Technical_Exhibit_A-Specifications.pdf
PDF 8 MB Posted
- Attached to
- Construct New Pole Barn Building 40028 Federal contract opportunity
- Solicitation number
- W91151-18-B-0013
About this file
Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Abstract_18-B-0013_Pole_Barn_FH_TX_5_Sep_18.pdf | ||
| Amendment_for_Site_Visit_and_RFI's_18-B-0013.pdf | ||
| Approved_W91151-18-B-0013_Pole_Barn.pdf | ||
| Amendment_for_Site_Visit_and_RFI's_18-B-0013.pdf | ||
| Approved_W91151-18-B-0013_Pole_Barn.pdf | ||
| Attachment_1-Appendix_A_04-Aug-2016.pdf | ||
| Technical_Exhibit_B_-_AD106008P_Construct_New_Pole_Barn.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Headquarters III Corps, Fort Hood Directorate of Public Works (DPW)
Technical Exhibit “A”
CONSTRUCT NEW POLE BARN
SPECIFICATIONS
April 30, 2018
Contract No. W91151‐16‐C‐XXXX
Directorate of Public Works Engineering Division US Army, III Corps 4612 Engineer Dr.
Fort Hood, TX 76544
DPW Specification Jan 11, 2016
DPWSPECS TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 32 01.00 10 1 JAN PROJECT SCHEDULE
01 33 00 1 JAN SUBMITTAL PROCEDURES
01 35 13 1 JAN SPECIAL PROJECT PROCEDURES
01 35 23.00 40 1 JAN OWNER SAFETY REQUIREMENTS
01 35 29 1 JAN SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS
01 45 01.00 20 1 JAN QUALITY CONTROL (QC)
01 57 20.00 10 1 JAN ENVIRONMENTAL PROTECTION
01 77 00 1 JAN CLOSEOUT PROCEDURES
01 78 23 1 JAN OPERATION AND MAINTENANCE DATA
01 80 00 1 JAN UTILITIES
DIVISION 02 - EXISTING CONDITIONS
02 41 00 10/14 DEMOLITION
02 82 00 10/14 ASBESTOS REMEDIATION
02 82 18.00 20 07/14 ENGINEERING CONTROL OF MOLD CONTAMINATED
MATERIALS
02 82 33.13 20 08/11 REMOVAL/CONTROL AND DISPOSAL OF PAINT WITH LEAD
DIVISION 03 - CONCRETE
03 30 00 09/14 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 01 41 04/06 RESTORATION AND CLEANING OF MASONRY
04 20 00 10/07 MASONRY
DIVISION 05 - METALS
05 12 00 11/11 STRUCTURAL STEEL
05 40 00 05/10 COLD-FORMED METAL FRAMING
05 50 00 04/06 METAL: MISCELLANEOUS AND FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 20 00 04/06 FINISH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 17 04/06 FIBERGLASS INSULATION
07 24 00 07/14 EXTERIOR INSULATION AND FINISH SYSTEMS
07 41 13 07/14 METAL ROOF PANELS
07 55 00 07/14 MEMBRANE ROOFING
07 57 14 09/14 SPRAYED POLYURETHANE FOAM (MEDIUM DENSITY)
07 60 00 07/14 FLASHING AND SHEET METAL
07 84 00 07/14 FIRESTOPPING
07 92 00 09/14 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 07/14 STEEL DOORS AND FRAMES
08 11 16 07/14 ALUMINUM DOORS AND FRAMES
08 14 00 07/14 WOOD DOORS
08 33 23 07/14 OVERHEAD COILING DOORS
MASTER TABLE OF CONTENTS Page 1
08 34 19.10 20 04/06 ROLLING SERVICE DOORS
08 36 13 08/11 SECTIONAL OVERHEAD DOORS
08 36 19 11/11 VERTICAL LIFT DOORS
08 51 13.00 20 07/14 ALUMINUM WINDOWS
08 60 45 07/14 SKYLIGHTS AND TRANSLUCENT PANELS
08 71 00 08/14 DOOR HARDWARE
08 81 00 08/14 GLAZING
08 91 00 08/14 METAL WALL AND DOOR LOUVERS
DIVISION 09 - FINISHES
09 29 00 09/14 GYPSUM BOARD
09 30 00 09/14 CERAMIC TILE, QUARRY TILE, AND PAVER TILE
09 51 00 09/14 ACOUSTICAL CEILINGS
09 65 00 09/14 RESILIENT FLOORING
09 68 00 09/14 CARPET
09 90 00 09/14 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 01 09/14 EXTERIOR SIGNAGE
10 14 02 09/14 INTERIOR SIGNAGE
10 21 13 09/14 TOILET COMPARTMENTS
10 22 13 09/14 WIRE MESH PARTITIONS
10 26 13 09/14 WALL AND CORNER GUARDS
10 28 13 09/14 TOILET ACCESSORIES
10 44 16 07/14 FIRE EXTINGUISHERS
10 90 00 08/08 MISCELLANEOUS SPECIALTIES
DIVISION 11 - EQUIPMENT
11 68 13 09/14 PLAYGROUND EQUIPMENT
DIVISION 12 - FURNISHINGS
12 24 13 09/14 ROLLER WINDOW SHADES
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19 11/11 METAL BUILDING SYSTEMS
DIVISION 21 - FIRE SUPPRESSION
21 12 00 05/11 STANDPIPE SYSTEMS
21 13 00.00 20 04/06 WET-PIPE FIRE SUPPRESSION SPRINKLERS
21 13 00.00 40 08/13 FIRE-SUPPRESSION SPRINKLER SYSTEMS
21 13 16.00 20 04/06 DRY-PIPE FIRE SPRINKLER SYSTEMS
21 13 18.00 10 05/09 PREACTION AND DELUGE SPRINKLER SYSTEMS, FIRE
PROTECTION
21 13 20.00 20 11/09 FOAM FIRE EXTINGUISHING FOR AIRCRAFT HANGARS
21 13 24.00 10 10/07 AQUEOUS FILM-FORMING FOAM (AFFF) FIRE
PROTECTION SYSTEM
21 13 26.00 40 08/13 DELUGE FIRE-SUPPRESSION SPRINKLER SYSTEMS
21 21 01.00 10 04/06 CLEAN AGENT FIRE EXTINGUISHING
21 21 03.00 10 02/09 WET CHEMICAL FIRE EXTINGUISHING SYSTEM
21 30 00 04/08 FIRE PUMPS
DIVISION 22 - PLUMBING
