Headquarters III Corps, Fort Hood Directorate of Public Works (DPW)

Technical Exhibit “A”

AD005435P – REPAIR HELIPADS

VARIOUS LOCATIONS

SPECIFICATIONS

April 21, 2015

Contract No. W91151-16-C-XXXX

Directorate of Public Works Engineering Division

US Army, III Corps 4612 Engineer Dr.

Fort Hood, TX 76544

DPW Specification

Jan 11, 2016

MASTER TABLE OFCONTENTS Page 1

DPWSPECS TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

DIVISION 02 - EXISTING CONDITIONS

02 41 00 10/14 DEMOLITION

02 82 00 10/14 ASBESTOS REMEDIATION

02 82 18.00 20 07/14 ENGINEERING CONTROL OF MOLD CONTAMINATED

MATERIALS

82 33.13 20 08/11 REMOVAL/CONTROL AND DISPOSAL OF PAINT WITH LEAD

DIVISION 03 - CONCRETE

30 00 09/14 CAST-IN-PLACE CONCRETE

DIVISION 04 - MASONRY

01 41 04/06 RESTORATION AND CLEANING OF MASONRY

04 20 00 10/07 MASONRY

DIVISION 05 - METALS

12 00 11/11 STRUCTURAL STEEL

05 40 00 05/10 COLD-FORMED METAL FRAMING

50 00 04/06 METAL: MISCELLANEOUS AND FABRICATIONS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

20 00 04/06 FINISH CARPENTRY

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 17 04/06 FIBERGLASS INSULATION

07 24 00 07/14 EXTERIOR INSULATION AND FINISH SYSTEMS

07 41 13 07/14 METAL ROOF PANELS

07 55 00 07/14 MEMBRANE ROOFING

07 57 14 09/14 SPRAYED POLYURETHANE FOAM (MEDIUM DENSITY)

07 60 00 07/14 FLASHING AND SHEET METAL

07 84 00 07/14 FIRESTOPPING

07 92 00 09/14 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 07/14 STEEL DOORS AND FRAMES

08 11 16 07/14 ALUMINUM DOORS AND FRAMES

08 14 00 07/14 WOOD DOORS

08 33 23 07/14 OVERHEAD COILING DOORS

01 32 01.00 10 1 JAN PROJECT SCHEDULE

01 33 00 1 JAN SUBMITTAL PROCEDURES

01 35 13 1 JAN SPECIAL PROJECT PROCEDURES

01 35 23.00 40 1 JAN OWNER SAFETY REQUIREMENTS

01 35 29 1 JAN SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS

01 45 01.00 20 1 JAN QUALITY CONTROL (QC)

01 57 20.00 10 1 JAN ENVIRONMENTAL PROTECTION

01 77 00 1 JAN CLOSEOUT PROCEDURES

01 78 23 1 JAN OPERATION AND MAINTENANCE DATA

01 80 00 1 JAN UTILITIES

MASTER TABLE OFCONTENTS Page 2

08 34 19.10 20 04/06 ROLLING SERVICE DOORS

08 36 13 08/11 SECTIONAL OVERHEAD DOORS

08 36 19 11/11 VERTICAL LIFT DOORS

08 51 13.00 20 07/14 ALUMINUM WINDOWS

08 60 45 07/14 SKYLIGHTS AND TRANSLUCENT PANELS

08 71 00 08/14 DOOR HARDWARE

08 81 00 08/14 GLAZING

08 91 00 08/14 METAL WALL AND DOOR LOUVERS

DIVISION 09 - FINISHES

09 29 00 09/14 GYPSUM BOARD

09 30 00 09/14 CERAMIC TILE, QUARRY TILE, AND PAVER TILE

09 51 00 09/14 ACOUSTICAL CEILINGS

09 65 00 09/14 RESILIENT FLOORING

09 68 00 09/14 CARPET

09 90 00 09/14 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 14 01 09/14 EXTERIOR SIGNAGE

10 14 02 09/14 INTERIOR SIGNAGE

10 21 13 09/14 TOILET COMPARTMENTS

10 22 13 09/14 WIRE MESH PARTITIONS

10 26 13 09/14 WALL AND CORNER GUARDS

10 28 13 09/14 TOILET ACCESSORIES

10 44 16 07/14 FIRE EXTINGUISHERS

10 90 00 08/08 MISCELLANEOUS SPECIALTIES

DIVISION 11 - EQUIPMENT

68 13 09/14 PLAYGROUND EQUIPMENT

DIVISION 12 - FURNISHINGS

24 13 09/14 ROLLER WINDOW SHADES

DIVISION 13 - SPECIAL CONSTRUCTION

34 19 11/11 METAL BUILDING SYSTEMS

DIVISION 21 - FIRE SUPPRESSION

21 12 00 05/11 STANDPIPE SYSTEMS

21 13 00.00 20 04/06 WET-PIPE FIRE SUPPRESSION SPRINKLERS

21 13 00.00 40 08/13 FIRE-SUPPRESSION SPRINKLER SYSTEMS

21 13 16.00 20 04/06 DRY-PIPE FIRE SPRINKLER SYSTEMS

21 13 18.00 10 05/09 PREACTION AND DELUGE SPRINKLER SYSTEMS, FIRE

PROTECTION

21 13 20.00 20 11/09 FOAM FIRE EXTINGUISHING FOR AIRCRAFT HANGARS

21 13 24.00 10 10/07 AQUEOUS FILM-FORMING FOAM (AFFF) FIRE

PROTECTION SYSTEM

21 13 26.00 40 08/13 DELUGE FIRE-SUPPRESSION SPRINKLER SYSTEMS

21 21 01.00 10 04/06 CLEAN AGENT FIRE EXTINGUISHING

21 21 03.00 10 02/09 WET CHEMICAL FIRE EXTINGUISHING SYSTEM

21 30 00 04/08 FIRE PUMPS

DIVISION 22 - PLUMBING

MASTER TABLE OFCONTENTS Page 3

22 00 00 11/11 PLUMBING, GENERAL PURPOSE

22 05 48.00 20 04/06 MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL

22 07 19.00 40 08/13 PLUMBING PIPING INSULATION

22 14 29.00 40 08/11 SUMP PUMPS

22 15 14.00 40 02/11 GENERAL SERVICE COMPRESSED-AIR SYSTEMS, LOW

PRESSURE

22 31 00 02/09 WATER SOFTENERS, CATION-EXCHANGE (SODIUM CYCLE)

