0010867356 AD002336P

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this solictation amendment is to answ er questions from industry and adjust the Period of Performance for this solicitation.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Sep-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91151-16-B-0034

X 9B. DATED (SEE ITEM 11)

25-Aug-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Sep-2016

CODE

MISSION AND INSTALLATION CONTRACTING

MISSION CONTRACTING OFFICE (MCO)

BUILDING 1001, ROOM W103

1001 761ST TANK BATTALION AVE

FORT HOOD TX 76544-5025

W91151 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91151-16-B-0034

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The contractor period of performance end date has increased by 30 days from 180 days to 210 days.

The required performance has changed from A Bid Bond is required (see section 00100, FAR Clause 52.228-1).Performance and Payment Bonds are required (see section 00700, FAR Clause 52.228-15).As required by FAR 36.204, the estimated magnitude of this project is between $250,000 and $500,000.The NAICS for this acquisition is 238220, Plumbing, Heating and Air-Conditioning Contractors (SB size standard $15 million).This acquisition is 100% set aside for Historically Underutilized Business Zones (HUBZone) concerns only; no large business bids will be accepted for this procurement.The awardee of this contract will be required to provide a dedicated Superintendent through completion of the project (see section 00700, FAR Clause 52.236-6).Project Manager, Quality Control and Superintendent positions are considered key positions. These positions SHALL not be subcontracted below the prime contractor.Bidders are required to provide a valid CAGE Code (Block 14 CODE), DUNS Code (Block 14 FACILITY), POC and email address w ith their bid. to A Bid Bond is required (see section 00100, FAR Clause 52.228-1).Performance and Payment Bonds are required (see section 00700, FAR Clause 52.228-15).As required by FAR 36.204, the estimated magnitude of this project is between $500,000 and $1.000,000.The NAICS for this acquisition is 238220, Plumbing, Heating and Air-Conditioning Contractors (SB size standard $15 million).This acquisition is 100% set aside for Historically Underutilized Business Zones (HUBZone) concerns only; no large business bids will be accepted for this procurement.The awardee of this contract will be required to provide a dedicated Superintendent through completion of the project (see section 00700, FAR Clause 52.236-6).Project Manager, Quality Control and Superintendent positions are considered key positions.

These positions SHALL not be subcontracted below the prime contractor.Bidders are required to provide a valid CAGE Code (Block 14 CODE), DUNS Code (Block 14 FACILITY), POC and email address w ith their bid..

The following have been modified:

SYNOPSIS

PROJECT SYNOPSIS

Repair Domestic Water Lines

Project No. AD002336P

DESCRIPTION OF WORK:

The work shall be located at Building 91220, located at the intersection of Clear Creek and Headquarters Ave, West Fort Hood Texas. The exact location will be shown by the Contracting Officer. Building(s) will not be occupied during performance of work under this Contract.

The purpose of this project is to replace the domestic, main water lines in Building 91220.

The following drawings are included as part of the Solicitation.

G-101 COVER SHEET

C-101 SITE PLAN - UTILITIES

P-101A ADMIN. AREA-1ST FLOOR PLUMBING PLAN

P-101B ZONE 5- 1ST FLOOR PLUMBING PLAN

P-101C ZONE 6- 1ST FLOOR PLUMBING PLAN

P-501 DOMESTIC HOT WATER PIPING DIAGRAM

P-502 DOMESTIC COLD & HOT WATER RISER DIAGRAM

P-601 MECHANICAL SCHEDULES

ROY.CANTRELL

Highlight

ROY.CANTRELL

Highlight

ROY.CANTRELL

Highlight

W91151-16-B-0034

One set of solicitation documents, including plans, specifications, and miscellaneous data, will be furnished to the contractor in Adobe PDF format. After award, one set of Adobe PDF contract drawings and PDF specifications, and one set of MicroStation format drawings (if available) will be furnished to the Contractor on CD. Reference publications will not be furnished. Contractor shall immediately check furnished drawings and notify the Government of any discrepancies.

A project construction sign will be required for this project. Contractor shall keep all permits and other documents required to be on the job site in a 3-ring binder or posed on a bulletin board within the construction area.

PERFORMANCE PERIOD: Barring any contingencies that arise during construction, the Government requires this project be completed within 210 calendar days. Completion is defined as completion of all contractual obligations.

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been added by full text:

RESPONSE TO INDUSTRY QUESTIONS

W91151-16-B-0034 Repair Domestic Water Supply

Request for Information Responses

1. “The Contractor shall provide written verification of being in the normal business of Plumbing as a prime contractor for a minimum of 5 years performing Plumbing work, utilizing the NAICS 238220, Plumbing, Heating and Air-Conditioning Contractors”

Contractor shall provide contract numbers, contract title, dollar amount of contract, agency worked for and short synopsis of the contract work performed.

2. The magnitude of the procurement is extimated to be between $500,000 and $1,000,000 is posted on FBO, but within the solicitation documents it is showing the estimated magnitude is between $250,000 and $500,000. Which is correct?

The estimated magnitude is between $500,000 and $1,000,000.

(End of Summary of Changes)