MASTER TABLE OF CONTENTS Page 2
22 00 00 11/11 PLUMBING, GENERAL PURPOSE
22 05 48.00 20 04/06 MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL
22 07 19.00 40 08/13 PLUMBING PIPING INSULATION
22 14 29.00 40 08/11 SUMP PUMPS
22 15 14.00 40 02/11 GENERAL SERVICE COMPRESSED-AIR SYSTEMS, LOW
PRESSURE
22 31 00 02/09 WATER SOFTENERS, CATION-EXCHANGE (SODIUM CYCLE)
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00 08/10 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND
EXHAUST SYSTEMS
23 01 30.41 08/10 HVAC SYSTEM CLEANING
23 03 00.00 20 08/10 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 02/14 COMMON PIPING FOR HVAC
23 05 48.00 40 02/11 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING
AND EQUIPMENT
23 05 93 08/09 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 09/14 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00.00 10 01/08 COMMISSIONING OF HVAC SYSTEMS
23 08 01.00 20 04/06 TESTING INDUSTRIAL VENTILATION SYSTEMS
23 09 13.34 40 02/11 CONTROL VALVES, SELF-CONTAINED
23 09 23 05/11 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND
OTHER BUILDING CONTROL SYSTEMS
23 09 53.00 20 02/10 SPACE TEMPERATURE CONTROL SYSTEMS
23 11 25 11/08 FACILITY GAS PIPING
23 21 13.00 20 04/06 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM
23 21 13.23 20 07/07 [HIGH][MEDIUM] TEMPERATURE WATER SYSTEM WITHIN
BUILDINGS
23 23 00 10/07 REFRIGERANT PIPING
23 25 00 11/08 CHEMICAL TREATMENT OF WATER FOR MECHANICAL
SYSTEMS
23 31 13.00 40 11/12 METAL DUCTS
23 34 23.00 40 05/14 HVAC POWER VENTILATORS
23 35 00.00 10 02/09 OVERHEAD VEHICLE TAILPIPE[ AND WELDING FUME]
EXHAUST REMOVAL SYSTEM(S)
23 35 19.00 20 02/10 INDUSTRIAL VENTILATION AND EXHAUST
23 36 00.00 40 02/11 AIR TERMINAL UNITS
23 37 13.00 40 05/10 DIFFUSERS, REGISTERS, AND GRILLS
23 41 13.00 40 05/10 PANEL FILTERS
23 52 00 04/08 HEATING BOILERS
23 52 33.03 20 11/08 WATER-TUBE BOILERS, OIL/GAS OR OIL
23 52 43.00 10 04/08 HEAT RECOVERY BOILERS
23 52 43.00 20 07/06 LOW PRESSURE WATER HEATING BOILERS (UNDER
800,000 BTU/HR OUTPUT)
23 52 46.00 20 04/06 LOW PRESSURE WATER HEATING BOILERS (OVER
800,000 BTU/HR OUTPUT)
23 54 16.00 10 08/14 HEATING SYSTEM; GAS-FIRED HEATERS
23 54 19 11/08 BUILDING HEATING SYSTEMS, WARM AIR
23 57 10.00 10 01/08 FORCED HOT WATER HEATING SYSTEMS USING WATER
AND STEAM HEAT EXCHANGERS
23 63 00.00 10 10/07 COLD STORAGE REFRIGERATION SYSTEMS
23 64 00 08/09 PACKAGED WATER CHILLERS, ABSORPTION TYPE
23 64 10 08/08 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 08/09 CHILLED, CHILLED-HOT, AND CONDENSER WATER
PIPING SYSTEMS
23 65 00 08/14 COOLING TOWERS
23 69 00.00 20 07/06 REFRIGERATION EQUIPMENT FOR COLD STORAGE
23 70 03.00 10 01/08 HEATING AND UTILITIES SYSTEMS, CENTRAL STEAM
MASTER TABLE OF CONTENTS Page 3
23 72 00.00 10 01/08 ENERGY RECOVERY SYSTEMS
23 72 26.00 10 04/08 DESICCANT COOLING SYSTEMS
23 73 13.00 40 05/14 MODULAR INDOOR CENTRAL-STATION AIR-HANDLING
UNITS
23 74 33.00 40 02/11 PACKAGED, OUTDOOR, HEATING AND COOLING MAKEUP
AIR-CONDITIONERS
23 76 00.00 10 04/08 EVAPORATIVE COOLING SYSTEMS
23 76 00.00 20 07/06 EVAPORATIVE COOLING SYSTEM
23 81 00.00 20 11/09 UNITARY AIR CONDITIONING EQUIPMENT
23 81 23.00 20 02/10 COMPUTER ROOM AIR CONDITIONING UNITS
23 81 47 08/08 WATER-LOOP AND GROUND-LOOP HEAT PUMP SYSTEMS
23 82 00.00 20 11/08 TERMINAL HEATING AND COOLING UNITS
23 82 01.00 10 04/08 WARM AIR HEATING SYSTEMS
23 82 02.00 10 04/08 UNITARY HEATING AND COOLING EQUIPMENT
23 82 16.00 40 08/14 AIR COILS
23 82 19.00 40 05/14 FAN COIL UNITS
23 82 23.00 40 05/14 UNIT VENTILATORS
23 82 43.00 40 08/11 ELECTRIC DUCT HEATERS
23 82 46.00 40 08/11 ELECTRIC UNIT HEATERS
23 83 00.00 20 04/06 ELECTRIC SPACE HEATING EQUIPMENT
23 84 16.00 20 11/08 DESICCANT DEHUMIDIFICATION EQUIPMENT
DIVISION 26 - ELECTRICAL
26 00 00.00 20 09/14 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 00.00 40 11/08 COMMON WORK RESULTS FOR ELECTRICAL
26 05 73.00 40 09/14 OVERCURRENT PROTECTIVE DEVICES
26 09 23.00 40 09/14 LIGHTING CONTROL DEVICES
26 12 00 09/14 TRANSFORMERS
26 23 00 09/14 SWITCHBOARDS AND SWITCHGEAR
26 24 16.00 40 09/14 PANELBOARDS
26 24 19.00 40 09/14 MOTORS AND MOTOR-CONTROL CENTERS
26 26 00.00 40 09/14 POWER DISTRIBUTION UNITS
26 27 13.10 30 09/17 ELECTRIC METERS
26 27 26.00 40 09/14 WIRING DEVICES
26 28 16.00 40 09/14 ENCLOSED SWITCHES AND CIRCUIT BREAKERS
26 29 23 09/14 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 51 00 09/17 INTERIOR LIGHTING
