

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to answ er Request for Information (RFI). Pleae see summary of changes for details.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 03-Sep-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9115120B0013

X 9B. DATED (SEE ITEM 11)

20-Aug-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-Sep-2020

CODE

MICC - FORT HOOD

36000 DARNALL LOOP, ROOM 1300B

FORT HOOD TX 76544-5025

W91151 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9115120B0013

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The Issued By organization has changed from

418TH CONTRACTING SUPPORT BRIGADE (CSB)

36000, DARNALL LOOP, ROOM 1300B

FORT HOOD TX 76544-5095

to

MICC - FORT HOOD

MISSION CONTRACTING OFFICE (MCO)

36000 DARNALL LOOP, ROOM 1300B

FORT HOOD TX 76544-5095

The following have been added by full text:

REQUEST FOR INFORMATION

Request for Information W91151-20-B-0013 Operations Building, Shorthorn AAF North Fort Hood, TX.

1. Will we need to get a price from American Water and Dominion Energy?

YES.

2. Will the job site be vacated?

YES, THE USER WILL NOT BE ON SITE DURING THE PROJECT. HOWEVER THERE IS

ANOTHER PROJECT 30’ WEST TO INSTALL ANOTHER FACILITY. COORDINATION WITH

DIFFERENT CONTRACTORS SHOULD BE ANTICIPATED.

3. Will a Traffic control plan be needed as per plans even though it is a remote area?

YES.

4. Since the Government engineers the foundation, will the Government provide engineered anchor bolts drawings as per plans? See PEMB note 9 on sheet S-001 says contractor will design Anchor bolt type, but length and diameter will vary per bldg. design and per foundation design engineer so will the GOVT provide?

CONTRACTOR SHALL BE RESPONSIBLE FOR ANCHOR BOLT DESIGN. REFER TO SHEET

S-301 AND S-502.

5. S001—Under foundation and Soil Data note 5 states, “A 10 mil POLYETHYLENE VAPOR BARRIER

AND 6 in MIN. CAPILLARY WATER BARRIER SHALL BE PROVIDED BENEATH THE SLAB, UNLESS NOTED OTHERWISE.” Do we need both?

REFER TO SHEET S-001, FOUNDATION AND SOIL DATA, NOTE 5. CONTRACTOR SHALL

INSTALL PER CONSTRUCTION DOCUMENTS

6. Is the power coming underground or over head?

COORDINATE WITH DOMINION ENERGY.

7. Is there a soil report?

REFER TO SHEET S-001, FOUNDATION & SOIL DATA, NOTE 1.

8. If needed can the existing pad be added on to?

REFER TO DRAWINGS.

9. UFC 4-010-01 is listed in the applicable codes on sheet S-001 however there are no AT/FP or blast requirements listed in the specifications.

CORRECT

10. Will the exterior doors require blast ratings? If so we need to know the explosive weight as well as the standoff distance.

EXPLOSIVE WEIGHTS ARE NOT APPLICABLE TO THIS PROJECT.

11. There is a call out for Wainscoat; but no detail. Will there be details provided?

SEE SHEET A-501, DETAIL C6. PER EXTERIOR ELEVATIONS, INSULATED METAL WALL

PANEL 1 (IMWP-1) AND IMWP-2 MEET AT THE “WAINSCOAT” HEIGHT CALLED OUT.

12. Will the exterior be revised to match the SAAB Building?

BUILDING EXTERIORS ARE CONSISTANT.

13. Plans indicated a shallow plumbing depth and that underground plumbing should penetrate all grade beams where they intersect. It would be much simpler and more cost effective to run the plumbing slightly deeper and avoid penetrating multiple grade beams. This would also prevent the grade beams from needing to be deepened in various locations. Is this permissible, or does the plumbing need to be run at depth indicated due to civil drainage concerns? Please advise.

COORDINATE PLUMBING DEPTH WITH AMERICAN WATERS.

14. Drawing CD 100 shows to demo approximately 50 sy of existing sidewalk at building 57138. CD 100 shows to demo approximately 199 sy of sidewalk to buildings 57136 and 57137. CE 100 shows these two sidewalks as existing. Please clarify.