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING

23 00 00 08/10 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND

EXHAUST SYSTEMS

23 01 30.41 08/10 HVAC SYSTEM CLEANING

23 03 00.00 20 08/10 BASIC MECHANICAL MATERIALS AND METHODS

23 05 15 02/14 COMMON PIPING FOR HVAC

23 05 48.00 40 02/11 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING

AND EQUIPMENT

23 05 93 08/09 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 09/14 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 08 00.00 10 01/08 COMMISSIONING OF HVAC SYSTEMS

23 08 01.00 20 04/06 TESTING INDUSTRIAL VENTILATION SYSTEMS

23 09 13.34 40 02/11 CONTROL VALVES, SELF-CONTAINED

23 09 23 05/11 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND

OTHER BUILDING CONTROL SYSTEMS

23 09 53.00 20 02/10 SPACE TEMPERATURE CONTROL SYSTEMS

23 11 25 11/08 FACILITY GAS PIPING

23 21 13.00 20 04/06 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM

23 21 13.23 20 07/07 [HIGH][MEDIUM] TEMPERATURE WATER SYSTEM WITHIN

BUILDINGS

23 23 00 10/07 REFRIGERANT PIPING

23 25 00 11/08 CHEMICAL TREATMENT OF WATER FOR MECHANICAL

SYSTEMS

23 31 13.00 40 11/12 METAL DUCTS

23 34 23.00 40 05/14 HVAC POWER VENTILATORS

23 35 00.00 10 02/09 OVERHEAD VEHICLE TAILPIPE[ AND WELDING FUME]

EXHAUST REMOVAL SYSTEM(S)

23 35 19.00 20 02/10 INDUSTRIAL VENTILATION AND EXHAUST

23 36 00.00 40 02/11 AIR TERMINAL UNITS

23 37 13.00 40 05/10 DIFFUSERS, REGISTERS, AND GRILLS

23 41 13.00 40 05/10 PANEL FILTERS

23 52 00 04/08 HEATING BOILERS

23 52 33.03 20 11/08 WATER-TUBE BOILERS, OIL/GAS OR OIL

23 52 43.00 10 04/08 HEAT RECOVERY BOILERS

23 52 43.00 20 07/06 LOW PRESSURE WATER HEATING BOILERS (UNDER

800,000 BTU/HR OUTPUT)

23 52 46.00 20 04/06 LOW PRESSURE WATER HEATING BOILERS (OVER

800,000 BTU/HR OUTPUT)

23 54 16.00 10 08/14 HEATING SYSTEM; GAS-FIRED HEATERS

23 54 19 11/08 BUILDING HEATING SYSTEMS, WARM AIR

23 57 10.00 10 01/08 FORCED HOT WATER HEATING SYSTEMS USING WATER

AND STEAM HEAT EXCHANGERS

23 63 00.00 10 10/07 COLD STORAGE REFRIGERATION SYSTEMS

23 64 00 08/09 PACKAGED WATER CHILLERS, ABSORPTION TYPE

23 64 10 08/08 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 08/09 CHILLED, CHILLED-HOT, AND CONDENSER WATER

PIPING SYSTEMS

23 65 00 08/14 COOLING TOWERS

23 69 00.00 20 07/06 REFRIGERATION EQUIPMENT FOR COLD STORAGE

23 70 03.00 10 01/08 HEATING AND UTILITIES SYSTEMS, CENTRAL STEAM

MASTER TABLE OFCONTENTS Page 4

23 72 00.00 10 01/08 ENERGY RECOVERY SYSTEMS

23 72 26.00 10 04/08 DESICCANT COOLING SYSTEMS

23 73 13.00 40 05/14 MODULAR INDOOR CENTRAL-STATION AIR-HANDLING

UNITS

23 74 33.00 40 02/11 PACKAGED, OUTDOOR, HEATING AND COOLING MAKEUP

AIR-CONDITIONERS

23 76 00.00 10 04/08 EVAPORATIVE COOLING SYSTEMS

23 76 00.00 20 07/06 EVAPORATIVE COOLING SYSTEM

23 81 00.00 20 11/09 UNITARY AIR CONDITIONING EQUIPMENT

23 81 23.00 20 02/10 COMPUTER ROOM AIR CONDITIONING UNITS

23 81 47 08/08 WATER-LOOP AND GROUND-LOOP HEAT PUMP SYSTEMS

23 82 00.00 20 11/08 TERMINAL HEATING AND COOLING UNITS

23 82 01.00 10 04/08 WARM AIR HEATING SYSTEMS

23 82 02.00 10 04/08 UNITARY HEATING AND COOLING EQUIPMENT

23 82 16.00 40 08/14 AIR COILS

23 82 19.00 40 05/14 FAN COIL UNITS

23 82 23.00 40 05/14 UNIT VENTILATORS

23 82 43.00 40 08/11 ELECTRIC DUCT HEATERS

23 82 46.00 40 08/11 ELECTRIC UNIT HEATERS

23 83 00.00 20 04/06 ELECTRIC SPACE HEATING EQUIPMENT

23 84 16.00 20 11/08 DESICCANT DEHUMIDIFICATION EQUIPMENT

DIVISION 26 - ELECTRICAL

26 00 00.00 20 09/14 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 00.00 40 11/08 COMMON WORK RESULTS FOR ELECTRICAL

26 05 73.00 40 09/14 OVERCURRENT PROTECTIVE DEVICES

26 09 23.00 40 09/14 LIGHTING CONTROL DEVICES

26 12 00 09/14 TRANSFORMERS

26 23 00 09/14 SWITCHBOARDS AND SWITCHGEAR

26 24 16.00 40 09/14 PANELBOARDS

26 24 19.00 40 09/14 MOTORS AND MOTOR-CONTROL CENTERS

26 26 00.00 40 09/14 POWER DISTRIBUTION UNITS

26 27 13.10 30 09/17 ELECTRIC METERS

26 27 26.00 40 09/14 WIRING DEVICES

26 28 16.00 40 09/14 ENCLOSED SWITCHES AND CIRCUIT BREAKERS

26 29 23 09/14 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 51 00 09/17 INTERIOR LIGHTING

