TECH_EXHIBIT_B_-_AD009747P_-_CONVERT_HPS_TO_HW_-_BLDG_36000_(1).pdf
PDF 33 MB Posted
- Attached to
- Remove and Replace Boilers in BLDG 36000
- Solicitation number
- W91151-19-B-0009
About this file
Technical Exhibit B Drawings
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G
F
E
D
C
B
A
US Army Corps of Engineers ®
FORT WORTH DISTRICT
36000 DARNALL LOOP,
FT. HOOD, TX 76544
RENOVATE 836000,
CONVERT HPS TO HW
836000
A/E PROJECT#: 218029
PROJECT TEAM
OWNER:
US ARMY CORPS OF ENGINEERS
FORT WORTH DISTRICT
819 TAYLOR STREET - RM 4A 17
FORT WORTH, TEXAS 7 6102
ARCHITECTURE
SEVEN GENERATIONS A+E
600 E. MICHIGAN AVENUE - SUITE B
KALAMAZOO, MICHIGAN 49007
PH: 269-927-0144
FX: 269-593-5933
MEP ENGINEERING
CSG, INC.
5202 COUNTY RD 7350 - SUITE A
LUBBOCK, TX 79424
PH: 806-748-0040
PROJECT# AD009747P
CONTRACT # W91151-19-C-XXXX
TECHNICAL EXHIBIT "B"
FOR BIDDING PURPOSES ONLY.
4 5 6
DRAWING SHEET INDEX
SHEET
G-001
G-002
ADl00
ADl00A
ADl00B
ADl00C
ADl00D
ADl00E
ADl0l
ADl0lA
ADl 01 B
ADl0lC
AD102
AD102A
AD102B
AD102C
AD103
AD103A
AD103B
AD104
AD105
AD106
A-120
A-l20A
A-l20B
A-l20C
A-l20D
A-l20E
A-121
A-l21A
A-121 B
A-121 C
A-122
A-l22A
A-l22B
A-l22C
A-123
A-l23A
A-l23B
A-124
A-125
A-126
F-100
F-101
F-102
F-103
F-104
F-105
M-000
MDl00
MDl0l
MD102
MD103
MD104
MD105
MD106
MD107
MD200
DESCRIPTION
TITLE
GENERAL INFORMATION & SYMBOL SHEET
COMPOSITE GROUND FLOOR DEMOLITION PLAN
GROUND FLOOR DEMOLITION PLAN - UNIT A
GROUND FLOOR DEMOLITION PLAN - UNIT B
GROUND FLOOR DEMOLITION PLAN - UNIT C
GROUND FLOOR DEMOLITION PLAN - UNIT D
GROUND FLOOR DEMOLITION PLAN - UNIT E
COMPOSITE FIRST FLOOR DEMOLITION PLAN
FIRST FLOOR DEMOLITION PLAN - UNIT A
FIRST FLOOR DEMOLITION PLAN - UNIT B
FIRST FLOOR DEMOLITION PLAN - UNIT C
COMPOSITE SECOND FLOOR DEMOLITION PLAN
SECOND FLOOR DEMOLITION PLAN - UNIT A
SECOND FLOOR DEMOLITION PLAN - UNIT B
SECOND FLOOR DEMOLITION PLAN - UNIT C
COMPOSITE THIRD FLOOR DEMOLITION PLAN
THIRD FLOOR DEMOLITION PLAN - UNIT A
THIRD FLOOR DEMOLITION PLAN - UNIT B
FOURTH FLOOR DEMOLITION PLAN
FIFTH FLOOR DEMOLITION PLAN
PENTHOUSE DEMOLITION PLAN
COMPOSITE GROUND FLOOR REFLECTED CEILING PLAN
GROUND FLOOR REFLECTED CEILING PLAN - UNIT A
GROUND FLOOR REFLECTED CEILING PLAN - UNIT B
GROUND FLOOR REFLECTED CEILING PLAN - UNIT C
GROUND FLOOR REFLECTED CEILING PLAN - UNIT D
GROUND FLOOR REFLECTED CEILING PLAN - UNIT E
COMPOSITE FIRST FLOOR REFLECTED CEILING PLAN
FIRST FLOOR REFLECTED CEILING PLAN - UNIT A
FIRST FLOOR REFLECTED CEILING PLAN - UNIT B
FIRST FLOOR REFLECTED CEILING PLAN - UNIT C
COMPOSITE SECOND FLOOR REFLECTED CEILING PLAN
SECOND FLOOR REFLECTED CEILING PLAN - UNIT A
SECOND FLOOR REFLECTED CEILING PLAN - UNIT B
SECOND FLOOR REFLECTED CEILING PLAN - UNIT C
COMPOSITE THIRD FLOOR REFLECTED CEILING PLAN
THIRD FLOOR REFLECTED CEILING PLAN - UNIT A
THIRD FLOOR REFLECTED CEILING PLAN - UNIT B
FOURTH FLOOR REFLECTED CEILING PLAN
FIFTH FLOOR REFLECTED CEILING PLAN
PENTHOUSE REFLECTED CEILING PLAN
FIRE PROTECTION - GROUND FLOOR
FIRE PROTECTION - FIRST FLOOR
FIRE PROTECTION - SECOND FLOOR
FIRE PROTECTION - THIRD FLOOR
FIRE PROTECTION - FOURTH FLOOR
FIRE PROTECTION - FIFTH FLOOR
MECHANICAL LEGENDS
MECHANICAL DEMOLITION PLAN - CRAWL SPACE
MECHANICAL DEMOLITION PLAN - GROUND FLOOR
MECHANICAL DEMOLITION PLAN - FIRST FLOOR
MECHANICAL DEMOLITION PLAN - SECOND FLOOR
MECHANICAL DEMOLITION PLAN - THIRD FLOOR
MECHANICAL DEMOLITION PLAN - FOURTH FLOOR
MECHANICAL DEMOLITION PLAN - FIFTH FLOOR
MECHANICAL DEMOLITION PLAN - PENTHOUSE
MECHANICAL DEMOLITION PLAN - ENLARGED
BOILER ROOM
ISSUE DATE
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
SHEET
M-100
M-101
M-102
M-103
M-104
M-105
M-106
M-107
M-200
M-201
M-202
M-203
M-204
M-500
M-600
MC400
MC40l
MC600
E-001
ED400
E-100
E-l 01
E-102
E-103
E-104
E-105
E-400
8 9
DESCRIPTION
MECHANICAL - CRAWL SPACE
MECHANICAL - GROUND FLOOR
MECHANICAL - FIRST FLOOR
MECHANICAL - SECOND FLOOR
MECHANICAL - THIRD FLOOR
MECHANICAL - FOURTH FLOOR
MECHANICAL - FIFTH FLOOR
MECHANICAL - PENTHOUSE
MECHANICAL - ENLARGED BOILER ROOM
MECHANICAL - ENLARGED MECHANICAL ROOMS
MECHANICAL - ENLARGED MECHANICAL ROOMS
MECHANICAL - ENLARGED MECHANICAL ROOMS
MECHANICAL - ENLARGED MECHANICAL ROOMS
MECHANICAL DETAILS
MECHANICAL SCHEDULES
MECHANICAL CONTROLS DIAGRAMS
MECHANICAL CONTROLS DIAGRAMS
MECHANICAL CONTROLS SCHEDULES
ELECTRICAL SYMBOL LEGEND
ISSUE DATE
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
ENLARGED MECHANICAL ROOM DEMOLITION PLAN
ELECTRICAL - GROUND FLOOR
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
15 MARCH 2019
ELECTRICAL - FIRST FLOOR
ELECTRICAL - SECOND FLOOR
ELECTRICAL - THIRD FLOOR
ELECTRICAL - FOURTH FLOOR
ELECTRICAL - FIFTH FLOOR
ELECTRICAL - ENLARGED BOILER ROOM PLAN
LOCATION MAP
Tanko ,.
estroyer Blvd
Tank Destroyer Blvd
15 MARCH 2019
Tanko esrroye, Blvd
_____.._ PROJECT
LOCATION
y In " 'l'°'I
Mission Training ft Complex T
,re I al On T
Carl R. Darnall Army Medical Center
ASAPQ
t-.,4edk:al c.nttr Road
FORT HOOD, TEXAS
Marvin Leath r.ti Visitor Center Y
NORTH
I
US Army Corps of Engineers ® w
C w
C m �ra ·:□
.. 0 z'1' 09 04 zo W<N f- ,-!. w<I -., ...J �"7 (.) -
�ci0 a! f-(!) �c!i -"' f-� f-Z W<( �"' � ::E _,_ z- <I.IW U)
"' om 0"' 0:: ...J w_ UJ:i: (.) :i: u::: u:::
w...J f-
0z o_ � >' (.)o wo ID 0 UJ (!) >' 0 0 w ----ID w � !::z z (.) �� 18 w c.. �� w (!) I:,; � (!) o,-.. OUJ (.) w U),-..
U)
0:: ...
w ::i:
WI- -.:t- N � u � � (!) ci: 0:: "' z I- I I"--w !11>- ><
ID
wW + t::: t-,..<�o
U)UJ 0
z, "'
_w_ u..i ci5 �z
UJ<(
LL t:l W I-0 w -Io:: I Clll- t-- 1-f- ;,: ::E �zow <(0 c.. 0:: UJ 0::
ifjQ � 0:: 0 o:: 0
8 :i:o s= (!) I ::E >- I- _J t-- z�< ::E 0:: � a'. w :;; ...J a'. 0 f-0 > -�
LL.
o:i u.. ww
UJ 0
U)
- 0
� CX) "'
SHEET ID
B36000
G-001
100% SUBMISSION
A
B
C
D
E
F
H
J
G
2 3 4 5 6
7 8 9 10 12 15 18 20 22 24 26 28 30 32 33 34 35 36 37 38 39
L
N
Q
S
U
K
M
P
R
T
V
X
AA
EE
JJ
NN
3129272523
RR
MM
WW
DD
24 " ( 61 CM )
24 "
24 "
B
L I CEN DES
61431P R
O
FESS ION AL ENGIN
EE
R
STATE OF TEXAS
DAVID J. BRANSON
160 64
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
FO
R T
W O
R
TH
D
IS
TR
IC
T
TA
YL
O
R S
TR
EE
T -R
M
A1
FO
R
T W
O R
TH
, T
X
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
SE
C
O N
D T
IT
LE
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N U
M
BE
R
Compliance Services Group, Inc.
Texas Registered Engineering Firm F-1070
Engineers - Architects - Scientists
D
AR
N
AL
L
LO
O
P
FO
R T
H O
O D
, T X
R
EN
O
VA
TE
B
0, C O
N
VE
RT
HI
G H
PR
ES
SU
RE
S
TE
AM
(H
PS
)T
O H
O T
W
AT
ER
(H
W
SE
VE
N G
EN
ER
AT
IO
N S
A+ E
E.
M
IC
H
IG
AN
A
VE
SU
IT
E
B
KA
LA
M
AZ
O
O , M
I 4
W
2G -1
8- F-
W
2G -1
7- D
-0
B3
A-
C
PF
B36000
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
F-100
FI
R
E
PR
O
TE
C
TI
O N
G
R O
U N
D F
LO
O
R
C
SG
D C
B
D
JB
M
AR
C
H
100% SUBMISSION
GENERAL NOTES:
A. HATCHING INDICATES AREAS WHERE CEILINGS ARE TO BE
TEMPORARILY REMOVED FOR INSTALLATION OF PIPING AND THEN
REPLACED. CONTRACTOR TO TEMPORARILY REMOVE SPRINKLER
ESCUTCHEONS AND FIRE ALARM DEVICES IN THESE AREAS AND
RE-INSTALL AT COMPLETION OF WORK. RE-CERTIFY THESE FIRE
ALARM DEVICES AFTER RE-INSTALLATION.
