Headquarters III Corps, Fort Hood Directorate of Public Works (DPW)
Technical Exhibit “A”
AD005435P – REPAIR HELIPADS
VARIOUS LOCATIONS
SPECIFICATIONS
April 21, 2015
Contract No. W91151-16-C-XXXX
Directorate of Public Works Engineering Division
US Army, III Corps 4612 Engineer Dr.
Fort Hood, TX 76544
DPW Specification
Jan 11, 2016
MASTER TABLE OFCONTENTS Page 1
DPWSPECS TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
DIVISION 02 - EXISTING CONDITIONS
02 41 00 10/14 DEMOLITION
02 82 00 10/14 ASBESTOS REMEDIATION
02 82 18.00 20 07/14 ENGINEERING CONTROL OF MOLD CONTAMINATED
MATERIALS
82 33.13 20 08/11 REMOVAL/CONTROL AND DISPOSAL OF PAINT WITH LEAD
DIVISION 03 - CONCRETE
30 00 09/14 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
01 41 04/06 RESTORATION AND CLEANING OF MASONRY
04 20 00 10/07 MASONRY
DIVISION 05 - METALS
12 00 11/11 STRUCTURAL STEEL
05 40 00 05/10 COLD-FORMED METAL FRAMING
50 00 04/06 METAL: MISCELLANEOUS AND FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
20 00 04/06 FINISH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 17 04/06 FIBERGLASS INSULATION
07 24 00 07/14 EXTERIOR INSULATION AND FINISH SYSTEMS
07 41 13 07/14 METAL ROOF PANELS
07 55 00 07/14 MEMBRANE ROOFING
07 57 14 09/14 SPRAYED POLYURETHANE FOAM (MEDIUM DENSITY)
07 60 00 07/14 FLASHING AND SHEET METAL
07 84 00 07/14 FIRESTOPPING
07 92 00 09/14 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 07/14 STEEL DOORS AND FRAMES
08 11 16 07/14 ALUMINUM DOORS AND FRAMES
08 14 00 07/14 WOOD DOORS
08 33 23 07/14 OVERHEAD COILING DOORS
01 32 01.00 10 1 JAN PROJECT SCHEDULE
01 33 00 1 JAN SUBMITTAL PROCEDURES
01 35 13 1 JAN SPECIAL PROJECT PROCEDURES
01 35 23.00 40 1 JAN OWNER SAFETY REQUIREMENTS
01 35 29 1 JAN SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS
01 45 01.00 20 1 JAN QUALITY CONTROL (QC)
01 57 20.00 10 1 JAN ENVIRONMENTAL PROTECTION
01 77 00 1 JAN CLOSEOUT PROCEDURES
01 78 23 1 JAN OPERATION AND MAINTENANCE DATA
01 80 00 1 JAN UTILITIES
MASTER TABLE OFCONTENTS Page 2
08 34 19.10 20 04/06 ROLLING SERVICE DOORS
08 36 13 08/11 SECTIONAL OVERHEAD DOORS
08 36 19 11/11 VERTICAL LIFT DOORS
08 51 13.00 20 07/14 ALUMINUM WINDOWS
08 60 45 07/14 SKYLIGHTS AND TRANSLUCENT PANELS
08 71 00 08/14 DOOR HARDWARE
08 81 00 08/14 GLAZING
08 91 00 08/14 METAL WALL AND DOOR LOUVERS
DIVISION 09 - FINISHES
09 29 00 09/14 GYPSUM BOARD
09 30 00 09/14 CERAMIC TILE, QUARRY TILE, AND PAVER TILE
09 51 00 09/14 ACOUSTICAL CEILINGS
09 65 00 09/14 RESILIENT FLOORING
09 68 00 09/14 CARPET
09 90 00 09/14 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 01 09/14 EXTERIOR SIGNAGE
10 14 02 09/14 INTERIOR SIGNAGE
10 21 13 09/14 TOILET COMPARTMENTS
10 22 13 09/14 WIRE MESH PARTITIONS
10 26 13 09/14 WALL AND CORNER GUARDS
10 28 13 09/14 TOILET ACCESSORIES
10 44 16 07/14 FIRE EXTINGUISHERS
10 90 00 08/08 MISCELLANEOUS SPECIALTIES
DIVISION 11 - EQUIPMENT
68 13 09/14 PLAYGROUND EQUIPMENT
DIVISION 12 - FURNISHINGS
24 13 09/14 ROLLER WINDOW SHADES
DIVISION 13 - SPECIAL CONSTRUCTION
34 19 11/11 METAL BUILDING SYSTEMS
DIVISION 21 - FIRE SUPPRESSION
21 12 00 05/11 STANDPIPE SYSTEMS
21 13 00.00 20 04/06 WET-PIPE FIRE SUPPRESSION SPRINKLERS
21 13 00.00 40 08/13 FIRE-SUPPRESSION SPRINKLER SYSTEMS
21 13 16.00 20 04/06 DRY-PIPE FIRE SPRINKLER SYSTEMS
21 13 18.00 10 05/09 PREACTION AND DELUGE SPRINKLER SYSTEMS, FIRE
PROTECTION
21 13 20.00 20 11/09 FOAM FIRE EXTINGUISHING FOR AIRCRAFT HANGARS
21 13 24.00 10 10/07 AQUEOUS FILM-FORMING FOAM (AFFF) FIRE
PROTECTION SYSTEM
21 13 26.00 40 08/13 DELUGE FIRE-SUPPRESSION SPRINKLER SYSTEMS
21 21 01.00 10 04/06 CLEAN AGENT FIRE EXTINGUISHING
21 21 03.00 10 02/09 WET CHEMICAL FIRE EXTINGUISHING SYSTEM
21 30 00 04/08 FIRE PUMPS
DIVISION 22 - PLUMBING
MASTER TABLE OFCONTENTS Page 3
22 00 00 11/11 PLUMBING, GENERAL PURPOSE
22 05 48.00 20 04/06 MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL
22 07 19.00 40 08/13 PLUMBING PIPING INSULATION
22 14 29.00 40 08/11 SUMP PUMPS
22 15 14.00 40 02/11 GENERAL SERVICE COMPRESSED-AIR SYSTEMS, LOW
PRESSURE
22 31 00 02/09 WATER SOFTENERS, CATION-EXCHANGE (SODIUM CYCLE)
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00 08/10 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND
EXHAUST SYSTEMS
23 01 30.41 08/10 HVAC SYSTEM CLEANING
23 03 00.00 20 08/10 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 02/14 COMMON PIPING FOR HVAC
23 05 48.00 40 02/11 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING
AND EQUIPMENT
23 05 93 08/09 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 09/14 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00.00 10 01/08 COMMISSIONING OF HVAC SYSTEMS
23 08 01.00 20 04/06 TESTING INDUSTRIAL VENTILATION SYSTEMS
23 09 13.34 40 02/11 CONTROL VALVES, SELF-CONTAINED
23 09 23 05/11 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND
OTHER BUILDING CONTROL SYSTEMS
23 09 53.00 20 02/10 SPACE TEMPERATURE CONTROL SYSTEMS
23 11 25 11/08 FACILITY GAS PIPING
23 21 13.00 20 04/06 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM
23 21 13.23 20 07/07 [HIGH][MEDIUM] TEMPERATURE WATER SYSTEM WITHIN
BUILDINGS
23 23 00 10/07 REFRIGERANT PIPING
23 25 00 11/08 CHEMICAL TREATMENT OF WATER FOR MECHANICAL
SYSTEMS
23 31 13.00 40 11/12 METAL DUCTS
23 34 23.00 40 05/14 HVAC POWER VENTILATORS
23 35 00.00 10 02/09 OVERHEAD VEHICLE TAILPIPE[ AND WELDING FUME]
EXHAUST REMOVAL SYSTEM(S)
23 35 19.00 20 02/10 INDUSTRIAL VENTILATION AND EXHAUST
23 36 00.00 40 02/11 AIR TERMINAL UNITS
23 37 13.00 40 05/10 DIFFUSERS, REGISTERS, AND GRILLS
23 41 13.00 40 05/10 PANEL FILTERS
23 52 00 04/08 HEATING BOILERS
23 52 33.03 20 11/08 WATER-TUBE BOILERS, OIL/GAS OR OIL
23 52 43.00 10 04/08 HEAT RECOVERY BOILERS
23 52 43.00 20 07/06 LOW PRESSURE WATER HEATING BOILERS (UNDER
800,000 BTU/HR OUTPUT)
23 52 46.00 20 04/06 LOW PRESSURE WATER HEATING BOILERS (OVER
800,000 BTU/HR OUTPUT)
23 54 16.00 10 08/14 HEATING SYSTEM; GAS-FIRED HEATERS
23 54 19 11/08 BUILDING HEATING SYSTEMS, WARM AIR
23 57 10.00 10 01/08 FORCED HOT WATER HEATING SYSTEMS USING WATER
AND STEAM HEAT EXCHANGERS
23 63 00.00 10 10/07 COLD STORAGE REFRIGERATION SYSTEMS
23 64 00 08/09 PACKAGED WATER CHILLERS, ABSORPTION TYPE
23 64 10 08/08 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 08/09 CHILLED, CHILLED-HOT, AND CONDENSER WATER
PIPING SYSTEMS
23 65 00 08/14 COOLING TOWERS
23 69 00.00 20 07/06 REFRIGERATION EQUIPMENT FOR COLD STORAGE
23 70 03.00 10 01/08 HEATING AND UTILITIES SYSTEMS, CENTRAL STEAM
MASTER TABLE OFCONTENTS Page 4
23 72 00.00 10 01/08 ENERGY RECOVERY SYSTEMS
23 72 26.00 10 04/08 DESICCANT COOLING SYSTEMS
23 73 13.00 40 05/14 MODULAR INDOOR CENTRAL-STATION AIR-HANDLING
UNITS
23 74 33.00 40 02/11 PACKAGED, OUTDOOR, HEATING AND COOLING MAKEUP
AIR-CONDITIONERS
23 76 00.00 10 04/08 EVAPORATIVE COOLING SYSTEMS
23 76 00.00 20 07/06 EVAPORATIVE COOLING SYSTEM
23 81 00.00 20 11/09 UNITARY AIR CONDITIONING EQUIPMENT
23 81 23.00 20 02/10 COMPUTER ROOM AIR CONDITIONING UNITS
23 81 47 08/08 WATER-LOOP AND GROUND-LOOP HEAT PUMP SYSTEMS
23 82 00.00 20 11/08 TERMINAL HEATING AND COOLING UNITS
23 82 01.00 10 04/08 WARM AIR HEATING SYSTEMS
23 82 02.00 10 04/08 UNITARY HEATING AND COOLING EQUIPMENT
23 82 16.00 40 08/14 AIR COILS
23 82 19.00 40 05/14 FAN COIL UNITS
23 82 23.00 40 05/14 UNIT VENTILATORS
23 82 43.00 40 08/11 ELECTRIC DUCT HEATERS
23 82 46.00 40 08/11 ELECTRIC UNIT HEATERS
23 83 00.00 20 04/06 ELECTRIC SPACE HEATING EQUIPMENT
23 84 16.00 20 11/08 DESICCANT DEHUMIDIFICATION EQUIPMENT
DIVISION 26 - ELECTRICAL
26 00 00.00 20 09/14 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 00.00 40 11/08 COMMON WORK RESULTS FOR ELECTRICAL
26 05 73.00 40 09/14 OVERCURRENT PROTECTIVE DEVICES
26 09 23.00 40 09/14 LIGHTING CONTROL DEVICES
26 12 00 09/14 TRANSFORMERS
26 23 00 09/14 SWITCHBOARDS AND SWITCHGEAR
26 24 16.00 40 09/14 PANELBOARDS
26 24 19.00 40 09/14 MOTORS AND MOTOR-CONTROL CENTERS
26 26 00.00 40 09/14 POWER DISTRIBUTION UNITS
26 27 13.10 30 09/17 ELECTRIC METERS
26 27 26.00 40 09/14 WIRING DEVICES
26 28 16.00 40 09/14 ENCLOSED SWITCHES AND CIRCUIT BREAKERS
26 29 23 09/14 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 51 00 09/17 INTERIOR LIGHTING
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 74.00 20 07/14 INTERIOR FIRE DETECTION AND ALARM SYSTEM
28 31 76 07/14 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 08/14 EARTHWORK
31 05 19 08/14 GEOTEXTILE
31 11 00 08/08 CLEARING AND GRUBBING
31 32 11 07 JU SOIL SURFACE EROSION CONTROL
31 36 00 08/14 WIRE MESH GABIONS AND MATTRESSES
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 11.51 08/14 RUBBER AND PAINT REMOVAL FROM AIRFIELD PAVEMENTS
32 01 13.00 20 09/14 EMULSIFIED ASPHALT SEAL COATS WITH OR WITHOUT
AGGREGATE
32 01 13 BITUMINOUS SEAL AND FOG COATS
32 01 16.17 08/14 COLD MILLING OF BITUMINOUS PAVEMENTS
MASTER TABLE OFCONTENTS Page 5
32 01 17.16 SEALING OF CRACKS IN BITUMINOUS PAVEMENTS
32 01 17 09/14 COLD-MIX RECYCLING
32 01 19.61 RESEALING OF JOINTS IN RIGID PAVEMENT
32 01 19 09/14 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN
RIGID PAVEMENTS
32 01 24 09/14 HOT IN-PLACE RECYCLING OF BITUMINOUS PAVEMENTS
32 01 25 09/14 HEATER SCARIFYING OF BITUMINOUS PAVEMENTS
32 01 26.71 09/14 GROOVING FOR AIRFIELD PAVEMENTS
32 01 29.61 08/14 PARTIAL DEPTH PATCHING OF RIGID PAVING
32 01 29.62 SLABJACKING RIGID PAVEMENTS
32 05 33 07/06 LANDSCAPE ESTABLISHMENT
32 10 00 08/14 PERVIOUS AND STANDARD BITUMINOUS CONCRETE
PAVEMENT
32 11 10 09/14 DRAINAGE LAYER
32 11 16.13 09/14 SAND-CLAY SUBBASE COURSE
32 11 16 08/14 BASE COURSE FOR RIGID AND SUBBASES FOR FLEXIBLE
PAVING