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 74.00 20 07/14 INTERIOR FIRE DETECTION AND ALARM SYSTEM
28 31 76 07/14 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 08/14 EARTHWORK
31 05 19 08/14 GEOTEXTILE
31 11 00 08/08 CLEARING AND GRUBBING
31 32 11 07 JU SOIL SURFACE EROSION CONTROL
31 36 00 08/14 WIRE MESH GABIONS AND MATTRESSES
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 11.51 08/14 RUBBER AND PAINT REMOVAL FROM AIRFIELD PAVEMENTS
32 01 13.00 20 09/14 EMULSIFIED ASPHALT SEAL COATS WITH OR WITHOUT
AGGREGATE
32 01 13 BITUMINOUS SEAL AND FOG COATS
32 01 16.17 08/14 COLD MILLING OF BITUMINOUS PAVEMENTS
MASTER TABLE OF CONTENTS Page 4
32 01 17.16 SEALING OF CRACKS IN BITUMINOUS PAVEMENTS
32 01 17 09/14 COLD-MIX RECYCLING
32 01 19.61 RESEALING OF JOINTS IN RIGID PAVEMENT
32 01 19 09/14 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN
RIGID PAVEMENTS
32 01 24 09/14 HOT IN-PLACE RECYCLING OF BITUMINOUS PAVEMENTS
32 01 25 09/14 HEATER SCARIFYING OF BITUMINOUS PAVEMENTS
32 01 26.71 09/14 GROOVING FOR AIRFIELD PAVEMENTS
32 01 29.61 08/14 PARTIAL DEPTH PATCHING OF RIGID PAVING
32 01 29.62 SLABJACKING RIGID PAVEMENTS
32 05 33 07/06 LANDSCAPE ESTABLISHMENT
32 10 00 08/14 PERVIOUS AND STANDARD BITUMINOUS CONCRETE
PAVEMENT
32 11 10 09/14 DRAINAGE LAYER
32 11 16.13 09/14 SAND-CLAY SUBBASE COURSE
32 11 16 08/14 BASE COURSE FOR RIGID AND SUBBASES FOR FLEXIBLE
PAVING
32 11 23 08/14 AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE
COURSE
32 11 24 GRADED CRUSHED AGGREGATE BASE COURSE FOR
PERVIOUS AND NORMAL FLEXIBLE PAVEMENT
32 11 29 LIME-STABILIZED SUBGRADE
32 11 33 CEMENT STABILIZED SUBBASE COURSE AT AIRFIELDS
AND ROADS
32 12 10 BITUMINOUS TACK AND PRIME COATS
32 12 11 07/14 BITUMINOUS SURFACE TREATMENT
32 12 15.13 HOT-MIX ASPHALT AIRFIELD PAVING
32 12 15.16 07/14 WARM-MIX ASPHALT AIRFIELD PAVING
32 12 16 08/14 HOT-MIX ASPHALT (HMA) FOR ROADS
32 12 17.00 44 0508 PAVEMENT REPLACEMENT
32 12 17 07/14 HOT MIX BITUMINOUS PAVEMENT
32 12 19 07/14 BITUMINOUS BINDER AND WEARING COURSES
(CENTRAL-PLANT COLD-MIX)
32 12 21 08/14 BITUMINOUS ROAD-MIX SURFACE COURSE
32 12 37 08/14 FUEL-RESISTANT (COAL TAR) SEALER
32 12 43.16 POROUS FRICTION COURSE FOR AIRFIELDS AND ROADS
32 13 11 07/14 CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER
HEAVY-DUTY PAVEMENTS
32 13 13.06 07/14 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND
SITE FACILITIES
32 13 15.20 08/14 CONCRETE PAVEMENT FOR CONTAINMENT DIKES
32 13 16.16 08/14 ROLLER COMPACTED CONCRETE (RCC) PAVEMENT
32 13 17 08/14 STONE MATRIX ASPHALT (SMA) FOR AIRFIELD
PAVEMENTS
32 13 43 PERVIOUS CONCRETE PAVING
32 13 73 08/14 COMPRESSION JOINT SEALS FOR CONCRETE PAVEMENTS
32 15 00 08/14 AGGREGATE SURFACE COURSE
32 16 13 07/14 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 16 15 08/14 CONCRETE BLOCK PAVEMENTS
32 17 23.00 20 07/14 PAVEMENT MARKINGS
32 18 16.13 08/14 PLAYGROUND PROTECTIVE SURFACING
32 31 13 01/08 CHAIN LINK FENCES AND GATES
32 92 19 06/15 SEEDING
32 92 23 04/06 SODDING
32 93 00 02/10 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 40 00 02/10 STORM DRAINAGE UTILITIES
MASTER TABLE OF CONTENTS Page 5
33 51 00.00 20 04/06 NATURAL GAS DISTRIBUTION
33 51 13.00 30 05/10 NATURAL-GAS METERING
33 71 01.00 40 09/14 OVERHEAD TRANSMISSION AND DISTRIBUTION
33 71 02 02/14 UNDERGROUND ELECTRICAL DISTRIBUTION
-- End of Master Table of Contents --
MASTER TABLE OF CONTENTS Page 6
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 140 PAGES
01 32 01.00 10 SD-01 Preconstruction Submittals
3.4.2 GInitial Project Schedule
3.4.1 GProgram Project Schedule
3.4.3 GPeriodic Schedule Update
01 35 13 SD-01 Preconstruction Submittals
1.4.7 GSupport Subcontractor Awards
1.4.2 GDigging And Water Use Permits
1.5.3 GStorm Water Prevention Pollution
Plan (SWPPP)
1.5.6 GWater Use Permit
1.4.1 GFort Hood Airfield Access
1.5.4 GTraffic Control Plan
1.5.5 GArmy Radiation Permit
1.5.8 GUtility Metering Permit
GRange Passes
1.5.10.1 GAT Level I Training
1.4.9.4 GOPSEC Training
01 35 23.00 40 SD-01 Preconstruction Submittals
1.3.1 GContractor's Health and Safety
Plan SD-06 Test Reports
1.14Gas Protection SD-07 Certificates
1.3.2Protection Plan 1.11License Certificates
01 35 29 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 140 PAGES
01 35 29 GActivity Hazard Analysis
1.13 GCrane Critical Lift Plan
