Attachment 1 Drawings.pdf
PDF 1 MB Posted
- Solicitation number
- W90VN9-24-R-0132
About this file
This document is a set of drawings and specifications for a federal contract opportunity to replace a defective air compressor and related valves and piping in Building 410 at Camp Walker.
The key details are:
- The contract will replace an existing air compressor, pressure maintenance device, pressure relief valve, ball valve, and swing check valve. New power cables and conduits will also be installed between the new compressor and the existing electrical panel.
- The estimated price range for this contract is less than $25,000. It is a non-work plan task order solicitation under an existing MATOC (Multiple Award Task Order Contract) for Area IV contractors.
- A site visit is required for offerors, who must have a valid Korean Identification Card. Proposals are due by 1300 KST on the closing date via email.
- The contracting agency is the Department of the Army Materiel Command Army Contracting Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W90VN9-24-R-0132_ Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCATION PLAN
NTS
1/5
FEWR NO: JN-00008-3J
LOCATION : B410, CAMP WALKER
B410, CAMP WALKER
REPLACE DEFECTIVE PRESSURE
SWITCH ASSEMBLY
JN-00008-3J
THIS PROJECT
B410, CAMP WALKER
AutoCAD SHX Text
REVISION:
AutoCAD SHX Text
PROJECT NO:
AutoCAD SHX Text
DRAWING NO:
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
TITLE:
AutoCAD SHX Text
SCALE AT A3:
AutoCAD SHX Text
SITE:
GENERAL NOTE
1. THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING
CONDITION AND DIMENSIONS PRIOR TO COMMENCING ANY CONSTRUCTION
AND RENOVATION.
ANY DISCREPANCIES SHALL BE BROUGHT IMMEDIATELY TO THE ATTENTION
OF THE CONTRACTING OFFICER.
2. THE CONTRACTOR SHALL BE RESPONSIBLE TO CONSTRUCT OR REPAIR ALL
DAMAGES TO EXISTING AREAS CAUSED BY THIS PROJECT AND TO MATCH
CONDITION TO ADJACENT AREAS DIRECTED BY THE CONTRACTING OFFICER.
3. THE CONTRACTOR SHALL PROVIDE, INSTALL, AND MAINTAIN ALL NECESSARY
SIGNS, LIGHTS, FLARES, BARRICADES, MARKERS, CONES AND OTHER
PROTECTIVE FACILITIES AND SHALL TAKE ALL NECESSARY PRECAUTIONS FOR
THE PROTECTION AND SAFETY OF THE PUBLIC AND/OR MILITARY TRAFFIC AND
OPERATIONS.
4. THE CONTRACTOR SHALL COORDINATE ALL PHASE OF WORK WITH THE
CONTRACTING OFFICER AND USER.
5. THE CONTRACTOR SHALL TAKE MEASURES TO PROTECT EXISTING FACILITIES
AND ANY DAMAGES THAT MAY OCCUR DURING THE COURSE OF HIS WORK
SHALL BE RESTORED AT THE EXPENSE OF THE CONTRACTOR.
6. THE CONTRACTOR SHOULD COORDINATE ANY SALVAGEABLE AND
RECYCLABLE MATERIALS WITHIN PROJECT LIMIT WITH COR CAREFULLY TO
DETERMINE PROPER MATERIAL HANDING METHODS.
7. ALL ELECTRICAL WORK SHALL CONFORM TO THE LATEST REQUIREMENTS OF
THE NATIONAL CODE, NATIONAL ELECTRICAL SAFETY CODE, FIRE CODE,
TECHNICAL STANDARD SPECIFICATIONS FOR O&MA PROJECTS, AND
SPECIFICATIONS.