32 11 23 08/14 AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE
COURSE
32 11 24 GRADED CRUSHED AGGREGATE BASE COURSE FOR
PERVIOUS AND NORMAL FLEXIBLE PAVEMENT
32 11 29 LIME-STABILIZED SUBGRADE
32 11 33 CEMENT STABILIZED SUBBASE COURSE AT AIRFIELDS
AND ROADS
32 12 10 BITUMINOUS TACK AND PRIME COATS
32 12 11 07/14 BITUMINOUS SURFACE TREATMENT
32 12 15.13 HOT-MIX ASPHALT AIRFIELD PAVING
32 12 15.16 07/14 WARM-MIX ASPHALT AIRFIELD PAVING
32 12 16 08/14 HOT-MIX ASPHALT (HMA) FOR ROADS
32 12 17.00 44 0508 PAVEMENT REPLACEMENT
32 12 17 07/14 HOT MIX BITUMINOUS PAVEMENT
32 12 19 07/14 BITUMINOUS BINDER AND WEARING COURSES
(CENTRAL-PLANT COLD-MIX)
32 12 21 08/14 BITUMINOUS ROAD-MIX SURFACE COURSE
32 12 37 08/14 FUEL-RESISTANT (COAL TAR) SEALER
32 12 43.16 POROUS FRICTION COURSE FOR AIRFIELDS AND ROADS
32 13 11 07/14 CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER
HEAVY-DUTY PAVEMENTS
32 13 13.06 07/14 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND
SITE FACILITIES
32 13 15.20 08/14 CONCRETE PAVEMENT FOR CONTAINMENT DIKES
32 13 16.16 08/14 ROLLER COMPACTED CONCRETE (RCC) PAVEMENT
32 13 17 08/14 STONE MATRIX ASPHALT (SMA) FOR AIRFIELD
PAVEMENTS
32 13 43 PERVIOUS CONCRETE PAVING
32 13 73 08/14 COMPRESSION JOINT SEALS FOR CONCRETE PAVEMENTS
32 15 00 08/14 AGGREGATE SURFACE COURSE
32 16 13 07/14 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 16 15 08/14 CONCRETE BLOCK PAVEMENTS
32 17 23.00 20 07/14 PAVEMENT MARKINGS
32 18 16.13 08/14 PLAYGROUND PROTECTIVE SURFACING
32 31 13 01/08 CHAIN LINK FENCES AND GATES
32 92 19 06/15 SEEDING
32 92 23 04/06 SODDING
32 93 00 02/10 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 40 00 02/10 STORM DRAINAGE UTILITIES
MASTER TABLE OFCONTENTS Page 6
33 51 00.00 20 04/06 NATURAL GAS DISTRIBUTION
33 51 13.00 30 05/10 NATURAL-GAS METERING
33 71 01.00 40 09/14 OVERHEAD TRANSMISSION AND DISTRIBUTION
33 71 02 02/14 UNDERGROUND ELECTRICAL DISTRIBUTION
-- End of Master Table of Contents --
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 140 PAGES
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
A C T I V I T Y
N O
R A N S M I T T
L
S P E
DESCRIPTION
ITEM SUBMITTED
R A G # R A
H
G
V
C T L A O S R S I A F / I E C A R T E I V O W N R
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH
REMARKS
SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
T I
D
DATE
OF
DATE FWD
TO APPR
AUTH/
FROM
CONTR
TO OTHER
REVIEWER
FROM OTH
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 32 01.00 10 SD-01 Preconstruction Submittals Initial Project Schedule 3.4.2 G Program Project Schedule 3.4.1 G Periodic Schedule Update 3.4.3 G 01 35 13 SD-01 Preconstruction Submittals Support Subcontractor Awards 1.4.7 G Digging And Water Use Permits 1.4.2 G Storm Water Prevention Pollution 1.5.3 G Plan (SWPPP) Water Use Permit 1.5.6 G Fort Hood Airfield Access 1.4.1 G Traffic Control Plan 1.5.4 G Army Radiation Permit 1.5.5 G Utility Metering Permit 1.5.8 G Range Passes G AT Level I Training 1.5.10.1 G OPSEC Training 1.4.9.4 G 01 35 23.00 40 SD-01 Preconstruction Submittals Contractor's Health and Safety 1.3.1 G Plan SD-06 Test Reports Gas Protection 1.14 SD-07 Certificates Protection Plan 1.3.2 License Certificates 1.11 01 35 29 SD-01 Preconstruction Submittals
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 140 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V
T I
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 35 29 Activity Hazard Analysis G Crane Critical Lift Plan 1.13 G Crane Operators G Confined Space Entry Permit G SD-06 Test Reports Accident Reports Regulatory Citations and 1.11.1 Violations 01 45 01.00 20 SD-01 Preconstruction Submittals 3-Key Personal 3.1 G Quality Control Plan (QCP) G 01 57 20.00 10 SD-01 Preconstruction Submittals Air Permits 3.4.1 Environmental Manager 3.8.1 G SD-11 Closeout Submittals Contractor Hazardous Material Inventory and Consumption Log Air Permits 3.4.1 G Refrigerant Equipment Service Log Emissions Inventory Questionnaire for New Sources Emission Inventory 3.4.2 Recycle Weight Tickets 3.9.2 Construction Waste Tickets 3.9.3
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 140 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V
T I
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 77 00 SD-10 Operation and Maintenance Data Equipment/Product Warranty List G SD-11 Closeout Submittals Certification of EPA Designated G Items Form DD1354 (and Appendix D G where applicable) Videos G Final Operation and Maintenance G Manuals Final Record Drawings G Inventory of Contractor Furnished G and Installed Equipment 02 41 00 SD-01 Preconstruction Submittals Demolition Plan G Utility Cut and Cap Plan G SD-07 Certificates Asbestos and Lead Based Paint Notification Forms submitted to Texas Department of State Healt h Services
FIO