SIDEWALK DEMOLITION IS NOT MENTIONED IN THE DRAWINGS.

15. Is the temporary construction fence per CS100 required by the contractor for the project? Will part of the new fence be on Phase 2?

YES, FENCE CALLED OUT IS REQUIRED BY CONTRACTOR ON THIS CONTRACT.

16. Per the structural drawings: Design load requirements are given for the PEMB. The details show decking beneath the roofing panels. The specifications given on S-001, PEMB note #7 state that the roof panels are to be insulated roof panels. These panels have foam insulation sandwiched between 2 panels, and are capable of being manufactured to meet the design loads given without the decking. Will it be acceptable to provide a PEMB that meets the required design loads without the roof decking to save cost?

CONSTRUCTION SHALL ADHERE TO CONTRACT DRAWINGS.

17. Structural drawings call out IMP for the roofing. Page A-521 detail D2 shows the makeup of the roofing, fascia, and soffit to be different than what is called out for in the structural drawings. With either design be acceptable?

REFER TO SHEET S-111, NOTE 4 AND SHEET S-511, NOTES 1 AND 2. CONTRACTORS SHOULD

VERIFY THEY ARE LOOKING AT DRAWINGS DATED APRIL 2020 FOR THIS PROJECT.

18. Note the following in reference to this question:

a. Page S-001

i. Applicable codes: 13. UFC 4-010-01, 12 DECEMBER 2018, DoD MINIMUM

ANTITERRORISM STANDARDS FOR BUILDINGS;

ii. Design Loads: 7. ANTI-TERRORISM FORCE PROTECTION 7.1 PER UFC 04-

010-01.

b. Page P-001

i. General Note B. OVERHEAD PLUMBING EQUIPMENT AND SYSTEMS

SHALL BE SUPPORTED TO MEET ANTI-TERRORISM/FORCE PROTECTION

MEASURES OF UFC 4-010-01

Will these specifications be enforced on this project? Can they be removed to save cost?

SPECIFICATIONS SHALL BE ENFORCED, HOWEVER THEY DO NOT IMPACT COST. REFER TO

UFC 4-010-01

19. Page A-611, detail C5 shows a solar shade. I do not see this on the elevation drawings, or the plan view drawings. These appear to be different from the Pre-Fab Canopies on pages S-511 and S-501. It also shows the Solar Shade to be mounted to the storefront framing, whereas the Pre-Fab Canopies show to be mounted to the exterior insulated panels. Are both products to be incorporated into the project? Or was only one of them intended to be required?

SOLAR SHADE IS REFERENCED ON SHEET A-611, WINDOW SCHEDULE AND WINDOW

SCHEDULE REMARKS. THIS IS A SEPARATE ELEMENT FROM THE PRE-FAB CANOPIES.

20. Sheet A-311 Wall section details. What is the spec for the prefabricated metal fascia and soffit?

SEE SPECIFICATIONS, SECTION 07-60-00 “FLASHING AND SHEET METAL”.

21. Sheet A401 Where are the descriptions of the toilet accessories to match the TA numbers?

SEE SPECIFICATIONS, SECTION 10-28-13 “TOILET ACCESSORIES”.

22. Sheet A401 Detail A1 Women’s north wall does not show all accessories i.e. grab bars, toilet roll holder, or at least the toilet partitions obscuring the view of these items as in detail E9.

MOUNTING HEIGHTS/LOCATIONS WILL BE PER A.D.A. GUIDELINES WHERE REQUIRED.

23. The temporary construction fence shown on C-001 encompasses both Admin and Operations projects. The drawings for the Admin building, should it be awarded without the OPS building, will not show a temporary construction fence.

CONCUR, THIS IS INTENTIONAL.

24. In the specifications, Division 13 34 19, paragraph 2.4.1 it describes IMWP-1 as having a “Tuffcote finish system- a hard aggregated fiber-reinforcing polymer coating” This is only offered by 1 manufacturer, and is costly compared to other similar IMPs that contain heavy textured protection. Is the intent here to have the appearance of a masonry texture on the panel? Will product equivalent in appearance (e.g. heavy embossed, stucco embossed, masonry style profile) be acceptable?

