This document contains questions and answers related to a federal contract opportunity for the delivery of dry ice to the Landstuhl Regional Medical Center in Germany.

The key details are:

  • The contract is for the weekly delivery of 800 kg of dry ice in the form of 3-16 mm pellets or nuggets, with a maximum container size of 300 kg.
  • The delivery period is from October 1, 2024 to September 30, 2025.
  • The contractor is responsible for providing all unloading equipment and personnel, and following security protocols for accessing the delivery site.
  • Payments will be processed through WAWF in accordance with FAR 52.212-4.
  • Quality assurance involves inspection of the delivered dry ice, with the government reserving the right to require repair, replacement, or price reduction for nonconforming items.
  • The government anticipates no changes to the 800 kg weekly quantity during the contract period.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W9114F24QA001 Questions and Answers.xlsx

Industry Question Government Answer Is one delivery per week with 800 kg of dry ice enough?

As per Deliveries or Performance, Delivery Schedule "800 Kilogram Weekly 52 Weeks 52 Expected Shipments"

What nugget diameter size of dry ice do you need?

According to the Salient Characteristics in the Addendum to 52.212-1 Instructions to Offerors, Page 27 of 29, "Dry ice with a diameter of 3 mm to 16 mm in the form of pellets or nuggets".

Provide weekly dry ice deliveries of 800 kg.

Maximum size per shipping container is 300

kg. Delivered dry ice shall Does the specification of max. 300 kg per dry ice container refer to the contents of the container?

Or is 300 kg the total weight with container and dry ice content?

Weight measurements in kg refer to contents of container.

1. Delivery Specifications:

- Delivery Schedule: Is there a preferred day and time for the weekly delivery, or is there flexibility in scheduling?

Preferred delivery day/time is Monday 0900, excluding German and US holidays, which then fall on the next working day.

- Unloading Requirements:

Will a forklift or other unloading equipment be provided at the delivery site? If not, should we arrange for our supplier to bring the necessary unloading aids, such as ramps?

Delivered dry ice shall be independently unloaded at the delivery address.

All unloading equipment, personnel and delivery note shall be provided by supplier.

- Access and Security:

Are there any specific security protocols or access requirements that our delivery personnel need to follow when entering the Landstuhl Regional Medical Center?

It is preferred that the driver obtain gate access. See additional information in AE REG 190-16 Installation Access Control for the U.S. Forces in Europe at https://www.aepubs.eur.army.mil/AE-Regulations/smdsearch8659/190-16/.

If this is not possible, the driver shall call the number provided 20 minutes before arrival so that the person can be signed in for delivery and escorted to the delivery location.

2. Product and Container Details:

- Dry Ice Specifications: Are there any specific requirements for the dry ice 3mm to 16mm, such as purity levels, that we need to be aware of?

According to the Salient Characteristics in the Addendum to 52.212-1 Instructions to Offerors, Page 27 of 29, "Dry ice with a diameter of 3 mm to 16 mm in the form of pellets or nuggets".

- Container Size and Handling:

You mentioned a maximum container size of 300 kg.

Would you prefer multiple containers per delivery, or can our supplier use the 200 kg or 400 kg containers we have available? If using 400 kg containers, will unloading equipment be available on-site? (Please note that we will use boxes with a capacity of approx. 200kg. Otherwise, we have to use 400kg boxes and fill in 300kg, but then the client have to grant a forklift or other uploading aids. There are no 300kg available)

According to Item 0001 Description "Maximum size per shipping container is 300 kg (net weight).

Delivered dry ice shall be independently unloaded at the delivery address below.

All unloading equipment, personnel and delivery note shall be provided by supplier.

Commercial shipment included at no additional cost to the following location:

Landstuhl Regional Medical Center (LRMC) Department of Pathology and Area Laboratory Services (DPALS)

BLDG 3711

66849 Landstuhl, Germany "

3. Documentation and Compliance:

- Required Documentation:

Are there any specific certifications, permits, or documents required by your department for the delivery of dry ice?

See information in AE REG 190-16 Installation Access Control for the U.S. Forces in Europe at https://www.aepubs.eur.army.mil/AE-Regulations/smdsearch8659/190-16/.

However, a delivery note is required that indicates at least the quantity of dry ice delivered in kg.

- VAT and Tax Considerations:

Are there any VAT or Tax implications we need to consider, given that our company is based in India but the deliveries Are within Germany?

Please read and follow the instruction of 252.229-7001 Tax Relief (Alternate I) which is included in the solicitation.

4. Contingency Planning:

- Handling Delays or Issues:

In the event of any delays or issues with delivery, what is your preferred method of communication, and how quickly would you require updates?

In case of delivery delays or issues, it is preferred calling the number provided within 4 hours.

- Volume Changes:

Do you anticipate any changes in the required weekly quantity of 800 kg during the contract period?

A change in the requested quantity is not foreseeable.

Delivery Schedule:

Is the weekly delivery schedule flexible in terms of the day or time of delivery?

Preferred delivery day/time is Monday 0900, excluding German and US holidays, which then fall on the next working day.

Can deliveries be adjusted for holidays or unforeseen events?

In accordance with FAR clause 52.212-4 (c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties. Deliveries that fall on a German or US holiday shall be made on the next working day.

In accordance with FAR clause 52.212-4 (f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.

See https://www.acquisition.gov/far/52.212-4 for additional details.

Container Specifications:

Are there any specific requirements or preferences for the type or material of the shipping containers provided by the vendor?

They shall be reusable hard-shell containers.

Are reusable containers preferred or required?

Containers shall be reusable.

Unloading Requirements:

What are the exact requirements for unloading the dry ice at the delivery location?

Delivered dry ice shall be independently unloaded at the delivery address.

All unloading equipment, personnel and delivery note shall be provided by supplier.

Are there any special equipment or personnel needed to meet the unloading requirements?

Delivered dry ice shall be independently unloaded at the delivery address.

All unloading equipment, personnel and delivery note shall be provided by supplier.

Payment Terms:

Are there specific payment terms associated with the firm fixed price contract?

All payments will be processed through WAWF. See DFARS Clause 252.232-7006 WAWF Payment Instructions for details.

In accordance with FAR clause 52.212-4 (g) Invoice.

(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include-

(i) Name and address of the Contractor;

(ii) Invoice date and number;

(iii) Contract number, line item number and, if applicable, the order number;

(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;

(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;

(vi) Terms of any discount for prompt payment offered;

(vii) Name and address of official to whom payment is to be sent;

(viii) Name, title, and phone number of person to notify in event of defective invoice; and

(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.

(x) Electronic funds transfer (EFT) banking information.

(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.

(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer-System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer-Other Than System for Award Management), or applicable agency procedures.

(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.

(2) Invoices will be handled in accordance with the Prompt Payment Act ( 31 U.S.C.3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR Part 1315.

See https://www.acquisition.gov/far/52.212-4 for additional details.

How frequently will payments be made, and is there any possibility for advance payments or milestones?

In accordance with FAR clause 52.212-4 (i) Payment.-

(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.

(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C.3903) and prompt payment regulations at 5 CFR Part 1315.

(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause. etc.

See https://www.acquisition.gov/far/52.212-4 for additional details.

Quality Assurance:

What are the procedures for quality assurance upon delivery?

In accordance with FAR clause 52.212-4 (a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights-

(1) Within a reasonable time after the defect was discovered or should have been discovered; and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

See https://www.acquisition.gov/far/52.212-4 for additional details.

Will there be inspections or quality checks performed at the delivery site, and what are the consequences of noncompliance with the dry ice specifications?

Delivered dry ice is inspected at time of delivery and documented on the delivery note.

In accordance with FAR clause 52.212-4 (a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights-

(1) Within a reasonable time after the defect was discovered or should have been discovered; and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

See https://www.acquisition.gov/far/52.212-4 for additional details.

Contingency Plans:

What are the contingency plans if the vendor is unable to deliver the dry ice as scheduled due to unforeseen circumstances, such as supply chain disruptions?

In accordance with FAR clause 52.212-4 (f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.

See https://www.acquisition.gov/far/52.212-4 for additional details.

Historical Data:

Can you provide any historical data on past consumption or any anticipated changes in the weekly quantity requirements throughout the contract period?

Past consumption has been 800 kg per week. A change in the requested quantity is not foreseeable.