SD-11 Closeout Submittals Receipts
FIO
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 140 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V
T I
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
02 82 00 SD-03 Product Data Material Safety Data Sheets 1.3.8 (MSDS) for all materials proposed for transport to the project site
FIO
SD-06 Test Reports Air sampling results 1.5.5
FIO
Asbestos disposal quantity report 3.3.3.2 Clearance sampling 3.2.7.3 Asbestos Survey Report showing G quantities and locations SD-07 Certificates Asbestos hazard abatement plan 1.3.9
FIO
Testing laboratory 1.3.10 Private qualified person Contractor's license 1.5.4 Competent person 1.5.2 Worker's license 1.5.3 Landfill approval 1.3.11 Employee training 1.3.3 Medical certification requirements Waste shipment records 1.3.11 Respiratory Protection Program 1.3.6
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 140 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V
T I
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
02 82 00 Delivery tickets 1.3.11 Notifications 1.3.4 Notifications to Texas Department of State Health Services; G SD-11 Closeout Submittals Notifications 1.3.4 Permits and licenses 1.3.4 02 82 18.00 20 SD-06 Test Reports Air sampling results 1.5.4 Clearance sampling 3.2.8.2 SD-07 Certificates Mold remediation plan 1.3.9 Private qualified person documentation (Mold assessors, remediators) Contractor's license 1.5.3 Responsible person Notifications 1.3.4 Notifications 1.3.4 SD-11 Closeout Submittals Notifications 1.3.4 Notifications 1.3.4 02 82 33.13 20 SD-03 Product Data Vacuum Filters 1.6.4 Respirators 1.6.1
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 140 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V
T I
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
02 82 33.13 20 SD-06 Test Reports sampling results 1.5.2.3 Occupational and Environmental 1.5.2.3 Assessment Data Report SD-07 Certificates Qualifications of CP 1.5.1.1 G Testing Laboratory 1.5.1.3 Occupant Notification 3.1.1.1 Training Certification 1.5.1.2 G Notification of the G Commencement of LBP Hazard Abatement activities Third Party Consultant 1.5.1.4 G Qualifications lead-based paint/paint with lead 1.5.3 removal/control plan Respiratory Protection Program 1.5.2.6 Hazard Communication Program 1.5.2.7 approved hazardous waste treatment, storage, or disposal facility Lead Waste Management Plan 1.5.2.8 Clearance Certification 3.5.1.1 SD-11 Closeout Submittals hazardous waste manifest 3.5.2.1 03 30 00 SD-02 Shop Drawings
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 140 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V
T I
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
03 30 00 Reinforcing steel 1.4.2.1 G SD-05 Design Data mix design 2.3.1 G SD-06 Test Reports Compressive strength tests 3.12.2.2
FIO
Slump Tests 3.12.2.1 SD-07 Certificates Reinforcing Bars 2.5.1
FIO
04 01 41 SD-03 Product Data Cleaning and Restoration Methods 04 20 00 SD-03 Product Data Shop Drawings Reinforcing Steel Local/Regional Materials 1.5.1 Masonry Blends being used; to include each type of rock include d in blend Environmental Data Brick Concrete Masonry Units (CMU) 2.2 Water-Repellant Admixture 2.5 SD-04 Samples Concrete Masonry Units (CMU) 2.2
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 140 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V
T I
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
04 20 00 Clay or Shale Brick 2.1 SD-08 Manufacturer’s Instructions Masonry Cement 2.4.2 05 12 00 SD-02 Shop Drawings Fabrication drawings; G SD-06 Test Reports Bolts, nuts, and washers 2.2 SD-07 Certificates Steel 2.1 Galvanizing 2.5 AISC Quality Certification 1.4 AISC Fabrication Plant Quality Certification 05 40 00 SD-02 Shop Drawings Framing Components 1.5.1 SD-03 Product Data studs,joists 2.1 SD-05 Design Data Metal framing calculations 1.5.2 Welds 3.1.1 05 50 00 SD-02 Shop Drawings steel stairs 2.20 structural steel door frames 2.22 Floor gratings and roof walkways 2.9 Handrails 2.12 Ladders 2.13
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 140 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V
T I
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
05 50 00 Roof hatch 3.14 SD-03 Product Data Floor gratings and roof walkways 2.9 Handrails 2.12 Ladders 2.13 Steel stairs 2.20 Structural steel door frames 2.22 Roof hatch 3.14 06 20 00 SD-03 Product Data Cabinetry hardware SD-04 Samples Cabinetry and couter top Moldings Fascias and Trim 2.3 07 21 17 SD-03 Product Data Insulation 3.3.1 Vapor retarder SD-08 Manufacturer’s Instructions Insulation 3.3.1 07 24 00 SD-03 Product Data Sheathing board 2.2 Vapor Barrier Thermal insulation 2.6 Adhesive Mechanical Fasteners 2.5 Accessories 2.12