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 74.00 20 07/14 INTERIOR FIRE DETECTION AND ALARM SYSTEM

28 31 76 07/14 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 08/14 EARTHWORK

31 05 19 08/14 GEOTEXTILE

31 11 00 08/08 CLEARING AND GRUBBING

31 32 11 07 JU SOIL SURFACE EROSION CONTROL

31 36 00 08/14 WIRE MESH GABIONS AND MATTRESSES

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 11.51 08/14 RUBBER AND PAINT REMOVAL FROM AIRFIELD PAVEMENTS

32 01 13.00 20 09/14 EMULSIFIED ASPHALT SEAL COATS WITH OR WITHOUT

AGGREGATE

32 01 13 BITUMINOUS SEAL AND FOG COATS

32 01 16.17 08/14 COLD MILLING OF BITUMINOUS PAVEMENTS

MASTER TABLE OFCONTENTS Page 5

32 01 17.16 SEALING OF CRACKS IN BITUMINOUS PAVEMENTS

32 01 17 09/14 COLD-MIX RECYCLING

32 01 19.61 RESEALING OF JOINTS IN RIGID PAVEMENT

32 01 19 09/14 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN

RIGID PAVEMENTS

32 01 24 09/14 HOT IN-PLACE RECYCLING OF BITUMINOUS PAVEMENTS

32 01 25 09/14 HEATER SCARIFYING OF BITUMINOUS PAVEMENTS

32 01 26.71 09/14 GROOVING FOR AIRFIELD PAVEMENTS

32 01 29.61 08/14 PARTIAL DEPTH PATCHING OF RIGID PAVING

32 01 29.62 SLABJACKING RIGID PAVEMENTS

32 05 33 07/06 LANDSCAPE ESTABLISHMENT

32 10 00 08/14 PERVIOUS AND STANDARD BITUMINOUS CONCRETE

PAVEMENT

32 11 10 09/14 DRAINAGE LAYER

32 11 16.13 09/14 SAND-CLAY SUBBASE COURSE

32 11 16 08/14 BASE COURSE FOR RIGID AND SUBBASES FOR FLEXIBLE

PAVING

32 11 23 08/14 AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE

COURSE

32 11 24 GRADED CRUSHED AGGREGATE BASE COURSE FOR

PERVIOUS AND NORMAL FLEXIBLE PAVEMENT

32 11 29 LIME-STABILIZED SUBGRADE

32 11 33 CEMENT STABILIZED SUBBASE COURSE AT AIRFIELDS

AND ROADS

32 12 10 BITUMINOUS TACK AND PRIME COATS

32 12 11 07/14 BITUMINOUS SURFACE TREATMENT

32 12 15.13 HOT-MIX ASPHALT AIRFIELD PAVING

32 12 15.16 07/14 WARM-MIX ASPHALT AIRFIELD PAVING

32 12 16 08/14 HOT-MIX ASPHALT (HMA) FOR ROADS

32 12 17.00 44 0508 PAVEMENT REPLACEMENT

32 12 17 07/14 HOT MIX BITUMINOUS PAVEMENT

32 12 19 07/14 BITUMINOUS BINDER AND WEARING COURSES

(CENTRAL-PLANT COLD-MIX)

32 12 21 08/14 BITUMINOUS ROAD-MIX SURFACE COURSE

32 12 37 08/14 FUEL-RESISTANT (COAL TAR) SEALER

32 12 43.16 POROUS FRICTION COURSE FOR AIRFIELDS AND ROADS

32 13 11 07/14 CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER

HEAVY-DUTY PAVEMENTS

32 13 13.06 07/14 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND

SITE FACILITIES

32 13 15.20 08/14 CONCRETE PAVEMENT FOR CONTAINMENT DIKES

32 13 16.16 08/14 ROLLER COMPACTED CONCRETE (RCC) PAVEMENT

32 13 17 08/14 STONE MATRIX ASPHALT (SMA) FOR AIRFIELD

PAVEMENTS

32 13 43 PERVIOUS CONCRETE PAVING

32 13 73 08/14 COMPRESSION JOINT SEALS FOR CONCRETE PAVEMENTS

32 15 00 08/14 AGGREGATE SURFACE COURSE

32 16 13 07/14 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

32 16 15 08/14 CONCRETE BLOCK PAVEMENTS

32 17 23.00 20 07/14 PAVEMENT MARKINGS

32 18 16.13 08/14 PLAYGROUND PROTECTIVE SURFACING

32 31 13 01/08 CHAIN LINK FENCES AND GATES

32 92 19 06/15 SEEDING

32 92 23 04/06 SODDING

32 93 00 02/10 EXTERIOR PLANTS

DIVISION 33 - UTILITIES

33 40 00 02/10 STORM DRAINAGE UTILITIES

MASTER TABLE OFCONTENTS Page 6

33 51 00.00 20 04/06 NATURAL GAS DISTRIBUTION

33 51 13.00 30 05/10 NATURAL-GAS METERING

33 71 01.00 40 09/14 OVERHEAD TRANSMISSION AND DISTRIBUTION

33 71 02 02/14 UNDERGROUND ELECTRICAL DISTRIBUTION

-- End of Master Table of Contents --

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 140 PAGES

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

A C T I V I T Y

N O

R A N S M I T T

L

S P E

DESCRIPTION

ITEM SUBMITTED

R A G # R A

H

G

V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH

REMARKS

SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

T I

D

DATE

OF

DATE FWD

TO APPR

AUTH/

FROM

CONTR

TO OTHER

REVIEWER

FROM OTH

T I

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 32 01.00 10 SD-01 Preconstruction Submittals Initial Project Schedule 3.4.2 G Program Project Schedule 3.4.1 G Periodic Schedule Update 3.4.3 G 01 35 13 SD-01 Preconstruction Submittals Support Subcontractor Awards 1.4.7 G Digging And Water Use Permits 1.4.2 G Storm Water Prevention Pollution 1.5.3 G Plan (SWPPP) Water Use Permit 1.5.6 G Fort Hood Airfield Access 1.4.1 G Traffic Control Plan 1.5.4 G Army Radiation Permit 1.5.5 G Utility Metering Permit 1.5.8 G Range Passes G AT Level I Training 1.5.10.1 G OPSEC Training 1.4.9.4 G 01 35 23.00 40 SD-01 Preconstruction Submittals Contractor's Health and Safety 1.3.1 G Plan SD-06 Test Reports Gas Protection 1.14 SD-07 Certificates Protection Plan 1.3.2 License Certificates 1.11 01 35 29 SD-01 Preconstruction Submittals