NORTH
1/32" = 1'-0"
GROUND FLOOR - FIRE PROTECTION
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DNUP
A
B
C
D
E
F
H
J
G
2 3 4 5 6
7 8 9 10 12 15 18 20 22 24 26 28 30 32 33 34 35 36 37 38 39
L
N
Q
S
U
K
M
P
R
T
V
X
AA
EE
JJ
NN
312927
MM
WW
DD
RR
191716
O
S
U
W
Y
BB
VV
UU
TT
SS
L I CEN DES
61431P R
O
FESS ION AL ENGIN
EE
R
STATE OF TEXAS
DAVID J. BRANSON
160 64
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
FO
R T
W O
R
TH
D
IS
TR
IC
T
TA
YL
O
R S
TR
EE
T -R
M
A1
FO
R
T W
O R
TH
, T
X
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
SE
C
O N
D T
IT
LE
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N U
M
BE
R
Compliance Services Group, Inc.
Texas Registered Engineering Firm F-1070
Engineers - Architects - Scientists
D
AR
N
AL
L
LO
O
P
FO
R T
H O
O D
, T X
R
EN
O
VA
TE
B
0, C O
N
VE
RT
HI
G H
PR
ES
SU
RE
S
TE
AM
(H
PS
)T
O H
O T
W
AT
ER
(H
W
SE
VE
N G
EN
ER
AT
IO
N S
A+ E
E.
M
IC
H
IG
AN
A
VE
SU
IT
E
B
KA
LA
M
AZ
O
O , M
I 4
W
2G -1
8- F-
W
2G -1
7- D
-0
B3
A-
C
PF
B36000
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
F-101
FI
R
E
PR
O
TE
C
TI
O N
FI
R
ST
FL
O
O R
C
SG
D C
B
D
JB
M
AR
C
H
100% SUBMISSION
GENERAL NOTES:
A. HATCHING INDICATES AREAS WHERE CEILINGS ARE TO BE
TEMPORARILY REMOVED FOR INSTALLATION OF PIPING AND THEN
REPLACED. CONTRACTOR TO TEMPORARILY REMOVE SPRINKLER
ESCUTCHEONS AND FIRE ALARM DEVICES IN THESE AREAS AND
RE-INSTALL AT COMPLETION OF WORK. RE-CERTIFY THESE FIRE
ALARM DEVICES AFTER RE-INSTALLATION.
NORTH
1/32" = 1'-0"
FIRST FLOOR - FIRE PROTECTION
M
AR
K D
ES
C
R
IP
TI
O
N D
L I CEN DES
61431P R
O
FESS ION AL ENGIN
EE
R
STATE OF TEXAS
DAVID J. BRANSON
160 64
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
FO
R T
W O
R
TH
D
IS
TR
IC
T
TA
YL
O
R S
TR
EE
T -R
M
A1
FO
R
T W
O R
TH
, T
X
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
SE
C
O N
D T
IT
LE
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N U
M
BE
R
Compliance Services Group, Inc.
Texas Registered Engineering Firm F-1070
Engineers - Architects - Scientists
D
AR
N
AL
L
LO
O
P
FO
R T
H O
O D
, T X
R
EN
O
VA
TE
B
0, C O
N
VE
RT
HI
G H
PR
ES
SU
RE
S
TE
AM
(H
PS
)T
O H
O T
W
AT
ER
(H
W
SE
VE
N G
EN
ER
AT
IO
N S
A+ E
E.
M
IC
H
IG
AN
A
VE
SU
IT
E
B
KA
LA
M
AZ
O
O , M
I 4
W
2G -1
8- F-
W
2G -1
7- D
-0
B3
A-
C
PF
B36000
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
F-102
FI
R
E
PR
O
TE
C
TI
O N
SE
C O
N D
F
LO
O R
C
SG
D C
B
D
JB
M
AR
C
H
100% SUBMISSION
NORTH
1/32" = 1'-0"
SECOND FLOOR - FIRE PROTECTION
GENERAL NOTES:
A. HATCHING INDICATES AREAS WHERE CEILINGS ARE TO BE
TEMPORARILY REMOVED FOR INSTALLATION OF PIPING AND THEN
REPLACED. CONTRACTOR TO TEMPORARILY REMOVE SPRINKLER
ESCUTCHEONS AND FIRE ALARM DEVICES IN THESE AREAS AND
RE-INSTALL AT COMPLETION OF WORK. RE-CERTIFY THESE FIRE
ALARM DEVICES AFTER RE-INSTALLATION.
M
AR
K D
ES
C
R
IP
TI
O
N D
R
O
FESS ION AL ENGIN
EE
R
STATE OF TEXAS
DAVID J. BRANSON
160 64
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
FO
R T
W O
R
TH
D
IS
TR
IC
T
TA
YL
O
R S
TR
EE
T -R
M
A1
FO
R
T W
O R
TH
, T
X
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
SE
C
O N
D T
IT
LE
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N U
M
BE
R
Compliance Services Group, Inc.
Texas Registered Engineering Firm F-1070
Engineers - Architects - Scientists
D
AR
N
AL
L
LO
O
P
FO
R T
H O
O D
, T X
R
EN
O
VA
TE
B
0, C O
N
VE
RT
HI
G H
PR
ES
SU
RE
S
TE
AM
(H
PS
)T
O H
O T
W
AT
ER
(H
W
SE
VE
N G
EN
ER
AT
IO
N S
A+ E
E.
M
IC
H
IG
AN
A
VE
SU
IT
E
B
KA
LA
M
AZ
O
O , M
I 4
W
2G -1
8- F-
W
2G -1
7- D
-0
B3
A-
C
PF
B36000
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
F-103
FI
R
E
PR
O
TE
C
TI
O N
TH
IR
D
FL
O
O R
C
SG
D C
B
D
JB
M
AR
C
H
100% SUBMISSION
NORTH
1/32" = 1'-0"
THIRD FLOOR - FIRE PROTECTION
GENERAL NOTES:
A. HATCHING INDICATES AREAS WHERE CEILINGS ARE TO BE
TEMPORARILY REMOVED FOR INSTALLATION OF PIPING AND THEN
REPLACED. CONTRACTOR TO TEMPORARILY REMOVE SPRINKLER
ESCUTCHEONS AND FIRE ALARM DEVICES IN THESE AREAS AND
RE-INSTALL AT COMPLETION OF WORK. RE-CERTIFY THESE FIRE
ALARM DEVICES AFTER RE-INSTALLATION.
M
AR
K D
ES
C
R
IP
TI
O
N D
R
O
FESS ION AL ENGIN
EE
R
STATE OF TEXAS
DAVID J. BRANSON
160 64
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
FO
R T
W O
R
TH
D
IS
TR
IC
T
TA
YL
O
R S
TR
EE
T -R
M
A1
FO
R
T W
O R
TH
, T
X
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
SE
C
O N
D T
IT
LE
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N U
M
BE
R
Compliance Services Group, Inc.
Texas Registered Engineering Firm F-1070
Engineers - Architects - Scientists
D
AR
N
AL
L
LO
O
P
FO
R T
H O
O D
, T X
R
EN
O
VA
TE
B
0, C O
N
VE
RT
HI
G H
PR
ES
SU
RE
S
TE
AM
(H
PS
)T
O H
O T
W
AT
ER
(H
W
SE
VE
N G
EN
ER
AT
IO
N S
A+ E
E.
M
IC
H
IG
AN
A
VE
SU
IT
E
B
KA
LA
M
AZ
O
O , M
I 4
W
2G -1
8- F-
W
2G -1
7- D
-0
B3
A-
C
PF
B36000
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
F-104
FI
R
E
PR
O
TE
C
TI
O N
FO
U R
TH
F
LO
O
R
C
SG
D C
B
D
JB
M
AR
C
H
100% SUBMISSION
NORTH
1/32" = 1'-0"
FOURTH FLOOR - FIRE PROTECTION
GENERAL NOTES:
A. HATCHING INDICATES AREAS WHERE CEILINGS ARE TO BE
TEMPORARILY REMOVED FOR INSTALLATION OF PIPING AND THEN
REPLACED. CONTRACTOR TO TEMPORARILY REMOVE SPRINKLER
ESCUTCHEONS AND FIRE ALARM DEVICES IN THESE AREAS AND
RE-INSTALL AT COMPLETION OF WORK. RE-CERTIFY THESE FIRE
ALARM DEVICES AFTER RE-INSTALLATION.
M
AR
K D
ES
C
R
IP
TI
O
N D
R
O
FESS ION AL ENGIN
EE
R
STATE OF TEXAS
DAVID J. BRANSON
160 64
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
FO
R T
W O
R
TH
D
IS
TR
IC
T
TA
YL
O
R S
TR
EE
T -R
M
A1
FO
R
T W
O R
TH
, T
X
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
SE
C
O N
D T
IT
LE
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N U
M
BE
R
Compliance Services Group, Inc.
Texas Registered Engineering Firm F-1070
Engineers - Architects - Scientists
D
AR
N
AL
L
LO
O
P
FO
R T
H O
O D
, T X
R
EN
O
VA
TE
B
0, C O
N
VE
RT
HI
G H
PR
ES
SU
RE
S
TE
AM
(H
PS
)T
O H
O T
W
AT
ER
(H
W
SE
VE
N G
EN
ER
AT
IO
N S
A+ E
E.
M
IC
H
IG
AN
A
VE
SU
IT
E
B
KA
LA
M
AZ
O
O , M
I 4
W
2G -1
8- F-
W
2G -1
7- D
-0
B3
A-
C
PF
B36000
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
F-105
FI
R
E
PR
O
TE
C
TI
O N
FI
FT
H
FL
O
O R
C
SG
D C
B
D
JB
M
AR
C
H
100% SUBMISSION
NORTH
1/32" = 1'-0"
FIFTH FLOOR - FIRE PROTECTION
M
AR
K D
ES
C
R
IP
TI
O
N D
R
O
FESS ION AL ENGIN
EE
R
STATE OF TEXAS
DAVID J. BRANSON
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
FO
R T
W O
R
TH
D
IS
TR
IC
T
TA
YL
O
R S
TR
EE
T -R
M
A1
FO
R
T W
O R
TH
, T
X
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
SE
C
O N
D T
IT
LE
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N U
M
BE
R
Compliance Services Group, Inc.
Texas Registered Engineering Firm F-1070
Engineers - Architects - Scientists
D
AR
N
AL
L
LO
O
P
FO
R T
H O
O D
, T X
R
EN
O
VA
TE
B
0, C O
N
VE
RT
HI
G H
PR
ES
SU
RE
S
TE
AM
(H
PS
)T
O H
O T
W
AT
ER
(H
W
SE
VE
N G
EN
ER
AT
IO
N S
A+ E
E.
