PROJECT SYNOPSIS
INSTALL KITCHEN AND BREAKROOM
Building 40001 Project No. AD003136P
DESCRIPTION OF WORK:
The work shall be located at building 40001, located at the intersection of Motor Pool Rd.
and 76th Street, Fort Hood Texas. The exact location will be shown by the Contracting Officer. Building(s) will be occupied during performance of work under this Contract.
The purpose of this project is to install a 24’x40’ mezzanine inside the bay area of building 40001, and construct a kitchen and breakroom below it to service the building.
This includes but is not limited to the construction of walls, cabinets, windows, and doors, as well as the rerouting of existing infrastructure to support this requirement.
The following drawings are included as part of the Solicitation.
G-101 COVER SHEET
A-001E GENERAL ARCHITECTURAL PLAN - AREA E
A-101 KITCHEN PLANS
A-301 WALL TYPES
A-401 INTERIOR ELEVATIONS
A-501 ARCHITECTURAL DETAILS I
A-502 ARCHITECTURAL DETAILS II
A-602 DOOR AND WINDOW SCHEDULES
E-101 POWER PLAN
E-102 LIGHTING PLAN
F-101 FIRE PROTECTION PLAN
One set of solicitation documents, including plans, specifications, and miscellaneous data, will be furnished to the contractor in Adobe PDF format. After award, one set of Adobe PDF contract drawings and PDF specifications, and one set of MicroStation format drawings (if available) will be furnished to the Contractor on CD. Reference publications will not be furnished. Contractor shall immediately check furnished drawings and notify the Government of any discrepancies.
A project construction sign will not be required for this project. Contractor shall keep all permits and other documents required to be on the job site in a 3-ring binder or posed on a bulletin board within the construction area.
PERFORMANCE PERIOD: Barring any contingencies that arise during construction, the Government requires this project be completed within 150 calendar days.
Completion is defined as completion of all contractual obligations.
IDENTIFICATION OF THE PROCUREMENT TEAM:
Contracting Officer (ACO): The Contracting Officer has sole authority to obligate the Government.
Contracting Officer's Representative (COR): The COR is appointed by the Contracting Officer and serves as the Government's technical representative and primary point of contact in the field following contract award. The COR will inspect various phases of work in progress to ensure the 3-phase inspection plan is in place and being adhered to. The COR will perform all inspection and acceptance on behalf of the Government for this project.
Project Manager: The Project Manager developed and reviewed this requirement, and will participate in further developing the project through negotiation of a firm fixed price. The PM will serve as the technical liaison between the Government (fire and safety staff) and the contractor in clarifying work requirements, performance standards, and other technical requirements.
Following contract award, the Project Manager is accessible only through coordination with the COR.
Design Engineer: Design Engineer developed this requirement, and will participate in further developing and reviewing the project through negotiation of a firm fixed price with the Project Manager. The DE will serve as a technical liaison to the in clarifying work requirements, performance standards, and other technical requirements. Following contract award, the Design Engineer is accessible only through coordination with the COR to the PM.