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 140 PAGES

T I V I

A N S M I T T

R A G # R A

V

C T L A O S R S I A F / I E C A R T E I V

T I

T I

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 35 29 Activity Hazard Analysis G Crane Critical Lift Plan 1.13 G Crane Operators G Confined Space Entry Permit G SD-06 Test Reports Accident Reports Regulatory Citations and 1.11.1 Violations 01 45 01.00 20 SD-01 Preconstruction Submittals 3-Key Personal 3.1 G Quality Control Plan (QCP) G 01 57 20.00 10 SD-01 Preconstruction Submittals Air Permits 3.4.1 Environmental Manager 3.8.1 G SD-11 Closeout Submittals Contractor Hazardous Material Inventory and Consumption Log Air Permits 3.4.1 G Refrigerant Equipment Service Log Emissions Inventory Questionnaire for New Sources Emission Inventory 3.4.2 Recycle Weight Tickets 3.9.2 Construction Waste Tickets 3.9.3

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 140 PAGES

T I V I

A N S M I T T

R A G # R A

V

C T L A O S R S I A F / I E C A R T E I V

T I

T I

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 77 00 SD-10 Operation and Maintenance Data Equipment/Product Warranty List G SD-11 Closeout Submittals Certification of EPA Designated G Items Form DD1354 (and Appendix D G where applicable) Videos G Final Operation and Maintenance G Manuals Final Record Drawings G Inventory of Contractor Furnished G and Installed Equipment 02 41 00 SD-01 Preconstruction Submittals Demolition Plan G Utility Cut and Cap Plan G SD-07 Certificates Asbestos and Lead Based Paint Notification Forms submitted to Texas Department of State Healt h Services

FIO

SD-11 Closeout Submittals Receipts

FIO

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 140 PAGES

T I V I

A N S M I T T

R A G # R A

V

C T L A O S R S I A F / I E C A R T E I V

T I

T I

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

02 82 00 SD-03 Product Data Material Safety Data Sheets 1.3.8 (MSDS) for all materials proposed for transport to the project site

FIO

SD-06 Test Reports Air sampling results 1.5.5

FIO

Asbestos disposal quantity report 3.3.3.2 Clearance sampling 3.2.7.3 Asbestos Survey Report showing G quantities and locations SD-07 Certificates Asbestos hazard abatement plan 1.3.9

FIO

Testing laboratory 1.3.10 Private qualified person Contractor's license 1.5.4 Competent person 1.5.2 Worker's license 1.5.3 Landfill approval 1.3.11 Employee training 1.3.3 Medical certification requirements Waste shipment records 1.3.11 Respiratory Protection Program 1.3.6

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 140 PAGES

T I V I

A N S M I T T

R A G # R A

V

C T L A O S R S I A F / I E C A R T E I V

T I

T I

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

02 82 00 Delivery tickets 1.3.11 Notifications 1.3.4 Notifications to Texas Department of State Health Services; G SD-11 Closeout Submittals Notifications 1.3.4 Permits and licenses 1.3.4 02 82 18.00 20 SD-06 Test Reports Air sampling results 1.5.4 Clearance sampling 3.2.8.2 SD-07 Certificates Mold remediation plan 1.3.9 Private qualified person documentation (Mold assessors, remediators) Contractor's license 1.5.3 Responsible person Notifications 1.3.4 Notifications 1.3.4 SD-11 Closeout Submittals Notifications 1.3.4 Notifications 1.3.4 02 82 33.13 20 SD-03 Product Data Vacuum Filters 1.6.4 Respirators 1.6.1

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 140 PAGES

T I V I

A N S M I T T

R A G # R A

V

C T L A O S R S I A F / I E C A R T E I V

T I

T I

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

02 82 33.13 20 SD-06 Test Reports sampling results 1.5.2.3 Occupational and Environmental 1.5.2.3 Assessment Data Report SD-07 Certificates Qualifications of CP 1.5.1.1 G Testing Laboratory 1.5.1.3 Occupant Notification 3.1.1.1 Training Certification 1.5.1.2 G Notification of the G Commencement of LBP Hazard Abatement activities Third Party Consultant 1.5.1.4 G Qualifications lead-based paint/paint with lead 1.5.3 removal/control plan Respiratory Protection Program 1.5.2.6 Hazard Communication Program 1.5.2.7 approved hazardous waste treatment, storage, or disposal facility Lead Waste Management Plan 1.5.2.8 Clearance Certification 3.5.1.1 SD-11 Closeout Submittals hazardous waste manifest 3.5.2.1 03 30 00 SD-02 Shop Drawings

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 140 PAGES

T I V I

A N S M I T T

R A G # R A

V

C T L A O S R S I A F / I E C A R T E I V

T I

T I

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

03 30 00 Reinforcing steel 1.4.2.1 G SD-05 Design Data mix design 2.3.1 G SD-06 Test Reports Compressive strength tests 3.12.2.2

FIO

Slump Tests 3.12.2.1 SD-07 Certificates Reinforcing Bars 2.5.1

FIO

04 01 41 SD-03 Product Data Cleaning and Restoration Methods 04 20 00 SD-03 Product Data Shop Drawings Reinforcing Steel Local/Regional Materials 1.5.1 Masonry Blends being used; to include each type of rock include d in blend Environmental Data Brick Concrete Masonry Units (CMU) 2.2 Water-Repellant Admixture 2.5 SD-04 Samples Concrete Masonry Units (CMU) 2.2