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 140 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V
T I
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
07 24 00 Base coat 2.7 Portland cement 2.8 Reinforcing fabric 2.9 Finish coat 2.10 Joint Sealant 2.13 Sealant Primer Bond breaker 2.14 Backer Rod 2.15 Insulation Board Warranty
FIO
SD-04 Samples Sample Boards SD-07 Certificates Qualifications of EIFS 1.4.1 Manufacturer Qualification of EIFS Installer 1.4.2 Qualification of Sealant Applicator SD-08 Manufacturer’s Instructions Installation 3.3 SD-10 Operation and Maintenance Data
EIFS
07 41 13 SD-02 Shop Drawings Flashing and Accessories
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 140 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V
T I
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
07 41 13 Gutter/Downspout Assembly SD-03 Product Data Roof panels
FACTORY-APPLIED COLOR
FINISH
Accessories 2.4 Fasteners SD-04 Samples Roof Panels G SD-06 Test Reports Fire Rating Test Report 2.6.2 Factory Finish and Color 2.2 Performance Requirements SD-08 Manufacturer’s Instructions
INSTALLATION MANUAL
07 55 00 SD-03 Product Data Insulation Board 2.2 Membrane Roofing Fasteners Sheet Metal Design Materials Caulking Contractors Qualifications 2-Roof Vents Scuppers and Curbs Designs Parapet Wall Flashing Designs Fascia Designs and Colors
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 140 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V
T I
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
07 55 00 SD-04 Samples Membrane Roofing G Insulation Board 2.2 Fasteners Fascia 2-Way Roof Vent SD-08 Manufacturer’s Instructions Installation SD-11 Closeout Submittals Manufacturers Final Inspection Quality Verification Report 07 57 14 SD-03 Product Data Polyurethane foam SD-07 Certificates Qualification of Manufacturer G Qualification of Applicator G 07 60 00 SD-02 Shop Drawings Flashing at roof penetrations 3.1.27 G 07 84 00 SD-03 Product Data Firestopping Materials 2.1 07 92 00 SD-03 Product Data Sealants 2.1 Backstops 2.4 08 11 13 SD-03 Product Data Doors 2.1 Frames
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 140 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V
T I
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
08 11 13 Accessories 2.2 Weatherstripping 08 11 16 SD-02 Shop Drawings Doors and frames 2.1 SD-08 Manufacturer’s Instructions Doors and frames 2.1 08 14 00 SD-03 Product Data Doors 2.1 Fire resistance rating 2.1.7 08 33 23 SD-02 Shop Drawings Overhead Coiling Doors 2.1 Counterbalancing Mechanism 1.6 Counterbalancing Mechanism 2.3 Manual Door Operators 1.6 Manual Door Operators 2.4 Electric Door Operators 1.6 Electric Door Operators 2.5 Bottom Bar 2.1.4 Guides 1.5 Mounting Brackets 2.3.1 Overhead Drum 2.1.10 Hood 1.6 Painting 1.6 Installation Drawings 1.5 SD-03 Product Data Overhead Coiling Doors 2.1
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 140 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V
T I
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
08 33 23 Hardware 2.2 Counterbalancing Mechanism 1.6 Counterbalancing Mechanism 2.3 Manual Door Operators 1.6 Manual Door Operators 2.4 Electric Door Operators 1.6 Electric Door Operators 2.5 Fire-Rated Door Assembly 2.6 SD-05 Design Data Overhead Coiling Doors 2.1 Hardware 2.2 Counterbalancing Mechanism 1.6 Counterbalancing Mechanism 2.3 Manual Door Operators 1.6 Manual Door Operators 2.4 Electric Door Operators 1.6 Electric Door Operators 2.5 Fire-Rated Door 1.2 SD-10 Operation and Maintenance Data Operation and Maintenance 1.5 Manuals Overhead Coiling Door 1.6 Assemblies Materials 1.6 Devices 1.6
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 140 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V
T I
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
08 33 23 Procedures 1.6 Manufacture's Brochures 1.6 Parts Lists 1.6 Cleaning 3.3.2 08 34 19.10 20 SD-02 Shop Drawings Rolling service doors 2.1 Rolling fire doors SD-03 Product Data Rolling service doors 2.1 Motors 2.4.2 Controls 2.4.3 SD-08 Manufacturer’s Instructions Rolling service doors 2.1 SD-10 Operation and Maintenance Data Rolling service doors 2.1 08 36 13 SD-02 Shop Drawings Doors 2.2 G SD-03 Product Data Doors 2.2 G Electric operators 2.6 G SD-08 Manufacturer’s Instructions Doors 2.2 SD-10 Operation and Maintenance Data Doors 2.2 G
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 140 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V
T I
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