GENERAL NOTE
NTS
2/5
FEWR NO: JN-00008-3J
LOCATION : B410, CAMP WALKER
B410, CAMP WALKER
THIS LOCATION
REPLACE DEFECTIVE PRESSURE
SWITCH ASSEMBLY
JN-00008-3J
AutoCAD SHX Text
REVISION:
AutoCAD SHX Text
PROJECT NO:
AutoCAD SHX Text
DRAWING NO:
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
TITLE:
AutoCAD SHX Text
SCALE AT A3:
AutoCAD SHX Text
SITE:
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
F
CURRENT SITE CONDITION
3/5
FEWR NO: JN-00008-3J
LOCATION : B410, CAMP WALKER
B410, CAMP WALKER
KEY PLAN
REPLACE DEFECTIVE PRESSURE
SWITCH ASSEMBLY
JN-00008-3J
EXISTING TRANSFORMER
EXISTING AIR DUCTS
COMPRESSOR
BOILER
HVAC
AIR
DUCT
TR
REFERENCE PICTURE
FLOOR PLAN
UNIT : MM
P/N
AutoCAD SHX Text
REVISION:
AutoCAD SHX Text
PROJECT NO:
AutoCAD SHX Text
DRAWING NO:
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
TITLE:
AutoCAD SHX Text
SCALE AT A3:
AutoCAD SHX Text
SITE:
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
DUCT REMOVAL PLAN
4/5
FEWR NO: JN-00008-3J
LOCATION : B410, CAMP WALKER
B410, CAMP WALKER
KEY PLAN
REPLACE DEFECTIVE PRESSURE
SWITCH ASSEMBLY
JN-00008-3J
COMPRESSOR
BOILER
HVAC
AIR
DUCT
TR
P/N
1. REMOVE AND RE-INSTALL AIR DUCTS TO MAKE SPACE FOR COMPRESSOR REPLACEMENT.
2. OLD AND NEW COMPRESSOR WILL BE MOVED THROUGH THE SPACE WHERE AIR DUCTS ARE REMOVED.
3. VALVES, PIPES, AND REQUIRED ACCESSORIES WILL BE REPLACED THROUGH THE SPACE
WHERE AIR DUCTS ARE REMOVED.
LEGEND
AutoCAD SHX Text
REVISION:
AutoCAD SHX Text
PROJECT NO:
AutoCAD SHX Text
DRAWING NO:
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
TITLE:
AutoCAD SHX Text
SCALE AT A3:
AutoCAD SHX Text
SITE:
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
SCOPE OF WORK
1. REPLACE THE EXISTING AIR COMPRESSOR WITH NEW AIR COMPRESSOR.
2. REPLACE EXISTING ALL TUBES AND PIPES LINES WITH NEW TUBES AND PIPES.
3. REPLACE THE EXISTING PRESSURE MAINTENANCE DEVICE WITH NEW PRESSURE MAINTENANCE DEVICE.
4. REPLACE THE EXISTING PRESSURE RELIEF VALVE WITH NEW PRESSURE RELIEF VALVE.
5. REPLACE THE EXISTING BALL VALVE WITH NEW BALL VALVE.
6. REPLACE THE EXISTING SWING CHECK VALVE WITH NEW SWING CHECK VALVE.
7. REPLACE EXISTING POWER CABLES AND CONDUITS WITH NEW POWER CABLES AND CONDUITS BETWEEN NEW
AIR COMPRESSOR AND EXISTING PANEL BOARD.
COMPRESSOR REPLACEMENT PLAN
NTS
5/5
FEWR NO: JN-00008-3J
LOCATION : B410, CAMP WALKER
B410, CAMP WALKER
KEY PLAN
REPLACE DEFECTIVE PRESSURE
SWITCH ASSEMBLY
JN-00008-3J
COMPRESSOR
BOILER
HVAC
TR
P/N
M S
R
AutoCAD SHX Text
REVISION:
AutoCAD SHX Text
PROJECT NO:
AutoCAD SHX Text
DRAWING NO:
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
TITLE:
AutoCAD SHX Text
SCALE AT A3:
AutoCAD SHX Text
SITE:
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
| 1 |
| Sheets and Views |
| Model |
| 2 |
| Sheets and Views |
| Model |
| 3 |
| Sheets and Views |
| Model |
| 4 |
| Sheets and Views |
| Model |
| 5 |
| Sheets and Views |
| Model |
File details come from the government source that posted it. Updated .