ANY AESTHETICALLY EQUIVALENT PRODUCT MEETING SPECIFICATIONS IS ACCEPTABLE,

PENDING C.O.R. APPROVAL.

25. Specifications 08 11 16, and 08 51 13 require a qualified blast engineer for testing and design calcs on the windows and doors. Will this be a requirement on this project?

THIS WILL NOT BE REQUIRED FOR THIS PROJECT

26. The specifications include Division 25-Integrated Automation. Can the government confirm that this specification section is for reference only?

DIVISION 25 IS NOT INCLUDED IN THIS PROJECTS’ SPECIFICATIONS.

27. Page S-003 calls for numerous special inspections that are required for the project. No sections were provided in the specifications for special inspectors. What will be the extent of the special inspections? Can additional specifications be provided?

CONTRACTORS SHOULD VERIFY THEY ARE LOOKING AT DRAWINGS DATED APRIL

2020 FOR THIS PROJECT.

28. Will the contractor be responsible for coordinating and obtaining estimates from the privatized utilities (American Water, Dominion) for demolition and installment of new utilities? Will it be required to be part of the bid lump sum? Will the privatized utility work be everything that is 5 LF outside of the building?

COORDINATE WITH AMERICAN WATERS AND DOMINION ENERGY. DEMOLITION OF

UTILITIES IS NOT INCLUDED IN THIS PROJECT.

29. Will whole building commissioning be required as part of this contract?

NO.

30. Are Exhibit C Division 01 Specifications supposed to replace the Division 01 specifications given in Exhibit A? Or are they in addition to?

TECHNICAL EXHIBIT C – DIVISION 01 SPECIFICATIONS REPLACES THE DIVISION 01

SPECIFICATIONS IN EXHIBIT A. TECHNICAL EXHIBIT C –DIVISION 01 TAKES PRECEDENCE

OVER TECHNICAL EXHIBIT A – SPECIFICATION, DIVISION 01.

31. Is sustainability reporting required of this project?

NO

32. In Division 07 27 10.00 10, the required submittals show Calculations being required for the air barrier system.

Will an engineer be required to provide the calcs for this submittal? Could further specifications be given on what is required for the design data and calculations? What type of products will be acceptable to achieve an air barrier system?

CALCULATIONS WILL NOT BE REQUIRED FOR AIR BARRIER SYSTEM DESIGN. SHOP

DRAWINGS SHOWING DETAILS OF VULNERABLE LOCATIONS WILL BE REQUIRED TO ENSURE

INSTALLATION ACCOUNTS FOR AIR LEEKAGE MITIGATION.

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

INSTRUCTIONS TO OFFERORS

THIS REQUIREMENT IS SUBJECT TO THE AVAILIBITY OF FUNDS

Any bids received in response to this solicitation SHALL carry a 120 day acceptance period before prices need to be verified, extended or re-negotiated.

1. Submission of Bids

a) The priced bid shall be supported by a draft progress schedule that demonstrates the offeror's understanding of the work requirements, phasing of work between buildings, and estimated time frames for ordering and installing equipment. Bidders are required to submit bid documents at the DoD Secure Access File Exchange Service website:

https://safe.apps.mil. The DoD SAFE website is an enterprise technical solution that provides the capability of secure data transfer of large files (8GB maximum). SAFE is available for use by unauthenticated users also;

however, a DoD CAC holder must initiate the exchange process. Users are identified as DoD users that authenticate to DoD SAFE using a CAC and non-DoD or non-CAC holders are referenced as Guest (Bidder). A copy of the DoD Safe User Guide will be available for your convenience.

b) If you would like to submit a bid for W91151-20-B-0013, submit an email with the subject line “Intent to bid for W91151-20-B-0013” to justin.j.mansfield.mil@mail.mil and roy.r.cantrell2.civ@mail.mil by 8 Sep 2020 at

03:00PM CDT.

c) On 10 Sep 2020, before 10:00 AM CDT, the recipient who sent an “Intent to Bid” email (as instructed in para. b) will receive an automated Request a Drop-off email with a URL, which allows for the uploading of the files. The URL also includes the request code, which also can be used to “drop-off” / upload a file. You will have 1 day to upload your “Intent to Bid” files: 11 Sep 2020, 4:30 PM CDT. LATE SUBMITTALS WILL NOT BE ACCEPTED.