GCrane Operators GConfined Space Entry Permit
SD-06 Test Reports Accident Reports
1.11.1Regulatory Citations and Violations
01 45 01.00 20 SD-01 Preconstruction Submittals
3.1 G3-Key Personal
GQuality Control Plan (QCP) 01 57 20.00 10 SD-01 Preconstruction Submittals
3.4.1Air Permits
3.8.1 GEnvironmental Manager
SD-11 Closeout Submittals Contractor Hazardous Material Inventory and Consumption Log
3.4.1 GAir Permits
Refrigerant Equipment Service Log
Emissions Inventory Questionnaire for New Sources
3.4.2Emission Inventory 3.9.2Recycle Weight Tickets 3.9.3Construction Waste Tickets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 140 PAGES
01 77 00 SD-10 Operation and Maintenance Data
GEquipment/Product Warranty List SD-11 Closeout Submittals
GCertification of EPA Designated Items
GForm DD1354 (and Appendix D where applicable)
GVideos GFinal Operation and Maintenance
Manuals GFinal Record Drawings GInventory of Contractor Furnished and Installed Equipment 02 41 00 SD-01 Preconstruction Submittals
GDemolition Plan GUtility Cut and Cap Plan
SD-07 Certificates Asbestos and Lead Based Paint Notification Forms submitted to Texas Department of State Health Services
FIO
SD-11 Closeout Submittals Receipts
FIO
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 140 PAGES
02 82 00 SD-03 Product Data 1.3.8Material Safety Data Sheets
(MSDS) for all materials proposed for transport to the project site
FIO
SD-06 Test Reports
1.5.5Air sampling results
FIO
3.3.3.2Asbestos disposal quantity report 3.2.7.3Clearance sampling
GAsbestos Survey Report showing quantities and locations
SD-07 Certificates 1.3.9Asbestos hazard abatement plan
FIO
1.3.10Testing laboratory
Private qualified person 1.5.4Contractor's license 1.5.2Competent person 1.5.3Worker's license 1.3.11Landfill approval 1.3.3Employee training
Medical certification requirements 1.3.11Waste shipment records 1.3.6Respiratory Protection Program
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 140 PAGES
02 82 00 1.3.11Delivery tickets 1.3.4Notifications
Notifications to Texas Department of State Health Services; G
SD-11 Closeout Submittals 1.3.4Notifications 1.3.4Permits and licenses
02 82 18.00 20 SD-06 Test Reports 1.5.4Air sampling results 3.2.8.2Clearance sampling
SD-07 Certificates 1.3.9Mold remediation plan
Private qualified person documentation (Mold assessors, remediators)
1.5.3Contractor's license Responsible person
1.3.4Notifications 1.3.4Notifications
SD-11 Closeout Submittals 1.3.4Notifications 1.3.4Notifications
02 82 33.13 20 SD-03 Product Data 1.6.4Vacuum Filters 1.6.1Respirators
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 140 PAGES
02 82 33.13 20 SD-06 Test Reports 1.5.2.3sampling results 1.5.2.3Occupational and Environmental
Assessment Data Report SD-07 Certificates
1.5.1.1 GQualifications of CP
1.5.1.3Testing Laboratory 3.1.1.1Occupant Notification
1.5.1.2 GTraining Certification
GNotification of the Commencement of LBP Hazard Abatement activities
1.5.1.4 GThird Party Consultant
Qualifications
1.5.3lead-based paint/paint with lead removal/control plan
1.5.2.6Respiratory Protection Program 1.5.2.7Hazard Communication Program approved hazardous waste treatment, storage, or disposal facility
1.5.2.8Lead Waste Management Plan 3.5.1.1Clearance Certification
SD-11 Closeout Submittals 3.5.2.1hazardous waste manifest
03 30 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 140 PAGES
03 30 00 1.4.2.1 GReinforcing steel SD-05 Design Data
2.3.1 Gmix design
SD-06 Test Reports
3.12.2.2Compressive strength tests
FIO
3.12.2.1Slump Tests SD-07 Certificates
2.5.1Reinforcing Bars
FIO
04 01 41 SD-03 Product Data Cleaning and Restoration Methods
04 20 00 SD-03 Product Data Shop Drawings Reinforcing Steel
1.5.1Local/Regional Materials Masonry Blends being used; to include each type of rock included in blend
Environmental Data Brick
2.2Concrete Masonry Units (CMU) 2.5Water-Repellant Admixture
SD-04 Samples 2.2Concrete Masonry Units (CMU)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 140 PAGES
04 20 00 2.1Clay or Shale Brick SD-08 Manufacturer’s Instructions
2.4.2Masonry Cement 05 12 00 SD-02 Shop Drawings
Fabrication drawings; G SD-06 Test Reports
2.2Bolts, nuts, and washers SD-07 Certificates
2.1Steel 2.5Galvanizing 1.4AISC Quality Certification
AISC Fabrication Plant Quality Certification
05 40 00 SD-02 Shop Drawings 1.5.1Framing Components
