Attachment 1 Drawings.pdf

PDF 1 MB Posted

Attached to
Replace Defective Air Compressor and Valves in B410, Camp Walker
Solicitation number
W90VN9-24-R-0132
Issued by

About this file

This document is a set of drawings and specifications for a federal contract opportunity to replace a defective air compressor and related valves and piping in Building 410 at Camp Walker.

The key details are:

  • The contract will replace an existing air compressor, pressure maintenance device, pressure relief valve, ball valve, and swing check valve. New power cables and conduits will also be installed between the new compressor and the existing electrical panel.
  • The estimated price range for this contract is less than $25,000. It is a non-work plan task order solicitation under an existing MATOC (Multiple Award Task Order Contract) for Area IV contractors.
  • A site visit is required for offerors, who must have a valid Korean Identification Card. Proposals are due by 1300 KST on the closing date via email.
  • The contracting agency is the Department of the Army Materiel Command Army Contracting Command.

View the file

Other files

File Type Posted
W90VN9-24-R-0132_ Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOCATION PLAN

NTS

1/5

FEWR NO: JN-00008-3J

LOCATION : B410, CAMP WALKER

B410, CAMP WALKER

REPLACE DEFECTIVE PRESSURE

SWITCH ASSEMBLY

JN-00008-3J

THIS PROJECT

B410, CAMP WALKER

AutoCAD SHX Text

REVISION:

AutoCAD SHX Text

PROJECT NO:

AutoCAD SHX Text

DRAWING NO:

AutoCAD SHX Text

DRAWN:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

CHECKED:

AutoCAD SHX Text

TITLE:

AutoCAD SHX Text

SCALE AT A3:

AutoCAD SHX Text

SITE:

GENERAL NOTE

1. THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING

CONDITION AND DIMENSIONS PRIOR TO COMMENCING ANY CONSTRUCTION

AND RENOVATION.

ANY DISCREPANCIES SHALL BE BROUGHT IMMEDIATELY TO THE ATTENTION

OF THE CONTRACTING OFFICER.

2. THE CONTRACTOR SHALL BE RESPONSIBLE TO CONSTRUCT OR REPAIR ALL

DAMAGES TO EXISTING AREAS CAUSED BY THIS PROJECT AND TO MATCH

CONDITION TO ADJACENT AREAS DIRECTED BY THE CONTRACTING OFFICER.

3. THE CONTRACTOR SHALL PROVIDE, INSTALL, AND MAINTAIN ALL NECESSARY

SIGNS, LIGHTS, FLARES, BARRICADES, MARKERS, CONES AND OTHER

PROTECTIVE FACILITIES AND SHALL TAKE ALL NECESSARY PRECAUTIONS FOR

THE PROTECTION AND SAFETY OF THE PUBLIC AND/OR MILITARY TRAFFIC AND

OPERATIONS.

4. THE CONTRACTOR SHALL COORDINATE ALL PHASE OF WORK WITH THE

CONTRACTING OFFICER AND USER.

5. THE CONTRACTOR SHALL TAKE MEASURES TO PROTECT EXISTING FACILITIES

AND ANY DAMAGES THAT MAY OCCUR DURING THE COURSE OF HIS WORK

SHALL BE RESTORED AT THE EXPENSE OF THE CONTRACTOR.

6. THE CONTRACTOR SHOULD COORDINATE ANY SALVAGEABLE AND

RECYCLABLE MATERIALS WITHIN PROJECT LIMIT WITH COR CAREFULLY TO

DETERMINE PROPER MATERIAL HANDING METHODS.

7. ALL ELECTRICAL WORK SHALL CONFORM TO THE LATEST REQUIREMENTS OF

THE NATIONAL CODE, NATIONAL ELECTRICAL SAFETY CODE, FIRE CODE,

TECHNICAL STANDARD SPECIFICATIONS FOR O&MA PROJECTS, AND

SPECIFICATIONS.