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 140 PAGES

T I V I

A N S M I T T

R A G # R A

V

C T L A O S R S I A F / I E C A R T E I V

T I

T I

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

04 20 00 Clay or Shale Brick 2.1 SD-08 Manufacturer’s Instructions Masonry Cement 2.4.2 05 12 00 SD-02 Shop Drawings Fabrication drawings; G SD-06 Test Reports Bolts, nuts, and washers 2.2 SD-07 Certificates Steel 2.1 Galvanizing 2.5 AISC Quality Certification 1.4 AISC Fabrication Plant Quality Certification 05 40 00 SD-02 Shop Drawings Framing Components 1.5.1 SD-03 Product Data studs,joists 2.1 SD-05 Design Data Metal framing calculations 1.5.2 Welds 3.1.1 05 50 00 SD-02 Shop Drawings steel stairs 2.20 structural steel door frames 2.22 Floor gratings and roof walkways 2.9 Handrails 2.12 Ladders 2.13

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 140 PAGES

T I V I

A N S M I T T

R A G # R A

V

C T L A O S R S I A F / I E C A R T E I V

T I

T I

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

05 50 00 Roof hatch 3.14 SD-03 Product Data Floor gratings and roof walkways 2.9 Handrails 2.12 Ladders 2.13 Steel stairs 2.20 Structural steel door frames 2.22 Roof hatch 3.14 06 20 00 SD-03 Product Data Cabinetry hardware SD-04 Samples Cabinetry and couter top Moldings Fascias and Trim 2.3 07 21 17 SD-03 Product Data Insulation 3.3.1 Vapor retarder SD-08 Manufacturer’s Instructions Insulation 3.3.1 07 24 00 SD-03 Product Data Sheathing board 2.2 Vapor Barrier Thermal insulation 2.6 Adhesive Mechanical Fasteners 2.5 Accessories 2.12

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 140 PAGES

T I V I

A N S M I T T

R A G # R A

V

C T L A O S R S I A F / I E C A R T E I V

T I

T I

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

07 24 00 Base coat 2.7 Portland cement 2.8 Reinforcing fabric 2.9 Finish coat 2.10 Joint Sealant 2.13 Sealant Primer Bond breaker 2.14 Backer Rod 2.15 Insulation Board Warranty

FIO

SD-04 Samples Sample Boards SD-07 Certificates Qualifications of EIFS 1.4.1 Manufacturer Qualification of EIFS Installer 1.4.2 Qualification of Sealant Applicator SD-08 Manufacturer’s Instructions Installation 3.3 SD-10 Operation and Maintenance Data

EIFS

07 41 13 SD-02 Shop Drawings Flashing and Accessories

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 140 PAGES

T I V I

A N S M I T T

R A G # R A

V

C T L A O S R S I A F / I E C A R T E I V

T I

T I

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

07 41 13 Gutter/Downspout Assembly SD-03 Product Data Roof panels

FACTORY-APPLIED COLOR

FINISH

Accessories 2.4 Fasteners SD-04 Samples Roof Panels G SD-06 Test Reports Fire Rating Test Report 2.6.2 Factory Finish and Color 2.2 Performance Requirements SD-08 Manufacturer’s Instructions

INSTALLATION MANUAL

07 55 00 SD-03 Product Data Insulation Board 2.2 Membrane Roofing Fasteners Sheet Metal Design Materials Caulking Contractors Qualifications 2-Roof Vents Scuppers and Curbs Designs Parapet Wall Flashing Designs Fascia Designs and Colors

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 140 PAGES

T I V I

A N S M I T T

R A G # R A

V

C T L A O S R S I A F / I E C A R T E I V

T I

T I

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

07 55 00 SD-04 Samples Membrane Roofing G Insulation Board 2.2 Fasteners Fascia 2-Way Roof Vent SD-08 Manufacturer’s Instructions Installation SD-11 Closeout Submittals Manufacturers Final Inspection Quality Verification Report 07 57 14 SD-03 Product Data Polyurethane foam SD-07 Certificates Qualification of Manufacturer G Qualification of Applicator G 07 60 00 SD-02 Shop Drawings Flashing at roof penetrations 3.1.27 G 07 84 00 SD-03 Product Data Firestopping Materials 2.1 07 92 00 SD-03 Product Data Sealants 2.1 Backstops 2.4 08 11 13 SD-03 Product Data Doors 2.1 Frames

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 140 PAGES

T I V I

A N S M I T T

R A G # R A

V

C T L A O S R S I A F / I E C A R T E I V

T I

T I

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

08 11 13 Accessories 2.2 Weatherstripping 08 11 16 SD-02 Shop Drawings Doors and frames 2.1 SD-08 Manufacturer’s Instructions Doors and frames 2.1 08 14 00 SD-03 Product Data Doors 2.1 Fire resistance rating 2.1.7 08 33 23 SD-02 Shop Drawings Overhead Coiling Doors 2.1 Counterbalancing Mechanism 1.6 Counterbalancing Mechanism 2.3 Manual Door Operators 1.6 Manual Door Operators 2.4 Electric Door Operators 1.6 Electric Door Operators 2.5 Bottom Bar 2.1.4 Guides 1.5 Mounting Brackets 2.3.1 Overhead Drum 2.1.10 Hood 1.6 Painting 1.6 Installation Drawings 1.5 SD-03 Product Data Overhead Coiling Doors 2.1

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 140 PAGES

T I V I

A N S M I T T

R A G # R A

V

C T L A O S R S I A F / I E C A R T E I V

T I

T I

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

08 33 23 Hardware 2.2 Counterbalancing Mechanism 1.6 Counterbalancing Mechanism 2.3 Manual Door Operators 1.6 Manual Door Operators 2.4 Electric Door Operators 1.6 Electric Door Operators 2.5 Fire-Rated Door Assembly 2.6 SD-05 Design Data Overhead Coiling Doors 2.1 Hardware 2.2 Counterbalancing Mechanism 1.6 Counterbalancing Mechanism 2.3 Manual Door Operators 1.6 Manual Door Operators 2.4 Electric Door Operators 1.6 Electric Door Operators 2.5 Fire-Rated Door 1.2 SD-10 Operation and Maintenance Data Operation and Maintenance 1.5 Manuals Overhead Coiling Door 1.6 Assemblies Materials 1.6 Devices 1.6