SD-03 Product Data 2.1studs,joists
SD-05 Design Data 1.5.2Metal framing calculations 3.1.1Welds
05 50 00 SD-02 Shop Drawings 2.20steel stairs 2.22structural steel door frames 2.9Floor gratings and roof walkways 2.12Handrails 2.13Ladders
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 140 PAGES
05 50 00 3.14Roof hatch SD-03 Product Data
2.9Floor gratings and roof walkways 2.12Handrails 2.13Ladders 2.20Steel stairs 2.22Structural steel door frames 3.14Roof hatch
06 20 00 SD-03 Product Data Cabinetry hardware
SD-04 Samples Cabinetry and couter top Moldings
2.3Fascias and Trim 07 21 17 SD-03 Product Data
3.3.1Insulation Vapor retarder
SD-08 Manufacturer’s Instructions 3.3.1Insulation
07 24 00 SD-03 Product Data 2.2Sheathing board
Vapor Barrier 2.6Thermal insulation
Adhesive 2.5Mechanical Fasteners 2.12Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 140 PAGES
07 24 00 2.7Base coat 2.8Portland cement 2.9Reinforcing fabric 2.10Finish coat 2.13Joint Sealant
Sealant Primer 2.14Bond breaker 2.15Backer Rod
Insulation Board Warranty
FIO
SD-04 Samples Sample Boards
SD-07 Certificates 1.4.1Qualifications of EIFS
Manufacturer 1.4.2Qualification of EIFS Installer
Qualification of Sealant Applicator
SD-08 Manufacturer’s Instructions 3.3Installation
SD-10 Operation and Maintenance Data
EIFS
07 41 13 SD-02 Shop Drawings Flashing and Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 140 PAGES
07 41 13 Gutter/Downspout Assembly SD-03 Product Data Roof panels
FACTORY-APPLIED COLOR
FINISH
2.4Accessories Fasteners
SD-04 Samples GRoof Panels
SD-06 Test Reports 2.6.2Fire Rating Test Report 2.2Factory Finish and Color
Performance Requirements SD-08 Manufacturer’s Instructions
INSTALLATION MANUAL
07 55 00 SD-03 Product Data 2.2Insulation Board
Membrane Roofing Fasteners Sheet Metal Design Materials Caulking Contractors Qualifications 2-Roof Vents Scuppers and Curbs Designs Parapet Wall Flashing Designs Fascia Designs and Colors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 140 PAGES
07 55 00 SD-04 Samples GMembrane Roofing
2.2Insulation Board Fasteners Fascia 2-Way Roof Vent
SD-08 Manufacturer’s Instructions Installation
SD-11 Closeout Submittals Manufacturers Final Inspection Quality Verification Report
07 57 14 SD-03 Product Data Polyurethane foam
SD-07 Certificates GQualification of Manufacturer GQualification of Applicator
07 60 00 SD-02 Shop Drawings
3.1.27 GFlashing at roof penetrations
07 84 00 SD-03 Product Data 2.1Firestopping Materials
07 92 00 SD-03 Product Data 2.1Sealants 2.4Backstops
08 11 13 SD-03 Product Data 2.1Doors
Frames
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 140 PAGES
08 11 13 2.2Accessories Weatherstripping
08 11 16 SD-02 Shop Drawings 2.1Doors and frames
SD-08 Manufacturer’s Instructions 2.1Doors and frames
08 14 00 SD-03 Product Data 2.1Doors 2.1.7Fire resistance rating
08 33 23 SD-02 Shop Drawings 2.1Overhead Coiling Doors 1.6Counterbalancing Mechanism 2.3Counterbalancing Mechanism 1.6Manual Door Operators 2.4Manual Door Operators 1.6Electric Door Operators 2.5Electric Door Operators 2.1.4Bottom Bar 1.5Guides 2.3.1Mounting Brackets 2.1.10Overhead Drum 1.6Hood 1.6Painting 1.5Installation Drawings
SD-03 Product Data 2.1Overhead Coiling Doors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 140 PAGES
08 33 23 2.2Hardware 1.6Counterbalancing Mechanism 2.3Counterbalancing Mechanism 1.6Manual Door Operators 2.4Manual Door Operators 1.6Electric Door Operators 2.5Electric Door Operators 2.6Fire-Rated Door Assembly
SD-05 Design Data 2.1Overhead Coiling Doors 2.2Hardware 1.6Counterbalancing Mechanism 2.3Counterbalancing Mechanism 1.6Manual Door Operators 2.4Manual Door Operators 1.6Electric Door Operators 2.5Electric Door Operators 1.2Fire-Rated Door
SD-10 Operation and Maintenance Data
1.5Operation and Maintenance Manuals
1.6Overhead Coiling Door Assemblies
1.6Materials 1.6Devices
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 140 PAGES
08 33 23 1.6Procedures 1.6Manufacture's Brochures 1.6Parts Lists 3.3.2Cleaning
08 34 19.10 20 SD-02 Shop Drawings 2.1Rolling service doors
Rolling fire doors SD-03 Product Data
2.1Rolling service doors 2.4.2Motors 2.4.3Controls
SD-08 Manufacturer’s Instructions 2.1Rolling service doors
SD-10 Operation and Maintenance Data
2.1Rolling service doors 08 36 13 SD-02 Shop Drawings
2.2 GDoors
SD-03 Product Data
2.2 GDoors
2.6 GElectric operators
SD-08 Manufacturer’s Instructions 2.2Doors
SD-10 Operation and Maintenance Data
2.2 GDoors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 140 PAGES
08 36 19 SD-02 Shop Drawings
2.2 GDoors
SD-03 Product Data
2.2 GDoors
2.4.1 GMotors
2.4.2 GControls
SD-08 Manufacturer’s Instructions 2.2Doors
SD-10 Operation and Maintenance Data
2.2 GDoors
08 51 13.00 20 SD-02 Shop Drawings
2.1Windows Fabrication Drawings
SD-03 Product Data 2.1Windows 2.2.5.1Hardware 2.2.2Weatherstripping 2.2.5Accessories
SD-05 Design Data Structural calculations for deflection
08 60 45 SD-02 Shop Drawings 3.2Shop Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 140 PAGES
08 60 45 2.1[SKYLIGHTS][ AND
][TRANSLUCENT PANELS]
1.6Warranty SD-06 Test Reports
2.1Test Reports SD-07 Certificates
2.5Systems 1.4Qualifications
08 71 00 SD-02 Shop Drawings 2.3.6Keying system
SD-03 Product Data 2.3Hardware items
SD-11 Closeout Submittals 1.3Key Bitting
08 81 00 SD-02 Shop Drawings Installation
SD-03 Product Data Insulating Glass
1.3Glazing Accessories SD-07 Certificates Insulating Glass Laminated Glass
08 91 00 SD-02 Shop Drawings 1.4Wall louvers 1.5Wall louvers
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 140 PAGES
08 91 00 2.2Metal Wall Louvers 09 29 00 SD-03 Product Data
Cementitious backer units 2.1.1Gypsum Board 2.1.7Accessories
SD-08 Manufacturer’s Instructions Material Safety Data Sheets
09 30 00 SD-03 Product Data 2.1Tile
Adhesive SD-04 Samples
2.1Tile 2.3Grout
09 51 00 SD-03 Product Data Acoustical Ceiling Systems
SD-07 Certificates Acoustic Ceiling Tiles and Suspension System
09 65 00 SD-03 Product Data Resilient Flooring and Accessories
2.4Adhesives SD-08 Manufacturer’s Instructions
3.2Surface Preparation Installation
09 68 00 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 140 PAGES
09 68 00 2.1Carpet 3.4Installation
SD-04 Samples 2.1Carpet
SD-07 Certificates 2.1Carpet
09 90 00 SD-03 Product Data Coating
SD-08 Manufacturer’s Instructions 1.6.2Manufacturer's Material Safety
Data Sheets 10 14 02 SD-03 Product Data
1.3Interior Signage 10 21 13 SD-02 Shop Drawings
GInstallation Drawings Fabrication Drawings
SD-03 Product Data 2.6Colors And Finishes 2.2Partition Panels and Doors 2.1.3Anchoring Devices and
Fasteners 2.1.5Hardware and Fittings
10 22 13 SD-03 Product Data 1.4Wire mesh partitions
10 26 13 SD-03 Product Data 2.2Corner Guards
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 140 PAGES
10 28 13 SD-03 Product Data Finishes Accessory Items
10 44 16 SD-03 Product Data 2.1Fire Extinguishers
Accessories Cabinets Wall Brackets Replacement Parts
SD-07 Certificates 2.1Fire Extinguishers 2.1Manufacturer's Warranty with
Inspection Tag 11 68 13 SD-02 Shop Drawings
Configuration 1.5.5Shop Drawings
Fall Height SD-03 Product Data
2.2Equipment 1.3.4Equipment Identification 1.6Delivery, Storage and Handling 1.5.1Manufacturer Qualification 2.1Materials
SD-04 Samples 2.1.5Color
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 140 PAGES
11 68 13 2.1.3Recycled Plastic Wood Finishes
SD-07 Certificates 2.1Materials 1.5.1Manufacturer Qualification 1.5.2Installer Qualification 1.5.3Manufacturer's Representative
Substitution SD-10 Operation and Maintenance Data
1.8Maintenance Instructions 12 24 13 SD-03 Product Data
2.1Window Shades 1.3Hardware
SD-08 Manufacturer’s Instructions 2.1Window Shades
13 34 19 SD-01 Preconstruction Submittals 1.6.2Manufacturer's Qualifications
SD-02 Shop Drawings Shop and Detail Drawings
SD-05 Design Data descriptive and technical literature building design analysis 21 12 00 SD-02 Shop Drawings
1.4.4 GStandpipe system
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 140 PAGES
21 12 00 SD-03 Product Data
2.1.1 GPipe and fittings
2.1.1 GMechanical couplings
2.1.2 GPipe hangers and supports
2.1.3 GValves
2.1.9 GFire department connections
2.1.10 GAlarm valves
2.1.11 GWater motor alarms
2.1.12 GPressure switch
2.1.13 GWaterflow detector
2.1.14 GFire hose cabinets
2.1.15 GValve tamper switch
2.1.17 GBackflow preventer
2.2.1 GBuried Pipe and fittings
SD-06 Test Reports
3.8.1 GPreliminary tests
3.8.2 GAcceptance tests
SD-07 Certificates
1.6.1 GQualifications of installer
SD-10 Operation and Maintenance Data
2.1.10 GAlarm valves
2.1.17 GBackflow preventer
SD-11 Closeout Submittals
1.6.2 GSystem as-built drawings
21 13 00.00 20 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 140 PAGES
