W90VN922R0119 Amend 03.pdf
PDF 394 KB Posted
- Attached to
- (LCS) Water Tank Truck, Camp Casey, South Korea
- Solicitation number
- W90VN922R0119
About this file
This amendment modifies a solicitation for three water tank trucks. The solicitation is issued by the 411th Contracting Support Brigade, Korea located at RCO Daegu, APO AP 96218 for the Department of the Army Materiel Command. The amendment clarifies that the solicitation is for three water tank trucks to meet the technical requirements specified. Awards will be made to the responsible offeror submitting the lowest price technically acceptable proposal in accordance with FAR Parts 12 and 13.5. Proposals will be evaluated on the basis of technical acceptability and price, with technical proposals rated as acceptable or unacceptable against the specified requirements for the vehicle specifications, warranties, and certifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W90VN922R0119 Amend 02.pdf | ||
| W90VN922R0119 Amend 01.pdf | ||
| W90VN922R0119.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
411TH CSB, KOREA - RCO DAEGU
POC: MR. HONG, YUN PYO
TEL: 315-763-5685
E-MAIL: YUN.P.HONG.CIV@ARMY.MIL
APO AP 96218-5682
UNITED STATES
0011822520
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to provide answ er to the question below .
Q: I could see that you asked for 3 trucks on CLIN, and SAM and Salient Characteristics, but the f irst sentence on page 14 says, "The
Government intends to execute a purchase order for four (4) Medium Sized Rescue Equipment Truck." I just w ant to make sure w hether it's
3 or 4.
So could you please tell me the exact number?
A: Three (3) Water Tank Truck.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Oct-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W90VN922R0119
X 9B. DATED (SEE ITEM 11)
20-Sep-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Oct-2022
CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
RCO DAEGU, UNIT #15682
APO AP 96218-5682
UNITED STATES
W90VN9 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W90VN9
FACILITY CODECODE
EMAIL:TEL:
W90VN922R0119
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
52.212-2 EVALUATION--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
SEE BELOW ADDENDUM TO FAR 52.212-2 EVALUATION--COMMERCIAL PRODUCTS AND
COMMERCIAL SERVICES (NOV 2021)
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of provision)
ADDENDUM TO FAR Clauses 52.212-2
EVALUATION – COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021)
In accordance with FAR 13.5, the Government will award a contract resulting from this solicitation to the responsible offeror submitting the lowest price technically acceptable offer that satisfies all terms and conditions of this solicitation.
The Government intends to execute a purchase order for three (3) Water Tank Truck. Award will be made to the responsible Offeror submitting the Lowest Price Technically Acceptable (LPTA) offer in accordance with the
Federal Acquisition Regulation (FAR) Parts 12 and 13.5 that satisfies all terms and conditions of the solicitation.
Offers will be evaluated for acceptability, but not ranked using the non-cost factors/subfactors. All non-cost factors and subfactors will be rated as either "acceptable" or "unacceptable". In order to be considered for award, there must be an acceptable" rating in every non-price factor/subfactor. In other words, a rating of "unacceptable" for any factor or subfactor will result in the entire offer being rated "unacceptable".
BASIS OF AWARD
The Government will award a contract resulting from this solicitation to the responsible offeror having submitted the lowest-price technically acceptable proposal that satisfies all terms and conditions of this solicitation. The following factors shall be used to evaluate proposals:
FACTOR I - TECHNICAL: Each factor and subfactor will be rated either acceptable or unacceptable. A rating of unacceptable for any factor or subfactor will result in an overall unacceptable rating. If an offeror fails to meet the
W90VN922R0119
minimum requirements outlined in one of the three (3) subfactors below, the subfactor, and overall proposal will be rated “unacceptable” and will not be eligible for award.
Technical Ratings
Ratings Description
Acceptable Proposal meets the minimum requirements of the solicitation.
Unacceptable Proposal does not meet the minimum requirements of the solicitation.
In order to be considered for award, there must be an “acceptable” rating in every non-price factor/subfactor. In other words, a rating of “unacceptable” for any factor or subfactor will result in the entire offer being rated
“unacceptable”.
(a) Technical Evaluation Factors:
(i) Sub-factor A – Specification for the proposed item. The offeror shall be evaluated on submitted the detailed specification for the proposed items along with the quotation, even if the quoter proposed the same item. The item must meet the salient characteristics by stating the description/specification of each listed item including manufacturer name and model/part number. Quoters who fail to submit all of the specified information will not be considered for award. Note: Copy and paste of salient characteristics of RFP for each item in the quotation is not acceptable and will not be considered for award.
(ii) Sub-factor B – Warranty: Two (2) years after the date of delivery: Bumper-to-Bumper and power train. Three
(3) years after the date of delivery: Firefighting system and general vehicle components (lights, electrical system, and gauges). The Contractor shall include the warranty information for the proposed items. Offers that do not include this information will be deemed technically unacceptable.
(iii) Sub-factor C – Certifications: The offeror shall be evaluated on submitted a valid current certificates (both
Korean and English) as required on SOW, paragraph 16.
Note 1: To be determined responsible, a prospective contractor must meet FAR 9.104-1 General standards.
Note 2: To be determined technically acceptable, the submitted specification must meet salient characteristics stated in the SOW of this solicitation.
FACTOR II – PRICE: Proposed price will be reviewed to determine if the estimate is adequate, complete, and reasonable to assess the offeror's understanding of the solicitation. Price proposal will be evaluated in accordance with FAR 13.106-3.
(End of ADDENDUM to FAR 52.212-2 EVALUATION--COMMERCIAL PRODUCTS AND
COMMERCIAL SERVICES (NOV 2021)
(End of Summary of Changes)
File details come from the government source that posted it. Updated .