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 140 PAGES

T I V I

A N S M I T T

R A G # R A

V

C T L A O S R S I A F / I E C A R T E I V

T I

T I

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

08 33 23 Procedures 1.6 Manufacture's Brochures 1.6 Parts Lists 1.6 Cleaning 3.3.2 08 34 19.10 20 SD-02 Shop Drawings Rolling service doors 2.1 Rolling fire doors SD-03 Product Data Rolling service doors 2.1 Motors 2.4.2 Controls 2.4.3 SD-08 Manufacturer’s Instructions Rolling service doors 2.1 SD-10 Operation and Maintenance Data Rolling service doors 2.1 08 36 13 SD-02 Shop Drawings Doors 2.2 G SD-03 Product Data Doors 2.2 G Electric operators 2.6 G SD-08 Manufacturer’s Instructions Doors 2.2 SD-10 Operation and Maintenance Data Doors 2.2 G

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 140 PAGES

T I V I

A N S M I T T

R A G # R A

V

C T L A O S R S I A F / I E C A R T E I V

T I

T I

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

08 36 19 SD-02 Shop Drawings Doors 2.2 G SD-03 Product Data Doors 2.2 G Motors 2.4.1 G Controls 2.4.2 G SD-08 Manufacturer’s Instructions Doors 2.2 SD-10 Operation and Maintenance Data Doors 2.2 G 08 51 13.00 20 SD-02 Shop Drawings Windows 2.1 Fabrication Drawings SD-03 Product Data Windows 2.1 Hardware 2.2.5.1 Weatherstripping 2.2.2 Accessories 2.2.5 SD-05 Design Data Structural calculations for deflection 08 60 45 SD-02 Shop Drawings Shop Drawings 3.2

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 140 PAGES

T I V I

A N S M I T T

R A G # R A

V

C T L A O S R S I A F / I E C A R T E I V

T I

T I

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

08 60 45 [SKYLIGHTS][ AND 2.1

][TRANSLUCENT PANELS]

Warranty 1.6 SD-06 Test Reports Test Reports 2.1 SD-07 Certificates Systems 2.5 Qualifications 1.4 08 71 00 SD-02 Shop Drawings Keying system 2.3.6 SD-03 Product Data Hardware items 2.3 SD-11 Closeout Submittals Key Bitting 1.3 08 81 00 SD-02 Shop Drawings Installation SD-03 Product Data Insulating Glass Glazing Accessories 1.3 SD-07 Certificates Insulating Glass Laminated Glass 08 91 00 SD-02 Shop Drawings Wall louvers 1.4 Wall louvers 1.5

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 140 PAGES

T I V I

A N S M I T T

R A G # R A

V

C T L A O S R S I A F / I E C A R T E I V

T I

T I

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

08 91 00 Metal Wall Louvers 2.2 09 29 00 SD-03 Product Data Cementitious backer units Gypsum Board 2.1.1 Accessories 2.1.7 SD-08 Manufacturer’s Instructions Material Safety Data Sheets 09 30 00 SD-03 Product Data Tile 2.1 Adhesive SD-04 Samples Tile 2.1 Grout 2.3 09 51 00 SD-03 Product Data Acoustical Ceiling Systems SD-07 Certificates Acoustic Ceiling Tiles and Suspension System 09 65 00 SD-03 Product Data Resilient Flooring and Accessories Adhesives 2.4 SD-08 Manufacturer’s Instructions Surface Preparation 3.2 Installation 09 68 00 SD-03 Product Data

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 140 PAGES

T I V I

A N S M I T T

R A G # R A

V

C T L A O S R S I A F / I E C A R T E I V

T I

T I

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

09 68 00 Carpet 2.1 Installation 3.4 SD-04 Samples Carpet 2.1 SD-07 Certificates Carpet 2.1 09 90 00 SD-03 Product Data Coating SD-08 Manufacturer’s Instructions Manufacturer's Material Safety 1.6.2 Data Sheets 10 14 02 SD-03 Product Data Interior Signage 1.3 10 21 13 SD-02 Shop Drawings Installation Drawings G Fabrication Drawings SD-03 Product Data Colors And Finishes 2.6 Partition Panels and Doors 2.2 Anchoring Devices and 2.1.3 Fasteners Hardware and Fittings 2.1.5 10 22 13 SD-03 Product Data Wire mesh partitions 1.4 10 26 13 SD-03 Product Data Corner Guards 2.2

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 140 PAGES

T I V I

A N S M I T T

R A G # R A

V

C T L A O S R S I A F / I E C A R T E I V

T I

T I

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

10 28 13 SD-03 Product Data Finishes Accessory Items 10 44 16 SD-03 Product Data Fire Extinguishers 2.1 Accessories Cabinets Wall Brackets Replacement Parts SD-07 Certificates Fire Extinguishers 2.1 Manufacturer's Warranty with 2.1 Inspection Tag 11 68 13 SD-02 Shop Drawings Configuration Shop Drawings 1.5.5 Fall Height SD-03 Product Data Equipment 2.2 Equipment Identification 1.3.4 Delivery, Storage and Handling 1.6 Manufacturer Qualification 1.5.1 Materials 2.1 SD-04 Samples Color 2.1.5 SD-06 Test Reports

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 140 PAGES

T I V I

A N S M I T T

R A G # R A

V

C T L A O S R S I A F / I E C A R T E I V

T I

T I

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

11 68 13 Recycled Plastic 2.1.3 Wood Finishes SD-07 Certificates Materials 2.1 Manufacturer Qualification 1.5.1 Installer Qualification 1.5.2 Manufacturer's Representative 1.5.3 Substitution SD-10 Operation and Maintenance Data Maintenance Instructions 1.8 12 24 13 SD-03 Product Data Window Shades 2.1 Hardware 1.3 SD-08 Manufacturer’s Instructions Window Shades 2.1 13 34 19 SD-01 Preconstruction Submittals Manufacturer's Qualifications 1.6.2 SD-02 Shop Drawings Shop and Detail Drawings SD-05 Design Data descriptive and technical literature building design analysis 21 12 00 SD-02 Shop Drawings Standpipe system 1.4.4 G