M
IC
H
IG
AN
A
VE
SU
IT
E
B
KA
LA
M
AZ
O
O , M
I 4
W
2G -1
8- F-
W
2G -1
7- D
-0
B3
A-
C
PF
B36000
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
M-000
M
EC
H
AN
IC
AL
L
EG
EN
D
S
C
SG
G
EC
D
JB
M
AR
C
H
100% SUBMISSION
MARK SYSTEM TYPE
HWS HEATING WATER SUPPLY
HWR HEATING WATER RETURN
CWS COOLING WATER SUPPLY
CWR COOLING WATER RETURN
GCR GRAVITY CONDENSATE RETURN
PCR PUMPED CONDENSATE RETURN
CR-### CONDENSATE RETURN AT INDICATED PRESSURE
S-### STEAM AT INDICATED PRESSURE
SYMBOL MEANING
PIPING TURNING DOWN
PIPING TURNING UP
PIPING TRANSITION
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
BUTTERFLY VALVE
AHU-GD3
AHU-GD2
AHU-GD1
CRU-GE1
S-
4" ø
PCR
1 1/4"ø
G C
R 4" ø
G C
R 1" ø
GCR
1"ø
S-
1/
4" ø
S-
1/
2" ø
GCR
1 1/4"ø
S-
1/
2" ø
GCR
1"ø
GCR
1"ø
G C
R 3" ø
GCR
1 1/4"ø
GCR
3"ø
G C
R
1/ 2" ø
GCR
3/4"ø
G C
R
1/ 2" ø
GCR
4"ø
GCR
4"ø
G C
R 2" ø
S-
3" ø
S-
3/ 4" ø
S-
3/ 4" ø
GCR
4"ø
S-35 6"ø
S-35 6"ø
G C
R 3" ø
GCR
3/4"ø
PC
R
1/
4" ø
C R
-6
3" ø
GCR
2 1/2"ø
CR-60
1 1/4"ø
CR-60
3"ø
C R
-6
1/
4" ø
CR-60
4"ø
CR-60
1 1/4"ø
C R
-6
1/
4" ø
PCR
3"ø
PCR
3"ø
PC
R
3" ø
PCR
3"ø
CR-100
3/4"ø
C R
-1
3/ 4" ø
CR-100
3/4"ø CR-100
3/4"ø
PC
R
1/
4" ø
GCR
1 1/2"ø
GCR
3/4"ø
GCR
1"ø
GCR
3"ø
GCR
1 1/4"ø
S-35 3"ø
7 8
L I CEN DES
61431P R
O
FESS ION AL ENGIN
EE
R
STATE OF TEXAS
DAVID J. BRANSON
160 64
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
FO
R T
W O
R
TH
D
IS
TR
IC
T
TA
YL
O
R S
TR
EE
T -R
M
A1
FO
R
T W
O R
TH
, T
X
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
SE
C
O N
D T
IT
LE
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N U
M
BE
R
Compliance Services Group, Inc.
Texas Registered Engineering Firm F-1070
Engineers - Architects - Scientists
D
AR
N
AL
L
LO
O
P
FO
R T
H O
O D
, T X
R
EN
O
VA
TE
B
0, C O
N
VE
RT
HI
G H
PR
ES
SU
RE
S
TE
AM
(H
PS
)T
O H
O T
W
AT
ER
(H
W
SE
VE
N G
EN
ER
AT
IO
N S
A+ E
E.
M
IC
H
IG
AN
A
VE
SU
IT
E
B
KA
LA
M
AZ
O
O , M
I 4
W
2G -1
8- F-
W
2G -1
7- D
-0
B3
A-
C
PF
B36000
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
MD100
M
EC
H
AN
IC
AL
D
EM
O
LI
TI
O
N
PL
AN
C R
AW
L
SP
AC
E
C
SG
G
EC
D
JB
M
AR
C
H
100% SUBMISSION
NORTH
1/32" = 1'-0"
CRAWL SPACE - MECHANICAL DEMOLITION
NOTES INDICATED BY " "
1 1" GCR PIPING UP TO AHU-GC1 TO BE ABANDONED IN PLACE.
2 1-1/4" GCR PIPING UP TO AHU-GC2 TO BE ABANDONED IN PLACE.
3 3/4" S-35 AND GCR PIPING UP TO KETTLE (600#/HR) TO BE ABANDONED
IN PLACE.
4 3/4" S-35 AND GCR PIPING UP TO BOOSTER HTR. (1035#/HR) TO BE
ABANDONED IN PLACE.
5 3/4" S-35 PIPING UP TO POT WASHER (345#/HR) TO BE ABANDONED IN
PLACE.
6 3/4" S-35 AND GCR PIPING UP TO KETTLE (690#/HR). FOUR PAIRS. TO
BE ABANDONED IN PLACE.
7 1-1/4" S-35 PIPING UP TO SANITIZER (1725#/HR NO RETURN) TO BE
ABANDONED IN PLACE.
8 1-1/4" S-35 PIPING UP TO DISHWASHER (1725#/HR) TO BE ABANDONED
IN PLACE.
9 3/4" GCR PIPING FROM DISHWASHER TO BE ABANDONED IN PLACE.
10 1-1/2" S-35 PIPING UP TO DISHWASHER DRYER (1700#/HR) TO BE
ABANDONED IN PLACE.
11 1-1/4" GCR PIPING UP TO "CART WASH" TO BE ABANDONED IN PLACE.
18 ALL STEAM AND CONDENSATE RETURN PIPES CONNECTED TO
CONVERTERS AND OTHER EQUIPMENT IN M6 TO BE REMOVED BACK
TO WALL AND ABANDONED IN PLACE.
13 1" GCR PIPING DOWN FROM AHU-GE2 TO BE ABANDONED IN PLACE.
14 1" GCR PIPING DOWN FROM AHU-GE1 TO BE ABANDONED IN PLACE.
15 3/4" GCR PIPING DOWN FROM ROOM GE-1 TO BE ABANDONED IN PLACE.
16 CONDENSATE RETURN UNIT HAS A 30" X 48" ACCESS DOOR IN SLAB
ABOVE UNIT INTO ROOM GE-1 TO REMAIN.
12 2-1/2" GCR PIPING FROM ABOVE CONNECTED TO CR-60 TO BE
ABANDONED IN PLACE.
17 3" GCR PIPING DOWN FROM HOT WATER CONVERTOR GC-1 TO BE
ABANDONED IN PLACE.
GENERAL NOTES:
A. ALL EXISTING STEAM AND CONDENSATE RETURN LINES ARE TO
REMAIN IN PLACE AND ACTIVE UNTIL SPECIFICALLY REMOVED OR
ABANDONED-IN-PLACE AS A STAGE OF CONSTRUCTION UNDER THIS
PROJECT. ALL STEAM AND CONDENSATE RETURN LINES THAT ARE
ABANDONED-IN-PLACE SHALL BE LABELED AS "AIP" BY STENCIL OR
STICKER.
B. ALL EXISTING HUMIDIFIERS CONNECTED TO THE STEAM SYSTEM ARE
TO BE REMOVED, DUCT PATCHED AND STEAM AND CONDENSATE
RETURN PIPING REMOVED BACK TO WALL AND CAPPED.
C. ALL EXISITING STEAM-HOT WATER CONVERTERS TO BE REMOVED AND
STEAM AND CONDENSATE RETURN PIPING REMOVED BACK TO WALL
AND CAPPED.
D. ALL EXISITING STEAM PREHEAT COILS TO BE REMOVED FROM AHUS
FOR REPLACEMENT WITH HEATING WATER COILS AND STEAM AND
CONDENSATE RETURN PIPING REMOVED BACK TO WALL AND CAPPED.
E. ALL EXISTING STEAM TUBE BUNDLES IN DOMESTIC HOT WATER
GENERATORS TO BE REMOVED AND REPLACED WITH HEATING WATER
TUBE BUNDLES. REMOVE ALL STEAM AND CONDENSATE RETURN
PIPING BACK TO WALL AND CAP.
F. CONTROLS FOR COMPONENTS BEING REMOVED SHALL BE REMOVED
AND TERMINATED SO AS TO LEAVE CONNECTED SYSTEMS FULLY
OPERATIONAL.
M
AR
K D
ES
C
R
IP
TI
O
N D
B
C
D
E
F
H
J
G
2 3 4 5 6
7 8 9 10 12 15 18 20 22 24 26 28 30 32 33 34 35 36 37 38 39
L
N
Q
S
U
K
M
P
R
3129272523
RR
MM
WW
DD
AHU-GE3
AHU-GE2
AHU-GE1
AHU-GC1
AHU-GC2
AHU-GB1
AREA OUTSIDE
OF CONTRACT
CRU-GB1
HWC-GC1
HWP-GC2
HWP-GC1
ET-GC1
S-
3/ 4" ø
S-
1/
4" ø S-60
1"ø S-60 3/4"øS-60
1 1/4"ø
GCR
2 1/2"ø
S-60 2"ø
GCR
2 1/2"ø
S-60 3"ø
S-60 4"ø
S-
1/
2" ø
GCR
2"ø
S-60 1 1/4"ø
S-
2" ø
S-60 2 1/2"ø
GCR
2 1/2"ø
S-
3" ø
G C
R
1/ 2" ø
S-15 4"ø
S-
3" ø
S-
6" ø
S-15 1 1/4"ø
S-
6" ø
S-
4" ø
S-15 2 1/2"ø
S-
4" ø
S-60 4"ø
GCR
2 1/2"ø
S-15 1 1/4"ø
S-60 4"ø
S-
4" ø S-
1" ø
G C
R 3" ø
S-60 4"ø
S-60 3"ø
S-
6" ø
S-100 6"ø
S-
6" ø
S-
8" ø
GCR
2 1/2"ø
S-
1/
2" ø
S-60 4"ø
G C
R 1" øS-
1" øGCR
1"ø
B-2E
B-1E
B-3E
S-60 2"ø
L I CEN DES
61431P R
O
FESS ION AL ENGIN
EE
R
STATE OF TEXAS
DAVID J. BRANSON
160 64
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
FO
R T
W O
R
TH
D
IS
TR
IC
T
TA
YL
O
R S
TR
EE
T -R
M
A1
FO
R
T W
O R
TH
, T
X
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
SE
C
O N
D T
IT
LE
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N U
M
BE
R
Compliance Services Group, Inc.
Texas Registered Engineering Firm F-1070
Engineers - Architects - Scientists
D
AR
N
AL
L
LO
O
P
FO
R T
H O
O D
, T X
R
EN
O
VA
TE
B
0, C O
N
VE
RT
HI
G H
PR
ES
SU
RE
S
TE
AM
(H
PS
)T
O H
O T
W
AT
ER
(H
W
SE
VE
N G
EN
ER
AT
IO
N S
A+ E
E.
M
IC
H
IG
AN
A
VE
SU
IT
E
B
KA
LA
M
AZ
O
O , M
I 4
W
2G -1
8- F-
W
2G -1
7- D
-0
B3
A-
C
PF
B36000
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
MD101
M
EC
H
AN
IC
AL
D
EM
O
LI
TI
O
N
PL
AN
G R
O U
N D
F
LO
O R
C
SG
G
EC
D
JB
M
AR
C
H
100% SUBMISSION
NORTH
1/32" = 1'-0"
GROUND FLOOR - MECHANICAL DEMOLITION
NOTES INDICATED BY " "
1 PIPING UP FROM MECHANICAL ROOM GD-2 TO MECHANICAL ROOM 1D-1
ON FIRST FLOOR TO BE ABANDONED IN PLACE.
2 PIPING CONNECTED TO KITCHEN EQUIPMENT TO BE ABANDONED IN
PLACE.
3 3/4" 15# STEAM AND 3/4" GCR PIPING ROUTED UP TO HUMIDIFIERS ON
FIRST AND SECOND FLOOR TO BE ABANDONED IN PLACE.
4 3/4" 60# STEAM PIPING UP TO STERILIZERS TO BE ABANDONED IN
PLACE.
5 3" 60# STEAM PIPING DOWN TO CART WASH ON SAME FLOOR TO BE
REMOVED BACK TO MAIN AND CAPPED.
6 3/4" 60# STEAM PIPING DOWN TO STERILIZERS ON SAME FLOOR TO BE
REMOVED BACK TO MAIN AND CAPPED.
