Amendment 0001-23R0049.pdf
PDF 138 KB Posted
- Solicitation number
- W90VN923R0049
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP W90VN923R0049.pdf | ||
| Attachment-Site Map.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3277823MPFSS1
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SEE NEXT PAGE ON SUMMARY OF CHANGES.
1. CONTRACT ID CODE PAGE OF PAGES
1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Apr-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W90VN923R0049
X 9B. DATED (SEE ITEM 11)
16-Mar-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Apr-2023
CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
RCO DAEGU, UNIT #15682
APO AP 96218-5682
UNITED STATES
W90VN9 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W90VN923R0049
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0001
1. The purpose of this amendment is to change CLINs’ description and period of performance as shown below:
CLIN FROM TO
0001AC, 1001AC,
2001AC, 3001AC and
4001AC
Maintenance of Naval Hospital Fire Suppression Systems
Maintenance of Family Housing Fire Suppression Systems
1001, 1002, 2001, 2002, 3001, 3002, 4001, and
BASE PERIOD: 1 July 2023 thru 30 June 2024
1ST Option Period: 1 July 2024 thru 30 June 2025 2ND Option Period: 1 July 2025 thru 30 June 2026 3RD Option Period: 1 July 2026 thru 30 June 2027 4TH Option Period: 1 July 2027 thru 30 June 2028
2. There are no changes to the solicitation with this amendment.
SECTION SF 1449 - CONTINUATION SHEET
SUPPLIES OR SERVICES AND PRICES
SUBCLIN 0001AC
The CLIN description has changed from Maintenance of Naval Hospital Fire to Maintenance of Family Housing Fire.
CLIN 1001
The CLIN extended description has changed from:
(ITM) Service (FIRM FIXED PORTION). The Contractor shall provide all necessary resources for this requirement and perform in accordance with the Performance Work Statement (PWS), UFC 3-601-2 (Unified Facilities Criteria) standard, and terms and conditions of this contract contained herein. The Building List, equipment inventory, and estimated service order workload are included in section 7 of this PWS and are only projections for the level of effort required for the ITM.BASE PERIOD: 1 July 2023 thru 30 June 2024
To:
(ITM) Service (FIRM FIXED PORTION). The Contractor shall provide all necessary resources for this requirement and perform in accordance with the Performance Work Statement (PWS), UFC 3-601-2 (Unified Facilities Criteria) standard, and terms and conditions of this contract contained herein. The Building List, equipment inventory, and estimated service order workload are included in section 7 of this PWS and are only projections for the level of effort required for the ITM.1ST Option Year: 1 July 2024 thru 30 June 2025
SUBCLIN 1001AC
CLIN 1002
(REQUIREMENT PORTION) in accordance with paragraph 5.3 and 5.5 of PWS. The Contractor shall provide all necessary resources for this requirement and perform in accordance with the Performance Work Statement (PWS), UFC 3-601-2 (Unified Facilities Criteria) standard, and terms and conditions of this contract contained herein.
REQUIREMENT work may be ordered via task order. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.BASE PERIOD: 1 July 2023 thru 30 June 2024
(REQUIREMENT PORTION) in accordance with paragraph 5.3 and 5.5 of PWS. The Contractor shall provide all necessary resources for this requirement and perform in accordance with the Performance Work Statement (PWS), UFC 3-601-2 (Unified Facilities Criteria) standard, and terms and conditions of this contract contained herein.
REQUIREMENT work may be ordered via task order. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.1ST Option Year: 1 July 2024 thru 30 June 2025
CLIN 2001
(ITM) Service (FIRM FIXED PORTION). The Contractor shall provide all necessary resources for this requirement and perform in accordance with the Performance Work Statement (PWS), UFC 3-601-2 (Unified Facilities Criteria) standard, and terms and conditions of this contract contained herein. The Building List, equipment inventory, and estimated service order workload are included in section 7 of this PWS and are only projections for the level of
(ITM) Service (FIRM FIXED PORTION). The Contractor shall provide all necessary resources for this requirement and perform in accordance with the Performance Work Statement (PWS), UFC 3-601-2 (Unified Facilities Criteria) standard, and terms and conditions of this contract contained herein. The Building List, equipment inventory, and estimated service order workload are included in section 7 of this PWS and are only projections for the level of effort required for the ITM.2ND Option Year: 1 July 2025 thru 30 June 2026
SUBCLIN 2001AC
CLIN 2002
(REQUIREMENT PORTION) in accordance with paragraph 5.3 and 5.5 of PWS. The Contractor shall provide all necessary resources for this requirement and perform in accordance with the Performance Work Statement (PWS), UFC 3-601-2 (Unified Facilities Criteria) standard, and terms and conditions of this contract contained herein.
REQUIREMENT work may be ordered via task order. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.BASE PERIOD: 1 July 2023 thru 30
(REQUIREMENT PORTION) in accordance with paragraph 5.3 and 5.5 of PWS. The Contractor shall provide all necessary resources for this requirement and perform in accordance with the Performance Work Statement (PWS), UFC 3-601-2 (Unified Facilities Criteria) standard, and terms and conditions of this contract contained herein.
REQUIREMENT work may be ordered via task order. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.2ND Option Year: 1 July 2025 thru 30 June 2026
CLIN 3001
(ITM) Service (FIRM FIXED PORTION). The Contractor shall provide all necessary resources for this requirement and perform in accordance with the Performance Work Statement (PWS), UFC 3-601-2 (Unified Facilities Criteria) standard, and terms and conditions of this contract contained herein. The Building List, equipment inventory, and estimated service order workload are included in section 7 of this PWS and are only projections for the level of
(ITM) Service (FIRM FIXED PORTION). The Contractor shall provide all necessary resources for this requirement and perform in accordance with the Performance Work Statement (PWS), UFC 3-601-2 (Unified Facilities Criteria) standard, and terms and conditions of this contract contained herein. The Building List, equipment inventory, and estimated service order workload are included in section 7 of this PWS and are only projections for the level of effort required for the ITM.3RD Option Year: 1 July 2026 thru 30 June 2027
SUBCLIN 3001AC
CLIN 3002
(REQUIREMENT PORTION) in accordance with paragraph 5.3 and 5.5 of PWS. The Contractor shall provide all necessary resources for this requirement and perform in accordance with the Performance Work Statement (PWS), UFC 3-601-2 (Unified Facilities Criteria) standard, and terms and conditions of this contract contained herein.
REQUIREMENT work may be ordered via task order. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.BASE PERIOD: 1 July 2023 thru 30
(REQUIREMENT PORTION) in accordance with paragraph 5.3 and 5.5 of PWS. The Contractor shall provide all necessary resources for this requirement and perform in accordance with the Performance Work Statement (PWS), UFC 3-601-2 (Unified Facilities Criteria) standard, and terms and conditions of this contract contained herein.
REQUIREMENT work may be ordered via task order. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.3RD Option Year: 1 July 2026 thru 30 June 2027
CLIN 4001
(ITM) Service (FIRM FIXED PORTION). The Contractor shall provide all necessary resources for this requirement and perform in accordance with the Performance Work Statement (PWS), UFC 3-601-2 (Unified Facilities Criteria) standard, and terms and conditions of this contract contained herein. The Building List, equipment inventory, and estimated service order workload are included in section 7 of this PWS and are only projections for the level of
(ITM) Service (FIRM FIXED PORTION). The Contractor shall provide all necessary resources for this requirement and perform in accordance with the Performance Work Statement (PWS), UFC 3-601-2 (Unified Facilities Criteria) standard, and terms and conditions of this contract contained herein. The Building List, equipment inventory, and estimated service order workload are included in section 7 of this PWS and are only projections for the level of effort required for the ITM.4TH Option Year: 1 July 2027 thru 30 June 2028
SUBCLIN 4001AC
CLIN 4002
(REQUIREMENT PORTION) in accordance with paragraph 5.3 and 5.5 of PWS. The Contractor shall provide all necessary resources for this requirement and perform in accordance with the Performance Work Statement (PWS), UFC 3-601-2 (Unified Facilities Criteria) standard, and terms and conditions of this contract contained herein.
REQUIREMENT work may be ordered via task order. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.BASE PERIOD: 1 July 2023 thru 30
(REQUIREMENT PORTION) in accordance with paragraph 5.3 and 5.5 of PWS. The Contractor shall provide all necessary resources for this requirement and perform in accordance with the Performance Work Statement (PWS), UFC 3-601-2 (Unified Facilities Criteria) standard, and terms and conditions of this contract contained herein.
REQUIREMENT work may be ordered via task order. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.4TH Option Year: 1 July 2027 thru 30 June 2028
(End of Summary of Changes)