B06 Solicitation QnA W90WL521Q0010.docx
DOCX document 15 KB Posted
- Attached to
- G-32 Weather Cover Federal contract opportunity
- Solicitation number
- W90WL521Q0010
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B08 G32 COVER 50 Wide.pdf | ||
| B08 Cover Site.jpg | JPG image | |
| Required Soliciation Clause Fill-In FAR 52.204-24.docx | DOCX document | |
| A03 ISOMETRIC.PNG | PNG image | |
| W90WL521Q0010.pdf | ||
| ufc_3_301_01_2019.pdf | ||
| A03 END VIEW.PNG | PNG image |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W90WL521Q0010 Pre-Award Q&A G-32 Weather Cover
1. Provide type, gauge, size of steel girder, beam and post:
Government Response: The structure is to be designed by the building manufacture. That includes all member sizes and connections. Building must meet UFC 3-301-01, local and national building codes.
2. Provide color of roof (different colors have different cost and availability), type of SSMR?
Government Response: Color of the roof shall be white or galvalume.
3. Provide type of connection (welding and type or nuts/bolts and size) location connection:
Government Response: The structure is to be designed by the building manufacture. That includes all member sizes and connections. Connections can be welded or bolted. Building must meet UFC 3-301-01, local and national building codes.
4. Provide type, size, gauge of base/connection plates:
Government Response: The structure is to be designed by the building manufacture. That includes all member sizes and connections. Building must meet UFC 3-301-01, local and national building codes.
5. Provide type of epoxy:
Government Response: The structure is to be designed by the building manufacture. That includes all member sizes and connections. Building must meet UFC 3-301-01, local and national building codes.
6. Hot work permit required?
Government Response: Hot work permits are a requirement on TEAD. Hot work permits can be issued if needed.
7. How tall is the Lightning protection system:
Government Response: The height measured is approximately 60 feet.