7 GCR PIPING FROM STERILIZERS TO BE ABANDONED IN PLACE.
8 GCR PIPING DOWN THROUGH FLOOR TO BE ABANDONED IN PLACE.
9 GCR PIPING UP IN CHASE TO BE ABANDONED IN PLACE.
10 60# STEAM PIPING UP THROUGH CEILING TO BE ABANDONED IN PLACE.
11 15# STEAM PIPING UP FROM MECHANICAL ROOM GD-1 TO BE
ABANDONED IN PLACE.
GENERAL NOTES:
A. ALL EXISTING STEAM AND CONDENSATE RETURN LINES ARE TO
REMAIN IN PLACE AND ACTIVE UNTIL SPECIFICALLY REMOVED OR
ABANDONED-IN-PLACE AS A PHASE OF CONSTRUCTION UNDER THIS
PROJECT. ALL STEAM AND CONDENSATE RETURN LINES THAT ARE
ABANDONED-IN-PLACE SHALL BE LABELED AS "AIP" BY STENCIL OR
STICKER.
B. ALL EXISTING KITCHEN EQUIPMENT CONNECTED TO THE STEAM
SYSTEM ARE TO BE ABANDONED IN PLACE.
12 AIR HANDLING UNIT GB1 TO BE ABANDONED IN PLACE.
C. ALL EXISTING HUMIDIFIERS CONNECTED TO THE STEAM SYSTEM ARE
TO BE REMOVED, DUCT PATCHED AND STEAM AND CONDENSATE
RETURN PIPING REMOVED BACK TO WALL AND CAPPED.
D. ALL EXISITING STEAM-HOT WATER CONVERTERS TO BE REMOVED AND
STEAM AND CONDENSATE RETURN PIPING REMOVED BACK TO WALL
AND CAPPED.
E. ALL EXISITING STEAM PREHEAT COILS TO BE REMOVED FROM AHUS
FOR REPLACEMENT WITH HEATING WATER COILS AND STEAM AND
CONDENSATE RETURN PIPING REMOVED BACK TO WALL AND CAPPED.
F. ALL EXISTING STEAM TUBE BUNDLES IN DOMESTIC HOT WATER
GENERATORS TO BE REMOVED AND REPLACED WITH HEATING WATER
TUBE BUNDLES. REMOVE ALL STEAM AND CONDENSATE RETURN
PIPING BACK TO WALL AND CAP.
G. CONTROLS FOR COMPONENTS BEING REMOVED SHALL BE REMOVED
AND TERMINATED SO AS TO LEAVE CONNECTED SYSTEMS FULLY
OPERATIONAL.
M
AR
K D
ES
C
R
IP
TI
O
N D
DNUP DNUP
A
B
C
D
E
F
H
J
G
2 3 4 5 6
7 8 9 10 12 15 18 20 22 24 26 28 30 32 33 34 35 36 37 38 39
L
N
Q
S
U
K
M
P
R
312927
MM
WW
DD
191716
O
S
U
W
Y
BB
VV
UU
TT
SS
AHU-1D1
AREA OUTSIDE
OF CONTRACT
2 2
S-60 3/4"ø
GCR
3/4"ø
S-
1" ø
S-
3/ 4" ø
S-60 1 1/4"ø
S-
1/
4" ø
S-
3/ 4" ø
GCR
1 1/4"ø
AHU-1A1
S-
3/ 4" ø
S-
3/ 4" ø
S-
3/ 4" ø
S-
3/ 4" ø
S-60 1 1/2"ø
S-60 1 1/4"ø
S-
3/ 4" ø
S-60 3/4"ø
S-15 3/4"ø
GCR
3/4"ø
S-
3/ 4" ø
G C
R 3/
4" ø
HWC-FP
L I CEN DES
61431P R
O
FESS ION AL ENGIN
EE
R
STATE OF TEXAS
DAVID J. BRANSON
160 64
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
FO
R T
W O
R
TH
D
IS
TR
IC
T
TA
YL
O
R S
TR
EE
T -R
M
A1
FO
R
T W
O R
TH
, T
X
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
SE
C
O N
D T
IT
LE
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N U
M
BE
R
Compliance Services Group, Inc.
Texas Registered Engineering Firm F-1070
Engineers - Architects - Scientists
D
AR
N
AL
L
LO
O
P
FO
R T
H O
O D
, T X
R
EN
O
VA
TE
B
0, C O
N
VE
RT
HI
G H
PR
ES
SU
RE
S
TE
AM
(H
PS
)T
O H
O T
W
AT
ER
(H
W
SE
VE
N G
EN
ER
AT
IO
N S
A+ E
E.
M
IC
H
IG
AN
A
VE
SU
IT
E
B
KA
LA
M
AZ
O
O , M
I 4
W
2G -1
8- F-
W
2G -1
7- D
-0
B3
A-
C
PF
B36000
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
MD102
M
EC
H
AN
IC
AL
D
EM
O
LI
TI
O
N
PL
AN
FI
R
ST
F
LO
O
R
C
SG
G
EC
D
JB
M
AR
C
H
100% SUBMISSION
NORTH
1/32" = 1'-0"
FIRST FLOOR - MECHANICAL DEMOLITION
NOTES INDICATED BY " "
1 3/4" GCR PIPING UP THROUGH CEILING TO BE ABANDONED IN PLACE.
2 3/4" 60# STEAM PIPING UP THROUGH CEILING TO BE ABANDONED IN
PLACE.
3 1 1/2" 60# STEAM PIPING FROM BELOW TO BE ABANDONED IN PLACE.
4 2 1/2" 60# STEAM AND 2" GCR PIPING UP AND DOWN WITH 1 1/4" 60#
STEAM PIPING PROVIDED TO THIS FLOOR TO BE ABANDONED IN PLACE.
5 3/4" 60# STEAM PIPING GOING DOWN THROUGH FLOOR TO BE
ABANDONED IN PLACE.
6 1 1/4" GCR PIPING GOING UP TO AIR HANDLING UNITS IN MECHANICAL
ROOM "2E" TO BE ABANDONED IN PLACE.
7 3/4" S-60 PIPING UP TO BEDPAN WASHER IN ROOM NO S223 TO BE
ABANDONED IN PLACE.
8 1 1/4" S-60 PIPING UP TO STERILIZERS IN ROOM NO D241 TO BE
ABANDONED IN PLACE.
9 3/4" S-120 PIPING UP TO BEDPAN WASHER TO BE ABANDONED IN
PLACE.
10 PIPING UP AND DOWN IN CHASE TO BE ABANDONED IN PLACE.
11 PIPE GOING UP AND DOWN FROM GROUND FLOOR UP TO MECHANICAL
ROOM 2C TO BE ABANDONED IN PLACE.
12 2 1/2" S-60 AND 2" GCR PIPING UP AND DOWN IN CHASE TO BE
ABANDONED IN PLACE.
13 60# STEAM PIPING CONNECTED TO GCR PIPING TO BE ABANDONED IN
PLACE.
14 3/4" 15# STEAM AND 3/4" GCR PIPING FROM MECHANICAL ROOM GC-1
UP IN CHASE TO BE ABANDONED IN PLACE.
15 3/4" 15# STEAM AND 3/4" GCR PIPING FEEDING HUMIDIFIERS 1C-1 AND
1C-2 TO BE ABANDONED IN PLACE.
16 3/4" 15# STEAM AND 3/4" GCR PIPING ROUTED TO HUMIDIFIERS ON
SECOND FLOOR TO BE ABANDONED IN PLACE.
17 3/4" 15# STEAM, 3/4" GCR AND 3/4" 60# STEAM PIPING GOING UP TO
SECOND FLOOR TO BE ABANDONED IN PLACE.
18 3/4" 60# STEAM PIPING FROM BELOW TO STERILIZERS TO BE
ABANDONED IN PLACE.
GENERAL NOTES:
A. ALL EXISTING STEAM AND CONDENSATE RETURN LINES ARE TO
REMAIN IN PLACE AND ACTIVE UNTIL SPECIFICALLY REMOVED OR
ABANDONED-IN-PLACE AS A STAGE OF CONSTRUCTION UNDER THIS
PROJECT. ALL STEAM AND CONDENSATE RETURN LINES THAT ARE
ABANDONED-IN-PLACE SHALL BE LABELED AS "AIP" BY STENCIL OR
STICKER.
B. ALL EXISTING HUMIDIFIERS CONNECTED TO THE STEAM SYSTEM ARE
TO BE REMOVED, DUCT PATCHED AND STEAM AND CONDENSATE
RETURN PIPING REMOVED BACK TO WALL AND CAPPED.
C. ALL EXISITING STEAM-HOT WATER CONVERTERS TO BE REMOVED AND
STEAM AND CONDENSATE RETURN PIPING REMOVED BACK TO WALL
AND CAPPED.
D. ALL EXISITING STEAM PREHEAT COILS TO BE REMOVED FROM AHUS
FOR REPLACEMENT WITH HEATING WATER COILS AND STEAM AND
CONDENSATE RETURN PIPING REMOVED BACK TO WALL AND CAPPED.
E. ALL EXISTING STEAM TUBE BUNDLES IN DOMESTIC HOT WATER
GENERATORS TO BE REMOVED AND REPLACED WITH HEATING WATER
TUBE BUNDLES. REMOVE ALL STEAM AND CONDENSATE RETURN
PIPING BACK TO WALL AND CAP.
F. CONTROLS FOR COMPONENTS BEING REMOVED SHALL BE REMOVED
AND TERMINATED SO AS TO LEAVE CONNECTED SYSTEMS FULLY
OPERATIONAL.
M
AR
K D
ES
C
R
IP
TI
O
N D
AHU-2C3
AHU-2E1 AHU-2E2
AHU-2E3
AHU-2F1
AREA OUTSIDE
OF CONTRACT
G C
R 1" ø
GCR
1 1/2"ø
S-
3/ 4" ø
S-
3/ 4" ø
HWC-2C1
AHU-2C2
AHU-2C1
S-15 3/4"ø
S-15 3/4"ø
GCR
3/4"ø
GCR
3/4"ø
1 1 1
1 1
6 7
L I CEN DES
61431P R
O
FESS ION AL ENGIN
EE
R
STATE OF TEXAS
DAVID J. BRANSON
160 64
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
FO
R T
W O
R
TH
D
IS
TR
IC
T
TA
YL
O
R S
TR
EE
T -R
M
A1
FO
R
T W
O R
TH
, T
X
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
SE
C
O N
D T
IT
LE
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N U
M
BE
R
Compliance Services Group, Inc.
Texas Registered Engineering Firm F-1070
Engineers - Architects - Scientists
D
AR
N
AL
L
LO
O
P
FO
R T
H O
O D
, T X
R
EN
O
VA
TE
B
0, C O
N
VE
RT
HI
G H
PR
ES
SU
RE
S
TE
AM
(H
PS
)T
O H
O T
W
AT
ER
(H
W
SE
VE
N G
EN
ER
AT
IO
N S
A+ E
E.
M
IC
H
IG
AN
A
VE
SU
IT
E
B
KA
LA
M
AZ
O
O , M
I 4
W
2G -1
8- F-
W
2G -1
7- D
-0
B3
A-
C
PF
B36000
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
MD103
M
EC
H
AN
IC
AL
D
EM
O
LI
TI
O
N
PL
AN
SE
C
O N
D F
LO
O
R
C
SG
G
EC
D
JB
M
AR
C
H
100% SUBMISSION
NORTH
1/32" = 1'-0"
SECOND FLOOR - MECHANICAL DEMOLITION
NOTES INDICATED BY " "
1 3/4" S-60 PIPING FROM BELOW TO STERILIZER TO BE ABANDONED IN
PLACE.
2 3/4" 60# STEAM PIPING UP TO BEDPAN WASHER ON THIRD FLOOR TO BE
ABANDONED IN PLACE.
3 1" GCR PIPING UP TO MECHANICAL ROOM 3B TO BE ABANDONED IN
PLACE.
4 3/4" GCR PIPING UP TO MECHANICAL ROOM 3B TO BE ABANDONED IN
PLACE.
5 PIPING ROUTED UP AND DOWN IN CHASE TO BE ABANDONED IN PLACE.
6 3/4" 60# STEAM PIPING TO BEDPAN WASHER TO BE ABANDONED IN
PLACE.
8 3/4" 15# STEAM AND 3/4" GCR PIPING CONNECTED TO HUMIDIFIERS
2C3-3 AND 2C3-4 TO BE ABANDONED IN PLACE.
7 3/4" 15# STEAM AND 3/4" GCR PIPING FROM BELOW FROM HUMIDIFIERS
TO BE ABANDONED IN PLACE.
9 CLEAN STEAM SYSTEM IN THIS LOCATION TO BE REMOVED.
GENERAL NOTES:
A. ALL EXISTING STEAM AND CONDENSATE RETURN LINES ARE TO
REMAIN IN PLACE AND ACTIVE UNTIL SPECIFICALLY REMOVED OR
ABANDONED-IN-PLACE AS A STAGE OF CONSTRUCTION UNDER THIS
PROJECT. ALL STEAM AND CONDENSATE RETURN LINES THAT ARE
ABANDONED-IN-PLACE SHALL BE LABELED AS "AIP" BY STENCIL OR
STICKER.
B. ALL EXISTING HUMIDIFIERS CONNECTED TO THE STEAM SYSTEM ARE
TO BE REMOVED, DUCT PATCHED AND STEAM AND CONDENSATE
RETURN PIPING REMOVED BACK TO WALL AND CAPPED.
C. ALL EXISITING STEAM-HOT WATER CONVERTERS TO BE REMOVED AND
STEAM AND CONDENSATE RETURN PIPING REMOVED BACK TO WALL
AND CAPPED.
D. ALL EXISITING STEAM PREHEAT COILS TO BE REMOVED FROM AHUS
FOR REPLACEMENT WITH HEATING WATER COILS AND STEAM AND
CONDENSATE RETURN PIPING REMOVED BACK TO WALL AND CAPPED.
E. ALL EXISTING STEAM TUBE BUNDLES IN DOMESTIC HOT WATER
GENERATORS TO BE REMOVED AND REPLACED WITH HEATING WATER
TUBE BUNDLES. REMOVE ALL STEAM AND CONDENSATE RETURN
PIPING BACK TO WALL AND CAP.
F. CONTROLS FOR COMPONENTS BEING REMOVED SHALL BE REMOVED
AND TERMINATED SO AS TO LEAVE CONNECTED SYSTEMS FULLY
OPERATIONAL.
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
10 STEAM AND CONDENSATE PIPING TO BE ABANDONED IN PLACE.
AHU-3B3
AHU-3B2
AHU-3B1
AREA OUTSIDE
OF CONTRACT
S-
3/ 4" ø
GCR
3/4"ø
S-
1" ø
S-60 2"ø
S-
1/
4" ø
S-
1/
4" ø
S-15 1 1/4"ø
L I CEN DES
61431P R
O
FESS ION AL ENGIN
EE
R
STATE OF TEXAS
DAVID J. BRANSON
160 64
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
FO
R T
W O
R
TH
D
IS
TR
IC
T
TA
YL
O
R S
TR
EE
T -R
M
A1
FO
R
T W
O R
TH
, T
X
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
SE
C
O N
D T
IT
LE
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N U
M
BE
R
Compliance Services Group, Inc.
Texas Registered Engineering Firm F-1070
Engineers - Architects - Scientists
D
AR
N
AL
L
LO
O
P
FO
R T
H O
O D
, T X
R
EN
O
VA
TE
B
0, C O
N
VE
RT
HI
G H
PR
ES
SU
RE
S
TE
AM
(H
PS
)T
O H
O T
W
AT
ER
(H
W
SE
VE
N G
EN
ER
AT
IO
N S
A+ E
E.
M
IC
H
IG
AN
A
VE
SU
IT
E
B
KA
LA
M
AZ
O
O , M
I 4
W
2G -1
8- F-
W
2G -1
7- D
-0
B3
A-
C
PF
B36000
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
MD104
M
EC
H
AN
IC
AL
D
EM
O
LI
TI
O
N
PL
AN
TH
IR
D F
LO
O
R
C
SG
G
EC
D
JB
M
AR
C
H
100% SUBMISSION
NORTH
1/32" = 1'-0"
THIRD FLOOR - MECHANICAL DEMOLITION
NOTES INDICATED BY " "
1 3/4" 60# STEAM PIPING FROM BELOW TO BEDPAN WASHER TO BE
ABANDONED IN PLACE.
2 1" 15# STEAM AND 3/4" GCR PIPING FED FROM UPPER PORTION OF
MECHANICAL ROOM 2E TO BE ABANDONED IN PLACE.
3 3/4" 60# STEAM PIPING GOING UP AND DOWN TO BE ABANDONED IN
PLACE.
4 3/4" 60# STEAM PIPING CONNECTED TO BEDPAN WASHER ON THIS
FLOOR TO BE ABANDONED IN PLACE.
5 3/4" 60# STEAM PIPING UP TO FOURTH FLOOR TO BE ABANDONED IN
PLACE.
6 3/4" 60# STEAM PIPING FROM BELOW TO BE ABANDONED IN PLACE.
7 1" GCR PIPING FROM BELOW TO BE ABANDONED IN PLACE.
8 3/4" GCR PIPING FROM BELOW TO BE ABANDONED IN PLACE.
9 3/4" GCR PIPING CONNECTS TO HUMIDIFIER UNITS IN DUCTWORK NEAR
AHU 3B-2 TO BE ABANDONED IN PLACE.
10 1" GCR PIPING FROM BELOW. PIPING ALSO CONNECTS TO HUMIDIFER
UNITS IN DUCTWORK NEAR AHU 3B-1 TO BE ABANDONED IN PLACE.
GENERAL NOTES:
A. ALL EXISTING STEAM AND CONDENSATE RETURN LINES ARE TO
REMAIN IN PLACE AND ACTIVE UNTIL SPECIFICALLY REMOVED OR
ABANDONED-IN-PLACE AS A STAGE OF CONSTRUCTION UNDER THIS
PROJECT. ALL STEAM AND CONDENSATE RETURN LINES THAT ARE
ABANDONED-IN-PLACE SHALL BE LABELED AS "AIP" BY STENCIL OR
STICKER.
B. ALL EXISTING HUMIDIFIERS CONNECTED TO THE STEAM SYSTEM ARE
TO BE REMOVED, DUCT PATCHED AND STEAM AND CONDENSATE
RETURN PIPING REMOVED BACK TO WALL AND CAPPED.
C. ALL EXISITING STEAM-HOT WATER CONVERTERS TO BE REMOVED AND
STEAM AND CONDENSATE RETURN PIPING REMOVED BACK TO WALL
AND CAPPED.
D. ALL EXISITING STEAM PREHEAT COILS TO BE REMOVED FROM AHUS
FOR REPLACEMENT WITH HEATING WATER COILS AND STEAM AND
CONDENSATE RETURN PIPING REMOVED BACK TO WALL AND CAPPED.
E. ALL EXISTING STEAM TUBE BUNDLES IN DOMESTIC HOT WATER
GENERATORS TO BE REMOVED AND REPLACED WITH HEATING WATER
TUBE BUNDLES. REMOVE ALL STEAM AND CONDENSATE RETURN
PIPING BACK TO WALL AND CAP.
F. CONTROLS FOR COMPONENTS BEING REMOVED SHALL BE REMOVED
AND TERMINATED SO AS TO LEAVE CONNECTED SYSTEMS FULLY
OPERATIONAL.
M
AR
K D
ES
C
R
IP
TI
O
N D
S-60 3/4"ø
2 3
L I CEN DES
61431P R
O
FESS ION AL ENGIN
EE
R
STATE OF TEXAS
DAVID J. BRANSON
160 64
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
FO
R T
W O
R
TH
D
IS
TR
IC
T
TA
YL
O
R S
TR
EE
T -R
M
A1
FO
R
T W
O R
TH
, T
X
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
SE
C
O N
D T
IT
LE
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N U
M
BE
R
Compliance Services Group, Inc.
Texas Registered Engineering Firm F-1070
Engineers - Architects - Scientists
D
AR
N
AL
L
LO
O
P
FO
R T
H O
O D
, T X
R
EN
O
VA
TE
B
0, C O
N
VE
RT
HI
G H
PR
ES
SU
RE
S
TE
AM
(H
PS
)T
O H
O T
W
AT
ER
(H
W
SE
VE
N G
EN
ER
AT
IO
N S
A+ E
E.
M
IC
H
IG
AN
A
VE
SU
IT
E
B
KA
LA
M
AZ
O
O , M
I 4
W
2G -1
8- F-
W
2G -1
7- D
-0
B3
A-
C
PF
B36000
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
MD105
M
EC
H
AN
IC
AL
D
EM
O
LI
TI
O
N
PL
AN
FO
U
R
TH
F
LO
O R
C
SG
G
EC
D
JB
M
AR
C
H
100% SUBMISSION
NORTH
1/32" = 1'-0"
FOURTH FLOOR - MECHANICAL DEMOLITION
NOTES INDICATED BY " "
1 PIPING THROUGH FLOOR AND THROUGH CEILING UP TO PENTHOUSE
TO BE ABANDONED IN PLACE.
2 3/4" 60# STEAM PIPING UP AND DOWN TO BE ABANDONED IN PLACE.
3 3/4" 60# STEAM PIPING UP TO BEDPAN WASHER ON FIFTH FLOOR TO BE
ABANDONED IN PLACE.
4 3/4" 60# STEAM PIPING FROM BELOW TO BEDPAN WASHER TO BE
ABANDONED IN PLACE.
5 PIPING ROUTED UP AND DOWN IN CHASE BY ELEVATOR TO BE
ABANDONED IN PLACE.
GENERAL NOTES:
A. ALL EXISTING STEAM AND CONDENSATE RETURN LINES ARE TO
REMAIN IN PLACE AND ACTIVE UNTIL SPECIFICALLY REMOVED OR
ABANDONED-IN-PLACE AS A STAGE OF CONSTRUCTION UNDER THIS
PROJECT. ALL STEAM AND CONDENSATE RETURN LINES THAT ARE
ABANDONED-IN-PLACE SHALL BE LABELED AS "AIP" BY STENCIL OR
STICKER.
B. ALL EXISTING HUMIDIFIERS CONNECTED TO THE STEAM SYSTEM ARE
TO BE REMOVED, DUCT PATCHED AND STEAM AND CONDENSATE
RETURN PIPING REMOVED BACK TO WALL AND CAPPED.
C. ALL EXISITING STEAM-HOT WATER CONVERTERS TO BE REMOVED AND
STEAM AND CONDENSATE RETURN PIPING REMOVED BACK TO WALL
AND CAPPED.
D. ALL EXISITING STEAM PREHEAT COILS TO BE REMOVED FROM AHUS
FOR REPLACEMENT WITH HEATING WATER COILS AND STEAM AND
CONDENSATE RETURN PIPING REMOVED BACK TO WALL AND CAPPED.
E. ALL EXISTING STEAM TUBE BUNDLES IN DOMESTIC HOT WATER
GENERATORS TO BE REMOVED AND REPLACED WITH HEATING WATER
TUBE BUNDLES. REMOVE ALL STEAM AND CONDENSATE RETURN
PIPING BACK TO WALL AND CAP.
F. CONTROLS FOR COMPONENTS BEING REMOVED SHALL BE REMOVED
AND TERMINATED SO AS TO LEAVE CONNECTED SYSTEMS FULLY
OPERATIONAL.
M
AR
K D
ES
C
R
IP
TI
O
N D
2 2
L I CEN DES
61431P R
O
FESS ION AL ENGIN
EE
R
STATE OF TEXAS
DAVID J. BRANSON
160 64
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
FO
R T
W O
R
TH
D
IS
TR
IC
T
TA
YL
O
R S
TR
EE
T -R
M
A1
FO
R
T W
O R
TH
, T
X
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
SE
C
O N
D T
IT
LE
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N U
M
BE
R
Compliance Services Group, Inc.
Texas Registered Engineering Firm F-1070
Engineers - Architects - Scientists
D
AR
N
AL
L
LO
O
P
FO
R T
H O
O D
, T X
R
EN
O
VA
TE
B
0, C O
N
VE
RT
HI
G H
PR
ES
SU
RE
S
TE
AM
(H
PS
)T
O H
O T
W
AT
ER
(H
W
SE
VE
N G
EN
ER
AT
IO
N S
A+ E
E.
M
IC
H
IG
AN
A
VE
SU
IT
E
B
KA
LA
M
AZ
O
O , M
I 4
W
2G -1
8- F-
W
2G -1
7- D
-0
B3
A-
C
PF
B36000
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
MD106
M
EC
H
AN
IC
AL
D
EM
O
LI
TI
O
N
PL
AN
FI
FT
H F
LO
O
R
C
SG
G
EC
D
JB
M
AR
C
H
100% SUBMISSION
NORTH
1/32" = 1'-0"
FIFTH FLOOR - MECHANICAL DEMOLITION
NOTES INDICATED BY " "
1 PIPING UP AND DOWN TO BE ABANDONED IN PLACE.
3 PIPING UP AND DOWN IN CHASE TO BE ABANDONED IN PLACE.
2 3/4" 60# STEAM PIPING FROM BELOW TO BEDPAN WASHER TO BE
ABANDONED IN PLACE.
GENERAL NOTES:
A. ALL EXISTING STEAM AND CONDENSATE RETURN LINES ARE TO
REMAIN IN PLACE AND ACTIVE UNTIL SPECIFICALLY REMOVED OR
ABANDONED-IN-PLACE AS A STAGE OF CONSTRUCTION UNDER THIS
PROJECT. ALL STEAM AND CONDENSATE RETURN LINES THAT ARE
ABANDONED-IN-PLACE SHALL BE LABELED AS "AIP" BY STENCIL OR
STICKER.
B. ALL EXISTING HUMIDIFIERS CONNECTED TO THE STEAM SYSTEM ARE
TO BE REMOVED, DUCT PATCHED AND STEAM AND CONDENSATE
RETURN PIPING REMOVED BACK TO WALL AND CAPPED.
C. ALL EXISITING STEAM-HOT WATER CONVERTERS TO BE REMOVED AND
STEAM AND CONDENSATE RETURN PIPING REMOVED BACK TO WALL
AND CAPPED.
D. ALL EXISITING STEAM PREHEAT COILS TO BE REMOVED FROM AHUS
FOR REPLACEMENT WITH HEATING WATER COILS AND STEAM AND
CONDENSATE RETURN PIPING REMOVED BACK TO WALL AND CAPPED.
E. ALL EXISTING STEAM TUBE BUNDLES IN DOMESTIC HOT WATER
GENERATORS TO BE REMOVED AND REPLACED WITH HEATING WATER
TUBE BUNDLES. REMOVE ALL STEAM AND CONDENSATE RETURN
PIPING BACK TO WALL AND CAP.
F. CONTROLS FOR COMPONENTS BEING REMOVED SHALL BE REMOVED
AND TERMINATED SO AS TO LEAVE CONNECTED SYSTEMS FULLY
OPERATIONAL.
M
AR
K D
ES
C
R
IP
TI
O
N D
S-
3" ø
S-15 1"ø
S-15 3"ø
GCR
2 1/2"ø
S-15 3"ø
AHU-P2
AHU-P3
AHU-P1
HWC-5-1
HWC-5-2
L I CEN DES
61431P R
O
FESS ION AL ENGIN
EE
R
STATE OF TEXAS
DAVID J. BRANSON
160 64
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
FO
R T
W O
R
TH
D
IS
TR
IC
T
TA
YL
O
R S
TR
EE
T -R
M
A1
FO
R
T W
O R
TH
, T
X
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
SE
C
O N
D T
IT
LE
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N U
M
BE
R
Compliance Services Group, Inc.
Texas Registered Engineering Firm F-1070
Engineers - Architects - Scientists
D
AR
N
AL
L
LO
O
P
FO
R T
H O
O D
, T X
R
EN
O
VA
TE
B
0, C O
N
VE
RT
HI
G H
PR
ES
SU
RE
S
TE
AM
(H
PS
)T
O H
O T
W
AT
ER
(H
W
SE
VE
N G
EN
ER
AT
IO
N S
A+ E
E.
M
IC
H
IG
AN
A
VE
SU
IT
E
B
KA
LA
M
AZ
O
O , M
I 4
W
2G -1
8- F-
W
2G -1
7- D
-0
B3
A-
C
PF
B36000
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
MD107
M
EC
H
AN
IC
AL
D
EM
O
LI
TI
O
N
PL
AN
PE
N
TH
O
U
SE
C
SG
G
EC
D
JB
M
AR
C
H
100% SUBMISSION
NORTH
1/32" = 1'-0"
PENTHOUSE - MECHANICAL DEMOLITION
GENERAL NOTES:
A. ALL EXISTING STEAM AND CONDENSATE RETURN LINES ARE TO
REMAIN IN PLACE AND ACTIVE UNTIL SPECIFICALLY REMOVED OR
ABANDONED-IN-PLACE AS A STAGE OF CONSTRUCTION UNDER THIS
PROJECT. ALL STEAM AND CONDENSATE RETURN LINES THAT ARE
ABANDONED-IN-PLACE SHALL BE LABELED AS "AIP" BY STENCIL OR
STICKER.
B. ALL EXISTING HUMIDIFIERS CONNECTED TO THE STEAM SYSTEM ARE
TO BE REMOVED, DUCT PATCHED AND STEAM AND CONDENSATE
RETURN PIPING REMOVED BACK TO WALL AND CAPPED.
C. ALL EXISITING STEAM-HOT WATER CONVERTERS TO BE REMOVED AND
STEAM AND CONDENSATE RETURN PIPING REMOVED BACK TO WALL
AND CAPPED.
D. ALL EXISITING STEAM PREHEAT COILS TO BE REMOVED FROM AHUS
FOR REPLACEMENT WITH HEATING WATER COILS AND STEAM AND
CONDENSATE RETURN PIPING REMOVED BACK TO WALL AND CAPPED.
E. ALL EXISTING STEAM TUBE BUNDLES IN DOMESTIC HOT WATER
GENERATORS TO BE REMOVED AND REPLACED WITH HEATING WATER
TUBE BUNDLES. REMOVE ALL STEAM AND CONDENSATE RETURN
PIPING BACK TO WALL AND CAP.
F. CONTROLS FOR COMPONENTS BEING REMOVED SHALL BE REMOVED
AND TERMINATED SO AS TO LEAVE CONNECTED SYSTEMS FULLY
OPERATIONAL.
M
AR
K D
ES
C
R
IP
TI
O
N D
7 8 9 10
L
N
7 8 9 10
B-1
AHU-GB1
AHU-1A1
B-1E
B-2E
B-3E
S-
6" ø
S-
4" ø
S-15 1 1/4"ø
S-
6" ø
S-15 1 1/4"ø
S-
6" ø S-
8" ø
S-
6" ø
S-100 6"ø
S-100 6"ø
S-100 6"ø
S-
6" ø
S-100 6"ø
S-
4" ø
S-15 4"ø
S-15 4"ø
CRU-GB1
GCR
2 1/2"ø
CRU-GD4
GCR
1"ø
G C
R 1" ø
GCR
1"øS-100
6"ø
S-15 1 1/4"ø
GCR
1"ø
CONDENSATE
TRANSFER PUMPS
PC
R
3" ø
G C
R 2" ø
GCR
1"ø
GCR
1"ø
GCR
1"ø
G C
R 2" ø G
C R
1" ø
80 32
L I CEN DES
61431P R
O
FESS ION AL ENGIN
EE
R
STATE OF TEXAS
DAVID J. BRANSON
NORTH
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
FO
R T
W O
R
TH
D
IS
TR
IC
T
TA
YL
O
R S
TR
EE
T -R
M
A1
FO
R
T W
O R
TH
, T
X
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
SE
C
O N
D T
IT
LE
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N U
M
BE
R
Compliance Services Group, Inc.
Texas Registered Engineering Firm F-1070
Engineers - Architects - Scientists
D
AR
N
AL
L
LO
O
P
FO
R T
H O
O D
, T X
R
EN
O
VA
TE
B
0, C O
N
VE
RT
HI
G H
PR
ES
SU
RE
S
TE
AM
(H
PS
)T
O H
O T
W
AT
ER
(H
W
SE
VE
N G
EN
ER
AT
IO
N S
A+ E
E.
M
IC
H
IG
AN
A
VE
SU
IT
E
B
KA
LA
M
AZ
O
O , M
I 4
W
2G -1
8- F-
W
2G -1
7- D
-0
B3
A-
C
PF
B36000
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
MD200
M
EC
H
AN
IC
AL
D
EM
O
LI
TI
O
N
PL
AN
EN
LA
R G
ED
B
O
IL
ER
PL
AN
C
SG
G
EC
D
JB
M
AR
C
H
100% SUBMISSION
3/32" = 1'-0"MD200
1 GROUND FLOOR - MECHANICAL DEMOLITION - ENLARGED BOILER ROOM
GENERAL NOTES:
A. ALL EXISTING STEAM AND CONDENSATE RETURN LINES ARE TO
REMAIN IN PLACE AND ACTIVE UNTIL SPECIFICALLY REMOVED OR
ABANDONED-IN-PLACE AS A STAGE OF CONSTRUCTION UNDER THIS
PROJECT. ALL STEAM AND CONDENSATE RETURN LINES THAT ARE
ABANDONED-IN-PLACE SHALL BE LABELED AS "AIP" BY STENCIL OR
STICKER.
B. ALL EXISTING HUMIDIFIERS CONNECTED TO THE STEAM SYSTEM ARE
TO BE REMOVED, DUCT PATCHED AND STEAM AND CONDENSATE
RETURN PIPING REMOVED BACK TO WALL AND CAPPED.
C. ALL EXISITING STEAM-HOT WATER CONVERTERS TO BE REMOVED AND
STEAM AND CONDENSATE RETURN PIPING REMOVED BACK TO WALL
AND CAPPED.
D. ALL EXISITING STEAM PREHEAT COILS TO BE REMOVED FROM AHUs
FOR REPLACEMENT WITH HEATING WATER COILS AND STEAM AND
CONDENSATE RETURN PIPING REMOVED BACK TO WALL AND CAPPED.
E. ALL EXISTING STEAM TUBE BUNDLES IN DOMESTIC HOT WATER
GENERATORS TO BE REMOVED AND OPENING IN TANK REPLACED WITH
BLANK FLANGE. REMOVE ALL STEAM AND CONDENSATE RETURN
PIPING BACK TO WALL AND CAP.
F. CONTROLS FOR COMPONENTS BEING REMOVED SHALL BE
TERMINATED SO AS TO LEAVE REMAINING CONNECTED SYSTEMS
FULLY OPERATIONAL.
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
G. THIS BOILER SYSTEM REPLACEMENT PROJECT REQUIRES STEAM
BOILER SYSTEMS TO REMAIN IN OPERATION UNTIL HYDRONIC BOILER
SYSTEMS ARE OPERATIONAL AND LOADS ARE SWITCHED OVER TO THE
NEW SYSTEMS. BOILERS WILL BE REPLACED ONE AT A TIME DURING
PERIODS OF LOW HEATING WATER DEMAND TO MINIMIZE IMPACT ON
BUILDING OCCUPANTS AND SYSTEMS.
NOTES INDICATED BY " "
1 CONTRACTOR TO REMOVE AND DISPOSE OF STEAM BOILER AND
PIPING. THIS IS TO BE A PHASED REMOVAL TO ALLOW THE
REPLACEMENT HYDRONIC BOILER SYSTEM TO BE PLACED INTO
OPERATION AND ALLOW THE FACILITY TO REMAIN OCCUPIED AND
OPERATIONAL DURING CONSTRUCTION.
2 DISCONNECT NATURAL GAS LINE TO STEAM BOILER AND PREPARE
FOR RECONNECTION TO NEW HYDRONIC BOILER IN THIS LOCATION.
3 DISCONNECT FLUE FROM STEAM BOILER NEAR ROOF LEVEL AND
PREPARE FOR RECONNECTION TO NEW HYDRONIC BOILER IN THIS
LOCATION.
24 " ( 61 CM )
24 "
24 "
B
AHU-GD3
AHU-GD2
AHU-GD1
HWS
2"ø
HWR
2"ø
HWS
1"ø
HWR
1"ø
HWS
1 1/2"ø
HWR
1 1/2"ø
HWR
6"ø
HWS
6"ø
H W
S 6" ø H
W R
6" ø
L I CEN DES
61431P R
O
FESS ION AL ENGIN
EE
R
STATE OF TEXAS
DAVID J. BRANSON
160 64
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
FO
R T
W O
R
TH
D
IS
TR
IC
T
TA
YL
O
R S
TR
EE
T -R
M
A1
FO
R
T W
O R
TH
, T
X
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
SE
C
O N
D T
IT
LE
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N U
M
BE
R
Compliance Services Group, Inc.
Texas Registered Engineering Firm F-1070
Engineers - Architects - Scientists
D
AR
N
AL
L
LO
O
P
FO
R T
H O
O D
, T X
R
EN
O
VA
TE
B
0, C O
N
VE
RT
HI
G H
PR
ES
SU
RE
S
TE
AM
(H
PS
)T
O H
O T
W
AT
ER
(H
W
SE
VE
N G
EN
ER
AT
IO
N S
A+ E
E.
M
IC
H
IG
AN
A
VE
SU
IT
E
B
KA
LA
M
AZ
O
O , M
I 4
W
2G -1
8- F-
W
2G -1
7- D
-0
B3
A-
C
PF
B36000
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
M-100
M
EC
H
AN
IC
AL
C
R
AW
L
SP
AC
E
C
SG
G
EC
D
JB
M
AR
C
H
100% SUBMISSION
NORTH
1/32" = 1'-0"
CRAWL SPACE - MECHANICAL
NOTES INDICATED BY " "
1 HEATING WATER SUPPLY AND RETURN PIPING FROM GROUND FLOOR
DOWN TO SERVE NEW PREHEAT COILS IN AIR HANDLING UNITS IN
MECHANICAL ROOM GD-1.
GENERAL NOTES:
A. ALL EXISTING STEAM AND CONDENSATE RETURN LINES ARE TO
REMAIN IN PLACE AND ACTIVE UNTIL SPECIFICALLY REMOVED OR
ABANDONED-IN-PLACE AS A STAGE OF CONSTRUCTION UNDER THIS
PROJECT. ALL STEAM AND CONDENSATE RETURN LINES THAT ARE
ABANDONED-IN-PLACE SHALL BE LABELED AS "AIP" BY STENCIL OR
STICKER.
B. CONTRACTOR TO STAGE CONSTRUCTION SO THAT DOWNTIME FOR
EQUIPMENT BEING SERVED IS MINIMIZED.
C. CONTRACTOR TO SEPARATE CONSTRUCTION AREA FROM ADJACENT
SPACES SO CONSTRUCTION WILL NOT IMPEDE OCCUPANTS OF
ADJACENT SPACES IN THEIR NORMAL OPERATION.
D. PROVIDE LABELING ON ALL NEW PIPING WHICH INDICATES SERVICE
AND DIRECTION OF FLOW.
E. ALL NEW EQUIPMENT SHALL BE PROVIDED WITH EMCS-COMPATIBLE
CONTROLS TO RESULT IN FULLY FUNCTIONING SYSTEM COMPONENTS.
F. CONTRACTOR TO RECORD AND PROVIDE TO LOCAL USACE PM THE
AIR-SIDE PERFORMANCE OF ALL AHUS TO BE MODIFIED PRIOR TO
WORK ON AHUS, AND SHALL REBALANCE AIR-SIDE AND WATER-SIDE
COMPONENTS AFTER INSTALLATION OF PRE-HEAT COILS.
G. CONTRACTOR TO PROVIDE ALL REQUIRED HARDWARE, SOFTWARE,
AND PROGRAMMING TO INTEGRATE NEW COMPONENTS WITH
EXISTING EMCS.
H. PROVIDE MANUAL BALANCING VALVES AT ALL HWS BRANCH LINES FOR
USE IN SYSTEM BALANCING.
2 EXTEND NEW HWS AND HWR PIPING TO AHU FOR CONNECTION TO
REPLACEMENT HEATING WATER PREHEAT COIL WITH 3-WAY VALVE.
REFER TO HOT WATER PREHEAT COIL DETAIL ON SHEET M-500.
3 INSTALL REPLACEMENT HEATING WATER COIL. REFER TO PREHEAT
COIL SCHEDULE ON M-600 FOR SPECIFIC COIL TO FIT EXISTING AIR
HANDLING UNIT.
M
AR
K D
ES
C
R
IP
TI
O
N D
B
C
D
E
F
H
J
G
2 3 4 5 6
7 8 9 10 12 15 18 20 22 24 26 28 30 32 33 34 35 36 37 38 39
L
N
Q
S
U
K
M
P
R
3129272523
RR
MM
WW
DD
24 " ( 61 CM )
24 "
24 "
B
AHU-GE3
AHU-GE2
AHU-GE1
AHU-GC1
AHU-GC2
AHU-GB1
AREA OUTSIDE
OF CONTRACT
HWS
6"ø
HWR
10"ø
HWR
6"ø
HWS
6"ø
HWS
10"ø
HWS
6"ø
HWR
6"ø
HWR
2"ø
HWS
2"ø
HWS
6"ø
HWR
6"ø
HWS
4"øHWR 4"ø
HWS
3"ø
HWR
3"ø HWS
3"ø
HWR
3"ø
HWS
3"ø
HWR
3"ø HWR
1 1/4"ø
HWS
1 1/2"ø
HWS
1 1/2"ø HWR
1 1/4"ø
HWR
2"ø
HWS
2"ø
HWS
4"ø
HWR
4"ø
HWR
6"ø
HWS
6"ø
HWS
1 1/2"ø
HWR
1 1/2"ø
HWR
4"ø
HWS
4"ø
HWS
6"ø
HWR
6"ø
HWR
4"ø
HWS
4"ø
HWS
6"ø
HWR
6"ø
HWR
4"ø HWS
4"ø
HWR
6"ø
HWS
6"ø
HWS
2"ø
HWR
2"ø
HWS
2"ø
HWR
2"ø
HWR
1 1/2"ø
HWS
1 1/2"ø
HWS
1 1/2"ø
HWR
1 1/2"ø
HWR
1 1/2"ø
HWS
1 1/2"ø
HWG-P5A
HWG-P5B
HWS
2 1/2"ø
HWR
2 1/2"ø
M-200
M-201
M-201
M-201
M-201
2 3
2 3
M-201
DHWG-2
HWR
2 1/2"ø
HWS
2 1/2"ø
DHWG-1
B-1
B-2
B-3
HP-1
HP-2
HP-3
L I CEN DES
61431P R
O
FESS ION AL ENGIN
EE
R
STATE OF TEXAS
DAVID J. BRANSON
160 64
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
FO
R T
W O
R
TH
D
IS
TR
IC
T
TA
YL
O
R S
TR
EE
T -R
M
A1
FO
R
T W
O R
TH
, T
X
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
SE
C
O N
D T
IT
LE
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N U
M
BE
R
Compliance Services Group, Inc.
Texas Registered Engineering Firm F-1070
Engineers - Architects - Scientists
D
AR
N
AL
L
LO
O
P
FO
R T
H O
O D
, T X
R
EN
O
VA
TE
B
0, C O
N
VE
RT
HI
G H
PR
ES
SU
RE
S
TE
AM
(H
PS
)T
O H
O T
W
AT
ER
(H
W
SE
VE
N G
EN
ER
AT
IO
N S
A+ E
E.
M
IC
H
IG
AN
A
VE
SU
IT
E
B
KA
LA
M
AZ
O
O , M
I 4
W
2G -1
8- F-
W
2G -1
7- D
-0
B3
A-
C
PF
B36000
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
M-101
M
EC
H
AN
IC
AL
G
R O
U N
D
FL
O O
R
C
SG
G
EC
D
JB
M
AR
C
H
100% SUBMISSION
NOTES INDICATED BY " "
1 NEW BOILERS WITH PUMPS, AIR SEPARATOR, AND EXPANSION TANK
TO BE INSTALLED.
NORTH
1/32" = 1'-0"
GROUND FLOOR - MECHANICAL
GENERAL NOTES:
A. ALL EXISTING STEAM AND CONDENSATE RETURN LINES ARE TO
REMAIN IN PLACE AND ACTIVE UNTIL SPECIFICALLY REMOVED OR
ABANDONED-IN-PLACE AS A STAGE OF CONSTRUCTION UNDER THIS
PROJECT. ALL STEAM AND CONDENSATE RETURN LINES THAT ARE
ABANDONED-IN-PLACE SHALL BE LABELED AS "AIP" BY STENCIL OR
STICKER.
B. CONTRACTOR TO STAGE CONSTRUCTION SO THAT DOWNTIME FOR
EQUIPMENT BEING SERVED IS MINIMIZED.
C. CONTRACTOR TO SEPARATE CONSTRUCTION AREA FROM ADJACENT
SPACES SO CONSTRUCTION WILL NOT IMPEDE OCCUPANTS OF
ADJACENT SPACES IN THEIR NORMAL OPERATION.
D. PROVIDE LABELING ON ALL NEW PIPING WHICH INDICATES SERVICE
AND DIRECTION OF FLOW.
E. ALL NEW EQUIPMENT SHALL BE PROVIDED WITH EMCS-COMPATIBLE
CONTROLS TO RESULT IN FULLY FUNCTIONING SYSTEM COMPONENTS.
F. CONTRACTOR TO RECORD AND PROVIDE TO LOCAL USACE PM THE
AIR-SIDE PERFORMANCE OF ALL AHUS TO BE MODIFIED PRIOR TO
WORK ON AHUS, AND SHALL REBALANCE AIR-SIDE AND WATER-SIDE
COMPONENTS AFTER INSTALLATION OF PRE-HEAT COILS.
G. CONTRACTOR TO PROVIDE ALL REQUIRED HARDWARE, SOFTWARE,
AND PROGRAMMING TO INTEGRATE NEW COMPONENTS WITH
EXISTING EMCS.
H. PROVIDE MANUAL BALANCING VALVES AT ALL HWS BRANCH LINES FOR
USE IN SYSTEM BALANCING.
2 EXTEND NEW HWS AND HWR PIPING TO AHU FOR CONNECTION TO
REPLACEMENT HEATING WATER PREHEAT COIL WITH 3-WAY VALVE.
REFER TO HOT WATER PREHEAT COIL DETAIL ON SHEET M-500.
3 INSTALL REPLACEMENT HEATING WATER COIL. REFER TO PREHEAT
COIL SCHEDULE ON M-600 FOR SPECIFIC COIL TO FIT EXISTING AIR
HANDLER.
4 CONNECT NEW HWS AND HWR TO EXISTING HWS AND HWR PIPING
FEEDING FROM PREVIOUS CONNECTION TO CONVERTER BEING
REPLACED. PROVIDE ISOLATION VALVES.
5 CONNECT NEW DOMESTIC HOT WATER GENERATOR TO EXISTING
TANKS.
M
AR
K D
ES
C
R
IP
TI
O
N D
DNUP DNUP
A
B
C
D
E
F
H
J
G
2 3 4 5 6
7 8 9 10 12 15 18 20 22 24 26 28 30 32 33 34 35 36 37 38 39
L
N
Q
S
U
K
M
P
R
312927
MM
WW
DD
191716
O
S
U
W
Y
BB
VV
UU
TT
SS
AREA OUTSIDE
OF CONTRACT
AHU-1A1
HWS
2"ø
HWR
2"ø
HWS
3"ø
HWR
3"ø
HWR
1 1/4"ø
HWS
1 1/2"ø
HWS
4"ø
HWR
4"ø
HWR
2 1/2"ø
HWS
2 1/2"ø
HWR
1 1/4"ø
HWS
1 1/4"ø
M-202
M-202
7 6
HWR
3"ø
HWS
3"ø
L I CEN DES
61431P R
O
FESS ION AL ENGIN
EE
R
STATE OF TEXAS
DAVID J. BRANSON
160 64
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
FO
R T
W O
R
TH
D
IS
TR
IC
T
TA
YL
O
R S
TR
EE
T -R
M
A1
FO
R
T W
O R
TH
, T
X
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
SE
C
O N
D T
IT
LE
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N U
M
BE
R
Compliance Services Group, Inc.
Texas Registered Engineering Firm F-1070
Engineers - Architects - Scientists
D
AR
N
AL
L
LO
O
P
FO
R T
H O
O D
, T X
R
EN
O
VA
TE
B
0, C O
N
VE
RT
HI
G H
PR
ES
SU
RE
S
TE
AM
(H
PS
)T
O H
O T
W
AT
ER
(H
W
SE
VE
N G
EN
ER
AT
IO
N S
A+ E
E.
M
IC
H
IG
AN
A
VE
SU
IT
E
B
KA
LA
M
AZ
O
O , M
I 4
W
2G -1
8- F-
W
2G -1
7- D
-0
B3
A-
C
PF
B36000
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
M-102
M
EC
H
AN
IC
AL
FI
R
ST
FL
O
O R
C
SG
G
EC
D
JB
M
AR
C
H
100% SUBMISSION
NORTH
1/32" = 1'-0"
FIRST FLOOR - MECHANICAL
NOTES INDICATED BY " "
1 HEATING WATER PIPING UP FROM BOILER ROOM TO FEED AHU-1A1.
2 HEATING WATER PIPING UP AND DOWN WITH CONNECTION TO FEED TO
CONVERTER.
3 HEATING WATER PIPING UP AND DOWN IN CHASE.
4 HEATING WATER PIPING RUN ABOVE PARTITION AND DOWN INTO
MECHANICAL ROOM GE1.
5 HEATING WATER PIPING RUN FROM BELOW TO MECHANICAL ROOM
1D1.
GENERAL NOTES:
A. ALL EXISTING STEAM AND CONDENSATE RETURN LINES ARE TO
REMAIN IN PLACE AND ACTIVE UNTIL SPECIFICALLY REMOVED OR
ABANDONED-IN-PLACE AS A STAGE OF CONSTRUCTION UNDER THIS
PROJECT. ALL STEAM AND CONDENSATE RETURN LINES THAT ARE
ABANDONED-IN-PLACE SHALL BE LABELED AS "AIP" BY STENCIL OR
STICKER.
B. -B. CONTRACTOR TO STAGE CONSTRUCTION SO THAT DOWNTIME FOR
EQUIPMENT BEING SERVED IS MINIMIZED.
C. CONTRACTOR TO SEPARATE CONSTRUCTION AREA FROM ADJACENT
SPACES SO CONSTRUCTION WILL NOT IMPEDE OCCUPANTS OF
ADJACENT SPACES IN THEIR NORMAL OPERATION.
D. PROVIDE LABELING ON ALL NEW PIPING WHICH INDICATES SERVICE
AND DIRECTION OF FLOW.
E. ALL NEW EQUIPMENT SHALL BE PROVIDED WITH EMCS-COMPATIBLE
CONTROLS TO RESULT IN FULLY FUNCTIONING SYSTEM COMPONENTS.
F. CONTRACTOR TO RECORD AND PROVIDE TO LOCAL USACE PM THE
AIR-SIDE PERFORMANCE OF ALL AHUS TO BE MODIFIED PRIOR TO
WORK ON AHUS, AND SHALL REBALANCE AIR-SIDE AND WATER-SIDE
COMPONENTS AFTER INSTALLATION OF PRE-HEAT COILS.
G. CONTRACTOR TO PROVIDE ALL REQUIRED HARDWARE, SOFTWARE,
AND PROGRAMMING TO INTEGRATE NEW COMPONENTS WITH
EXISTING EMCS.
H. PROVIDE MANUAL BALANCING VALVES AT ALL HWS BRANCH LINES FOR
USE IN SYSTEM BALANCING.
6 EXTEND NEW HWS AND HWR PIPING TO AHU FOR CONNECTION TO
REPLACEMENT HEATING WATER PREHEAT COIL WITH 3-WAY VALVE.
REFER TO HOT WATER PREHEAT COIL DETAIL ON SHEET M-500.
7 INSTALL REPLACEMENT HEATING WATER COIL. REFER TO PREHEAT
COIL SCHEDULE ON M-600 FOR SPECIFIC COIL TO FIT EXISTING AIR
HANDLER.
8 CONNECT NEW HWS AND HWR TO EXISTING HWS AND HWR PIPING
FEEDING FROM PREVIOUS CONNECTION TO CONVERTER BEING
REPLACED. PROVIDE ISOLATION VALVES.
M
AR
K D
ES
C
R
IP
TI
O
N D
B
C
D
E
F
H
J
G
2 3 4 5 6
7 8 9 10 12 18 20 22 24 26 28 30 32 33 34 35 36 37 38 39
L
N
Q
S
U
K
M
P
R
312927
MM
WW
DD
O
S
U
W
Y
BB
VV
UU
TT
SS
Z
AHU-2C3
AHU-2E1
AHU-2E2
AHU-2E3
AREA OUTSIDE
OF CONTRACT
AHU-2C2
AHU-2C1
HWR
2"ø
HWS
2"ø
HWR
2"ø
HWS
2"ø
HWR
3"ø
HWS
3"ø
HWS
3"ø
HWR
3"ø
HWR
1 1/4"ø HWS 1 1/2"ø
HWR
2 1/2"ø
HWS
2 1/2"ø
M-203
M-203
4 5
L I CEN DES
61431P R
O
FESS ION AL ENGIN
EE
R
STATE OF TEXAS
DAVID J. BRANSON
160 64
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
FO
R T
W O
R
TH
D
IS
TR
IC
T
TA
YL
O
R S
TR
EE
T -R
M
A1
FO
R
T W
O R
TH
, T
X
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
SE
C
O N
D T
IT
LE
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N U
M
BE
R
Compliance Services Group, Inc.
Texas Registered Engineering Firm F-1070
Engineers - Architects - Scientists
D
AR
N
AL
L
LO
O
P
FO
R T
H O
O D
, T X
R
EN
O
VA
TE
B
0, C O
N
VE
RT
HI
G H
PR
ES
SU
RE
S
TE
AM
(H
PS
)T
O H
O T
W
AT
ER
(H
W
SE
VE
N G
EN
ER
AT
IO
N S
A+ E
E.
M
IC
H
IG
AN
A
VE
SU
IT
E
B
KA
LA
M
AZ
O
O , M
I 4
W
2G -1
8- F-
W
2G -1
7- D
-0
B3
A-
C
PF
B36000
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
M-103
M
EC
H
AN
IC
AL
SE
C O
N D
FL
O
O R
C
SG
G
EC
D
JB
M
AR
C
H
100% SUBMISSION
NORTH
1/32" = 1'-0"
SECOND FLOOR - MECHANICAL
NOTES INDICATED BY " "
1 HEATING WATER SUPPLY AND RETURN PIPING FROM BELOW TO
MECHANICAL ROOM 2C
2 HEATING WATER SUPPLY AND RETURN PIPING UP AND DOWN IN
CHASE.
3 HEATING WATER SUPPLY AND RETURN PIPING UP TO MECHANICAL
ROOM 2E.
GENERAL NOTES:
A. ALL EXISTING STEAM AND CONDENSATE RETURN LINES ARE TO
REMAIN IN PLACE AND ACTIVE UNTIL SPECIFICALLY REMOVED OR
ABANDONED-IN-PLACE AS A STAGE OF CONSTRUCTION UNDER THIS
PROJECT. ALL STEAM AND CONDENSATE RETURN LINES THAT ARE
ABANDONED-IN-PLACE SHALL BE LABELED AS "AIP" BY STENCIL OR
STICKER.
B. -B. CONTRACTOR TO STAGE CONSTRUCTION SO THAT DOWNTIME FOR
EQUIPMENT BEING SERVED IS MINIMIZED.
C. CONTRACTOR TO SEPARATE CONSTRUCTION AREA FROM ADJACENT
SPACES SO CONSTRUCTION WILL NOT IMPEDE OCCUPANTS OF
ADJACENT SPACES IN THEIR NORMAL OPERATION.
D. PROVIDE LABELING ON ALL NEW PIPING WHICH INDICATES SERVICE
AND DIRECTION OF FLOW.
E. ALL NEW EQUIPMENT SHALL BE PROVIDED WITH EMCS-COMPATIBLE
CONTROLS TO RESULT IN FULLY FUNCTIONING SYSTEM COMPONENTS.
F. CONTRACTOR TO RECORD AND PROVIDE TO LOCAL USACE PM THE
AIR-SIDE PERFORMANCE OF ALL AHUS TO BE MODIFIED PRIOR TO
WORK ON AHUS, AND SHALL REBALANCE AIR-SIDE AND WATER-SIDE
COMPONENTS AFTER INSTALLATION OF PRE-HEAT COILS.
G. CONTRACTOR TO PROVIDE ALL REQUIRED HARDWARE, SOFTWARE,
AND PROGRAMMING TO INTEGRATE NEW COMPONENTS WITH
EXISTING EMCS.
H. PROVIDE MANUAL BALANCING VALVES AT ALL HWS BRANCH LINES FOR
USE IN SYSTEM BALANCING.
4 EXTEND NEW HWS AND HWR PIPING TO AHU FOR CONNECTION TO
REPLACEMENT HEATING WATER PREHEAT COIL WITH 3-WAY VALVE.
REFER TO HOT WATER PREHEAT COIL DETAIL ON SHEET M-500.
5 INSTALL REPLACEMENT HEATING WATER COIL.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.