08 36 19 SD-02 Shop Drawings Doors 2.2 G SD-03 Product Data Doors 2.2 G Motors 2.4.1 G Controls 2.4.2 G SD-08 Manufacturer’s Instructions Doors 2.2 SD-10 Operation and Maintenance Data Doors 2.2 G 08 51 13.00 20 SD-02 Shop Drawings Windows 2.1 Fabrication Drawings SD-03 Product Data Windows 2.1 Hardware 2.2.5.1 Weatherstripping 2.2.2 Accessories 2.2.5 SD-05 Design Data Structural calculations for deflection 08 60 45 SD-02 Shop Drawings Shop Drawings 3.2
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 140 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V
T I
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
08 60 45 [SKYLIGHTS][ AND 2.1
][TRANSLUCENT PANELS]
Warranty 1.6 SD-06 Test Reports Test Reports 2.1 SD-07 Certificates Systems 2.5 Qualifications 1.4 08 71 00 SD-02 Shop Drawings Keying system 2.3.6 SD-03 Product Data Hardware items 2.3 SD-11 Closeout Submittals Key Bitting 1.3 08 81 00 SD-02 Shop Drawings Installation SD-03 Product Data Insulating Glass Glazing Accessories 1.3 SD-07 Certificates Insulating Glass Laminated Glass 08 91 00 SD-02 Shop Drawings Wall louvers 1.4 Wall louvers 1.5
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 140 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V
T I
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
08 91 00 Metal Wall Louvers 2.2 09 29 00 SD-03 Product Data Cementitious backer units Gypsum Board 2.1.1 Accessories 2.1.7 SD-08 Manufacturer’s Instructions Material Safety Data Sheets 09 30 00 SD-03 Product Data Tile 2.1 Adhesive SD-04 Samples Tile 2.1 Grout 2.3 09 51 00 SD-03 Product Data Acoustical Ceiling Systems SD-07 Certificates Acoustic Ceiling Tiles and Suspension System 09 65 00 SD-03 Product Data Resilient Flooring and Accessories Adhesives 2.4 SD-08 Manufacturer’s Instructions Surface Preparation 3.2 Installation 09 68 00 SD-03 Product Data
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 140 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V
T I
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
09 68 00 Carpet 2.1 Installation 3.4 SD-04 Samples Carpet 2.1 SD-07 Certificates Carpet 2.1 09 90 00 SD-03 Product Data Coating SD-08 Manufacturer’s Instructions Manufacturer's Material Safety 1.6.2 Data Sheets 10 14 02 SD-03 Product Data Interior Signage 1.3 10 21 13 SD-02 Shop Drawings Installation Drawings G Fabrication Drawings SD-03 Product Data Colors And Finishes 2.6 Partition Panels and Doors 2.2 Anchoring Devices and 2.1.3 Fasteners Hardware and Fittings 2.1.5 10 22 13 SD-03 Product Data Wire mesh partitions 1.4 10 26 13 SD-03 Product Data Corner Guards 2.2
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 140 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V
T I
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
10 28 13 SD-03 Product Data Finishes Accessory Items 10 44 16 SD-03 Product Data Fire Extinguishers 2.1 Accessories Cabinets Wall Brackets Replacement Parts SD-07 Certificates Fire Extinguishers 2.1 Manufacturer's Warranty with 2.1 Inspection Tag 11 68 13 SD-02 Shop Drawings Configuration Shop Drawings 1.5.5 Fall Height SD-03 Product Data Equipment 2.2 Equipment Identification 1.3.4 Delivery, Storage and Handling 1.6 Manufacturer Qualification 1.5.1 Materials 2.1 SD-04 Samples Color 2.1.5 SD-06 Test Reports
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 140 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V
T I
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
11 68 13 Recycled Plastic 2.1.3 Wood Finishes SD-07 Certificates Materials 2.1 Manufacturer Qualification 1.5.1 Installer Qualification 1.5.2 Manufacturer's Representative 1.5.3 Substitution SD-10 Operation and Maintenance Data Maintenance Instructions 1.8 12 24 13 SD-03 Product Data Window Shades 2.1 Hardware 1.3 SD-08 Manufacturer’s Instructions Window Shades 2.1 13 34 19 SD-01 Preconstruction Submittals Manufacturer's Qualifications 1.6.2 SD-02 Shop Drawings Shop and Detail Drawings SD-05 Design Data descriptive and technical literature building design analysis 21 12 00 SD-02 Shop Drawings Standpipe system 1.4.4 G
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 140 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V
T I
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
21 12 00 SD-03 Product Data Pipe and fittings 2.1.1 G Mechanical couplings 2.1.1 G Pipe hangers and supports 2.1.2 G Valves 2.1.3 G Fire department connections 2.1.9 G Alarm valves 2.1.10 G Water motor alarms 2.1.11 G Pressure switch 2.1.12 G Waterflow detector 2.1.13 G Fire hose cabinets 2.1.14 G Valve tamper switch 2.1.15 G Backflow preventer 2.1.17 G Buried Pipe and fittings 2.2.1 G SD-06 Test Reports Preliminary tests 3.8.1 G Acceptance tests 3.8.2 G SD-07 Certificates Qualifications of installer 1.6.1 G SD-10 Operation and Maintenance Data Alarm valves 2.1.10 G Backflow preventer 2.1.17 G SD-11 Closeout Submittals System as-built drawings 1.6.2 G 21 13 00.00 20 SD-02 Shop Drawings