(DoD SAFE will retain data for up to 7 days).

d) Bidders should include bid number W91151-20-B-0013 in their short note to the recipient on DoD SAFE. NO hard copies or CDs will be accepted.

e) The Bidder can upload up to a maximum of 25 files, (total size cannot exceed 8GB). The Bidder shall place a description of each file uploaded in the “Description of File(s)” box located on the right. It is the Bidder’s responsibility to ensure the proposal is uploaded correctly.

2. Telephonic Bid Opening

a) The Bid Opening will be held by telephone conference call on 15 Sep 2020, 10:00 AM CDT-11:30 AM CDT, bidders are to dial in at the following phone number at (978)990-5000 Access Code 304649. Bidders will announce their full name and company when prompted to do so at the beginning of the call.

b) Anyone wishing to attend the telephonic bid opening MUST notify the Contracting Officer roy.r.cantrell2.civ@mail.mil and Contract Specialist justin.j.mansfield.mil@mail.mil by email no later than 8 Sep 2020, 3:00 PM CDT with a firm commitment.

3. Pre-requisites for Specialty Trade licensure and certification:

Master Electrician Master Plumber Texas Refrigeration License (HVAC) License Fire Suppression

In responding to this solicitation for bids, the bidder shall provide copies of certifications/training identified above and below as a part of the bid. Failure to provide this documentation will render the bid non- responsive and no further consideration will be given to that bidder for award of this contract. No substitution of the individual possessing the required pre-qualifications will be authorized without the written approval of the Contracting Officer, and no time will be allowed for the contractor to acquire the required training/certification after the contract is awarded.

4. Work Experience:

The prime contractor shall demonstrate that it possesses general construction contract management by providing at least three examples of relevant work experience in an awarded contract similar to the requirements stated in this solicitation. Failure to provide this documentation will render bid/offer non-responsive and no further consideration will be given to that bidder for award of the contract. Documentation shall be submitted with the W9115120B0013 bid and include the contract number, the date of contract award, the customer's name and contact information, the awarded dollar value, the value of the contract at completion, a description of all work elements included in thecontract, the number and type of specialty trades needed to complete the contract, the period of time allocated for completion of the work and actual time required to complete the work (include reasons for time extensions).

Federalwork experience is preferred; however, the Government will accept work experience from both State and institutional and commercial contracts as well. No residential work experience will be considered appropriate for this purpose. Failure to provide this documentation will render the bid/offer non-responsive and no further consideration will be given to that bidder for award of this contract.

5. Pre-Bid and Pre-Construction Conferences

The Contracting Officer shall conduct a pre-bid/pre-proposal conference in conjunction with the site visit.

Information on the scheduled Site Visit is located in FAR 52.236-3 SITE VISIT (CONSTRUCTION) (FEB1995) of this solicitation. The Contractor shall attend a Government coordinated preconstruction conference within 10 calendar days of contract award. As a minimum, the conference shall be attended by the contractor’s appointed project manager, the superintendent, the QCM, and administrative personnel responsible for preparation of contract documents, certified payroll records and invoices. The contractor shall deliver letter appointments of its key personnel that include each individual’s duties, roles and responsibilities.

6. Subcontractor List

Offerors shall submit a list of proposed subcontractors as an attachment to their bid. If offeror does not intend on utilizing subcontractors (self-perform), offeror shall state so in their bid. Failure to provide this listing or statement will deed the offeror nonresponsive and eliminate the offer from further consideration for award.

(End of special requirements)

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

Amendment 01 – Responses to questions from industry.

(End of Provision)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .