G

F

E

D

C

B

A

US Army Corps of Engineers ®

FORT WORTH DISTRICT

36000 DARNALL LOOP,

FT. HOOD, TX 76544

RENOVATE 836000,

CONVERT HPS TO HW

836000

A/E PROJECT#: 218029

PROJECT TEAM

OWNER:

US ARMY CORPS OF ENGINEERS

FORT WORTH DISTRICT

819 TAYLOR STREET - RM 4A 17

FORT WORTH, TEXAS 7 6102

ARCHITECTURE

SEVEN GENERATIONS A+E

600 E. MICHIGAN AVENUE - SUITE B

KALAMAZOO, MICHIGAN 49007

PH: 269-927-0144

FX: 269-593-5933

MEP ENGINEERING

CSG, INC.

5202 COUNTY RD 7350 - SUITE A

LUBBOCK, TX 79424

PH: 806-748-0040

PROJECT# AD009747P

CONTRACT # W91151-19-C-XXXX

TECHNICAL EXHIBIT "B"

FOR BIDDING PURPOSES ONLY.

4 5 6

DRAWING SHEET INDEX

SHEET

G-001

G-002

ADl00

ADl00A

ADl00B

ADl00C

ADl00D

ADl00E

ADl0l

ADl0lA

ADl 01 B

ADl0lC

AD102

AD102A

AD102B

AD102C

AD103

AD103A

AD103B

AD104

AD105

AD106

A-120

A-l20A

A-l20B

A-l20C

A-l20D

A-l20E

A-121

A-l21A

A-121 B

A-121 C

A-122

A-l22A

A-l22B

A-l22C

A-123

A-l23A

A-l23B

A-124

A-125

A-126

F-100

F-101

F-102

F-103

F-104

F-105

M-000

MDl00

MDl0l

MD102

MD103

MD104

MD105

MD106

MD107

MD200

DESCRIPTION

TITLE

GENERAL INFORMATION & SYMBOL SHEET

COMPOSITE GROUND FLOOR DEMOLITION PLAN

GROUND FLOOR DEMOLITION PLAN - UNIT A

GROUND FLOOR DEMOLITION PLAN - UNIT B

GROUND FLOOR DEMOLITION PLAN - UNIT C

GROUND FLOOR DEMOLITION PLAN - UNIT D

GROUND FLOOR DEMOLITION PLAN - UNIT E

COMPOSITE FIRST FLOOR DEMOLITION PLAN

FIRST FLOOR DEMOLITION PLAN - UNIT A

FIRST FLOOR DEMOLITION PLAN - UNIT B

FIRST FLOOR DEMOLITION PLAN - UNIT C

COMPOSITE SECOND FLOOR DEMOLITION PLAN

SECOND FLOOR DEMOLITION PLAN - UNIT A

SECOND FLOOR DEMOLITION PLAN - UNIT B

SECOND FLOOR DEMOLITION PLAN - UNIT C

COMPOSITE THIRD FLOOR DEMOLITION PLAN

THIRD FLOOR DEMOLITION PLAN - UNIT A

THIRD FLOOR DEMOLITION PLAN - UNIT B

FOURTH FLOOR DEMOLITION PLAN

FIFTH FLOOR DEMOLITION PLAN

PENTHOUSE DEMOLITION PLAN

COMPOSITE GROUND FLOOR REFLECTED CEILING PLAN

GROUND FLOOR REFLECTED CEILING PLAN - UNIT A

GROUND FLOOR REFLECTED CEILING PLAN - UNIT B

GROUND FLOOR REFLECTED CEILING PLAN - UNIT C

GROUND FLOOR REFLECTED CEILING PLAN - UNIT D

GROUND FLOOR REFLECTED CEILING PLAN - UNIT E

COMPOSITE FIRST FLOOR REFLECTED CEILING PLAN

FIRST FLOOR REFLECTED CEILING PLAN - UNIT A

FIRST FLOOR REFLECTED CEILING PLAN - UNIT B

FIRST FLOOR REFLECTED CEILING PLAN - UNIT C

COMPOSITE SECOND FLOOR REFLECTED CEILING PLAN

SECOND FLOOR REFLECTED CEILING PLAN - UNIT A

SECOND FLOOR REFLECTED CEILING PLAN - UNIT B

SECOND FLOOR REFLECTED CEILING PLAN - UNIT C

COMPOSITE THIRD FLOOR REFLECTED CEILING PLAN

THIRD FLOOR REFLECTED CEILING PLAN - UNIT A

THIRD FLOOR REFLECTED CEILING PLAN - UNIT B

FOURTH FLOOR REFLECTED CEILING PLAN

FIFTH FLOOR REFLECTED CEILING PLAN

PENTHOUSE REFLECTED CEILING PLAN

FIRE PROTECTION - GROUND FLOOR

FIRE PROTECTION - FIRST FLOOR

FIRE PROTECTION - SECOND FLOOR

FIRE PROTECTION - THIRD FLOOR

FIRE PROTECTION - FOURTH FLOOR

FIRE PROTECTION - FIFTH FLOOR

MECHANICAL LEGENDS

MECHANICAL DEMOLITION PLAN - CRAWL SPACE

MECHANICAL DEMOLITION PLAN - GROUND FLOOR

MECHANICAL DEMOLITION PLAN - FIRST FLOOR

MECHANICAL DEMOLITION PLAN - SECOND FLOOR

MECHANICAL DEMOLITION PLAN - THIRD FLOOR

MECHANICAL DEMOLITION PLAN - FOURTH FLOOR

MECHANICAL DEMOLITION PLAN - FIFTH FLOOR

MECHANICAL DEMOLITION PLAN - PENTHOUSE

MECHANICAL DEMOLITION PLAN - ENLARGED

BOILER ROOM

ISSUE DATE

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

SHEET

M-100

M-101

M-102

M-103

M-104

M-105

M-106

M-107

M-200

M-201

M-202

M-203

M-204

M-500

M-600

MC400

MC40l

MC600

E-001

ED400

E-100

E-l 01

E-102

E-103

E-104

E-105

E-400

8 9

DESCRIPTION

MECHANICAL - CRAWL SPACE

MECHANICAL - GROUND FLOOR

MECHANICAL - FIRST FLOOR

MECHANICAL - SECOND FLOOR

MECHANICAL - THIRD FLOOR

MECHANICAL - FOURTH FLOOR

MECHANICAL - FIFTH FLOOR

MECHANICAL - PENTHOUSE

MECHANICAL - ENLARGED BOILER ROOM

MECHANICAL - ENLARGED MECHANICAL ROOMS

MECHANICAL - ENLARGED MECHANICAL ROOMS

MECHANICAL - ENLARGED MECHANICAL ROOMS

MECHANICAL - ENLARGED MECHANICAL ROOMS

MECHANICAL DETAILS

MECHANICAL SCHEDULES

MECHANICAL CONTROLS DIAGRAMS

MECHANICAL CONTROLS DIAGRAMS

MECHANICAL CONTROLS SCHEDULES

ELECTRICAL SYMBOL LEGEND

ISSUE DATE

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

ENLARGED MECHANICAL ROOM DEMOLITION PLAN

ELECTRICAL - GROUND FLOOR

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

15 MARCH 2019

ELECTRICAL - FIRST FLOOR

ELECTRICAL - SECOND FLOOR

ELECTRICAL - THIRD FLOOR

ELECTRICAL - FOURTH FLOOR

ELECTRICAL - FIFTH FLOOR

ELECTRICAL - ENLARGED BOILER ROOM PLAN

LOCATION MAP

Tanko ,.

estroyer Blvd

Tank Destroyer Blvd

15 MARCH 2019

Tanko esrroye, Blvd

_____.._ PROJECT

LOCATION

y In " 'l'°'I

Mission Training ft Complex T

,re I al On T

Carl R. Darnall Army Medical Center

ASAPQ

t-.,4edk:al c.nttr Road

FORT HOOD, TEXAS

Marvin Leath r.ti Visitor Center Y

NORTH

I

US Army Corps of Engineers ® w

C w

C m �ra ·:□

.. 0 z'1' 09 04 zo W<N f- ,-!. w<I -., ...J �"7 (.) -

�ci0 a! f-(!) �c!i -"' f-� f-Z W<( �"' � ::E _,_ z- <I.IW U)

"' om 0"' 0:: ...J w_ UJ:i: (.) :i: u::: u:::

w...J f-

0z o_ � >' (.)o wo ID 0 UJ (!) >' 0 0 w ----ID w � !::z z (.) �� 18 w c.. �� w (!) I:,; � (!) o,-.. OUJ (.) w U),-..

U)

0:: ...

w ::i:

WI- -.:t- N � u � � (!) ci: 0:: "' z I- I I"--w !11>- ><

ID

wW + t::: t-,..<�o

U)UJ 0

z, "'

_w_ u..i ci5 �z

UJ<(

LL t:l W I-0 w -Io:: I Clll- t-- 1-f- ;,: ::E �zow <(0 c.. 0:: UJ 0::

ifjQ � 0:: 0 o:: 0

8 :i:o s= (!) I ::E >- I- _J t-- z�< ::E 0:: � a'. w :;; ...J a'. 0 f-0 > -�

LL.

o:i u.. ww

UJ 0

U)

- 0

� CX) "'

SHEET ID

B36000

G-001

100% SUBMISSION

A

B

C

D

E

F

H

J

G

2 3 4 5 6

7 8 9 10 12 15 18 20 22 24 26 28 30 32 33 34 35 36 37 38 39

L

N

Q

S

U

K

M

P

R

T

V

X

AA

EE

JJ

NN

3129272523

RR

QQ

MM

WW

DD

24 " ( 61 CM )

24 "

24 "

B

L I CEN DES

61431P R

O

FESS ION AL ENGIN

EE

R

STATE OF TEXAS

DAVID J. BRANSON

160 64

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

FO

R T

W O

R

TH

D

IS

TR

IC

T

TA

YL

O

R S

TR

EE

T -R

M

A1

FO

R

T W

O R

TH

, T

X

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

SE

C

O N

D T

IT

LE

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

Compliance Services Group, Inc.

Texas Registered Engineering Firm F-1070

Engineers - Architects - Scientists

D

AR

N

AL

L

LO

O

P

FO

R T

H O

O D

, T X

R

EN

O

VA

TE

B

0, C O

N

VE

RT

HI

G H

PR

ES

SU

RE

S

TE

AM

(H

PS

)T

O H

O T

W

AT

ER

(H

W

SE

VE

N G

EN

ER

AT

IO

N S

A+ E

E.

M

IC

H

IG

AN

A

VE

SU

IT

E

B

KA

LA

M

AZ

O

O , M

I 4

W

2G -1

8- F-

W

2G -1

7- D

-0

B3

A-

C

PF

B36000

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

F-100

FI

R

E

PR

O

TE

C

TI

O N

G

R O

U N

D F

LO

O

R

C

SG

D C

B

D

JB

M

AR

C

H

100% SUBMISSION

GENERAL NOTES:

A. HATCHING INDICATES AREAS WHERE CEILINGS ARE TO BE

TEMPORARILY REMOVED FOR INSTALLATION OF PIPING AND THEN

REPLACED. CONTRACTOR TO TEMPORARILY REMOVE SPRINKLER

ESCUTCHEONS AND FIRE ALARM DEVICES IN THESE AREAS AND

RE-INSTALL AT COMPLETION OF WORK. RE-CERTIFY THESE FIRE

ALARM DEVICES AFTER RE-INSTALLATION.

NORTH

1/32" = 1'-0"

GROUND FLOOR - FIRE PROTECTION

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DNUP

A

B

C

D

E

F

H

J

G

2 3 4 5 6

7 8 9 10 12 15 18 20 22 24 26 28 30 32 33 34 35 36 37 38 39

L

N

Q

S

U

K

M

P

R

T

V

X

AA

EE

JJ

NN

312927

QQ

MM

WW

DD

RR

191716

O

S

U

W

Y

BB

VV

UU

TT

SS

L I CEN DES

61431P R

O

FESS ION AL ENGIN

EE

R

STATE OF TEXAS

DAVID J. BRANSON

160 64

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

FO

R T

W O

R

TH

D

IS

TR

IC

T

TA

YL

O

R S

TR

EE

T -R

M

A1

FO

R

T W

O R

TH

, T

X

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

SE

C

O N

D T

IT

LE

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

Compliance Services Group, Inc.

Texas Registered Engineering Firm F-1070

Engineers - Architects - Scientists

D

AR

N

AL

L

LO

O

P

FO

R T

H O

O D

, T X

R

EN

O

VA

TE

B

0, C O

N

VE

RT

HI

G H

PR

ES

SU

RE

S

TE

AM

(H

PS

)T

O H

O T

W

AT

ER

(H

W

SE

VE

N G

EN

ER

AT

IO

N S

A+ E

E.

M

IC

H

IG

AN

A

VE

SU

IT

E

B

KA

LA

M

AZ

O

O , M

I 4

W

2G -1

8- F-

W

2G -1

7- D

-0

B3

A-

C

PF

B36000

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

F-101

FI

R

E

PR

O

TE

C

TI

O N

FI

R

ST

FL

O

O R

C

SG

D C

B

D

JB

M

AR

C

H

100% SUBMISSION

GENERAL NOTES:

A. HATCHING INDICATES AREAS WHERE CEILINGS ARE TO BE

TEMPORARILY REMOVED FOR INSTALLATION OF PIPING AND THEN

REPLACED. CONTRACTOR TO TEMPORARILY REMOVE SPRINKLER

ESCUTCHEONS AND FIRE ALARM DEVICES IN THESE AREAS AND

RE-INSTALL AT COMPLETION OF WORK. RE-CERTIFY THESE FIRE

ALARM DEVICES AFTER RE-INSTALLATION.

NORTH

1/32" = 1'-0"

FIRST FLOOR - FIRE PROTECTION

M

AR

K D

ES

C

R

IP

TI

O

N D

L I CEN DES

61431P R

O

FESS ION AL ENGIN

EE

R

STATE OF TEXAS

DAVID J. BRANSON

160 64

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

FO

R T

W O

R

TH

D

IS

TR

IC

T

TA

YL

O

R S

TR

EE

T -R

M

A1

FO

R

T W

O R

TH

, T

X

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

SE

C

O N

D T

IT

LE

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

Compliance Services Group, Inc.

Texas Registered Engineering Firm F-1070

Engineers - Architects - Scientists

D

AR

N

AL

L

LO

O

P

FO

R T

H O

O D

, T X

R

EN

O

VA

TE

B

0, C O

N

VE

RT

HI

G H

PR

ES

SU

RE

S

TE

AM

(H

PS

)T

O H

O T

W

AT

ER

(H

W

SE

VE

N G

EN

ER

AT

IO

N S

A+ E

E.

M

IC

H

IG

AN

A

VE

SU

IT

E

B

KA

LA

M

AZ

O

O , M

I 4

W

2G -1

8- F-

W

2G -1

7- D

-0

B3

A-

C

PF

B36000

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

F-102

FI

R

E

PR

O

TE

C

TI

O N

SE

C O

N D

F

LO

O R

C

SG

D C

B

D

JB

M

AR

C

H

100% SUBMISSION

NORTH

1/32" = 1'-0"

SECOND FLOOR - FIRE PROTECTION

GENERAL NOTES:

A. HATCHING INDICATES AREAS WHERE CEILINGS ARE TO BE

TEMPORARILY REMOVED FOR INSTALLATION OF PIPING AND THEN

REPLACED. CONTRACTOR TO TEMPORARILY REMOVE SPRINKLER

ESCUTCHEONS AND FIRE ALARM DEVICES IN THESE AREAS AND

RE-INSTALL AT COMPLETION OF WORK. RE-CERTIFY THESE FIRE

ALARM DEVICES AFTER RE-INSTALLATION.

M

AR

K D

ES

C

R

IP

TI

O

N D

R

O

FESS ION AL ENGIN

EE

R

STATE OF TEXAS

DAVID J. BRANSON

160 64

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

FO

R T

W O

R

TH

D

IS

TR

IC

T

TA

YL

O

R S

TR

EE

T -R

M

A1

FO

R

T W

O R

TH

, T

X

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

SE

C

O N

D T

IT

LE

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

Compliance Services Group, Inc.

Texas Registered Engineering Firm F-1070

Engineers - Architects - Scientists

D

AR

N

AL

L

LO

O

P

FO

R T

H O

O D

, T X

R

EN

O

VA

TE

B

0, C O

N

VE

RT

HI

G H

PR

ES

SU

RE

S

TE

AM

(H

PS

)T

O H

O T

W

AT

ER

(H

W

SE

VE

N G

EN

ER

AT

IO

N S

A+ E

E.

M

IC

H

IG

AN

A

VE

SU

IT

E

B

KA

LA

M

AZ

O

O , M

I 4

W

2G -1

8- F-

W

2G -1

7- D

-0

B3

A-

C

PF

B36000

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

F-103

FI

R

E

PR

O

TE

C

TI

O N

TH

IR

D

FL

O

O R

C

SG

D C

B

D

JB

M

AR

C

H

100% SUBMISSION

NORTH

1/32" = 1'-0"

THIRD FLOOR - FIRE PROTECTION

GENERAL NOTES:

A. HATCHING INDICATES AREAS WHERE CEILINGS ARE TO BE

TEMPORARILY REMOVED FOR INSTALLATION OF PIPING AND THEN

REPLACED. CONTRACTOR TO TEMPORARILY REMOVE SPRINKLER

ESCUTCHEONS AND FIRE ALARM DEVICES IN THESE AREAS AND

RE-INSTALL AT COMPLETION OF WORK. RE-CERTIFY THESE FIRE

ALARM DEVICES AFTER RE-INSTALLATION.

M

AR

K D

ES

C

R

IP

TI

O

N D

R

O

FESS ION AL ENGIN

EE

R

STATE OF TEXAS

DAVID J. BRANSON

160 64

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

FO

R T

W O

R

TH

D

IS

TR

IC

T

TA

YL

O

R S

TR

EE

T -R

M

A1

FO

R

T W

O R

TH

, T

X

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

SE

C

O N

D T

IT

LE

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

Compliance Services Group, Inc.

Texas Registered Engineering Firm F-1070

Engineers - Architects - Scientists

D

AR

N

AL

L

LO

O

P

FO

R T

H O

O D

, T X

R

EN

O

VA

TE

B

0, C O

N

VE

RT

HI

G H

PR

ES

SU

RE

S

TE

AM

(H

PS

)T

O H

O T

W

AT

ER

(H

W

SE

VE

N G

EN

ER

AT

IO

N S

A+ E

E.

M

IC

H

IG

AN

A

VE

SU

IT

E

B

KA

LA

M

AZ

O

O , M

I 4

W

2G -1

8- F-

W

2G -1

7- D

-0

B3

A-

C

PF

B36000

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

F-104

FI

R

E

PR

O

TE

C

TI

O N

FO

U R

TH

F

LO

O

R

C

SG

D C

B

D

JB

M

AR

C

H

100% SUBMISSION

NORTH

1/32" = 1'-0"

FOURTH FLOOR - FIRE PROTECTION

GENERAL NOTES:

A. HATCHING INDICATES AREAS WHERE CEILINGS ARE TO BE

TEMPORARILY REMOVED FOR INSTALLATION OF PIPING AND THEN

REPLACED. CONTRACTOR TO TEMPORARILY REMOVE SPRINKLER

ESCUTCHEONS AND FIRE ALARM DEVICES IN THESE AREAS AND

RE-INSTALL AT COMPLETION OF WORK. RE-CERTIFY THESE FIRE

ALARM DEVICES AFTER RE-INSTALLATION.

M

AR

K D

ES

C

R

IP

TI

O

N D

R

O

FESS ION AL ENGIN

EE

R

STATE OF TEXAS

DAVID J. BRANSON

160 64

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

FO

R T

W O

R

TH

D

IS

TR

IC

T

TA

YL

O

R S

TR

EE

T -R

M

A1

FO

R

T W

O R

TH

, T

X

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

SE

C

O N

D T

IT

LE

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

Compliance Services Group, Inc.

Texas Registered Engineering Firm F-1070

Engineers - Architects - Scientists

D

AR

N

AL

L

LO

O

P

FO

R T

H O

O D

, T X

R

EN

O

VA

TE

B

0, C O

N

VE

RT

HI

G H

PR

ES

SU

RE

S

TE

AM

(H

PS

)T

O H

O T

W

AT

ER

(H

W

SE

VE

N G

EN

ER

AT

IO

N S

A+ E

E.

M

IC

H

IG

AN

A

VE

SU

IT

E

B

KA

LA

M

AZ

O

O , M

I 4

W

2G -1

8- F-

W

2G -1

7- D

-0

B3

A-

C

PF

B36000

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

F-105

FI

R

E

PR

O

TE

C

TI

O N

FI

FT

H

FL

O

O R

C

SG

D C

B

D

JB

M

AR

C

H

100% SUBMISSION

NORTH

1/32" = 1'-0"

FIFTH FLOOR - FIRE PROTECTION

M

AR

K D

ES

C

R

IP

TI

O

N D

R

O

FESS ION AL ENGIN

EE

R

STATE OF TEXAS

DAVID J. BRANSON

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

FO

R T

W O

R

TH

D

IS

TR

IC

T

TA

YL

O

R S

TR

EE

T -R

M

A1

FO

R

T W

O R

TH

, T

X

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

SE

C

O N

D T

IT

LE

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

Compliance Services Group, Inc.

Texas Registered Engineering Firm F-1070

Engineers - Architects - Scientists

D

AR

N

AL

L

LO

O

P

FO

R T

H O

O D

, T X

R

EN

O

VA

TE

B

0, C O

N

VE

RT

HI

G H

PR

ES

SU

RE

S

TE

AM

(H

PS

)T

O H

O T

W

AT

ER

(H

W

SE

VE

N G

EN

ER

AT

IO

N S

A+ E

E.

M

IC

H

IG

AN

A

VE

SU

IT

E

B

KA

LA

M

AZ

O

O , M

I 4

W

2G -1

8- F-

W

2G -1

7- D

-0

B3

A-

C

PF

B36000

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

M-000

M

EC

H

AN

IC

AL

L

EG

EN

D

S

C

SG

G

EC

D

JB

M

AR

C

H

100% SUBMISSION

MARK SYSTEM TYPE

HWS HEATING WATER SUPPLY

HWR HEATING WATER RETURN

CWS COOLING WATER SUPPLY

CWR COOLING WATER RETURN

GCR GRAVITY CONDENSATE RETURN

PCR PUMPED CONDENSATE RETURN

CR-### CONDENSATE RETURN AT INDICATED PRESSURE

S-### STEAM AT INDICATED PRESSURE

SYMBOL MEANING

PIPING TURNING DOWN

PIPING TURNING UP

PIPING TRANSITION

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

BUTTERFLY VALVE

AHU-GD3

AHU-GD2

AHU-GD1

CRU-GE1

S-

4" ø

PCR

1 1/4"ø

G C

R 4" ø

G C

R 1" ø

GCR

1"ø

S-

1/

4" ø

S-

1/

2" ø

GCR

1 1/4"ø

S-

1/

2" ø

GCR

1"ø

GCR

1"ø

G C

R 3" ø

GCR

1 1/4"ø

GCR

3"ø

G C

R

1/ 2" ø

GCR

3/4"ø

G C

R

1/ 2" ø

GCR

4"ø

GCR

4"ø

G C

R 2" ø

S-

3" ø

S-

3/ 4" ø

S-

3/ 4" ø

GCR

4"ø

S-35 6"ø

S-35 6"ø

G C

R 3" ø

GCR

3/4"ø

PC

R

1/

4" ø

C R

-6

3" ø

GCR

2 1/2"ø

CR-60

1 1/4"ø

CR-60

3"ø

C R

-6

1/

4" ø

CR-60

4"ø

CR-60

1 1/4"ø

C R

-6

1/

4" ø

PCR

3"ø

PCR

3"ø

PC

R

3" ø

PCR

3"ø

CR-100

3/4"ø

C R

-1

3/ 4" ø

CR-100

3/4"ø CR-100

3/4"ø

PC

R

1/

4" ø

GCR

1 1/2"ø

GCR

3/4"ø

GCR

1"ø

GCR

3"ø

GCR

1 1/4"ø

S-35 3"ø

7 8

L I CEN DES

61431P R

O

FESS ION AL ENGIN

EE

R

STATE OF TEXAS

DAVID J. BRANSON

160 64

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

FO

R T

W O

R

TH

D

IS

TR

IC

T

TA

YL

O

R S

TR

EE

T -R

M

A1

FO

R

T W

O R

TH

, T

X

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

SE

C

O N

D T

IT

LE

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

Compliance Services Group, Inc.

Texas Registered Engineering Firm F-1070

Engineers - Architects - Scientists

D

AR

N

AL

L

LO

O

P

FO

R T

H O

O D

, T X

R

EN

O

VA

TE

B

0, C O

N

VE

RT

HI

G H

PR

ES

SU

RE

S

TE

AM

(H

PS

)T

O H

O T

W

AT

ER

(H

W

SE

VE

N G

EN

ER

AT

IO

N S

A+ E

E.

M

IC

H

IG

AN

A

VE

SU

IT

E

B

KA

LA

M

AZ

O

O , M

I 4

W

2G -1

8- F-

W

2G -1

7- D

-0

B3

A-

C

PF

B36000

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

MD100

M

EC

H

AN

IC

AL

D

EM

O

LI

TI

O

N

PL

AN

C R

AW

L

SP

AC

E

C

SG

G

EC

D

JB

M

AR

C

H

100% SUBMISSION

NORTH

1/32" = 1'-0"

CRAWL SPACE - MECHANICAL DEMOLITION

NOTES INDICATED BY " "

1 1" GCR PIPING UP TO AHU-GC1 TO BE ABANDONED IN PLACE.

2 1-1/4" GCR PIPING UP TO AHU-GC2 TO BE ABANDONED IN PLACE.

3 3/4" S-35 AND GCR PIPING UP TO KETTLE (600#/HR) TO BE ABANDONED

IN PLACE.

4 3/4" S-35 AND GCR PIPING UP TO BOOSTER HTR. (1035#/HR) TO BE

ABANDONED IN PLACE.

5 3/4" S-35 PIPING UP TO POT WASHER (345#/HR) TO BE ABANDONED IN

PLACE.

6 3/4" S-35 AND GCR PIPING UP TO KETTLE (690#/HR). FOUR PAIRS. TO

BE ABANDONED IN PLACE.

7 1-1/4" S-35 PIPING UP TO SANITIZER (1725#/HR NO RETURN) TO BE

ABANDONED IN PLACE.

8 1-1/4" S-35 PIPING UP TO DISHWASHER (1725#/HR) TO BE ABANDONED

IN PLACE.

9 3/4" GCR PIPING FROM DISHWASHER TO BE ABANDONED IN PLACE.

10 1-1/2" S-35 PIPING UP TO DISHWASHER DRYER (1700#/HR) TO BE

ABANDONED IN PLACE.

11 1-1/4" GCR PIPING UP TO "CART WASH" TO BE ABANDONED IN PLACE.

18 ALL STEAM AND CONDENSATE RETURN PIPES CONNECTED TO

CONVERTERS AND OTHER EQUIPMENT IN M6 TO BE REMOVED BACK

TO WALL AND ABANDONED IN PLACE.

13 1" GCR PIPING DOWN FROM AHU-GE2 TO BE ABANDONED IN PLACE.

14 1" GCR PIPING DOWN FROM AHU-GE1 TO BE ABANDONED IN PLACE.

15 3/4" GCR PIPING DOWN FROM ROOM GE-1 TO BE ABANDONED IN PLACE.

16 CONDENSATE RETURN UNIT HAS A 30" X 48" ACCESS DOOR IN SLAB

ABOVE UNIT INTO ROOM GE-1 TO REMAIN.

12 2-1/2" GCR PIPING FROM ABOVE CONNECTED TO CR-60 TO BE

ABANDONED IN PLACE.

17 3" GCR PIPING DOWN FROM HOT WATER CONVERTOR GC-1 TO BE

ABANDONED IN PLACE.

GENERAL NOTES:

A. ALL EXISTING STEAM AND CONDENSATE RETURN LINES ARE TO

REMAIN IN PLACE AND ACTIVE UNTIL SPECIFICALLY REMOVED OR

ABANDONED-IN-PLACE AS A STAGE OF CONSTRUCTION UNDER THIS

PROJECT. ALL STEAM AND CONDENSATE RETURN LINES THAT ARE

ABANDONED-IN-PLACE SHALL BE LABELED AS "AIP" BY STENCIL OR

STICKER.

B. ALL EXISTING HUMIDIFIERS CONNECTED TO THE STEAM SYSTEM ARE

TO BE REMOVED, DUCT PATCHED AND STEAM AND CONDENSATE

RETURN PIPING REMOVED BACK TO WALL AND CAPPED.

C. ALL EXISITING STEAM-HOT WATER CONVERTERS TO BE REMOVED AND

STEAM AND CONDENSATE RETURN PIPING REMOVED BACK TO WALL

AND CAPPED.

D. ALL EXISITING STEAM PREHEAT COILS TO BE REMOVED FROM AHUS

FOR REPLACEMENT WITH HEATING WATER COILS AND STEAM AND

CONDENSATE RETURN PIPING REMOVED BACK TO WALL AND CAPPED.

E. ALL EXISTING STEAM TUBE BUNDLES IN DOMESTIC HOT WATER

GENERATORS TO BE REMOVED AND REPLACED WITH HEATING WATER

TUBE BUNDLES. REMOVE ALL STEAM AND CONDENSATE RETURN

PIPING BACK TO WALL AND CAP.

F. CONTROLS FOR COMPONENTS BEING REMOVED SHALL BE REMOVED

AND TERMINATED SO AS TO LEAVE CONNECTED SYSTEMS FULLY

OPERATIONAL.

M

AR

K D

ES

C

R

IP

TI

O

N D

B

C

D

E

F

H

J

G

2 3 4 5 6

7 8 9 10 12 15 18 20 22 24 26 28 30 32 33 34 35 36 37 38 39

L

N

Q

S

U

K

M

P

R

3129272523

RR

QQ

MM

WW

DD

AHU-GE3

AHU-GE2

AHU-GE1

AHU-GC1

AHU-GC2

AHU-GB1

AREA OUTSIDE

OF CONTRACT

CRU-GB1

HWC-GC1

HWP-GC2

HWP-GC1

ET-GC1

S-

3/ 4" ø

S-

1/

4" ø S-60

1"ø S-60 3/4"øS-60

1 1/4"ø

GCR

2 1/2"ø

S-60 2"ø

GCR

2 1/2"ø

S-60 3"ø

S-60 4"ø

S-

1/

2" ø

GCR

2"ø

S-60 1 1/4"ø

S-

2" ø

S-60 2 1/2"ø

GCR

2 1/2"ø

S-

3" ø

G C

R

1/ 2" ø

S-15 4"ø

S-

3" ø

S-

6" ø

S-15 1 1/4"ø

S-

6" ø

S-

4" ø

S-15 2 1/2"ø

S-

4" ø

S-60 4"ø

GCR

2 1/2"ø

S-15 1 1/4"ø

S-60 4"ø

S-

4" ø S-

1" ø

G C

R 3" ø

S-60 4"ø

S-60 3"ø

S-

6" ø

S-100 6"ø

S-

6" ø

S-

8" ø

GCR

2 1/2"ø

S-

1/

2" ø

S-60 4"ø

G C

R 1" øS-

1" øGCR

1"ø

B-2E

B-1E

B-3E

S-60 2"ø

L I CEN DES

61431P R

O

FESS ION AL ENGIN

EE

R

STATE OF TEXAS

DAVID J. BRANSON

160 64

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

FO

R T

W O

R

TH

D

IS

TR

IC

T

TA

YL

O

R S

TR

EE

T -R

M

A1

FO

R

T W

O R

TH

, T

X

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

SE

C

O N

D T

IT

LE

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

Compliance Services Group, Inc.

Texas Registered Engineering Firm F-1070

Engineers - Architects - Scientists

D

AR

N

AL

L

LO

O

P

FO

R T

H O

O D

, T X

R

EN

O

VA

TE

B

0, C O

N

VE

RT

HI

G H

PR

ES

SU

RE

S

TE

AM

(H

PS

)T

O H

O T

W

AT

ER

(H

W

SE

VE

N G

EN

ER

AT

IO

N S

A+ E

E.

M

IC

H

IG

AN

A

VE

SU

IT

E

B

KA

LA

M

AZ

O

O , M

I 4

W

2G -1

8- F-

W

2G -1

7- D

-0

B3

A-

C

PF

B36000

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

MD101

M

EC

H

AN

IC

AL

D

EM

O

LI

TI

O

N

PL

AN

G R

O U

N D

F

LO

O R

C

SG

G

EC

D

JB

M

AR

C

H

100% SUBMISSION

NORTH

1/32" = 1'-0"

GROUND FLOOR - MECHANICAL DEMOLITION

NOTES INDICATED BY " "

1 PIPING UP FROM MECHANICAL ROOM GD-2 TO MECHANICAL ROOM 1D-1

ON FIRST FLOOR TO BE ABANDONED IN PLACE.

2 PIPING CONNECTED TO KITCHEN EQUIPMENT TO BE ABANDONED IN

PLACE.

3 3/4" 15# STEAM AND 3/4" GCR PIPING ROUTED UP TO HUMIDIFIERS ON

FIRST AND SECOND FLOOR TO BE ABANDONED IN PLACE.

4 3/4" 60# STEAM PIPING UP TO STERILIZERS TO BE ABANDONED IN

PLACE.

5 3" 60# STEAM PIPING DOWN TO CART WASH ON SAME FLOOR TO BE

REMOVED BACK TO MAIN AND CAPPED.

6 3/4" 60# STEAM PIPING DOWN TO STERILIZERS ON SAME FLOOR TO BE

REMOVED BACK TO MAIN AND CAPPED.

7 GCR PIPING FROM STERILIZERS TO BE ABANDONED IN PLACE.

8 GCR PIPING DOWN THROUGH FLOOR TO BE ABANDONED IN PLACE.

9 GCR PIPING UP IN CHASE TO BE ABANDONED IN PLACE.

10 60# STEAM PIPING UP THROUGH CEILING TO BE ABANDONED IN PLACE.

11 15# STEAM PIPING UP FROM MECHANICAL ROOM GD-1 TO BE

ABANDONED IN PLACE.

GENERAL NOTES:

A. ALL EXISTING STEAM AND CONDENSATE RETURN LINES ARE TO

REMAIN IN PLACE AND ACTIVE UNTIL SPECIFICALLY REMOVED OR

ABANDONED-IN-PLACE AS A PHASE OF CONSTRUCTION UNDER THIS

PROJECT. ALL STEAM AND CONDENSATE RETURN LINES THAT ARE

ABANDONED-IN-PLACE SHALL BE LABELED AS "AIP" BY STENCIL OR

STICKER.

B. ALL EXISTING KITCHEN EQUIPMENT CONNECTED TO THE STEAM

SYSTEM ARE TO BE ABANDONED IN PLACE.

12 AIR HANDLING UNIT GB1 TO BE ABANDONED IN PLACE.

C. ALL EXISTING HUMIDIFIERS CONNECTED TO THE STEAM SYSTEM ARE

TO BE REMOVED, DUCT PATCHED AND STEAM AND CONDENSATE

RETURN PIPING REMOVED BACK TO WALL AND CAPPED.

D. ALL EXISITING STEAM-HOT WATER CONVERTERS TO BE REMOVED AND

STEAM AND CONDENSATE RETURN PIPING REMOVED BACK TO WALL

AND CAPPED.

E. ALL EXISITING STEAM PREHEAT COILS TO BE REMOVED FROM AHUS

FOR REPLACEMENT WITH HEATING WATER COILS AND STEAM AND

CONDENSATE RETURN PIPING REMOVED BACK TO WALL AND CAPPED.

F. ALL EXISTING STEAM TUBE BUNDLES IN DOMESTIC HOT WATER

GENERATORS TO BE REMOVED AND REPLACED WITH HEATING WATER

TUBE BUNDLES. REMOVE ALL STEAM AND CONDENSATE RETURN

PIPING BACK TO WALL AND CAP.

G. CONTROLS FOR COMPONENTS BEING REMOVED SHALL BE REMOVED

AND TERMINATED SO AS TO LEAVE CONNECTED SYSTEMS FULLY

OPERATIONAL.

M

AR

K D

ES

C

R

IP

TI

O

N D

DNUP DNUP

A

B

C

D

E

F

H

J

G

2 3 4 5 6

7 8 9 10 12 15 18 20 22 24 26 28 30 32 33 34 35 36 37 38 39

L

N

Q

S

U

K

M

P

R

312927

QQ

MM

WW

DD

191716

O

S

U

W

Y

BB

VV

UU

TT

SS

AHU-1D1

AREA OUTSIDE

OF CONTRACT

2 2

S-60 3/4"ø

GCR

3/4"ø

S-

1" ø

S-

3/ 4" ø

S-60 1 1/4"ø

S-

1/

4" ø

S-

3/ 4" ø

GCR

1 1/4"ø

AHU-1A1

S-

3/ 4" ø

S-

3/ 4" ø

S-

3/ 4" ø

S-

3/ 4" ø

S-60 1 1/2"ø

S-60 1 1/4"ø

S-

3/ 4" ø

S-60 3/4"ø

S-15 3/4"ø

GCR

3/4"ø

S-

3/ 4" ø

G C

R 3/

4" ø

HWC-FP

L I CEN DES

61431P R

O

FESS ION AL ENGIN

EE

R

STATE OF TEXAS

DAVID J. BRANSON

160 64

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

FO

R T

W O

R

TH

D

IS

TR

IC

T

TA

YL

O

R S

TR

EE

T -R

M

A1

FO

R

T W

O R

TH

, T

X

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

SE

C

O N

D T

IT

LE

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

Compliance Services Group, Inc.

Texas Registered Engineering Firm F-1070

Engineers - Architects - Scientists

D

AR

N

AL

L

LO

O

P

FO

R T

H O

O D

, T X

R

EN

O

VA

TE

B

0, C O

N

VE

RT

HI

G H

PR

ES

SU

RE

S

TE

AM

(H

PS

)T

O H

O T

W

AT

ER

(H

W

SE

VE

N G

EN

ER

AT

IO

N S

A+ E

E.

M

IC

H

IG

AN

A

VE

SU

IT

E

B

KA

LA

M

AZ

O

O , M

I 4

W

2G -1

8- F-

W

2G -1

7- D

-0

B3

A-

C

PF

B36000

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

MD102

M

EC

H

AN

IC

AL

D

EM

O

LI

TI

O

N

PL

AN

FI

R

ST

F

LO

O

R

C

SG

G

EC

D

JB

M

AR

C

H

100% SUBMISSION

NORTH

1/32" = 1'-0"

FIRST FLOOR - MECHANICAL DEMOLITION

NOTES INDICATED BY " "

1 3/4" GCR PIPING UP THROUGH CEILING TO BE ABANDONED IN PLACE.

2 3/4" 60# STEAM PIPING UP THROUGH CEILING TO BE ABANDONED IN

PLACE.

3 1 1/2" 60# STEAM PIPING FROM BELOW TO BE ABANDONED IN PLACE.

4 2 1/2" 60# STEAM AND 2" GCR PIPING UP AND DOWN WITH 1 1/4" 60#

STEAM PIPING PROVIDED TO THIS FLOOR TO BE ABANDONED IN PLACE.

5 3/4" 60# STEAM PIPING GOING DOWN THROUGH FLOOR TO BE

ABANDONED IN PLACE.

6 1 1/4" GCR PIPING GOING UP TO AIR HANDLING UNITS IN MECHANICAL

ROOM "2E" TO BE ABANDONED IN PLACE.

7 3/4" S-60 PIPING UP TO BEDPAN WASHER IN ROOM NO S223 TO BE

ABANDONED IN PLACE.

8 1 1/4" S-60 PIPING UP TO STERILIZERS IN ROOM NO D241 TO BE

ABANDONED IN PLACE.

9 3/4" S-120 PIPING UP TO BEDPAN WASHER TO BE ABANDONED IN

PLACE.

10 PIPING UP AND DOWN IN CHASE TO BE ABANDONED IN PLACE.

11 PIPE GOING UP AND DOWN FROM GROUND FLOOR UP TO MECHANICAL

ROOM 2C TO BE ABANDONED IN PLACE.

12 2 1/2" S-60 AND 2" GCR PIPING UP AND DOWN IN CHASE TO BE

ABANDONED IN PLACE.

13 60# STEAM PIPING CONNECTED TO GCR PIPING TO BE ABANDONED IN

PLACE.

14 3/4" 15# STEAM AND 3/4" GCR PIPING FROM MECHANICAL ROOM GC-1

UP IN CHASE TO BE ABANDONED IN PLACE.

15 3/4" 15# STEAM AND 3/4" GCR PIPING FEEDING HUMIDIFIERS 1C-1 AND

1C-2 TO BE ABANDONED IN PLACE.

16 3/4" 15# STEAM AND 3/4" GCR PIPING ROUTED TO HUMIDIFIERS ON

SECOND FLOOR TO BE ABANDONED IN PLACE.

17 3/4" 15# STEAM, 3/4" GCR AND 3/4" 60# STEAM PIPING GOING UP TO

SECOND FLOOR TO BE ABANDONED IN PLACE.

18 3/4" 60# STEAM PIPING FROM BELOW TO STERILIZERS TO BE

ABANDONED IN PLACE.

GENERAL NOTES:

A. ALL EXISTING STEAM AND CONDENSATE RETURN LINES ARE TO

REMAIN IN PLACE AND ACTIVE UNTIL SPECIFICALLY REMOVED OR

ABANDONED-IN-PLACE AS A STAGE OF CONSTRUCTION UNDER THIS

PROJECT. ALL STEAM AND CONDENSATE RETURN LINES THAT ARE

ABANDONED-IN-PLACE SHALL BE LABELED AS "AIP" BY STENCIL OR

STICKER.

B. ALL EXISTING HUMIDIFIERS CONNECTED TO THE STEAM SYSTEM ARE

TO BE REMOVED, DUCT PATCHED AND STEAM AND CONDENSATE

RETURN PIPING REMOVED BACK TO WALL AND CAPPED.

C. ALL EXISITING STEAM-HOT WATER CONVERTERS TO BE REMOVED AND

STEAM AND CONDENSATE RETURN PIPING REMOVED BACK TO WALL

AND CAPPED.

D. ALL EXISITING STEAM PREHEAT COILS TO BE REMOVED FROM AHUS

FOR REPLACEMENT WITH HEATING WATER COILS AND STEAM AND

CONDENSATE RETURN PIPING REMOVED BACK TO WALL AND CAPPED.

E. ALL EXISTING STEAM TUBE BUNDLES IN DOMESTIC HOT WATER

GENERATORS TO BE REMOVED AND REPLACED WITH HEATING WATER

TUBE BUNDLES. REMOVE ALL STEAM AND CONDENSATE RETURN

PIPING BACK TO WALL AND CAP.

F. CONTROLS FOR COMPONENTS BEING REMOVED SHALL BE REMOVED

AND TERMINATED SO AS TO LEAVE CONNECTED SYSTEMS FULLY

OPERATIONAL.

M

AR

K D

ES

C

R

IP

TI

O

N D

AHU-2C3

AHU-2E1 AHU-2E2

AHU-2E3

AHU-2F1

AREA OUTSIDE

OF CONTRACT

G C

R 1" ø

GCR

1 1/2"ø

S-

3/ 4" ø

S-

3/ 4" ø

HWC-2C1

AHU-2C2

AHU-2C1

S-15 3/4"ø

S-15 3/4"ø

GCR

3/4"ø

GCR

3/4"ø

1 1 1

1 1

6 7

L I CEN DES

61431P R

O

FESS ION AL ENGIN

EE

R

STATE OF TEXAS

DAVID J. BRANSON

160 64

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

FO

R T

W O

R

TH

D

IS

TR

IC

T

TA

YL

O

R S

TR

EE

T -R

M

A1

FO

R

T W

O R

TH

, T

X

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

SE

C

O N

D T

IT

LE

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

Compliance Services Group, Inc.

Texas Registered Engineering Firm F-1070

Engineers - Architects - Scientists

D

AR

N

AL

L

LO

O

P

FO

R T

H O

O D

, T X

R

EN

O

VA

TE

B

0, C O

N

VE

RT

HI

G H

PR

ES

SU

RE

S

TE

AM

(H

PS

)T

O H

O T

W

AT

ER

(H

W

SE

VE

N G

EN

ER

AT

IO

N S

A+ E

E.

M

IC

H

IG

AN

A

VE

SU

IT

E

B

KA

LA

M

AZ

O

O , M

I 4

W

2G -1

8- F-

W

2G -1

7- D

-0

B3

A-

C

PF

B36000

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

MD103

M

EC

H

AN

IC

AL

D

EM

O

LI

TI

O

N

PL

AN

SE

C

O N

D F

LO

O

R

C

SG

G

EC

D

JB

M

AR

C

H

100% SUBMISSION

NORTH

1/32" = 1'-0"

SECOND FLOOR - MECHANICAL DEMOLITION

NOTES INDICATED BY " "

1 3/4" S-60 PIPING FROM BELOW TO STERILIZER TO BE ABANDONED IN

PLACE.

2 3/4" 60# STEAM PIPING UP TO BEDPAN WASHER ON THIRD FLOOR TO BE

ABANDONED IN PLACE.

3 1" GCR PIPING UP TO MECHANICAL ROOM 3B TO BE ABANDONED IN

PLACE.

4 3/4" GCR PIPING UP TO MECHANICAL ROOM 3B TO BE ABANDONED IN

PLACE.

5 PIPING ROUTED UP AND DOWN IN CHASE TO BE ABANDONED IN PLACE.

6 3/4" 60# STEAM PIPING TO BEDPAN WASHER TO BE ABANDONED IN

PLACE.

8 3/4" 15# STEAM AND 3/4" GCR PIPING CONNECTED TO HUMIDIFIERS

2C3-3 AND 2C3-4 TO BE ABANDONED IN PLACE.

7 3/4" 15# STEAM AND 3/4" GCR PIPING FROM BELOW FROM HUMIDIFIERS

TO BE ABANDONED IN PLACE.

9 CLEAN STEAM SYSTEM IN THIS LOCATION TO BE REMOVED.

GENERAL NOTES:

A. ALL EXISTING STEAM AND CONDENSATE RETURN LINES ARE TO

REMAIN IN PLACE AND ACTIVE UNTIL SPECIFICALLY REMOVED OR

ABANDONED-IN-PLACE AS A STAGE OF CONSTRUCTION UNDER THIS

PROJECT. ALL STEAM AND CONDENSATE RETURN LINES THAT ARE

ABANDONED-IN-PLACE SHALL BE LABELED AS "AIP" BY STENCIL OR

STICKER.

B. ALL EXISTING HUMIDIFIERS CONNECTED TO THE STEAM SYSTEM ARE

TO BE REMOVED, DUCT PATCHED AND STEAM AND CONDENSATE

RETURN PIPING REMOVED BACK TO WALL AND CAPPED.

C. ALL EXISITING STEAM-HOT WATER CONVERTERS TO BE REMOVED AND

STEAM AND CONDENSATE RETURN PIPING REMOVED BACK TO WALL

AND CAPPED.

D. ALL EXISITING STEAM PREHEAT COILS TO BE REMOVED FROM AHUS

FOR REPLACEMENT WITH HEATING WATER COILS AND STEAM AND

CONDENSATE RETURN PIPING REMOVED BACK TO WALL AND CAPPED.

E. ALL EXISTING STEAM TUBE BUNDLES IN DOMESTIC HOT WATER

GENERATORS TO BE REMOVED AND REPLACED WITH HEATING WATER

TUBE BUNDLES. REMOVE ALL STEAM AND CONDENSATE RETURN

PIPING BACK TO WALL AND CAP.

F. CONTROLS FOR COMPONENTS BEING REMOVED SHALL BE REMOVED

AND TERMINATED SO AS TO LEAVE CONNECTED SYSTEMS FULLY

OPERATIONAL.

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

10 STEAM AND CONDENSATE PIPING TO BE ABANDONED IN PLACE.

AHU-3B3

AHU-3B2

AHU-3B1

AREA OUTSIDE

OF CONTRACT

S-

3/ 4" ø

GCR

3/4"ø

S-

1" ø

S-60 2"ø

S-

1/

4" ø

S-

1/

4" ø

S-15 1 1/4"ø

L I CEN DES

61431P R

O

FESS ION AL ENGIN

EE

R

STATE OF TEXAS

DAVID J. BRANSON

160 64

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

FO

R T

W O

R

TH

D

IS

TR

IC

T

TA

YL

O

R S

TR

EE

T -R

M

A1

FO

R

T W

O R

TH

, T

X

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

SE

C

O N

D T

IT

LE

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

Compliance Services Group, Inc.

Texas Registered Engineering Firm F-1070

Engineers - Architects - Scientists

D

AR

N

AL

L

LO

O

P

FO

R T

H O

O D

, T X

R

EN

O

VA

TE

B

0, C O

N

VE

RT

HI

G H

PR

ES

SU

RE

S

TE

AM

(H

PS

)T

O H

O T

W

AT

ER

(H

W

SE

VE

N G

EN

ER

AT

IO

N S

A+ E

E.

M

IC

H

IG

AN

A

VE

SU

IT

E

B

KA

LA

M

AZ

O

O , M

I 4

W

2G -1

8- F-

W

2G -1

7- D

-0

B3

A-

C

PF

B36000

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

MD104

M

EC

H

AN

IC

AL

D

EM

O

LI

TI

O

N

PL

AN

TH

IR

D F

LO

O

R

C

SG

G

EC

D

JB

M

AR

C

H

100% SUBMISSION

NORTH

1/32" = 1'-0"

THIRD FLOOR - MECHANICAL DEMOLITION

NOTES INDICATED BY " "

1 3/4" 60# STEAM PIPING FROM BELOW TO BEDPAN WASHER TO BE

ABANDONED IN PLACE.

2 1" 15# STEAM AND 3/4" GCR PIPING FED FROM UPPER PORTION OF

MECHANICAL ROOM 2E TO BE ABANDONED IN PLACE.

3 3/4" 60# STEAM PIPING GOING UP AND DOWN TO BE ABANDONED IN

PLACE.

4 3/4" 60# STEAM PIPING CONNECTED TO BEDPAN WASHER ON THIS

FLOOR TO BE ABANDONED IN PLACE.

5 3/4" 60# STEAM PIPING UP TO FOURTH FLOOR TO BE ABANDONED IN

PLACE.

6 3/4" 60# STEAM PIPING FROM BELOW TO BE ABANDONED IN PLACE.

7 1" GCR PIPING FROM BELOW TO BE ABANDONED IN PLACE.

8 3/4" GCR PIPING FROM BELOW TO BE ABANDONED IN PLACE.

9 3/4" GCR PIPING CONNECTS TO HUMIDIFIER UNITS IN DUCTWORK NEAR

AHU 3B-2 TO BE ABANDONED IN PLACE.

10 1" GCR PIPING FROM BELOW. PIPING ALSO CONNECTS TO HUMIDIFER

UNITS IN DUCTWORK NEAR AHU 3B-1 TO BE ABANDONED IN PLACE.

GENERAL NOTES:

A. ALL EXISTING STEAM AND CONDENSATE RETURN LINES ARE TO

REMAIN IN PLACE AND ACTIVE UNTIL SPECIFICALLY REMOVED OR

ABANDONED-IN-PLACE AS A STAGE OF CONSTRUCTION UNDER THIS

PROJECT. ALL STEAM AND CONDENSATE RETURN LINES THAT ARE

ABANDONED-IN-PLACE SHALL BE LABELED AS "AIP" BY STENCIL OR

STICKER.

B. ALL EXISTING HUMIDIFIERS CONNECTED TO THE STEAM SYSTEM ARE

TO BE REMOVED, DUCT PATCHED AND STEAM AND CONDENSATE

RETURN PIPING REMOVED BACK TO WALL AND CAPPED.

C. ALL EXISITING STEAM-HOT WATER CONVERTERS TO BE REMOVED AND

STEAM AND CONDENSATE RETURN PIPING REMOVED BACK TO WALL

AND CAPPED.

D. ALL EXISITING STEAM PREHEAT COILS TO BE REMOVED FROM AHUS

FOR REPLACEMENT WITH HEATING WATER COILS AND STEAM AND

CONDENSATE RETURN PIPING REMOVED BACK TO WALL AND CAPPED.

E. ALL EXISTING STEAM TUBE BUNDLES IN DOMESTIC HOT WATER

GENERATORS TO BE REMOVED AND REPLACED WITH HEATING WATER

TUBE BUNDLES. REMOVE ALL STEAM AND CONDENSATE RETURN

PIPING BACK TO WALL AND CAP.

F. CONTROLS FOR COMPONENTS BEING REMOVED SHALL BE REMOVED

AND TERMINATED SO AS TO LEAVE CONNECTED SYSTEMS FULLY

OPERATIONAL.

M

AR

K D

ES

C

R

IP

TI

O

N D

S-60 3/4"ø

2 3

L I CEN DES

61431P R

O

FESS ION AL ENGIN

EE

R

STATE OF TEXAS

DAVID J. BRANSON

160 64

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

FO

R T

W O

R

TH

D

IS

TR

IC

T

TA

YL

O

R S

TR

EE

T -R

M

A1

FO

R

T W

O R

TH

, T

X

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

SE

C

O N

D T

IT

LE

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

Compliance Services Group, Inc.

Texas Registered Engineering Firm F-1070

Engineers - Architects - Scientists

D

AR

N

AL

L

LO

O

P

FO

R T

H O

O D

, T X

R

EN

O

VA

TE

B

0, C O

N

VE

RT

HI

G H

PR

ES

SU

RE

S

TE

AM

(H

PS

)T

O H

O T

W

AT

ER

(H

W

SE

VE

N G

EN

ER

AT

IO

N S

A+ E

E.

M

IC

H

IG

AN

A

VE

SU

IT

E

B

KA

LA

M

AZ

O

O , M

I 4

W

2G -1

8- F-

W

2G -1

7- D

-0

B3

A-

C

PF

B36000

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

MD105

M

EC

H

AN

IC

AL

D

EM

O

LI

TI

O

N

PL

AN

FO

U

R

TH

F

LO

O R

C

SG

G

EC

D

JB

M

AR

C

H

100% SUBMISSION

NORTH

1/32" = 1'-0"

FOURTH FLOOR - MECHANICAL DEMOLITION

NOTES INDICATED BY " "

1 PIPING THROUGH FLOOR AND THROUGH CEILING UP TO PENTHOUSE

TO BE ABANDONED IN PLACE.

2 3/4" 60# STEAM PIPING UP AND DOWN TO BE ABANDONED IN PLACE.

3 3/4" 60# STEAM PIPING UP TO BEDPAN WASHER ON FIFTH FLOOR TO BE

ABANDONED IN PLACE.

4 3/4" 60# STEAM PIPING FROM BELOW TO BEDPAN WASHER TO BE

ABANDONED IN PLACE.

5 PIPING ROUTED UP AND DOWN IN CHASE BY ELEVATOR TO BE

ABANDONED IN PLACE.

GENERAL NOTES:

A. ALL EXISTING STEAM AND CONDENSATE RETURN LINES ARE TO

REMAIN IN PLACE AND ACTIVE UNTIL SPECIFICALLY REMOVED OR

ABANDONED-IN-PLACE AS A STAGE OF CONSTRUCTION UNDER THIS

PROJECT. ALL STEAM AND CONDENSATE RETURN LINES THAT ARE

ABANDONED-IN-PLACE SHALL BE LABELED AS "AIP" BY STENCIL OR

STICKER.

B. ALL EXISTING HUMIDIFIERS CONNECTED TO THE STEAM SYSTEM ARE

TO BE REMOVED, DUCT PATCHED AND STEAM AND CONDENSATE

RETURN PIPING REMOVED BACK TO WALL AND CAPPED.

C. ALL EXISITING STEAM-HOT WATER CONVERTERS TO BE REMOVED AND

STEAM AND CONDENSATE RETURN PIPING REMOVED BACK TO WALL

AND CAPPED.

D. ALL EXISITING STEAM PREHEAT COILS TO BE REMOVED FROM AHUS

FOR REPLACEMENT WITH HEATING WATER COILS AND STEAM AND

CONDENSATE RETURN PIPING REMOVED BACK TO WALL AND CAPPED.

E. ALL EXISTING STEAM TUBE BUNDLES IN DOMESTIC HOT WATER

GENERATORS TO BE REMOVED AND REPLACED WITH HEATING WATER

TUBE BUNDLES. REMOVE ALL STEAM AND CONDENSATE RETURN

PIPING BACK TO WALL AND CAP.

F. CONTROLS FOR COMPONENTS BEING REMOVED SHALL BE REMOVED

AND TERMINATED SO AS TO LEAVE CONNECTED SYSTEMS FULLY

OPERATIONAL.

M

AR

K D

ES

C

R

IP

TI

O

N D

2 2

L I CEN DES

61431P R

O

FESS ION AL ENGIN

EE

R

STATE OF TEXAS

DAVID J. BRANSON

160 64

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

FO

R T

W O

R

TH

D

IS

TR

IC

T

TA

YL

O

R S

TR

EE

T -R

M

A1

FO

R

T W

O R

TH

, T

X

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

SE

C

O N

D T

IT

LE

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

Compliance Services Group, Inc.

Texas Registered Engineering Firm F-1070

Engineers - Architects - Scientists

D

AR

N

AL

L

LO

O

P

FO

R T

H O

O D

, T X

R

EN

O

VA

TE

B

0, C O

N

VE

RT

HI

G H

PR

ES

SU

RE

S

TE

AM

(H

PS

)T

O H

O T

W

AT

ER

(H

W

SE

VE

N G

EN

ER

AT

IO

N S

A+ E

E.

M

IC

H

IG

AN

A

VE

SU

IT

E

B

KA

LA

M

AZ

O

O , M

I 4

W

2G -1

8- F-

W

2G -1

7- D

-0

B3

A-

C

PF

B36000

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

MD106

M

EC

H

AN

IC

AL

D

EM

O

LI

TI

O

N

PL

AN

FI

FT

H F

LO

O

R

C

SG

G

EC

D

JB

M

AR

C

H

100% SUBMISSION

NORTH

1/32" = 1'-0"

FIFTH FLOOR - MECHANICAL DEMOLITION

NOTES INDICATED BY " "

1 PIPING UP AND DOWN TO BE ABANDONED IN PLACE.

3 PIPING UP AND DOWN IN CHASE TO BE ABANDONED IN PLACE.

2 3/4" 60# STEAM PIPING FROM BELOW TO BEDPAN WASHER TO BE

ABANDONED IN PLACE.

GENERAL NOTES:

A. ALL EXISTING STEAM AND CONDENSATE RETURN LINES ARE TO

REMAIN IN PLACE AND ACTIVE UNTIL SPECIFICALLY REMOVED OR

ABANDONED-IN-PLACE AS A STAGE OF CONSTRUCTION UNDER THIS

PROJECT. ALL STEAM AND CONDENSATE RETURN LINES THAT ARE

ABANDONED-IN-PLACE SHALL BE LABELED AS "AIP" BY STENCIL OR

STICKER.

B. ALL EXISTING HUMIDIFIERS CONNECTED TO THE STEAM SYSTEM ARE

TO BE REMOVED, DUCT PATCHED AND STEAM AND CONDENSATE

RETURN PIPING REMOVED BACK TO WALL AND CAPPED.

C. ALL EXISITING STEAM-HOT WATER CONVERTERS TO BE REMOVED AND

STEAM AND CONDENSATE RETURN PIPING REMOVED BACK TO WALL

AND CAPPED.

D. ALL EXISITING STEAM PREHEAT COILS TO BE REMOVED FROM AHUS

FOR REPLACEMENT WITH HEATING WATER COILS AND STEAM AND

CONDENSATE RETURN PIPING REMOVED BACK TO WALL AND CAPPED.

E. ALL EXISTING STEAM TUBE BUNDLES IN DOMESTIC HOT WATER

GENERATORS TO BE REMOVED AND REPLACED WITH HEATING WATER

TUBE BUNDLES. REMOVE ALL STEAM AND CONDENSATE RETURN

PIPING BACK TO WALL AND CAP.

F. CONTROLS FOR COMPONENTS BEING REMOVED SHALL BE REMOVED

AND TERMINATED SO AS TO LEAVE CONNECTED SYSTEMS FULLY

OPERATIONAL.

M

AR

K D

ES

C

R

IP

TI

O

N D

S-

3" ø

S-15 1"ø

S-15 3"ø

GCR

2 1/2"ø

S-15 3"ø

AHU-P2

AHU-P3

AHU-P1

HWC-5-1

HWC-5-2

L I CEN DES

61431P R

O

FESS ION AL ENGIN

EE

R

STATE OF TEXAS

DAVID J. BRANSON

160 64

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

FO

R T

W O

R

TH

D

IS

TR

IC

T

TA

YL

O

R S

TR

EE

T -R

M

A1

FO

R

T W

O R

TH

, T

X

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

SE

C

O N

D T

IT

LE

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

Compliance Services Group, Inc.

Texas Registered Engineering Firm F-1070

Engineers - Architects - Scientists

D

AR

N

AL

L

LO

O

P

FO

R T

H O

O D

, T X

R

EN

O

VA

TE

B

0, C O

N

VE

RT

HI

G H

PR

ES

SU

RE

S

TE

AM

(H

PS

)T

O H

O T

W

AT

ER

(H

W

SE

VE

N G

EN

ER

AT

IO

N S

A+ E

E.

M

IC

H

IG

AN

A

VE

SU

IT

E

B

KA

LA

M

AZ

O

O , M

I 4

W

2G -1

8- F-

W

2G -1

7- D

-0

B3

A-

C

PF

B36000

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

MD107

M

EC

H

AN

IC

AL

D

EM

O

LI

TI

O

N

PL

AN

PE

N

TH

O

U

SE

C

SG

G

EC

D

JB

M

AR

C

H

100% SUBMISSION

NORTH

1/32" = 1'-0"

PENTHOUSE - MECHANICAL DEMOLITION

GENERAL NOTES:

A. ALL EXISTING STEAM AND CONDENSATE RETURN LINES ARE TO

REMAIN IN PLACE AND ACTIVE UNTIL SPECIFICALLY REMOVED OR

ABANDONED-IN-PLACE AS A STAGE OF CONSTRUCTION UNDER THIS

PROJECT. ALL STEAM AND CONDENSATE RETURN LINES THAT ARE

ABANDONED-IN-PLACE SHALL BE LABELED AS "AIP" BY STENCIL OR

STICKER.

B. ALL EXISTING HUMIDIFIERS CONNECTED TO THE STEAM SYSTEM ARE

TO BE REMOVED, DUCT PATCHED AND STEAM AND CONDENSATE

RETURN PIPING REMOVED BACK TO WALL AND CAPPED.

C. ALL EXISITING STEAM-HOT WATER CONVERTERS TO BE REMOVED AND

STEAM AND CONDENSATE RETURN PIPING REMOVED BACK TO WALL

AND CAPPED.

D. ALL EXISITING STEAM PREHEAT COILS TO BE REMOVED FROM AHUS

FOR REPLACEMENT WITH HEATING WATER COILS AND STEAM AND

CONDENSATE RETURN PIPING REMOVED BACK TO WALL AND CAPPED.

E. ALL EXISTING STEAM TUBE BUNDLES IN DOMESTIC HOT WATER

GENERATORS TO BE REMOVED AND REPLACED WITH HEATING WATER

TUBE BUNDLES. REMOVE ALL STEAM AND CONDENSATE RETURN

PIPING BACK TO WALL AND CAP.

F. CONTROLS FOR COMPONENTS BEING REMOVED SHALL BE REMOVED

AND TERMINATED SO AS TO LEAVE CONNECTED SYSTEMS FULLY

OPERATIONAL.

M

AR

K D

ES

C

R

IP

TI

O

N D

7 8 9 10

L

N

7 8 9 10

B-1

AHU-GB1

AHU-1A1

B-1E

B-2E

B-3E

S-

6" ø

S-

4" ø

S-15 1 1/4"ø

S-

6" ø

S-15 1 1/4"ø

S-

6" ø S-

8" ø

S-

6" ø

S-100 6"ø

S-100 6"ø

S-100 6"ø

S-

6" ø

S-100 6"ø

S-

4" ø

S-15 4"ø

S-15 4"ø

CRU-GB1

GCR

2 1/2"ø

CRU-GD4

GCR

1"ø

G C

R 1" ø

GCR

1"øS-100

6"ø

S-15 1 1/4"ø

GCR

1"ø

CONDENSATE

TRANSFER PUMPS

PC

R

3" ø

G C

R 2" ø

GCR

1"ø

GCR

1"ø

GCR

1"ø

G C

R 2" ø G

C R

1" ø

80 32

L I CEN DES

61431P R

O

FESS ION AL ENGIN

EE

R

STATE OF TEXAS

DAVID J. BRANSON

NORTH

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

FO

R T

W O

R

TH

D

IS

TR

IC

T

TA

YL

O

R S

TR

EE

T -R

M

A1

FO

R

T W

O R

TH

, T

X

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

SE

C

O N

D T

IT

LE

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

Compliance Services Group, Inc.

Texas Registered Engineering Firm F-1070

Engineers - Architects - Scientists

D

AR

N

AL

L

LO

O

P

FO

R T

H O

O D

, T X

R

EN

O

VA

TE

B

0, C O

N

VE

RT

HI

G H

PR

ES

SU

RE

S

TE

AM

(H

PS

)T

O H

O T

W

AT

ER

(H

W

SE

VE

N G

EN

ER

AT

IO

N S

A+ E

E.

M

IC

H

IG

AN

A

VE

SU

IT

E

B

KA

LA

M

AZ

O

O , M

I 4

W

2G -1

8- F-

W

2G -1

7- D

-0

B3

A-

C

PF

B36000

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

MD200

M

EC

H

AN

IC

AL

D

EM

O

LI

TI

O

N

PL

AN

EN

LA

R G

ED

B

O

IL

ER

PL

AN

C

SG

G

EC

D

JB

M

AR

C

H

100% SUBMISSION

3/32" = 1'-0"MD200

1 GROUND FLOOR - MECHANICAL DEMOLITION - ENLARGED BOILER ROOM

GENERAL NOTES:

A. ALL EXISTING STEAM AND CONDENSATE RETURN LINES ARE TO

REMAIN IN PLACE AND ACTIVE UNTIL SPECIFICALLY REMOVED OR

ABANDONED-IN-PLACE AS A STAGE OF CONSTRUCTION UNDER THIS

PROJECT. ALL STEAM AND CONDENSATE RETURN LINES THAT ARE

ABANDONED-IN-PLACE SHALL BE LABELED AS "AIP" BY STENCIL OR

STICKER.

B. ALL EXISTING HUMIDIFIERS CONNECTED TO THE STEAM SYSTEM ARE

TO BE REMOVED, DUCT PATCHED AND STEAM AND CONDENSATE

RETURN PIPING REMOVED BACK TO WALL AND CAPPED.

C. ALL EXISITING STEAM-HOT WATER CONVERTERS TO BE REMOVED AND

STEAM AND CONDENSATE RETURN PIPING REMOVED BACK TO WALL

AND CAPPED.

D. ALL EXISITING STEAM PREHEAT COILS TO BE REMOVED FROM AHUs

FOR REPLACEMENT WITH HEATING WATER COILS AND STEAM AND

CONDENSATE RETURN PIPING REMOVED BACK TO WALL AND CAPPED.

E. ALL EXISTING STEAM TUBE BUNDLES IN DOMESTIC HOT WATER

GENERATORS TO BE REMOVED AND OPENING IN TANK REPLACED WITH

BLANK FLANGE. REMOVE ALL STEAM AND CONDENSATE RETURN

PIPING BACK TO WALL AND CAP.

F. CONTROLS FOR COMPONENTS BEING REMOVED SHALL BE

TERMINATED SO AS TO LEAVE REMAINING CONNECTED SYSTEMS

FULLY OPERATIONAL.

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

G. THIS BOILER SYSTEM REPLACEMENT PROJECT REQUIRES STEAM

BOILER SYSTEMS TO REMAIN IN OPERATION UNTIL HYDRONIC BOILER

SYSTEMS ARE OPERATIONAL AND LOADS ARE SWITCHED OVER TO THE

NEW SYSTEMS. BOILERS WILL BE REPLACED ONE AT A TIME DURING

PERIODS OF LOW HEATING WATER DEMAND TO MINIMIZE IMPACT ON

BUILDING OCCUPANTS AND SYSTEMS.

NOTES INDICATED BY " "

1 CONTRACTOR TO REMOVE AND DISPOSE OF STEAM BOILER AND

PIPING. THIS IS TO BE A PHASED REMOVAL TO ALLOW THE

REPLACEMENT HYDRONIC BOILER SYSTEM TO BE PLACED INTO

OPERATION AND ALLOW THE FACILITY TO REMAIN OCCUPIED AND

OPERATIONAL DURING CONSTRUCTION.

2 DISCONNECT NATURAL GAS LINE TO STEAM BOILER AND PREPARE

FOR RECONNECTION TO NEW HYDRONIC BOILER IN THIS LOCATION.

3 DISCONNECT FLUE FROM STEAM BOILER NEAR ROOF LEVEL AND

PREPARE FOR RECONNECTION TO NEW HYDRONIC BOILER IN THIS

LOCATION.

24 " ( 61 CM )

24 "

24 "

B

AHU-GD3

AHU-GD2

AHU-GD1

HWS

2"ø

HWR

2"ø

HWS

1"ø

HWR

1"ø

HWS

1 1/2"ø

HWR

1 1/2"ø

HWR

6"ø

HWS

6"ø

H W

S 6" ø H

W R

6" ø

L I CEN DES

61431P R

O

FESS ION AL ENGIN

EE

R

STATE OF TEXAS

DAVID J. BRANSON

160 64

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

FO

R T

W O

R

TH

D

IS

TR

IC

T

TA

YL

O

R S

TR

EE

T -R

M

A1

FO

R

T W

O R

TH

, T

X

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

SE

C

O N

D T

IT

LE

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

Compliance Services Group, Inc.

Texas Registered Engineering Firm F-1070

Engineers - Architects - Scientists

D

AR

N

AL

L

LO

O

P

FO

R T

H O

O D

, T X

R

EN

O

VA

TE

B

0, C O

N

VE

RT

HI

G H

PR

ES

SU

RE

S

TE

AM

(H

PS

)T

O H

O T

W

AT

ER

(H

W

SE

VE

N G

EN

ER

AT

IO

N S

A+ E

E.

M

IC

H

IG

AN

A

VE

SU

IT

E

B

KA

LA

M

AZ

O

O , M

I 4

W

2G -1

8- F-

W

2G -1

7- D

-0

B3

A-

C

PF

B36000

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

M-100

M

EC

H

AN

IC

AL

C

R

AW

L

SP

AC

E

C

SG

G

EC

D

JB

M

AR

C

H

100% SUBMISSION

NORTH

1/32" = 1'-0"

CRAWL SPACE - MECHANICAL

NOTES INDICATED BY " "

1 HEATING WATER SUPPLY AND RETURN PIPING FROM GROUND FLOOR

DOWN TO SERVE NEW PREHEAT COILS IN AIR HANDLING UNITS IN

MECHANICAL ROOM GD-1.

GENERAL NOTES:

A. ALL EXISTING STEAM AND CONDENSATE RETURN LINES ARE TO

REMAIN IN PLACE AND ACTIVE UNTIL SPECIFICALLY REMOVED OR

ABANDONED-IN-PLACE AS A STAGE OF CONSTRUCTION UNDER THIS

PROJECT. ALL STEAM AND CONDENSATE RETURN LINES THAT ARE

ABANDONED-IN-PLACE SHALL BE LABELED AS "AIP" BY STENCIL OR

STICKER.

B. CONTRACTOR TO STAGE CONSTRUCTION SO THAT DOWNTIME FOR

EQUIPMENT BEING SERVED IS MINIMIZED.

C. CONTRACTOR TO SEPARATE CONSTRUCTION AREA FROM ADJACENT

SPACES SO CONSTRUCTION WILL NOT IMPEDE OCCUPANTS OF

ADJACENT SPACES IN THEIR NORMAL OPERATION.

D. PROVIDE LABELING ON ALL NEW PIPING WHICH INDICATES SERVICE

AND DIRECTION OF FLOW.

E. ALL NEW EQUIPMENT SHALL BE PROVIDED WITH EMCS-COMPATIBLE

CONTROLS TO RESULT IN FULLY FUNCTIONING SYSTEM COMPONENTS.

F. CONTRACTOR TO RECORD AND PROVIDE TO LOCAL USACE PM THE

AIR-SIDE PERFORMANCE OF ALL AHUS TO BE MODIFIED PRIOR TO

WORK ON AHUS, AND SHALL REBALANCE AIR-SIDE AND WATER-SIDE

COMPONENTS AFTER INSTALLATION OF PRE-HEAT COILS.

G. CONTRACTOR TO PROVIDE ALL REQUIRED HARDWARE, SOFTWARE,

AND PROGRAMMING TO INTEGRATE NEW COMPONENTS WITH

EXISTING EMCS.

H. PROVIDE MANUAL BALANCING VALVES AT ALL HWS BRANCH LINES FOR

USE IN SYSTEM BALANCING.

2 EXTEND NEW HWS AND HWR PIPING TO AHU FOR CONNECTION TO

REPLACEMENT HEATING WATER PREHEAT COIL WITH 3-WAY VALVE.

REFER TO HOT WATER PREHEAT COIL DETAIL ON SHEET M-500.

3 INSTALL REPLACEMENT HEATING WATER COIL. REFER TO PREHEAT

COIL SCHEDULE ON M-600 FOR SPECIFIC COIL TO FIT EXISTING AIR

HANDLING UNIT.

M

AR

K D

ES

C

R

IP

TI

O

N D

B

C

D

E

F

H

J

G

2 3 4 5 6

7 8 9 10 12 15 18 20 22 24 26 28 30 32 33 34 35 36 37 38 39

L

N

Q

S

U

K

M

P

R

3129272523

RR

QQ

MM

WW

DD

24 " ( 61 CM )

24 "

24 "

B

AHU-GE3

AHU-GE2

AHU-GE1

AHU-GC1

AHU-GC2

AHU-GB1

AREA OUTSIDE

OF CONTRACT

HWS

6"ø

HWR

10"ø

HWR

6"ø

HWS

6"ø

HWS

10"ø

HWS

6"ø

HWR

6"ø

HWR

2"ø

HWS

2"ø

HWS

6"ø

HWR

6"ø

HWS

4"øHWR 4"ø

HWS

3"ø

HWR

3"ø HWS

3"ø

HWR

3"ø

HWS

3"ø

HWR

3"ø HWR

1 1/4"ø

HWS

1 1/2"ø

HWS

1 1/2"ø HWR

1 1/4"ø

HWR

2"ø

HWS

2"ø

HWS

4"ø

HWR

4"ø

HWR

6"ø

HWS

6"ø

HWS

1 1/2"ø

HWR

1 1/2"ø

HWR

4"ø

HWS

4"ø

HWS

6"ø

HWR

6"ø

HWR

4"ø

HWS

4"ø

HWS

6"ø

HWR

6"ø

HWR

4"ø HWS

4"ø

HWR

6"ø

HWS

6"ø

HWS

2"ø

HWR

2"ø

HWS

2"ø

HWR

2"ø

HWR

1 1/2"ø

HWS

1 1/2"ø

HWS

1 1/2"ø

HWR

1 1/2"ø

HWR

1 1/2"ø

HWS

1 1/2"ø

HWG-P5A

HWG-P5B

HWS

2 1/2"ø

HWR

2 1/2"ø

M-200

M-201

M-201

M-201

M-201

2 3

2 3

M-201

DHWG-2

HWR

2 1/2"ø

HWS

2 1/2"ø

DHWG-1

B-1

B-2

B-3

HP-1

HP-2

HP-3

L I CEN DES

61431P R

O

FESS ION AL ENGIN

EE

R

STATE OF TEXAS

DAVID J. BRANSON

160 64

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

FO

R T

W O

R

TH

D

IS

TR

IC

T

TA

YL

O

R S

TR

EE

T -R

M

A1

FO

R

T W

O R

TH

, T

X

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

SE

C

O N

D T

IT

LE

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

Compliance Services Group, Inc.

Texas Registered Engineering Firm F-1070

Engineers - Architects - Scientists

D

AR

N

AL

L

LO

O

P

FO

R T

H O

O D

, T X

R

EN

O

VA

TE

B

0, C O

N

VE

RT

HI

G H

PR

ES

SU

RE

S

TE

AM

(H

PS

)T

O H

O T

W

AT

ER

(H

W

SE

VE

N G

EN

ER

AT

IO

N S

A+ E

E.

M

IC

H

IG

AN

A

VE

SU

IT

E

B

KA

LA

M

AZ

O

O , M

I 4

W

2G -1

8- F-

W

2G -1

7- D

-0

B3

A-

C

PF

B36000

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

M-101

M

EC

H

AN

IC

AL

G

R O

U N

D

FL

O O

R

C

SG

G

EC

D

JB

M

AR

C

H

100% SUBMISSION

NOTES INDICATED BY " "

1 NEW BOILERS WITH PUMPS, AIR SEPARATOR, AND EXPANSION TANK

TO BE INSTALLED.

NORTH

1/32" = 1'-0"

GROUND FLOOR - MECHANICAL

GENERAL NOTES:

A. ALL EXISTING STEAM AND CONDENSATE RETURN LINES ARE TO

REMAIN IN PLACE AND ACTIVE UNTIL SPECIFICALLY REMOVED OR

ABANDONED-IN-PLACE AS A STAGE OF CONSTRUCTION UNDER THIS

PROJECT. ALL STEAM AND CONDENSATE RETURN LINES THAT ARE

ABANDONED-IN-PLACE SHALL BE LABELED AS "AIP" BY STENCIL OR

STICKER.

B. CONTRACTOR TO STAGE CONSTRUCTION SO THAT DOWNTIME FOR

EQUIPMENT BEING SERVED IS MINIMIZED.

C. CONTRACTOR TO SEPARATE CONSTRUCTION AREA FROM ADJACENT

SPACES SO CONSTRUCTION WILL NOT IMPEDE OCCUPANTS OF

ADJACENT SPACES IN THEIR NORMAL OPERATION.

D. PROVIDE LABELING ON ALL NEW PIPING WHICH INDICATES SERVICE

AND DIRECTION OF FLOW.

E. ALL NEW EQUIPMENT SHALL BE PROVIDED WITH EMCS-COMPATIBLE

CONTROLS TO RESULT IN FULLY FUNCTIONING SYSTEM COMPONENTS.

F. CONTRACTOR TO RECORD AND PROVIDE TO LOCAL USACE PM THE

AIR-SIDE PERFORMANCE OF ALL AHUS TO BE MODIFIED PRIOR TO

WORK ON AHUS, AND SHALL REBALANCE AIR-SIDE AND WATER-SIDE

COMPONENTS AFTER INSTALLATION OF PRE-HEAT COILS.

G. CONTRACTOR TO PROVIDE ALL REQUIRED HARDWARE, SOFTWARE,

AND PROGRAMMING TO INTEGRATE NEW COMPONENTS WITH

EXISTING EMCS.

H. PROVIDE MANUAL BALANCING VALVES AT ALL HWS BRANCH LINES FOR

USE IN SYSTEM BALANCING.

2 EXTEND NEW HWS AND HWR PIPING TO AHU FOR CONNECTION TO

REPLACEMENT HEATING WATER PREHEAT COIL WITH 3-WAY VALVE.

REFER TO HOT WATER PREHEAT COIL DETAIL ON SHEET M-500.

3 INSTALL REPLACEMENT HEATING WATER COIL. REFER TO PREHEAT

COIL SCHEDULE ON M-600 FOR SPECIFIC COIL TO FIT EXISTING AIR

HANDLER.

4 CONNECT NEW HWS AND HWR TO EXISTING HWS AND HWR PIPING

FEEDING FROM PREVIOUS CONNECTION TO CONVERTER BEING

REPLACED. PROVIDE ISOLATION VALVES.

5 CONNECT NEW DOMESTIC HOT WATER GENERATOR TO EXISTING

TANKS.

M

AR

K D

ES

C

R

IP

TI

O

N D

DNUP DNUP

A

B

C

D

E

F

H

J

G

2 3 4 5 6

7 8 9 10 12 15 18 20 22 24 26 28 30 32 33 34 35 36 37 38 39

L

N

Q

S

U

K

M

P

R

312927

QQ

MM

WW

DD

191716

O

S

U

W

Y

BB

VV

UU

TT

SS

AREA OUTSIDE

OF CONTRACT

AHU-1A1

HWS

2"ø

HWR

2"ø

HWS

3"ø

HWR

3"ø

HWR

1 1/4"ø

HWS

1 1/2"ø

HWS

4"ø

HWR

4"ø

HWR

2 1/2"ø

HWS

2 1/2"ø

HWR

1 1/4"ø

HWS

1 1/4"ø

M-202

M-202

7 6

HWR

3"ø

HWS

3"ø

L I CEN DES

61431P R

O

FESS ION AL ENGIN

EE

R

STATE OF TEXAS

DAVID J. BRANSON

160 64

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

FO

R T

W O

R

TH

D

IS

TR

IC

T

TA

YL

O

R S

TR

EE

T -R

M

A1

FO

R

T W

O R

TH

, T

X

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

SE

C

O N

D T

IT

LE

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

Compliance Services Group, Inc.

Texas Registered Engineering Firm F-1070

Engineers - Architects - Scientists

D

AR

N

AL

L

LO

O

P

FO

R T

H O

O D

, T X

R

EN

O

VA

TE

B

0, C O

N

VE

RT

HI

G H

PR

ES

SU

RE

S

TE

AM

(H

PS

)T

O H

O T

W

AT

ER

(H

W

SE

VE

N G

EN

ER

AT

IO

N S

A+ E

E.

M

IC

H

IG

AN

A

VE

SU

IT

E

B

KA

LA

M

AZ

O

O , M

I 4

W

2G -1

8- F-

W

2G -1

7- D

-0

B3

A-

C

PF

B36000

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

M-102

M

EC

H

AN

IC

AL

FI

R

ST

FL

O

O R

C

SG

G

EC

D

JB

M

AR

C

H

100% SUBMISSION

NORTH

1/32" = 1'-0"

FIRST FLOOR - MECHANICAL

NOTES INDICATED BY " "

1 HEATING WATER PIPING UP FROM BOILER ROOM TO FEED AHU-1A1.

2 HEATING WATER PIPING UP AND DOWN WITH CONNECTION TO FEED TO

CONVERTER.

3 HEATING WATER PIPING UP AND DOWN IN CHASE.

4 HEATING WATER PIPING RUN ABOVE PARTITION AND DOWN INTO

MECHANICAL ROOM GE1.

5 HEATING WATER PIPING RUN FROM BELOW TO MECHANICAL ROOM

1D1.

GENERAL NOTES:

A. ALL EXISTING STEAM AND CONDENSATE RETURN LINES ARE TO

REMAIN IN PLACE AND ACTIVE UNTIL SPECIFICALLY REMOVED OR

ABANDONED-IN-PLACE AS A STAGE OF CONSTRUCTION UNDER THIS

PROJECT. ALL STEAM AND CONDENSATE RETURN LINES THAT ARE

ABANDONED-IN-PLACE SHALL BE LABELED AS "AIP" BY STENCIL OR

STICKER.

B. -B. CONTRACTOR TO STAGE CONSTRUCTION SO THAT DOWNTIME FOR

EQUIPMENT BEING SERVED IS MINIMIZED.

C. CONTRACTOR TO SEPARATE CONSTRUCTION AREA FROM ADJACENT

SPACES SO CONSTRUCTION WILL NOT IMPEDE OCCUPANTS OF

ADJACENT SPACES IN THEIR NORMAL OPERATION.

D. PROVIDE LABELING ON ALL NEW PIPING WHICH INDICATES SERVICE

AND DIRECTION OF FLOW.

E. ALL NEW EQUIPMENT SHALL BE PROVIDED WITH EMCS-COMPATIBLE

CONTROLS TO RESULT IN FULLY FUNCTIONING SYSTEM COMPONENTS.

F. CONTRACTOR TO RECORD AND PROVIDE TO LOCAL USACE PM THE

AIR-SIDE PERFORMANCE OF ALL AHUS TO BE MODIFIED PRIOR TO

WORK ON AHUS, AND SHALL REBALANCE AIR-SIDE AND WATER-SIDE

COMPONENTS AFTER INSTALLATION OF PRE-HEAT COILS.

G. CONTRACTOR TO PROVIDE ALL REQUIRED HARDWARE, SOFTWARE,

AND PROGRAMMING TO INTEGRATE NEW COMPONENTS WITH

EXISTING EMCS.

H. PROVIDE MANUAL BALANCING VALVES AT ALL HWS BRANCH LINES FOR

USE IN SYSTEM BALANCING.

6 EXTEND NEW HWS AND HWR PIPING TO AHU FOR CONNECTION TO

REPLACEMENT HEATING WATER PREHEAT COIL WITH 3-WAY VALVE.

REFER TO HOT WATER PREHEAT COIL DETAIL ON SHEET M-500.

7 INSTALL REPLACEMENT HEATING WATER COIL. REFER TO PREHEAT

COIL SCHEDULE ON M-600 FOR SPECIFIC COIL TO FIT EXISTING AIR

HANDLER.

8 CONNECT NEW HWS AND HWR TO EXISTING HWS AND HWR PIPING

FEEDING FROM PREVIOUS CONNECTION TO CONVERTER BEING

REPLACED. PROVIDE ISOLATION VALVES.

M

AR

K D

ES

C

R

IP

TI

O

N D

B

C

D

E

F

H

J

G

2 3 4 5 6

7 8 9 10 12 18 20 22 24 26 28 30 32 33 34 35 36 37 38 39

L

N

Q

S

U

K

M

P

R

312927

QQ

MM

WW

DD

O

S

U

W

Y

BB

VV

UU

TT

SS

Z

AHU-2C3

AHU-2E1

AHU-2E2

AHU-2E3

AREA OUTSIDE

OF CONTRACT

AHU-2C2

AHU-2C1

HWR

2"ø

HWS

2"ø

HWR

2"ø

HWS

2"ø

HWR

3"ø

HWS

3"ø

HWS

3"ø

HWR

3"ø

HWR

1 1/4"ø HWS 1 1/2"ø

HWR

2 1/2"ø

HWS

2 1/2"ø

M-203

M-203

4 5

L I CEN DES

61431P R

O

FESS ION AL ENGIN

EE

R

STATE OF TEXAS

DAVID J. BRANSON

160 64

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

FO

R T

W O

R

TH

D

IS

TR

IC

T

TA

YL

O

R S

TR

EE

T -R

M

A1

FO

R

T W

O R

TH

, T

X

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

SE

C

O N

D T

IT

LE

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

Compliance Services Group, Inc.

Texas Registered Engineering Firm F-1070

Engineers - Architects - Scientists

D

AR

N

AL

L

LO

O

P

FO

R T

H O

O D

, T X

R

EN

O

VA

TE

B

0, C O

N

VE

RT

HI

G H

PR

ES

SU

RE

S

TE

AM

(H

PS

)T

O H

O T

W

AT

ER

(H

W

SE

VE

N G

EN

ER

AT

IO

N S

A+ E

E.

M

IC

H

IG

AN

A

VE

SU

IT

E

B

KA

LA

M

AZ

O

O , M

I 4

W

2G -1

8- F-

W

2G -1

7- D

-0

B3

A-

C

PF

B36000

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

M-103

M

EC

H

AN

IC

AL

SE

C O

N D

FL

O

O R

C

SG

G

EC

D

JB

M

AR

C

H

100% SUBMISSION

NORTH

1/32" = 1'-0"

SECOND FLOOR - MECHANICAL

NOTES INDICATED BY " "

1 HEATING WATER SUPPLY AND RETURN PIPING FROM BELOW TO

MECHANICAL ROOM 2C

2 HEATING WATER SUPPLY AND RETURN PIPING UP AND DOWN IN

CHASE.

3 HEATING WATER SUPPLY AND RETURN PIPING UP TO MECHANICAL

ROOM 2E.

GENERAL NOTES:

A. ALL EXISTING STEAM AND CONDENSATE RETURN LINES ARE TO

REMAIN IN PLACE AND ACTIVE UNTIL SPECIFICALLY REMOVED OR

ABANDONED-IN-PLACE AS A STAGE OF CONSTRUCTION UNDER THIS

PROJECT. ALL STEAM AND CONDENSATE RETURN LINES THAT ARE

ABANDONED-IN-PLACE SHALL BE LABELED AS "AIP" BY STENCIL OR

STICKER.

B. -B. CONTRACTOR TO STAGE CONSTRUCTION SO THAT DOWNTIME FOR

EQUIPMENT BEING SERVED IS MINIMIZED.

C. CONTRACTOR TO SEPARATE CONSTRUCTION AREA FROM ADJACENT

SPACES SO CONSTRUCTION WILL NOT IMPEDE OCCUPANTS OF

ADJACENT SPACES IN THEIR NORMAL OPERATION.

D. PROVIDE LABELING ON ALL NEW PIPING WHICH INDICATES SERVICE

AND DIRECTION OF FLOW.

E. ALL NEW EQUIPMENT SHALL BE PROVIDED WITH EMCS-COMPATIBLE

CONTROLS TO RESULT IN FULLY FUNCTIONING SYSTEM COMPONENTS.

F. CONTRACTOR TO RECORD AND PROVIDE TO LOCAL USACE PM THE

AIR-SIDE PERFORMANCE OF ALL AHUS TO BE MODIFIED PRIOR TO

WORK ON AHUS, AND SHALL REBALANCE AIR-SIDE AND WATER-SIDE

COMPONENTS AFTER INSTALLATION OF PRE-HEAT COILS.

G. CONTRACTOR TO PROVIDE ALL REQUIRED HARDWARE, SOFTWARE,

AND PROGRAMMING TO INTEGRATE NEW COMPONENTS WITH

EXISTING EMCS.

H. PROVIDE MANUAL BALANCING VALVES AT ALL HWS BRANCH LINES FOR

USE IN SYSTEM BALANCING.

4 EXTEND NEW HWS AND HWR PIPING TO AHU FOR CONNECTION TO

REPLACEMENT HEATING WATER PREHEAT COIL WITH 3-WAY VALVE.

REFER TO HOT WATER PREHEAT COIL DETAIL ON SHEET M-500.

5 INSTALL REPLACEMENT HEATING WATER COIL.