N3277823MPFSS1

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SEE NEXT PAGE ON SUMMARY OF CHANGES.

1. CONTRACT ID CODE PAGE OF PAGES

1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 06-Apr-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W90VN923R0049

X 9B. DATED (SEE ITEM 11)

16-Mar-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Apr-2023

CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

RCO DAEGU, UNIT #15682

APO AP 96218-5682

UNITED STATES

W90VN9 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W90VN923R0049

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0001

1. The purpose of this amendment is to change CLINs’ description and period of performance as shown below:

CLIN FROM TO

0001AC, 1001AC,

2001AC, 3001AC and

4001AC

Maintenance of Naval Hospital Fire Suppression Systems

Maintenance of Family Housing Fire Suppression Systems

1001, 1002, 2001, 2002, 3001, 3002, 4001, and

BASE PERIOD: 1 July 2023 thru 30 June 2024

1ST Option Period: 1 July 2024 thru 30 June 2025 2ND Option Period: 1 July 2025 thru 30 June 2026 3RD Option Period: 1 July 2026 thru 30 June 2027 4TH Option Period: 1 July 2027 thru 30 June 2028

2. There are no changes to the solicitation with this amendment.

SECTION SF 1449 - CONTINUATION SHEET

SUPPLIES OR SERVICES AND PRICES

SUBCLIN 0001AC

The CLIN description has changed from Maintenance of Naval Hospital Fire to Maintenance of Family Housing Fire.

CLIN 1001

The CLIN extended description has changed from:

(ITM) Service (FIRM FIXED PORTION). The Contractor shall provide all necessary resources for this requirement and perform in accordance with the Performance Work Statement (PWS), UFC 3-601-2 (Unified Facilities Criteria) standard, and terms and conditions of this contract contained herein. The Building List, equipment inventory, and estimated service order workload are included in section 7 of this PWS and are only projections for the level of effort required for the ITM.BASE PERIOD: 1 July 2023 thru 30 June 2024

To:

(ITM) Service (FIRM FIXED PORTION). The Contractor shall provide all necessary resources for this requirement and perform in accordance with the Performance Work Statement (PWS), UFC 3-601-2 (Unified Facilities Criteria) standard, and terms and conditions of this contract contained herein. The Building List, equipment inventory, and estimated service order workload are included in section 7 of this PWS and are only projections for the level of effort required for the ITM.1ST Option Year: 1 July 2024 thru 30 June 2025

SUBCLIN 1001AC

CLIN 1002

(REQUIREMENT PORTION) in accordance with paragraph 5.3 and 5.5 of PWS. The Contractor shall provide all necessary resources for this requirement and perform in accordance with the Performance Work Statement (PWS), UFC 3-601-2 (Unified Facilities Criteria) standard, and terms and conditions of this contract contained herein.

REQUIREMENT work may be ordered via task order. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.BASE PERIOD: 1 July 2023 thru 30 June 2024

(REQUIREMENT PORTION) in accordance with paragraph 5.3 and 5.5 of PWS. The Contractor shall provide all necessary resources for this requirement and perform in accordance with the Performance Work Statement (PWS), UFC 3-601-2 (Unified Facilities Criteria) standard, and terms and conditions of this contract contained herein.

REQUIREMENT work may be ordered via task order. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.1ST Option Year: 1 July 2024 thru 30 June 2025

CLIN 2001

(ITM) Service (FIRM FIXED PORTION). The Contractor shall provide all necessary resources for this requirement and perform in accordance with the Performance Work Statement (PWS), UFC 3-601-2 (Unified Facilities Criteria) standard, and terms and conditions of this contract contained herein. The Building List, equipment inventory, and estimated service order workload are included in section 7 of this PWS and are only projections for the level of

(ITM) Service (FIRM FIXED PORTION). The Contractor shall provide all necessary resources for this requirement and perform in accordance with the Performance Work Statement (PWS), UFC 3-601-2 (Unified Facilities Criteria) standard, and terms and conditions of this contract contained herein. The Building List, equipment inventory, and estimated service order workload are included in section 7 of this PWS and are only projections for the level of effort required for the ITM.2ND Option Year: 1 July 2025 thru 30 June 2026

SUBCLIN 2001AC

CLIN 2002

(REQUIREMENT PORTION) in accordance with paragraph 5.3 and 5.5 of PWS. The Contractor shall provide all necessary resources for this requirement and perform in accordance with the Performance Work Statement (PWS), UFC 3-601-2 (Unified Facilities Criteria) standard, and terms and conditions of this contract contained herein.

REQUIREMENT work may be ordered via task order. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.BASE PERIOD: 1 July 2023 thru 30

(REQUIREMENT PORTION) in accordance with paragraph 5.3 and 5.5 of PWS. The Contractor shall provide all necessary resources for this requirement and perform in accordance with the Performance Work Statement (PWS), UFC 3-601-2 (Unified Facilities Criteria) standard, and terms and conditions of this contract contained herein.

REQUIREMENT work may be ordered via task order. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.2ND Option Year: 1 July 2025 thru 30 June 2026

CLIN 3001

(ITM) Service (FIRM FIXED PORTION). The Contractor shall provide all necessary resources for this requirement and perform in accordance with the Performance Work Statement (PWS), UFC 3-601-2 (Unified Facilities Criteria) standard, and terms and conditions of this contract contained herein. The Building List, equipment inventory, and estimated service order workload are included in section 7 of this PWS and are only projections for the level of

(ITM) Service (FIRM FIXED PORTION). The Contractor shall provide all necessary resources for this requirement and perform in accordance with the Performance Work Statement (PWS), UFC 3-601-2 (Unified Facilities Criteria) standard, and terms and conditions of this contract contained herein. The Building List, equipment inventory, and estimated service order workload are included in section 7 of this PWS and are only projections for the level of effort required for the ITM.3RD Option Year: 1 July 2026 thru 30 June 2027

SUBCLIN 3001AC

CLIN 3002

(REQUIREMENT PORTION) in accordance with paragraph 5.3 and 5.5 of PWS. The Contractor shall provide all necessary resources for this requirement and perform in accordance with the Performance Work Statement (PWS), UFC 3-601-2 (Unified Facilities Criteria) standard, and terms and conditions of this contract contained herein.

REQUIREMENT work may be ordered via task order. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.BASE PERIOD: 1 July 2023 thru 30

(REQUIREMENT PORTION) in accordance with paragraph 5.3 and 5.5 of PWS. The Contractor shall provide all necessary resources for this requirement and perform in accordance with the Performance Work Statement (PWS), UFC 3-601-2 (Unified Facilities Criteria) standard, and terms and conditions of this contract contained herein.

REQUIREMENT work may be ordered via task order. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.3RD Option Year: 1 July 2026 thru 30 June 2027

CLIN 4001

(ITM) Service (FIRM FIXED PORTION). The Contractor shall provide all necessary resources for this requirement and perform in accordance with the Performance Work Statement (PWS), UFC 3-601-2 (Unified Facilities Criteria) standard, and terms and conditions of this contract contained herein. The Building List, equipment inventory, and estimated service order workload are included in section 7 of this PWS and are only projections for the level of

(ITM) Service (FIRM FIXED PORTION). The Contractor shall provide all necessary resources for this requirement and perform in accordance with the Performance Work Statement (PWS), UFC 3-601-2 (Unified Facilities Criteria) standard, and terms and conditions of this contract contained herein. The Building List, equipment inventory, and estimated service order workload are included in section 7 of this PWS and are only projections for the level of effort required for the ITM.4TH Option Year: 1 July 2027 thru 30 June 2028

SUBCLIN 4001AC

CLIN 4002

(REQUIREMENT PORTION) in accordance with paragraph 5.3 and 5.5 of PWS. The Contractor shall provide all necessary resources for this requirement and perform in accordance with the Performance Work Statement (PWS), UFC 3-601-2 (Unified Facilities Criteria) standard, and terms and conditions of this contract contained herein.

REQUIREMENT work may be ordered via task order. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.BASE PERIOD: 1 July 2023 thru 30

(REQUIREMENT PORTION) in accordance with paragraph 5.3 and 5.5 of PWS. The Contractor shall provide all necessary resources for this requirement and perform in accordance with the Performance Work Statement (PWS), UFC 3-601-2 (Unified Facilities Criteria) standard, and terms and conditions of this contract contained herein.

REQUIREMENT work may be ordered via task order. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.4TH Option Year: 1 July 2027 thru 30 June 2028

(End of Summary of Changes)