Solicitation Admendment W90VN924R0117-0001.pdf
PDF 442 KB Posted
- Attached to
- Purchase Six (6) Pickup Trucks in South Korea
- Solicitation number
- W90VN924R0117
About this file
This document is a solicitation amendment for federal contract opportunity W90VN924R0117 to purchase six (6) pickup trucks in South Korea. The key changes in this amendment are: a) removing the requirement for the contractor to provide valid current certificates, and b) adding a new sub-factor C for delivery time under the Basis of Award section. The solicitation is for a firm-fixed-price purchase order to be awarded to the responsible offeror submitting the lowest price technically acceptable offer. Offers will be evaluated on technical capability, warranty, delivery time, and price. Award will be made on an all-or-none basis.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment W90VN924R0117-0003.pdf | ||
| Solicitation Amendment W90VN924R0117-0002.pdf | ||
| Solicitation W90VN924R0117.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SC06002400980
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment as follow ing:
a. Remove “(iii) Sub-factor C – Certif ications: The Contractor shall provide a valid current certificates (both Korean and English) as required on SOW” in the Instructions to Offeror in Section L.
b. Add a Sub-factor C in the Basis of Aw ard in Section M.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W90VN924R0117
X 9B. DATED (SEE ITEM 11)
28-Jun-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Jul-2024
CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
RCO DAEGU, UNIT #15682
APO AP 96218-5682
UNITED STATES
W90VN9 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W90VN924R0117
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
INSTRUCTIONS TO OFFEROR
I. PURCHASE ORDER AWARD
1.1. The Government intends to execute a purchase order for Non-Technical Vehicle (NTV) Truck, Pickup, 4-Door (6 each) for DLA Energy Pacific-Korea. Award will be made to the responsible Offeror submitting the Lowest Price Technically Acceptable (LPTA) offer in accordance with the Federal Acquisition Regulation (FAR) Parts 12 and
13.303 that satisfies all terms and conditions of the solicitation. Offers will be evaluated for acceptability, but not ranked using the non-cost factors/subfactors. All non-cost factors and subfactors will be rated as either "acceptable" or "unacceptable". In order to be considered for award, there must be an acceptable" rating in every non-price factor/subfactor. In other words, a rating of "unacceptable" for any factor or subfactor will result in the entire offer being rated "unacceptable".
1.2. The Government reserves the right, based on the Government’s best interests, to make a determination to: 1) award without discussions; 2) make multiple awards for this requirement; 3) establish a competitive range in order to conduct discussions. If an award cannot be made on initial offer and the Government determines discussions to be necessary, the competitive range will be established in considering technical, past performance and price evaluation factors to conduct discussions IAW FAR 15.306(c).; and/or 4) make no award if, upon evaluation, none of the proposals are deemed likely to meet the requirements.
II. QUOTATION SUBMISSION:
2.1. These instructions are designed to ensure submission of essential information in order for the Government to understanding and evaluate proposals. Offerors are cautioned to follow the detailed instructions fully and carefully, as the Government reserves the right to make award based on initial offers received, without discussions with Offerors.
2.2. Offerors are cautioned to submit adequate information to enable the Government team to fully ascertain each Offeror’s capability to perform all of the requirements identified in the solicitation. All commitments made in the proposal shall become a part of the resultant contract.
2.3. Offerors are required to submit complete proposals (Technical Proposal, Past Performance Proposal, and Price Proposal) and also submit the documents listed below in Paragraphs III through the Contract Specialist email, jungho.hong.civ@army.mil by 13:00 hours on closing date of Block #8 of the SF 1449, Local Korea Time). The Offeror(s) shall round all unit prices to the nearest whole Korean Won (KRW) thereby eliminating the use of any decimal points. All questions should be emailed to Jungho Hong, jungho.hong.civ@army.mil within five (5) calendar days after the solicitation is issued. Questions received after this date and time may not be answered.
III. SUBMITTAL REQUIREMENTS
1(a) Technical Capability: Offerors who fail to submit all of the specified information will not be considered for award.
(i) Sub-factor A – Specification for the proposed items. The contractor shall submit the detailed specification for the proposed items along with the quotation, even if the quoter proposed the same item.
The item must meet the salient characteristics by stating the description/specification of each listed item including manufacturer name and model/part number. Quoters who fail to submit all of the specified information will not be considered for award. Note: Copy and paste of salient characteristics of RFP for each item in the quotation is not acceptable and will not be considered for award.
(ii) Sub-factor B – Warranty: The Contractor shall provide no less than the manufacturer’s favorable commercial warranties given to any customer. Warranty service must be provided within 50 kilometers of the delivery point. Offers that do not include this warranty information will be deemed technically unacceptable. During the warranty period, the contractor shall provide 24 hour on-call maintenance service on the warranty guaranteed parts with 100% coverage at no cost. The Contractor shall include the warranty information for the proposed items. Offers that do not include this information will be deemed technically unacceptable.