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 140 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V
T I
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
21 13 00.00 20 Sprinkler heads and piping 1.4 system layout Electrical wiring diagrams 1.4.8 SD-03 Product Data Piping 2.2 Alarm valves 2.2.4 Valves 2.2.8 Water motor alarms 2.2.5 Sprinkler heads 2.2.2 Pipe hangers and supports 2.2.7 Flow switch 2.2.6 Fire department connections 2.2.13 Excess pressure pump 2.2.14 Mechanical couplings 2.2.1 Backflow Preventer 2.2.9 SD-05 Design Data Sprinkler system design 1.4 SD-06 Test Reports Preliminary tests 3.2.1 SD-07 Certificates Qualifications of installer 1.6.1 SD-10 Operation and Maintenance Data Alarm valves 2.2.4 Excess pressure pump 2.2.14 Backflow preventer 2.2.9
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 140 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V
T I
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
21 13 00.00 20 SD-11 Closeout Submittals As-built drawings 1.4.9 21 13 00.00 40 SD-01 Preconstruction Submittals Record of Existing Conditions 1.2 G SD-02 Shop Drawings Supporting Elements 2.2.3 G Fire-Department Connections 2.2.4 G Fire Alarm System 2.2.9.1 G Sprinkler Heads 2.2.8 G Valves 2.2.9 G SD-03 Product Data Underground Piping Materials 2.2.1 G Aboveground Piping Materials 2.2.2 G Valves 2.2.9 G Fire-Department Connections 2.2.4 G Riser Alarm Equipment 2.2.5 G Air Compressor 2.2.6.1 G Standpipe Equipment and Fire 2.2.7 G Hose Cabinet Stations Sprinkler Heads 2.2.8 G Materials 2.3 G Supporting Elements 2.2.3 G Equipment and Performance 2.1 G Data SD-05 Design Data Design Analysis and Calculations Part 2 G
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 140 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V
T I
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
21 13 00.00 40 SD-06 Test Reports Pressure Tests 3.3.6 G System Operating Tests 3.3.3 G Air Tests 3.3.3 G Valve-Operating Tests 3.3.3 G Drainage Tests 3.3.3 G 21 13 16.00 20 SD-02 Shop Drawings Sprinkler heads and piping 1.3.8 system layout Electrical wiring diagrams 1.3.8 SD-03 Product Data Piping 2.1 Valves 2.1.10 Water motor alarms 2.1.5 Sprinkler heads 2.1.2 Pipe hangers and supports 2.1.9 Fire department connections 2.1.14 Low air pressure supervisory 2.1.7 switch Dry pipe valves 2.1.4 Air compressor 2.1.8 Mechanical couplings 2.1.1 Backflow Preventers 2.1.10.1 Pressure Switch 2.1.6
Sprinkler system design 1.3
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 140 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V
T I
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
21 13 16.00 20 SD-06 Test Reports Preliminary tests 3.2.1 SD-07 Certificates Qualifications of installer 1.5.1 SD-10 Operation and Maintenance Data Dry pipe valves 2.1.4 Air compressor 2.1.8 SD-11 Closeout Submittals As-built drawings of each system 1.3.9 21 13 18.00 10 SD-02 Shop Drawings Shop Drawings 1.4.3 G As-Built Drawings 3.8 SD-03 Product Data Fire Protection Specialist 1.4.1 G Installer Qualifications 1.4.2 List of Submittals 1.4.1 Materials and Equipment 2.1 G Spare Parts 1.6 OnSite Training 3.9 G SD-05 Design Data Sway Bracing 3.3.1 Hydraulic Calculations 1.2.1.2 G Storage Batteries 2.13.4.1 G SD-06 Test Reports Preliminary Tests 3.7 G
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 140 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V
T I
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
21 13 18.00 10 Final Acceptance Tests 3.8 SD-07 Certificates Inspection by Fire Protection 3.2 G Specialist SD-10 Operation and Maintenance Data Operating and Maintenance 3.9 G Instructions 21 13 20.00 20 SD-02 Shop Drawings Fire extinguishing system 1.3.1.1 G SD-03 Product Data Pipe, fittings, and mechanical 2.19.1 G couplings [Deluge] [Pre-action] valves 2.1.3 G Valves 2.19.5 G Water motor alarms 2.11.1 G Sprinkler heads 2.1.1 G Monitor nozzles 2.16 G Hose and nozzles 2.17 G Pipe hangers and supports 2.19.4 G Pressure switch 2.11.3.1 G Fire department inlet connections 2.19.11 G Tank mounted air compressor 2.12 G Air pressure regulating device 2.12 G Air compressor 2.3.1 G trouble alarm 2.11.4 G
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 140 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V
T I
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
21 13 20.00 20 Detection devices 2.2 G Storage batteries 2.2.2.1 G Alarm bells 2.11.2 G Alarm horns 2.11.2 G Annunciator panel 2.2.1.3 G Foam hydrants 2.18 G AFFF concentrate storage tanks 2.15.3 G Proportioning equipment 2.14 G AFFF concentrate 2.13 G Strainers 2.19.3 G Manual release stations 2.5 G Backflow preventers 2.19.12 G Control panel 2.2.1 G Battery charger 2.2.2.2 G SD-05 Design Data Hydraulic calculations 1.3.1.2 G Pressure discharge graphs or 1.3.1.2 G tables Battery standby power 1.3.1.2 G requirements calculations System surge analysis 1.3.1.2 G SD-06 Test Reports 2-wire smoke detectors 2.7 G Preliminary tests 3.8.1 G Acceptance tests 3.8.2 G
