B06 Solicitation QnA W90WL521Q0010.docx

DOCX document 15 KB Posted

Attached to
G-32 Weather Cover Federal contract opportunity
Solicitation number
W90WL521Q0010
Issued by
Department of the Army Materiel Command Contracting Command Rock Island Arsenal

View the file

Other files for this federal contract opportunity

Other files attached to G-32 Weather Cover, newest first.
File Type Posted
B08 G32 COVER 50 Wide.pdf PDF
B08 Cover Site.jpg JPG image
Required Soliciation Clause Fill-In FAR 52.204-24.docx DOCX document
A03 ISOMETRIC.PNG PNG image
W90WL521Q0010.pdf PDF
ufc_3_301_01_2019.pdf PDF
A03 END VIEW.PNG PNG image

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W90WL521Q0010 Pre-Award Q&A G-32 Weather Cover

1. Provide type, gauge, size of steel girder, beam and post:

Government Response: The structure is to be designed by the building manufacture. That includes all member sizes and connections. Building must meet UFC 3-301-01, local and national building codes.

2. Provide color of roof (different colors have different cost and availability), type of SSMR?

Government Response: Color of the roof shall be white or galvalume.

3. Provide type of connection (welding and type or nuts/bolts and size) location connection:

Government Response: The structure is to be designed by the building manufacture. That includes all member sizes and connections. Connections can be welded or bolted. Building must meet UFC 3-301-01, local and national building codes.

4. Provide type, size, gauge of base/connection plates:

Government Response: The structure is to be designed by the building manufacture. That includes all member sizes and connections. Building must meet UFC 3-301-01, local and national building codes.

5. Provide type of epoxy:

Government Response: The structure is to be designed by the building manufacture. That includes all member sizes and connections. Building must meet UFC 3-301-01, local and national building codes.

6. Hot work permit required?

Government Response: Hot work permits are a requirement on TEAD. Hot work permits can be issued if needed.

7. How tall is the Lightning protection system:

Government Response: The height measured is approximately 60 feet.