Amendment_1_Response to RFIs_W91151-20-B-0005_FTHX_15JUL20.pdf
PDF 386 KB Posted
- Solicitation number
- W91151-20-B-0005
About this file
This document is an amendment to a solicitation providing responses to industry questions, additional attachments, and modifications to the solicitation terms. The solicitation is for corrective drainage work at the Shorthorn Airstrip on North Fort Hood in Texas. Additional attachments provided include a geo-technical report, construction quality management certifications memo, and site visit roster. Responses were given to industry questions regarding dumpsite locations, utility details, engineer's quantities, construction quality management training requirements, and use of temporary fuel tanks onsite. The solicitation number is W91151-20-B-0005 and is issued by the Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood for corrective drainage failures at the Shorthorn Airstrip.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011469566 AD015773P
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
A. This amendment is issued to provide Responses to Industry.
B. This amendment is issued to provide a Geo Technical Report.
C. This amendment is issued to provide the Construction Quality Managment Memorandum.
D. This amendment is issued to provide the sign-in roster from the site visit.
E. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Jul-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9115120B0005
X 9B. DATED (SEE ITEM 11)
21-May-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Jul-2020
CODE
MICC - FORT HOOD
36000 DARNALL LOOP, ROOM 1300B
FORT HOOD TX 76544-5025
W91151 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9115120B0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The Issued By organization has changed from
MICC - FORT HOOD
36000 DARNALL LOOP, RM 1300B
FORT HOOD TX 76544
to
MICC - FORT HOOD-
36000 DARNALL LOOP, RM 1300B
FORT HOOD TX 76544
TABLE OF CONTENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Exhibit A Tech Exhibit A - CoE
Specifications
230 14-FEB-2020
Exhibit B Tech Exhibit B - Drawings
39 14-FEB-2020
Exhibit C Tech Exhibit C - DPW Division 01 Specifications
113 27-APR-2019
Attachment 1 Appendix A 120 16-APR-2020 Attachment 2 DOD Secure Access File
Exchange
27 04-SEP-2019
to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Exhibit A Tech Exhibit A - CoE
Specifications
230 14-FEB-2020
Exhibit B Tech Exhibit B - Drawings
39 14-FEB-2020
Exhibit C Tech Exhibit C - DPW Division 01 Specifications
113 27-APR-2019
Attachment 1 Appendix A 120 16-APR-2020 Attachment 2 DOD Secure Access File
Exchange
27 04-SEP-2019
Attachment 3 Geo Technical Report 11 18-NOV-2019 Attachment 4 CQM Certifications
Memo
1 27-APR-2020
Attachment 5 Agenda/ Site Visit Roster 4 30-JUN-2020
The following have been added by full text:
RESPONSE TO INDUSTRY QUESTIONS
Request for Information (RFI) Consolidated List
W91151-20-B-0005 Shorthorn Airstrip/AAF
1. Q. Is there a dumpsite on post? Or shall we prepare our estimate to include hauling all spoils to an approved dumpsite off post?
A. All trash will have to be hauled off away from site.
2. Q. Sheet C-501 indicates utility lowering details. I am unable to locate any of these lines on the Shorthorn plans. Can you confirm that these are typical details that may not exist on this project?
A. The contractor will not be responsible for any of the work regarding utilities on site. It is however the responsibility of the contractor to reach out the appropriate company to discuss work on site. As stated on the Ft. Hood Privatized Utility Policy Ref. Attachment 1- Appendix A
3. Q. Is it possible to share the Engineer's quantities with us?
A. Unfortunately, the Government will not be sharing this information.
4. Q. I have personally attended the USACE QA/QC class, but it is not current and needs to be updated. It is indicated that the refresher courses are not available on line at this time. Additionally, there are no classes scheduled due to Covid-19 until way after the bid date. Will there be any relief offered with this requirement?
A. Please see attached Temporary extension of CQM .
5. Q. Can you provide a geotechnical report?
A. Please See attached Geo Tech Report.
6. Q. Technical Exhibit A, Scenario #5 lists “15/12 under the column for male CRP, however the Scenario and additional instructions section lists 5 male CRPs. Please clarify which is correct.
A. Please send an attachment of what it is the contractor is looking at. I am unable to locate a similar document with these references in the Solicitation Packet.
7. Q. Will the Government allow the use of EPA approved temporary fuel tanks onsite?
A. Ensure that the fuel tank has the proper self-containment properties, such as a ground cover in the event of a spill, the fuel will not penetrate the ground.
8. Q. Can you make available a copy of the pre-bid attendance sign in sheet?
A. Please reach out to Jeaneen Monroe, Contract Specialist, for a copy of the sign in roster.
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been modified:
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
Amendment 01 – Responses to questions from industry, geo-tech report, and Key Personnel Requirements/Qualifications.
(End of Provision)
(End of Summary of Changes)