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 140 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V
T I
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
21 13 20.00 20 diaphragm pressure 2.14.1 G proportioning tanks SD-07 Certificates Qualifications of installer 1.5.1 G AFFF containment and disposal 1.3.1.3 G plan Backflow preventers 2.19.12 G SD-10 Operation and Maintenance Data [Deluge] [Pre-action] valves 2.1.3 G Tank mounted air compressor 2.12 G Proportioning equipment 2.14 G Control panel 2.2.1 G AFFF concentrate storage tanks 2.15.3 G Monitor nozzles 2.16 G fire extinguishing system 1.3.1.1 G SD-11 Closeout Submittals As-built drawings for the fire 1.3.1.4 G extinguishing system 21 13 24.00 10 SD-02 Shop Drawings Detail Drawings 1.4.3 G As-built Drawings 1.4.1 SD-03 Product Data Materials and Equipment 2.1 G Spare Parts 1.5 AFFF System 1.2 G
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 140 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V
T I
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
21 13 24.00 10 Installer's Qualifications 1.4.2 G Post-discharge Test 3.6.4 G Requirements SD-06 Test Reports Test Reports 3.6.4 SD-07 Certificates Materials and Equipment 2.1 G SD-10 Operation and Maintenance Data Operation and Maintenance 3.8 G Manuals 21 13 26.00 40 SD-01 Preconstruction Submittals Material, Equipment, and Fixture Part 2 G Lists Record of Existing Conditions 1.4 G SD-02 Shop Drawings Connection Diagrams Part 2 G Control Diagrams Part 2 G Installation Drawings 1.4 G SD-03 Product Data Equipment and Performance Part 2 G Data Equipment Foundation Data Part 2 G Piping Materials Part 2 G Aboveground Piping Systems 2.3.7 G Valves Part 2 G
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 140 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V
T I
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
21 13 26.00 40 Detection Systems 2.3.5 G Alarms Part 2 G Sprinkler Heads Part 2 G Supporting Elements Part 2 G SD-04 Samples Manufacturer's Standard Color 3.1.3 G Charts SD-05 Design Data Design Analysis and Calculations Part 2 G SD-06 Test Reports Pressure Tests 3.2 G System Tests 3.2 G Operating Tests 3.2 G SD-07 Certificates Listing of Product Installations 1.3 G Piping Materials Part 2 G Aboveground Piping Systems 2.3.7 G Valves Part 2 G Detection Systems 2.3.5 G Alarms Part 2 G Air Compressor Part 2 G Sprinkler Heads Part 2 G Supporting Elements Part 2 G SD-10 Operation and Maintenance Data
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 140 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V
T I
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
21 13 26.00 40 Operation and Maintenance 3.4.1 G Manuals 21 21 01.00 10 SD-02 Shop Drawings Piping layout 1.3 Electrical wiring diagrams 1.3.1 SD-03 Product Data Storage cylinders Discharge head Manifolds Discharge alarm 2.9 Pipe and fittings 2.3 Pipe hangers and supports 2.4.3 Actuating stations 2.6 Pressure switch 2.6.3 Control panel 2.6.5 Smoke detectors 2.7.1 Heat activated detectors 2.7.2 Alarm horns 2.9.2 Visual alarms 2.9.3 Dampers 2.11 Main and reserve switch Warning signs 2.9 Storage batteries 2.6.6.1 Battery charger 2.6.6.2
System calculations 1.3.2
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 140 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V
T I
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
21 21 01.00 10 Calculations substantiating 2.6.6.1 battery capacity Open-area smoke detectors 1.3.2 calculations SD-06 Test Reports Preliminary tests 3.5.1 SD-07 Certificates Qualifications of installer 1.5.1 SD-10 Operation and Maintenance Data Discharge head Control panel 2.6.5 21 21 03.00 10 SD-02 Shop Drawings Installation Drawings 1.4.3 G SD-03 Product Data Similar Services 1.4 Standard Products 2.1 G Preliminary Tests 3.2 G Final Acceptance Tests 3.3 G Field Training 3.4 SD-06 Test Reports Preliminary Tests 3.2 Final Acceptance Tests 3.3 SD-07 Certificates Installation Technician 1.4.2 G Installation Drawings 1.4.3 G
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 140 PAGES
T I V I
A N S M I T T
R A G # R A
V
C T L A O S R S I A F / I E C A R T E I V
T I
T I
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
21 21 03.00 10 SD-10 Operation and Maintenance Data Operation and Maintenance 3.4 Instructions 21 30 00 SD-01 Preconstruction Submittals Fire Pump Installation Related 1.3 Submittals Fire Protection Specialist 1.7.1 G SD-02 Shop Drawings Installation Drawings 3.3.1 G As-Built Drawings 3.11.2 G Piping Layout 3.3.2 G Pump Room 3.3.2 G
Catalog Data 2.1 G