(iii) Sub-factor C – Delivery Time: The Contractor shall provide delivery time in writing. Offers that do not include this information will be dimmed technically unacceptable.
(iv) The Government reserves the right to obtain past performance information from any reasonable source available, including Contractor Performance Assessment Reporting System (CPARS).
(b) Price: The offeror shall provide a price proposal for this requirement that is reflective of the level of work effort detailed in the specification. The proposal shall be detailed and incorporate all costs associated with this procurement. Proposed prices will be evaluated in accordance with FAR 13.106-3.
2. Addendum to local clause FAR 52.212-1 and 2: The terms “Quotation” and “Quoter” shall be substituted for “Offer” and “Offeror.”
3. Clauses 52.204-24, 52.204-26, and ATTACHMENT: CONTRACTOR'S TAX EXEMPTION DECLARATION shall be filled out and submitted upon request from the Government.
4. The tax exemptions stated in Attachment, Contractor’s Tax Exemption Declaration” will be reviewed by the contracting officer for reasonableness and necessity to complete the work. The contracting officer may reject a proposal if the offeror appears to improperly overstate any proposed tax exemptions or submitted pricing and cost data that appear to be unreasonable.
5. All offeror(s) shall provide the price proposal in Korea Won (KW).
6. Delivery Lead Time: Quotation(s) shall specify delivery date and shall meet the delivery terms of the RFP.
7. Partial proposal is not acceptable. Award will be on an all or none basis.
8. Failure to submit the above requirements may indicate the offeror fails to understand the requirement, and may be grounds for determining the proposal to be technically unacceptable and ineligible for contract award.
SECTION M - EVALUATION FACTORS FOR AWARD
The following have been modified:
EVALUATION - BASIS OF AWARD
In accordance with FAR 15.101-2, the Government will award a contract resulting from this solicitation to the responsible offeror submitting the lowest price technically acceptable offer that satisfies all terms and conditions of this solicitation.
The following factors shall be used to evaluate proposals:
FACTOR I - TECHNICAL: Each factor and subfactor will be rated either acceptable or unacceptable. A rating of unacceptable for any factor or subfactor will result in an overall unacceptable rating. If an offeror fails to meet the minimum requirements outlined in one of the three (3) subfactors below, the subfactor, and overall proposal will be rated “unacceptable” and will not be eligible for award.
• Factor A. Technical Capability: Government will evaluate the offeror’s proposal against Government’s minimum requirements as specified on the solicitation to determine whether the proposal is acceptable or unacceptable using the ratings and descriptions outlined in table below.
Technical Acceptable/Unacceptable Ratings Rating Description Acceptable Proposal meets the minimum requirements of the solicitation.
Unacceptable Proposal does not meet the minimum requirements of the solicitation.
In order to be considered for award, there must be an “acceptable” rating in every non-price factor/subfactor. In other words, a rating of “unacceptable” for any factor or subfactor will result in the entire offer being rated “unacceptable”.
(a) Technical Evaluation Factors:
(i) Sub-factor A – Specification for the proposed item. The offeror’s detailed specification and quotation for the proposed items shall be evaluated. The item must meet the salient characteristics by stating the description/specification of each listed item including manufacturer’s name and model/part number. Quoters who fail to submit all the specified information will not be considered for award. Note: Copy and paste of salient characteristics of RFP for each item in the quotation is not acceptable and will not be considered for award.
(ii) Sub-factor B – Warranty: The offeror’s warranty shall be evaluated on whether it meets the requirement of salient characteristics in the Section C of this solicitation . Offers that don’t include this information will be rated as technically unacceptable.
(iii) Sub-factor C – Delivery Time: The Contractor shall state delivery time in writing. Offers that do not include this information will be dimmed technically unacceptable.
Note 1: To be determined responsible, a prospective contractor must meet FAR 9.104-1 General standards.
Note 2: To be determined technically acceptable, the submitted specification must meet salient characteristics stated in the SOW of this solicitation.
FACTOR II – PRICE: Proposed price will be reviewed to determine if the estimate is adequate, complete, and reasonable to assess the offeror's understanding of the solicitation. Price proposal will be evaluated in accordance with FAR 15.404-1(b).
Note 1: To be determined responsible, a prospective contractor must meet FAR 9.104-1 General standards.
Note 2: To be determined technically acceptable, the submitted specification must meet salient characteristics stated in each line item of this RFP.
Note 3: Award will be based on all or none basis.
(b) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer, whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
Failure to submit the above requirements may indicate that the offeror fails to understand the requirement, and may be grounds for determining the proposal to be non-responsive and ineligible for contract award in accordance with Basis of Award of this solicitation.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .