Amendment_01_16-B-0009.pdf

PDF 61 KB Posted

Attached to
Replace HVAC System with new Federal contract opportunity
Solicitation number
W91151-16-B-0009
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood

About this file

Amendment 01- 16-B-0009

View the file

Other files for this federal contract opportunity

Other files attached to Replace HVAC System with new, newest first.
File Type Posted
Bid_Abstract--16-B-0009_Repair_HVAC_Bldg_10040.pdf PDF
16-B-0009_Repair_HVAC_System _Bldg_10040.docx DOCX document
TE_B-_Revised_Drawing.pdf PDF
Site_Visit_Log.pdf PDF
TE_B_Drawings.pdf PDF
Attachment_1-Appendix_A_01-11-2016.pdf PDF
IFB_16-B-0009.pdf PDF
TE_A_Specifications_1-11-16.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0010781426 AD010994P

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The solicitation w as amended to provide response for industry RFIs, revised SOW and TE B revised draw ings and to incorporate in full text clauses 52-228-1 Bid Guarantee and 52.228-15 Bid bond.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-Apr-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91151-16-B-0009

X 9B. DATED (SEE ITEM 11)

05-Apr-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-Apr-2016

CODE

MISSION AND INSTALLATION CONTRACTING

MISSION CONTRACTING OFFICE (MCO)

BUILDING 1001, ROOM W103

1001 761ST TANK BATTALION AVE

FORT HOOD TX 76544-5025

W91151 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91151-16-B-0009

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

RFI RESPONSES

16-B-0009 RFIs-responses

On the plans it says we will do Test and Balance but it does not mention commissioning. Will this be required?

TA&B is required for this contract, but commissioning is not required.

There is a wooden set of steps that the new gas line will have to run under. When we take down these steps they may not go back together very well. Should we include a more permeate set of steps? If so, how would you like them? The wooden stairs is to remain, contractor shall run the new gas line around the wooden stairs and shall bury the gas line 2’ underground w/ trace tape.

On plan page D-101 #4 it states that 2 windows will be demo’d. The duct that will go back in the holes will not be the same size. What do you want the extra space filled in with Sheet metal? Contractor shall fill/patch the extra space with mini. 3’’ insulated sheet metal and seal tight the holes.

On plan page D-101 #6 it states that the roof opening will be patched and we are to match the existing. At the job site visit we couldn’t tell what the existing roof was. What is the existing roof? Any roof opening that exist and there is no need for it, shall be demolished and capped. (Leave two opening for the flue stacks of the two furnaces, the rest shall be demo’d and capped)

There are several places where the 38” x 38” transfer grills are to be removed. Would it be ok to to seal these openings with insulation and cover with sheet metal and paint to match existing? No, the transfer grills shown for demolition shall be patched and painted to match existing.

On plan page M-102 #6 it states to install a fire rated wall and ceiling. Can you provide a wall detail?

The wall openings in the mechanical room, where ductwork pass through, shall be sealed with fire rated material.

(Two hours, fire rated sheet rock)

At the job site we will have to replace some ceiling grid and ceiling tile were needed. When we lifted the ceiling tile there was no insulation above the tile. When we replace the tile it will we be required to put insulation in as well?

In some places insulation will not fit between the ceiling tile and the duct. See sheet D-101, note # 11. Demo ceiling tiles and grid where needed and install new to match existing. So, if there is no insulation already exist in place then there’s no need for insulation.

We also noticed that the ceiling tile through- out the building isn’t in the best shape. When we replace SOME of it, the REST of it will look bad. Would you like us to replace ALL the ceiling tile and grid in the areas where we will be working? No, only replace some ceiling grid and ceiling tiles were needed.

Who is responsible for moving the furniture where we are working? Contractor shall be responsible for moving/ shifting the furniture around the construction area and shall be responsible to put it back in its original place when work is complete.

Drawings call to demo out existing boiler flue. Please confirm if roof is under warranty and whom holds this warranty if so? Yes, the roof is still under warranty, the contractor will be responsible for any damages to the roof if any damages happen during construction. (The roof was installed by Johnson roofing)

Please provide detail showing the factory mixing box. It is not standard on up flow furnace to have factory mixing box. This is normally done with dampers in the return and outside air ductwork. Is this acceptable? The mixing box may be not standard, but it can be ordered with the furnaces. Contractor shall provide mixing boxes (factory assembled) for the new furnaces.

Please confirm the ductwork in mechanical room needs to be rigid board with white finish and ductwork on package unit needs to be rigid board with aluminum jacketing on exterior? All new ductwork shall be galvanized sheet metal and shall comply IAW SMACNA and DPW specs. Also, all new ductwork shall be insulated per DPW Specs. The ductwork on the package unit shall be insulated on the inside for outdoor ducts and insulation on outside for indoor ducts.

Please provide efficiency of AHU-1 & AHU-2? 80 % or 95%? Provide furnaces with minimum 80% efficiency.

Please advise if the government wants the equipment stands made out of angle iron with ductwork beneath unit or can the stands be made of treated wood? The equipment stands shall be made of iron, treated wood stand is not allowed.

Spec section 01 32 01.00 10, para 3.6.1 discusses periodic schedule update meetings, it states: “…the contractor’s Project Manager and scheduler must attend….” Is a separate Project Scheduler required for this project? No, the project manager and the scheduler can be one.

Spec section 01 33 00, part 1 states: “The attached submittal register contains the required items the Contractor shall submit for Government approval”. The specification is 3312 pages and the submittal register is 147 pages.

Both include contain many items that do not pertain to the scope of this project. Is the government going to provide a submittal register and specifications tailored to this project in an amendment? No, the contractor is responsible to provide submittals for all new equipment and all other accessories that required for this project. In addition, the COR might request more additional submittals if needed.

If no amendment is posted, Who makes the final determination of which spec’s are used and what items are required to be submitted? The specifications provided are general specs. Contractor shall use sections/divisions of specs that only apply to those sections of work shown on the drawings and are applicable to this project. The COR has the final decision on what to submit and what not.

If no amendment is posted, Is the contractor responsible for editing the spec’s and submittal register and include the cost of those man hours in their proposal? The contractor is responsible to provide submittals for this project.

Spec section 01 33 00, part 1 states: “all electronic submittals (disk) shall be on a CD-R disk only……….A hardcopy eng form 4025 shall accompany the CD-R and electronic form submitted by e-mail to COR. Are submittals submitted to the Government on CD with hardcopy 4025 and an e-mailed 4025 to the COR?;

“OR” are all submittals transmitted electronically to the COR as described in para 1.5.1?

All submittals shall be submitted per division 1 and as requested by the COR.

Spec section 01 33 00, para 1.10 states: “For any rejection of a submittal the QCM has 1 days to resubmit unless directed otherwise from the KO.” One day is not enough time to change, rebuild and resubmit any submittal.

Is this an error in the specifications? Contractor shall contact the KO immediately for any problems/issues with submittals or for any other projects related issues.

Spec section 01 35 13 para 1.4.9.4 discusses OPSEC Training. The website or training location is NOT in the paragraph. Will the government provide this information? Not required for this project

The Spec’s and Submittal Register call for a SWPPP and a TRAFFIC CONTROL PLAN. Are these plans required for this project? No

Spec section 01 45 01.00 20, para 3.3 states: “30 hour Federal OSHA Safety and Health Standards 29 CFR 1910 safety course EM 385-1-1 and annual refresher courses as required.” Please clarify, as we are only aware of the OSHA safety courses, not EM 385-1-1 safety courses. Safety and Health Requirements Manual (US Army Corps of Engineers EM 385-1-1)

Spec section 01 45 01.00 20, para 3.1 3-Key Personal. Is a Full time Project Manager, Full time Superintendent and Full time Quality Control Manager required? No, the only full time personal required is the superintendent.

Spec section 01 45 01.00 20, para 3 discusses the qualifications of the Project Manager, Superintendent and QCM.

It states for all, “shall not be the principle, owner, or president of the company.” Please clarify this statement; If the 3-KEY Personnel meet the minimum requirements as defined in the specification, this statement appears prejudiced against small businesses & employee owned companies. Check with the contracting office (KO) for clarification.

Has an environmental survey been conducted on the building for asbestos and lead base paint for the areas to be demo’d? There is an existing asbestos survey for the bldg.

Is the contractor responsible to conduct asbestos and lead base paint survey on the areas to be demo’d? No.

Is testing required on the new concrete? No

Reference sheet M-101, note # 2; “cap opening, patch and paint the wall to match existing.” Sheet D-101 notes #1 & #2 say; “patch wall to match existing.” Is it the Governments intent to patch the walls with CMU toothed into the existing wall? Yes, patch and paint to match existing with same material and color.

Reference sheet M-101, general notes #1 & #2, these discuss “ALL NEW DUCTWORK” in the building, however the drawing pages M101 & D-101only show partial removal. Please clarify how much of the ductwork is to be replaced with new. It is very clear on the drawings. See sheet D-101 AND M-101 for ductwork replacement.

“All new ductwork…” means all ductwork that will be removed and replaced with new as shown on the drawings.

Does the existing ductwork need to be cleaned? No

Does the insulation on the remaining existing ductwork need to be repaired and patched? Yes, as stated on sheet M-101 note #2.

Is commissioning of the HVAC system required? No

Access was not available for the roof during the site visit; what type of roof material are currently on the roof and is the roof currently under warranty? Duro-last membrane roofing system. The roof is still under warranty.

Reference sheet M-102, note 6; “install fire rated wall & ceiling…” The walls in the mechanical room are CMU except the last couple of feet to the deck. What is the government requesting in this area?

a. complete sheetrock room, walls & ceiling? b. sheetrock firewall from the top of the CMU wall to the deck?

c. sheetrock firewall from top of CMU and sheetrock ceiling?

Sheetrock fire wall from the top of the CMU wall to the deck.

What hour fire rating is required in the mechanical room area? 2 hours fire rated wall.

Does insulation need to be installed above the new ceiling tile? No

Will this building be occupied during construction? No

Will the furniture be removed before construction? No, Contractor shall be responsible for moving/ shifting the furniture around the construction area and shall be responsible to put it back in its original place when work is complete.

Is duct leak testing required? No

Is DALT testing required? No

Is 2 season TAB be required? TA&B is required for this project.

Is the bathroom exhaust fan required to be tested IAW 23 08 01.00 20? Yes

Reference sheet D-101, General Notes #11; “Demo ceiling tiles and grid where needed and install new to match existing.” The existing ceiling tiles are 2’X4’. The specification calls for 24”X24” ceiling tiles. Please clarify.

Remove and replace ceiling to match existing tiles in the bldg.

Mechanical Schedule- on M-601 Calls for CU1 and CU2 to have 2-stage compressors at 208 volt 3-phase. 2 stage systems at 4 and 5 tons are only available in single phase application. Do we need to price single stage systems at 208- 3-phase or 2 stage systems at 208- single phase? Two stage systems with 208v 1 phase. See revised drawings for details.

Mechanical Schedule on M-601 asks for AHU,s 1& 2 to be 208 volt 3 phase. The 4 and 5 ton gas furnaces are 115 volt single phase. Will 115 volt single phase power be provided for gas furnaces? Contractor shall be responsible to connect AHU-1 &2 to the existing electrical. (115v single phase power can be tied in/polled from the existing 208 v, 3 phase panel in the bldg.)

AHU 2 is 1600CFM will it still require smoke detectors for supply and return? Yes

Will fire and smoke dampers be required for return and supply ducts that are penetrating exterior and mechanical room walls? Yes, fire dampers will be required ONLY on supply and return ductwork that penetrate the mech. Room. Revised scope and drawings will be furnished to reflect these changes. (No need for fire dampers on PU-1 ducts)

Will Smoke detectors need to wire to fire alarm system or will they need a warning light and audible alarm independent of fire alarm? The smoke detectors need a warning light and audible alarm. The alarms shall be placed in the bldg. corridor and shall include a sign that reads air duct detector trouble-contact DPW.

PU 1 Calls for Barometric relief and VFD, 2-stage cooling and modulating gas valve for heat. Lay out appears to be constant volume single zone system. Will single stage cooling with 2-stage heat and factory full economizer, without VFD, exhaust, and Barometric relief be acceptable? Yes, single stage cooling with 2 stage heating and factory full economizer without VFD, exhaust and relief is acceptable for PU-1. Revised scope and drawings will be furnished to reflect all these changes.

Will PU 1 require LON Card? Yes. Also the unit shall be connected to the new DDC control panel in the mechanical room via lON trunk.

Will Existing Duct and diffusers not scheduled for demo require cleaning? No.

Please confirm that the building will be vacated prior to construction. Yes the bldg. will not be occupied during construction.

Please indicate if the existing roof is under warranty by either a certain manufacturer or roofing subcontractor. Yes the roof is still under warranty.

The specifications (most of the specs) include sections of work not shown or identified on the drawings. We understand from the pre-bid meeting that only those sections of work shown or described on the drawings are applicable to this project. Yes that is correct.

Per General Note #2 “Repair existing ductwork & piping insulation if damaged” We were unable to look above the ceiling at the Site Visit to inspect the existing insulation. What percentage of existing insulation should we assume will be repaired? 10%

Per General Note #12 “Test & Balance to shown CFM” CFM requirements & neck sizes are not shown for the Return Air Grilles. There is not a Grill Schedule on the drawings. Please provide CFM requirements in order to provide Certified Test & Balance. Cfm for return grills and neck sizes will be provided, see revised scope and drawings for details.

Per General Note #11 “Demo ceiling tiles and grid where needed, and install new to match existing” For bidding purposes what percentages of ceiling tile and grid are we to assume to replace? Approximately 1000 square feet.

Is any commissioning needed for this project No General Note #10 “Install smoke detector on supply and return ducts. Wire to shut down units.” Will the smoke detectors have to be tested and certified, when complete? Yes

Install fire rated wall and ceiling and seal all penetrations (concrete wall & ceiling are not required fire wall or ceiling) Please clarify. See response above for the same question.

SECTION 00010 - SOLICITATION CONTRACT FORM

The Issued By organization has changed from

MISSION AND INSTALLATION CONTRACTING CMD

MISSION CONTRACTING OFFICE (MCO)

BUILDING 1001, ROOM W103

1001 761ST TANK BATTALION AVE

FORT HOOD TX 76544-5025

to

MISSION AND INSTALLATION CONTRACTING

MISSION CONTRACTING OFFICE (MCO)

BUILDING 1001, ROOM W103

1001 761ST TANK BATTALION AVE

FORT HOOD TX 76544-5025

TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit A TE A Specifications 3312 11-JAN-2016 Exhibit B TE B Drawings 8 02-JUN-2015 Attachment Attachment Appendix A 111 11-JAN-2016

Specifications to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit A TE A Specifications 3312 11-JAN-2016 Exhibit B TE B Revised Drawings 8 02-JUN-2015 Attachment Attachment Appendix A

Specifications

111 11-JAN-2016

REVISED SOW

REVISED PROJECT SYNOPSIS

REPAIR HVAC SYSTEM

Building 10040 Project No. AD010994P

APR 20, 2016

DESCRIPTION OF WORK:

The work shall be located at building 10040, located at the intersection of Battalion Ave and 25th St., Fort Hood Texas. The exact location will be shown by the Contracting Officer. Building(s) will not be occupied during performance of work under this Contract.

The purpose of this project is to replace the HVAC System in building 10040 with new.

The following drawings are included as part of the Solicitation.

G-101 Cover Sheet and Index of Drawings C-101 Site Plan Utilities D-101 Demolition Plan – Mechanical (REVISED) M-101 Mechanical Plan – New (REVISED) M-102 Enlarged Mechanical Plan (REVISED) M-601 Mech. Schedule & Controls- Split Systems (REVISED) M-602 Mech. Schedule & Controls- Package Unit (REVISED) M-701 Mech. Controls Cont’d

One set of solicitation documents, including plans, specifications, and miscellaneous data, will be furnished to the contractor in Adobe PDF format. After award, one set of Adobe PDF contract drawings and PDF specifications, and one set of Micro-Station format drawings (if available) will be furnished to the Contractor on CD. Reference publications will not be furnished. Contractor shall immediately check furnished drawings and notify the Government of any discrepancies.

A project construction sign will not be required for this project. Contractor shall keep all permits and other documents required to be on the job site in a 3-ring binder or posted on a bulletin board within the construction area.

PERFORMANCE PERIOD: Barring any contingencies that arise during construction, the Government requires this project be completed within 120 calendar days. An additional 30 days will be added to the project completion dated to account for processing of award. Completion is defined as completion of all contractual obligations.

The following have been deleted:

SYNOPSIS

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be 20% percent of the bid price or $3,000,000, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of provision)

SECTION 00700 - CONTRACT CLAUSES

The following have been added by reference:

52.242-13 Bankruptcy JUL 1995 252.201-7000 Contracting Officer's Representative DEC 1991

The following have been deleted:

52.242-13

The following were previously included by reference and are now included by full text:

52.228-15 PERFORMANCE AND PAYMENT BONDS--CONSTRUCTION (OCT 2010)

(a) Definitions. As used in this clause--

Original contract price means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.

(b) Amount of required bonds. Unless the resulting contract price is $150,000 or less, the successful offeror shall furnish performance and payment bonds to the Contracting Officer as follows:

(1) Performance bonds (Standard Form 25). The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.

(2) Payment Bonds (Standard Form 25-A). The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.

(3) Additional bond protection. (i) The Government may require additional performance and payment bond protection if the contract price is increased. The increase in protection generally will equal 100 percent of the increase in contract price.

(ii) The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond.

(c) Furnishing executed bonds. The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer, within the time period specified in the Bid Guarantee provision of the solicitation, or otherwise specified by the Contracting Officer, but in any event, before starting work.

(d) Surety or other security for bonds. The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier's check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the Federal Register or may be obtained from the U.S. Department of the Treasury, Financial Management Service, Surety Bond Branch, 3700 East West Highway, Room 6F01, Hyattsville, MD 20782. Or via the internet at http://www.fms.treas.gov/c570/.

(e) Notice of subcontractor waiver of protection (40 U.S.C. 3133(c)). Any waiver of the right to sue on the payment bond is void unless it is in writing, signed by the person whose right is waived, and executed after such person has first furnished labor or material for use in the performance of the contract.

(End of clause)

(End of Summary of Changes)