21 13 00.00 20 1.4Sprinkler heads and piping system layout
1.4.8Electrical wiring diagrams SD-03 Product Data
2.2Piping 2.2.4Alarm valves 2.2.8Valves 2.2.5Water motor alarms 2.2.2Sprinkler heads 2.2.7Pipe hangers and supports 2.2.6Flow switch 2.2.13Fire department connections 2.2.14Excess pressure pump 2.2.1Mechanical couplings 2.2.9Backflow Preventer
SD-05 Design Data 1.4Sprinkler system design
SD-06 Test Reports 3.2.1Preliminary tests
SD-07 Certificates 1.6.1Qualifications of installer
SD-10 Operation and Maintenance Data
2.2.4Alarm valves 2.2.14Excess pressure pump 2.2.9Backflow preventer
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 140 PAGES
21 13 00.00 20 SD-11 Closeout Submittals 1.4.9As-built drawings
21 13 00.00 40 SD-01 Preconstruction Submittals
1.2 GRecord of Existing Conditions
SD-02 Shop Drawings
2.2.3 GSupporting Elements
2.2.4 GFire-Department Connections
2.2.9.1 GFire Alarm System
2.2.8 GSprinkler Heads
2.2.9 GValves
SD-03 Product Data
2.2.1 GUnderground Piping Materials
2.2.2 GAboveground Piping Materials
2.2.9 GValves
2.2.4 GFire-Department Connections
2.2.5 GRiser Alarm Equipment
2.2.6.1 GAir Compressor
2.2.7 GStandpipe Equipment and Fire
Hose Cabinet Stations
2.2.8 GSprinkler Heads
2.3 GMaterials
2.2.3 GSupporting Elements
2.1 GEquipment and Performance
Data SD-05 Design Data
Part 2 GDesign Analysis and Calculations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 140 PAGES
21 13 00.00 40 SD-06 Test Reports
3.3.6 GPressure Tests
3.3.3 GSystem Operating Tests
3.3.3 GAir Tests
3.3.3 GValve-Operating Tests
3.3.3 GDrainage Tests
21 13 16.00 20 SD-02 Shop Drawings 1.3.8Sprinkler heads and piping system layout 1.3.8Electrical wiring diagrams
SD-03 Product Data 2.1Piping 2.1.10Valves 2.1.5Water motor alarms 2.1.2Sprinkler heads 2.1.9Pipe hangers and supports 2.1.14Fire department connections 2.1.7Low air pressure supervisory switch 2.1.4Dry pipe valves 2.1.8Air compressor 2.1.1Mechanical couplings 2.1.10.1Backflow Preventers 2.1.6Pressure Switch
SD-05 Design Data 1.3Sprinkler system design
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 140 PAGES
21 13 16.00 20 SD-06 Test Reports 3.2.1Preliminary tests
SD-07 Certificates 1.5.1Qualifications of installer
SD-10 Operation and Maintenance Data
2.1.4Dry pipe valves 2.1.8Air compressor
SD-11 Closeout Submittals 1.3.9As-built drawings of each system
21 13 18.00 10 SD-02 Shop Drawings
1.4.3 GShop Drawings
3.8As-Built Drawings
SD-03 Product Data
1.4.1 GFire Protection Specialist
1.4.2Installer Qualifications 1.4.1List of Submittals
2.1 GMaterials and Equipment
1.6Spare Parts
3.9 GOnSite Training
SD-05 Design Data 3.3.1Sway Bracing
1.2.1.2 GHydraulic Calculations
2.13.4.1 GStorage Batteries
SD-06 Test Reports
3.7 GPreliminary Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 140 PAGES
21 13 18.00 10 3.8Final Acceptance Tests SD-07 Certificates
3.2 GInspection by Fire Protection
Specialist
SD-10 Operation and Maintenance Data
3.9 GOperating and Maintenance
Instructions
21 13 20.00 20 SD-02 Shop Drawings
1.3.1.1 GFire extinguishing system
SD-03 Product Data
2.19.1 GPipe, fittings, and mechanical
couplings
2.1.3 G[Deluge] [Pre-action] valves
2.19.5 GValves
2.11.1 GWater motor alarms
2.1.1 GSprinkler heads
2.16 GMonitor nozzles
2.17 GHose and nozzles
2.19.4 GPipe hangers and supports
2.11.3.1 GPressure switch
2.19.11 GFire department inlet connections
2.12 GTank mounted air compressor
2.12 GAir pressure regulating device
2.3.1 GAir compressor
2.11.4 Gtrouble alarm
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 140 PAGES
21 13 20.00 20 2.2 GDetection devices
2.2.2.1 GStorage batteries
2.11.2 GAlarm bells
2.11.2 GAlarm horns
2.2.1.3 GAnnunciator panel
2.18 GFoam hydrants
2.15.3 GAFFF concentrate storage tanks
2.14 GProportioning equipment
2.13 GAFFF concentrate
2.19.3 GStrainers
2.5 GManual release stations
2.19.12 GBackflow preventers
2.2.1 GControl panel
2.2.2.2 GBattery charger
SD-05 Design Data
1.3.1.2 GHydraulic calculations
1.3.1.2 GPressure discharge graphs or
tables
1.3.1.2 GBattery standby power
requirements calculations
1.3.1.2 GSystem surge analysis
SD-06 Test Reports
2.7 G2-wire smoke detectors
3.8.1 GPreliminary tests
3.8.2 GAcceptance tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 140 PAGES
21 13 20.00 20 2.14.1 Gdiaphragm pressure proportioning tanks
SD-07 Certificates
1.5.1 GQualifications of installer
1.3.1.3 GAFFF containment and disposal
plan
2.19.12 GBackflow preventers
SD-10 Operation and Maintenance Data
2.1.3 G[Deluge] [Pre-action] valves
2.12 GTank mounted air compressor
2.14 GProportioning equipment
2.2.1 GControl panel
2.15.3 GAFFF concentrate storage tanks
2.16 GMonitor nozzles
1.3.1.1 Gfire extinguishing system
SD-11 Closeout Submittals
1.3.1.4 GAs-built drawings for the fire
extinguishing system 21 13 24.00 10 SD-02 Shop Drawings
1.4.3 GDetail Drawings
1.4.1As-built Drawings
SD-03 Product Data
2.1 GMaterials and Equipment
1.5Spare Parts
1.2 GAFFF System
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 140 PAGES
21 13 24.00 10 1.4.2 GInstaller's Qualifications
3.6.4 GPost-discharge Test
Requirements SD-06 Test Reports
3.6.4Test Reports SD-07 Certificates
2.1 GMaterials and Equipment
SD-10 Operation and Maintenance Data
3.8 GOperation and Maintenance
Manuals
21 13 26.00 40 SD-01 Preconstruction Submittals Part 2 GMaterial, Equipment, and Fixture
Lists
1.4 GRecord of Existing Conditions
SD-02 Shop Drawings Part 2 GConnection Diagrams Part 2 GControl Diagrams
1.4 GInstallation Drawings
SD-03 Product Data Part 2 GEquipment and Performance
Data Part 2 GEquipment Foundation Data Part 2 GPiping Materials
2.3.7 GAboveground Piping Systems
Part 2 GValves
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 140 PAGES
21 13 26.00 40 2.3.5 GDetection Systems Part 2 GAlarms Part 2 GSprinkler Heads Part 2 GSupporting Elements
SD-04 Samples
3.1.3 GManufacturer's Standard Color
Charts SD-05 Design Data
Part 2 GDesign Analysis and Calculations SD-06 Test Reports
3.2 GPressure Tests
3.2 GSystem Tests
3.2 GOperating Tests
SD-07 Certificates
1.3 GListing of Product Installations
Part 2 GPiping Materials
2.3.7 GAboveground Piping Systems
Part 2 GValves
2.3.5 GDetection Systems
Part 2 GAlarms Part 2 GAir Compressor Part 2 GSprinkler Heads Part 2 GSupporting Elements
SD-10 Operation and Maintenance Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 140 PAGES
21 13 26.00 40 3.4.1 GOperation and Maintenance Manuals
21 21 01.00 10 SD-02 Shop Drawings 1.3Piping layout 1.3.1Electrical wiring diagrams
SD-03 Product Data Storage cylinders Discharge head Manifolds
2.9Discharge alarm 2.3Pipe and fittings 2.4.3Pipe hangers and supports 2.6Actuating stations 2.6.3Pressure switch 2.6.5Control panel 2.7.1Smoke detectors 2.7.2Heat activated detectors 2.9.2Alarm horns 2.9.3Visual alarms 2.11Dampers
Main and reserve switch 2.9Warning signs 2.6.6.1Storage batteries 2.6.6.2Battery charger
SD-05 Design Data 1.3.2System calculations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 140 PAGES
21 21 01.00 10 2.6.6.1Calculations substantiating battery capacity
1.3.2Open-area smoke detectors calculations
SD-06 Test Reports 3.5.1Preliminary tests
SD-07 Certificates 1.5.1Qualifications of installer
SD-10 Operation and Maintenance Data Discharge head
2.6.5Control panel 21 21 03.00 10 SD-02 Shop Drawings
1.4.3 GInstallation Drawings
SD-03 Product Data
1.4Similar Services
2.1 GStandard Products
3.2 GPreliminary Tests
3.3 GFinal Acceptance Tests
3.4Field Training
SD-06 Test Reports 3.2Preliminary Tests 3.3Final Acceptance Tests
SD-07 Certificates
1.4.2 GInstallation Technician
1.4.3 GInstallation Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 140 PAGES
21 21 03.00 10 SD-10 Operation and Maintenance Data
3.4Operation and Maintenance Instructions
21 30 00 SD-01 Preconstruction Submittals 1.3Fire Pump Installation Related
Submittals
1.7.1 GFire Protection Specialist
SD-02 Shop Drawings
3.3.1 GInstallation Drawings
3.11.2 GAs-Built Drawings
3.3.2 GPiping Layout
3.3.2 GPump Room
SD-03 Product Data
2.1 GCatalog Data
1.6Spare Parts 3.8.2Preliminary Tests
3.8 GField Tests
1.7.6 GManufacturer's Representative
3.11.1 GField Training
3.8.3Army Final Acceptance Test
Navy Formal Inspection and Tests
SD-06 Test Reports 3.8.2Preliminary Tests 3.8.3Army Final Acceptance Test
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 140 PAGES
21 30 00 SD-07 Certificates 1.7.1Fire Protection Specialist 1.7.2Qualifications of Welders 1.7.3Qualifications of Installer 1.7.4Preliminary Test Certification 1.7.5Final Test Certification
SD-10 Operation and Maintenance Data
3.11.1Operating and Maintenance Instructions
2.17Flow Meter 22 00 00 SD-03 Product Data
2.4Fixtures 2.4.
This is the start of the file's text. The full file is on GovTribe.