GENERAL NOTE

NTS

2/5

FEWR NO: JN-00008-3J

LOCATION : B410, CAMP WALKER

B410, CAMP WALKER

THIS LOCATION

REPLACE DEFECTIVE PRESSURE

SWITCH ASSEMBLY

JN-00008-3J

AutoCAD SHX Text

REVISION:

AutoCAD SHX Text

PROJECT NO:

AutoCAD SHX Text

DRAWING NO:

AutoCAD SHX Text

DRAWN:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

CHECKED:

AutoCAD SHX Text

TITLE:

AutoCAD SHX Text

SCALE AT A3:

AutoCAD SHX Text

SITE:

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

F

CURRENT SITE CONDITION

3/5

FEWR NO: JN-00008-3J

LOCATION : B410, CAMP WALKER

B410, CAMP WALKER

KEY PLAN

REPLACE DEFECTIVE PRESSURE

SWITCH ASSEMBLY

JN-00008-3J

EXISTING TRANSFORMER

EXISTING AIR DUCTS

COMPRESSOR

BOILER

HVAC

AIR

DUCT

TR

REFERENCE PICTURE

FLOOR PLAN

UNIT : MM

P/N

AutoCAD SHX Text

REVISION:

AutoCAD SHX Text

PROJECT NO:

AutoCAD SHX Text

DRAWING NO:

AutoCAD SHX Text

DRAWN:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

CHECKED:

AutoCAD SHX Text

TITLE:

AutoCAD SHX Text

SCALE AT A3:

AutoCAD SHX Text

SITE:

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

DUCT REMOVAL PLAN

4/5

FEWR NO: JN-00008-3J

LOCATION : B410, CAMP WALKER

B410, CAMP WALKER

KEY PLAN

REPLACE DEFECTIVE PRESSURE

SWITCH ASSEMBLY

JN-00008-3J

COMPRESSOR

BOILER

HVAC

AIR

DUCT

TR

P/N

1. REMOVE AND RE-INSTALL AIR DUCTS TO MAKE SPACE FOR COMPRESSOR REPLACEMENT.

2. OLD AND NEW COMPRESSOR WILL BE MOVED THROUGH THE SPACE WHERE AIR DUCTS ARE REMOVED.

3. VALVES, PIPES, AND REQUIRED ACCESSORIES WILL BE REPLACED THROUGH THE SPACE

WHERE AIR DUCTS ARE REMOVED.

LEGEND

AutoCAD SHX Text

REVISION:

AutoCAD SHX Text

PROJECT NO:

AutoCAD SHX Text

DRAWING NO:

AutoCAD SHX Text

DRAWN:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

CHECKED:

AutoCAD SHX Text

TITLE:

AutoCAD SHX Text

SCALE AT A3:

AutoCAD SHX Text

SITE:

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

SCOPE OF WORK

1. REPLACE THE EXISTING AIR COMPRESSOR WITH NEW AIR COMPRESSOR.

2. REPLACE EXISTING ALL TUBES AND PIPES LINES WITH NEW TUBES AND PIPES.

3. REPLACE THE EXISTING PRESSURE MAINTENANCE DEVICE WITH NEW PRESSURE MAINTENANCE DEVICE.

4. REPLACE THE EXISTING PRESSURE RELIEF VALVE WITH NEW PRESSURE RELIEF VALVE.

5. REPLACE THE EXISTING BALL VALVE WITH NEW BALL VALVE.

6. REPLACE THE EXISTING SWING CHECK VALVE WITH NEW SWING CHECK VALVE.

7. REPLACE EXISTING POWER CABLES AND CONDUITS WITH NEW POWER CABLES AND CONDUITS BETWEEN NEW

AIR COMPRESSOR AND EXISTING PANEL BOARD.

COMPRESSOR REPLACEMENT PLAN

NTS

5/5

FEWR NO: JN-00008-3J

LOCATION : B410, CAMP WALKER

B410, CAMP WALKER

KEY PLAN

REPLACE DEFECTIVE PRESSURE

SWITCH ASSEMBLY

JN-00008-3J

COMPRESSOR

BOILER

HVAC

TR

P/N

M S

R

AutoCAD SHX Text

REVISION:

AutoCAD SHX Text

PROJECT NO:

AutoCAD SHX Text

DRAWING NO:

AutoCAD SHX Text

DRAWN:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

CHECKED:

AutoCAD SHX Text

TITLE:

AutoCAD SHX Text

SCALE AT A3:

AutoCAD SHX Text

SITE:

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

1
Sheets and Views
Model
2
Sheets and Views
Model
3
Sheets and Views
Model
4
Sheets and Views
Model
5
Sheets and Views
Model

File details come from the government source that posted it. Updated .