TE-E__GLAZING_SERVICES_PRS.docx
DOCX document 25 KB Posted
- Attached to
- Glsazing Service
- Solicitation number
- W91151-17-R-0055
About this file
TE E
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_2_-_PAST_PERFORMANCE_QUESTIONNAIRE-Glazing_Svc-8_Aug17.docx | DOCX document | |
| TE-C_GLAZING_SERVICES_WORK_STATUS_REPORT.xlsx | XLSX spreadsheet | |
| WD_2015-5237_Rev_3_06-08-2017.docx | DOCX document | |
| TE-A_BARRACKS_WINDOW_AND_SCREEN_STANDARD_DIMENSIONS.xlsx | XLSX spreadsheet | |
| Solicitation_W91151-17-R-0055_Glazing_Svc_Ft_Hood_11_Aug_17.pdf | ||
| Attachment_1_Bid_Schedule_Solicitation.xlsx | XLSX spreadsheet | |
| TE-B_GLAZING_SERVICE_ORDER_HISTORICAL_DATA.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL EXHIBIT E
PERFORMANCE REQUIREMENTS SUMMARY
· Performance Objective: Defines specific results or outcomes that will satisfy the overall requirement.
· Performance Standard: Level of performance required to meet the Performance Objective
· Performance Threshold: Amount of deviation from 100% compliance that is acceptable
· Incentive / Disincentive: Good and poor performance will be reflected in some way.
PERFORMANCE OBJECTIVE
(PWS Paragraph)
| PERFORMANCE STANDARD |
| PERFORMANCE THRESHOLD |
(AQL)
| TASK VALUE % |
| INCENTIVE / DISINCENTIVE |
1.6.1.
QUALITY CONTROL
| The Contractor shall provide an approved Quality Control Plan within ten (10) days after contract award date. |
| 4% |
| 5% |
| Any of the following may occur: |
4.1. – 4.4.
CONTRACTOR FURNISHED PROPERTY
| The Contractor shall provide property and materials that meet the safety standards and Federal glass standards. |
| 4% |
| 10% |
| 1) Surveillance may Increase or decrease. |
5.1.1 – 5.3.
SERVICE CALL WORK
| The Contractor shall respond to service call requests within two (2) hours after notification and secure the facility. |
| 4% |
| 60% |
| 2) Good or poor performance could affect decisions to exercise options or award future contracts. |
5.7.
WINDOW SCREEN WORK
| The Contractor shall respond to service calls to repair/replace screens in barracks facilities. |
| 4% |
| 10% |
5.9.
WARRANTY
| The Contractor shall warranty all work for a period of one (1) year after any work is performed. |
| 4% |
| 5% |
| 3) Un-acceptable performance could result in reductions of monthly payments. (See deduction formula) |
5.10. – 5.10.1.
WORK CONTROL RECORDS AND WORK STATUS REPORTS
| The Contractor shall be responsible for providing a status report by 9:00 am the next working day for all work performed. |
| 4% |
| 10% |
Formula for calculating deduction from contract payment based on PRS table (for each required service:
(Quantity of Samples that are Defective) / (Total Quantity of Samples) x 100% = X % (X% - AQL) x (Task Value Percent) x (Total Contract Cost) = Total Deduction for the Month
Note: Government surveillance of contractor performance is not limited to the Performance Objectives as outlined in this PRS. The government reserves the right to conduct compliance surveillance of any contractual requirement of this acquisition.