0011342446 CA901128P
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is issued to:
a. Provide the Government's response to questions received from industry.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Jul-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9115119B0019
X 9B. DATED (SEE ITEM 11)
26-Jun-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Jul-2019
CODE
MISSION AND INSTALLATION CONTRACTING
MISSION CONTRACTING OFFICE (MCO)
36000 DARNALL LOOP, ROOM 1300B
FORT HOOD TX 76544-5095
W91151 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9115119B0019
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
TABLE OF CONTENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Exhibit A Tech Exhibit - A
Specification
3313 23-APR-2019
Exhibit B Tech Exhibit - B Drawings
9 22-OCT-2018
Attachment 1 Appendix A 139 01-JUL-2018 to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Exhibit A Tech Exhibit A -
Specification
3313 23-APR-2019
Exhibit B Tech Exhibit B - Drawings
9 22-OCT-2018
Attachment 1 Appendix A 139 01-JUL-2018
The following have been added by full text:
RESPONSE TO INDUSTRY QUESTIONS
Responses to Questions from Industries W91151-19-B-0019
REPLACE ROOF PACKAGE UNITS Building 5764 on Fort Hood, TX, DPW Project CA901128P
Please see below Contractor Question(s) in response to Site Visit conducted on 03 July 2019 at 10:00 am
1. Will the bond for this project be claimable after contract award? Or will the bond have to be dispersed throughout the contract’s project schedule and claimed in increments?
Answer: IAW FAR 52.232-5(g) Reimbursement for bond premiums. In making these progress payments, the Government shall, upon request, reimburse the Contractor for the amount of premiums paid for performance and payment bonds (including coinsurance and reinsurance agreements, when applicable) after the Contractor has furnished evidence of full payment to the surety. The retainage provisions in paragraph (e) of this clause shall not apply to that portion of progress payments attributable to bond premiums.
2. Are there latrines available for use on this project? Or will the contractor be responsible for supplying portable latrines to the on-site workers?
Answer: CONTRACTOR WILL BE RESPONSIBLE FOR PORTABLE TOILETS.
3. Will the government confirm that TAB will be require for this project? Will grill to grill TAB be required for the new AHUs?
Answer: CONTRACTOR SHALL REPORT AIR FLOW READINGS ONLY.
4. Will commissioning be required for this project?
Answer: YES, ALL NEW EQUIPMENT SHALL BE COMMISSIONED.
5. Will any duct or grille cleaning be required as part of this project?
Answer: NO.
6. Will the government confirm that all replacement AHUs sit on existing supports and no additional curbs or curb adapters are required? ME101A, note 2 calls for the contractor to thoroughly seal all roof curb/duct and wall penetrations. M-601, note 5, states contractor shall be responsible for modifying the steel platforms for installation of new units.
Answer: THE CONTRACTOR WILL MODIFY THE CURBS AS NECESSARY IN ORDER TO PLACE THE
EQUIPMENT THAT THE CONTRACOR WILL BE SUPPLYING. THE GOVERNMENT CAN’T CONFIRM
THAT THE EXISTING SUPPORTS WILL BE SUFFICIENT TO SUPPORT THE CONTRACTOR
SUPPLIED/MANUFACTURER RECOMMENDED SUPPORTS. CURB ADAPTERS SHALL BE INSTALLED
AS NECESSARY.
7. Are stainless steel coil casings for chilled water coils required along with stainless steel drain pans?
Answer: YES.
8. Page M-601 Cooling capacities: Are these calculated or based on a particular equipment manufacturer’s selection or load program?
Answer: THE COOLING CAPACITIES LISTED ARE THE NOMINAL COOLING CAPACITIES THE
CONTRACTOR SHALL BE EXPECTED TO INSTALL REGUARDLESS OF THE METHOD USED.
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been modified:
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
Amendment 01 is issued to provide the Government's response to questions received from industry.
(End of Provision)