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 140 PAGES

T I V I

A N S M I T T

R A G # R A

V

C T L A O S R S I A F / I E C A R T E I V

T I

T I

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

21 12 00 SD-03 Product Data Pipe and fittings 2.1.1 G Mechanical couplings 2.1.1 G Pipe hangers and supports 2.1.2 G Valves 2.1.3 G Fire department connections 2.1.9 G Alarm valves 2.1.10 G Water motor alarms 2.1.11 G Pressure switch 2.1.12 G Waterflow detector 2.1.13 G Fire hose cabinets 2.1.14 G Valve tamper switch 2.1.15 G Backflow preventer 2.1.17 G Buried Pipe and fittings 2.2.1 G SD-06 Test Reports Preliminary tests 3.8.1 G Acceptance tests 3.8.2 G SD-07 Certificates Qualifications of installer 1.6.1 G SD-10 Operation and Maintenance Data Alarm valves 2.1.10 G Backflow preventer 2.1.17 G SD-11 Closeout Submittals System as-built drawings 1.6.2 G 21 13 00.00 20 SD-02 Shop Drawings

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 140 PAGES

T I V I

A N S M I T T

R A G # R A

V

C T L A O S R S I A F / I E C A R T E I V

T I

T I

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

21 13 00.00 20 Sprinkler heads and piping 1.4 system layout Electrical wiring diagrams 1.4.8 SD-03 Product Data Piping 2.2 Alarm valves 2.2.4 Valves 2.2.8 Water motor alarms 2.2.5 Sprinkler heads 2.2.2 Pipe hangers and supports 2.2.7 Flow switch 2.2.6 Fire department connections 2.2.13 Excess pressure pump 2.2.14 Mechanical couplings 2.2.1 Backflow Preventer 2.2.9 SD-05 Design Data Sprinkler system design 1.4 SD-06 Test Reports Preliminary tests 3.2.1 SD-07 Certificates Qualifications of installer 1.6.1 SD-10 Operation and Maintenance Data Alarm valves 2.2.4 Excess pressure pump 2.2.14 Backflow preventer 2.2.9

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 140 PAGES

T I V I

A N S M I T T

R A G # R A

V

C T L A O S R S I A F / I E C A R T E I V

T I

T I

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

21 13 00.00 20 SD-11 Closeout Submittals As-built drawings 1.4.9 21 13 00.00 40 SD-01 Preconstruction Submittals Record of Existing Conditions 1.2 G SD-02 Shop Drawings Supporting Elements 2.2.3 G Fire-Department Connections 2.2.4 G Fire Alarm System 2.2.9.1 G Sprinkler Heads 2.2.8 G Valves 2.2.9 G SD-03 Product Data Underground Piping Materials 2.2.1 G Aboveground Piping Materials 2.2.2 G Valves 2.2.9 G Fire-Department Connections 2.2.4 G Riser Alarm Equipment 2.2.5 G Air Compressor 2.2.6.1 G Standpipe Equipment and Fire 2.2.7 G Hose Cabinet Stations Sprinkler Heads 2.2.8 G Materials 2.3 G Supporting Elements 2.2.3 G Equipment and Performance 2.1 G Data SD-05 Design Data Design Analysis and Calculations Part 2 G

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 140 PAGES

T I V I

A N S M I T T

R A G # R A

V

C T L A O S R S I A F / I E C A R T E I V

T I

T I

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

21 13 00.00 40 SD-06 Test Reports Pressure Tests 3.3.6 G System Operating Tests 3.3.3 G Air Tests 3.3.3 G Valve-Operating Tests 3.3.3 G Drainage Tests 3.3.3 G 21 13 16.00 20 SD-02 Shop Drawings Sprinkler heads and piping 1.3.8 system layout Electrical wiring diagrams 1.3.8 SD-03 Product Data Piping 2.1 Valves 2.1.10 Water motor alarms 2.1.5 Sprinkler heads 2.1.2 Pipe hangers and supports 2.1.9 Fire department connections 2.1.14 Low air pressure supervisory 2.1.7 switch Dry pipe valves 2.1.4 Air compressor 2.1.8 Mechanical couplings 2.1.1 Backflow Preventers 2.1.10.1 Pressure Switch 2.1.6

Sprinkler system design 1.3

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 140 PAGES

T I V I

A N S M I T T

R A G # R A

V

C T L A O S R S I A F / I E C A R T E I V

T I

T I

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

21 13 16.00 20 SD-06 Test Reports Preliminary tests 3.2.1 SD-07 Certificates Qualifications of installer 1.5.1 SD-10 Operation and Maintenance Data Dry pipe valves 2.1.4 Air compressor 2.1.8 SD-11 Closeout Submittals As-built drawings of each system 1.3.9 21 13 18.00 10 SD-02 Shop Drawings Shop Drawings 1.4.3 G As-Built Drawings 3.8 SD-03 Product Data Fire Protection Specialist 1.4.1 G Installer Qualifications 1.4.2 List of Submittals 1.4.1 Materials and Equipment 2.1 G Spare Parts 1.6 OnSite Training 3.9 G SD-05 Design Data Sway Bracing 3.3.1 Hydraulic Calculations 1.2.1.2 G Storage Batteries 2.13.4.1 G SD-06 Test Reports Preliminary Tests 3.7 G

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 140 PAGES

T I V I

A N S M I T T

R A G # R A

V

C T L A O S R S I A F / I E C A R T E I V

T I

T I

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

21 13 18.00 10 Final Acceptance Tests 3.8 SD-07 Certificates Inspection by Fire Protection 3.2 G Specialist SD-10 Operation and Maintenance Data Operating and Maintenance 3.9 G Instructions 21 13 20.00 20 SD-02 Shop Drawings Fire extinguishing system 1.3.1.1 G SD-03 Product Data Pipe, fittings, and mechanical 2.19.1 G couplings [Deluge] [Pre-action] valves 2.1.3 G Valves 2.19.5 G Water motor alarms 2.11.1 G Sprinkler heads 2.1.1 G Monitor nozzles 2.16 G Hose and nozzles 2.17 G Pipe hangers and supports 2.19.4 G Pressure switch 2.11.3.1 G Fire department inlet connections 2.19.11 G Tank mounted air compressor 2.12 G Air pressure regulating device 2.12 G Air compressor 2.3.1 G trouble alarm 2.11.4 G

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 140 PAGES

T I V I

A N S M I T T

R A G # R A

V

C T L A O S R S I A F / I E C A R T E I V

T I

T I

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

21 13 20.00 20 Detection devices 2.2 G Storage batteries 2.2.2.1 G Alarm bells 2.11.2 G Alarm horns 2.11.2 G Annunciator panel 2.2.1.3 G Foam hydrants 2.18 G AFFF concentrate storage tanks 2.15.3 G Proportioning equipment 2.14 G AFFF concentrate 2.13 G Strainers 2.19.3 G Manual release stations 2.5 G Backflow preventers 2.19.12 G Control panel 2.2.1 G Battery charger 2.2.2.2 G SD-05 Design Data Hydraulic calculations 1.3.1.2 G Pressure discharge graphs or 1.3.1.2 G tables Battery standby power 1.3.1.2 G requirements calculations System surge analysis 1.3.1.2 G SD-06 Test Reports 2-wire smoke detectors 2.7 G Preliminary tests 3.8.1 G Acceptance tests 3.8.2 G

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 140 PAGES

T I V I

A N S M I T T

R A G # R A

V

C T L A O S R S I A F / I E C A R T E I V

T I

T I

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

21 13 20.00 20 diaphragm pressure 2.14.1 G proportioning tanks SD-07 Certificates Qualifications of installer 1.5.1 G AFFF containment and disposal 1.3.1.3 G plan Backflow preventers 2.19.12 G SD-10 Operation and Maintenance Data [Deluge] [Pre-action] valves 2.1.3 G Tank mounted air compressor 2.12 G Proportioning equipment 2.14 G Control panel 2.2.1 G AFFF concentrate storage tanks 2.15.3 G Monitor nozzles 2.16 G fire extinguishing system 1.3.1.1 G SD-11 Closeout Submittals As-built drawings for the fire 1.3.1.4 G extinguishing system 21 13 24.00 10 SD-02 Shop Drawings Detail Drawings 1.4.3 G As-built Drawings 1.4.1 SD-03 Product Data Materials and Equipment 2.1 G Spare Parts 1.5 AFFF System 1.2 G

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 140 PAGES

T I V I

A N S M I T T

R A G # R A

V

C T L A O S R S I A F / I E C A R T E I V

T I

T I

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

21 13 24.00 10 Installer's Qualifications 1.4.2 G Post-discharge Test 3.6.4 G Requirements SD-06 Test Reports Test Reports 3.6.4 SD-07 Certificates Materials and Equipment 2.1 G SD-10 Operation and Maintenance Data Operation and Maintenance 3.8 G Manuals 21 13 26.00 40 SD-01 Preconstruction Submittals Material, Equipment, and Fixture Part 2 G Lists Record of Existing Conditions 1.4 G SD-02 Shop Drawings Connection Diagrams Part 2 G Control Diagrams Part 2 G Installation Drawings 1.4 G SD-03 Product Data Equipment and Performance Part 2 G Data Equipment Foundation Data Part 2 G Piping Materials Part 2 G Aboveground Piping Systems 2.3.7 G Valves Part 2 G

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 140 PAGES

T I V I

A N S M I T T

R A G # R A

V

C T L A O S R S I A F / I E C A R T E I V

T I

T I

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

21 13 26.00 40 Detection Systems 2.3.5 G Alarms Part 2 G Sprinkler Heads Part 2 G Supporting Elements Part 2 G SD-04 Samples Manufacturer's Standard Color 3.1.3 G Charts SD-05 Design Data Design Analysis and Calculations Part 2 G SD-06 Test Reports Pressure Tests 3.2 G System Tests 3.2 G Operating Tests 3.2 G SD-07 Certificates Listing of Product Installations 1.3 G Piping Materials Part 2 G Aboveground Piping Systems 2.3.7 G Valves Part 2 G Detection Systems 2.3.5 G Alarms Part 2 G Air Compressor Part 2 G Sprinkler Heads Part 2 G Supporting Elements Part 2 G SD-10 Operation and Maintenance Data

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 140 PAGES

T I V I

A N S M I T T

R A G # R A

V

C T L A O S R S I A F / I E C A R T E I V

T I

T I

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

21 13 26.00 40 Operation and Maintenance 3.4.1 G Manuals 21 21 01.00 10 SD-02 Shop Drawings Piping layout 1.3 Electrical wiring diagrams 1.3.1 SD-03 Product Data Storage cylinders Discharge head Manifolds Discharge alarm 2.9 Pipe and fittings 2.3 Pipe hangers and supports 2.4.3 Actuating stations 2.6 Pressure switch 2.6.3 Control panel 2.6.5 Smoke detectors 2.7.1 Heat activated detectors 2.7.2 Alarm horns 2.9.2 Visual alarms 2.9.3 Dampers 2.11 Main and reserve switch Warning signs 2.9 Storage batteries 2.6.6.1 Battery charger 2.6.6.2

System calculations 1.3.2

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 140 PAGES

T I V I

A N S M I T T

R A G # R A

V

C T L A O S R S I A F / I E C A R T E I V

T I

T I

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

21 21 01.00 10 Calculations substantiating 2.6.6.1 battery capacity Open-area smoke detectors 1.3.2 calculations SD-06 Test Reports Preliminary tests 3.5.1 SD-07 Certificates Qualifications of installer 1.5.1 SD-10 Operation and Maintenance Data Discharge head Control panel 2.6.5 21 21 03.00 10 SD-02 Shop Drawings Installation Drawings 1.4.3 G SD-03 Product Data Similar Services 1.4 Standard Products 2.1 G Preliminary Tests 3.2 G Final Acceptance Tests 3.3 G Field Training 3.4 SD-06 Test Reports Preliminary Tests 3.2 Final Acceptance Tests 3.3 SD-07 Certificates Installation Technician 1.4.2 G Installation Drawings 1.4.3 G

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 140 PAGES

T I V I

A N S M I T T

R A G # R A

V

C T L A O S R S I A F / I E C A R T E I V

T I

T I

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

21 21 03.00 10 SD-10 Operation and Maintenance Data Operation and Maintenance 3.4 Instructions 21 30 00 SD-01 Preconstruction Submittals Fire Pump Installation Related 1.3 Submittals Fire Protection Specialist 1.7.1 G SD-02 Shop Drawings Installation Drawings 3.3.1 G As-Built Drawings 3.11.2 G Piping Layout 3.3.2 G Pump Room 3.3.2 G

Catalog Data 2.1 G