W90VN922R0028.pdf

PDF 693 KB Posted

Attached to
W90VN922R0028-Cleaning Service of Food Exhaust Fans and Ducts in Area IV
Solicitation number
W90VN922R0028
Issued by

About this file

This is a solicitation for cleaning services of food exhaust fans and ducts in various locations in South Korea. The contractor will be required to clean exhaust duct systems, exhaust fan assemblies, and keep service areas free from trash for multiple dining facilities. Response is due by April 27, 2022. The contract will have a base period of performance from October 2022 through August 2023 with four one-year option periods to extend through August 2027. The solicitation is set aside for small businesses and identifies pricing, inspection, and delivery terms for cleaning services at different locations on a monthly, bi-monthly, or annual basis.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W90VN922R0028 28-Mar-2022

b. TELEPHONE NUMBER

315-763-5687

8. OFFER DUE DATE/LOCAL TIME

01:00 PM 27 Apr 2022

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W90VN99. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

MS. YI, CHI HYON

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED ORX

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

RCO DAEGU, UNIT #15682

APO AP 96218-5682

UNITED STATES

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

X SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$8,000,000

NAICS:

561790

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF105

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W90VN922R0028

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

CLEANING SERVICE-AREA IV

FFP

Removal of grease and oily sludge from ducts and roofs of dining facilities.

NET AMT

0001AA 11 Months Cleaning Service-Daegu Area

FFP

Provide the services once a month for 10 Buildings (10,757 SF) listed in Attachment A (Daegu Area).

FOB: Destination

PSC CD: S203

0001AB 10 Months Cleaning Service- C/W, C/G -School

FFP

Provide the services once a month for 2 Buildings (2,985 SF) listed in Attachment A (C/W, C/G - School) (Delete two months during vacation).

0001AC 6 Months Cleaning Service- Camp Henry

FFP

Provide the services one time per two month for 1 Building#1669 (251 SF) listed in Attachment A (Camp Henry).

0001AD 11 Months Cleaning Service- Camp Carroll

FFP

Provide the services once a month for 3 Buildings#117, 138, 303 (7,406 SF) listed in Attachment A (Carroll Area).

0001AE 6 Months Cleaning Service-Camp Carroll

FFP

Provide the services one time per two month for 3 Buildings#170, 301, 904 (794 SF) listed in Attachment A (Carroll Area).

0001AF 6 Months Cleaning Service-Busan Area

FFP

Provide the services one time per two month for 2 Buildings (1,095 SF) listed in Attachment A (Busan Area).

0001AG 11 Months Cleaning Service- Camp Mujuk

FFP

Provide the services once a month for Bldg #1104 (1,400 SF) listed in Attachment A (Camp Mujuk).

War Hazard

Estimated cost for war hazard losses is zero (0).

0003 1 Months Phase In

FFP

Phase In: 1 Sep 2022 thru 30 Sep 2022

OPTION CLEANING SERVICE-AREA IV

1001AA 12 Months OPTION Cleaning Service-Daegu Area

FFP

Provide the services once a month for 10 Buildings (10,757 SF) listed in Attachment A (Daegu Area).

1001AB 10 Months OPTION Cleaning Service- C/W, C/G -School

FFP

Provide the services once a month for 2 Buildings (2,985 SF) listed in Attachment A (C/W, C/G - School) (Delete two months during vacation).

1001AC 6 Months OPTION Cleaning Service- Camp Henry

FFP

Provide the services one time per two month for 1 Building#1669 (251 SF) listed in Attachment A (Camp Henry).

1001AD 12 Months OPTION Cleaning Service- Camp Carroll

FFP

Provide the services once a month for 3 Buildings#117, 138, 303 (7,406 SF) listed in Attachment A (Carroll Area).

1001AE 6 Months OPTION Cleaning Service-Camp Carroll

FFP

Provide the services one time per two month for 3 Buildings#170, 301, 904 (794 SF) listed in Attachment A (Carroll Area).

1001AF 6 Months OPTION Cleaning Service-Busan Area

FFP

Provide the services one time per two month for 2 Buildings (1,095 SF) listed in Attachment A (Busan Area).

1001AG 12 Months OPTION Cleaning Service- Camp Mujuk

FFP

Provide the services once a month for Bldg #1104 (1,400 SF) listed in Attachment A (Camp Mujuk).

OPTION War Hazard

Estimated Cost for War Hazard Losses is Zero (0).

OPTION CLEANING SERVICE-AREA IV

2001AA 12 Months OPTION Cleaning Service-Daegu Area

FFP

Provide the services once a month for 10 Buildings (10,757 SF) listed in Attachment A (Daegu Area).

2001AB 10 Months OPTION Cleaning Service- C/W, C/G -School

FFP

Provide the services once a month for 2 Buildings (2,985 SF) listed in Attachment A (C/W, C/G - School) (Delete two months during vacation).

2001AC 6 Months OPTION Cleaning Service- Camp Henry

FFP

Provide the services one time per two month for 1 Building#1669 (251 SF) listed in Attachment A (Camp Henry).

2001AD 12 Months OPTION Cleaning Service- Camp Carroll

FFP

Provide the services once a month for 3 Buildings#117, 138, 303 (7,406 SF) listed in Attachment A (Carroll Area).

2001AE 6 Months OPTION Cleaning Service-Camp Carroll

FFP

Provide the services one time per two month for 3 Buildings#170, 301, 904 (794 SF) listed in Attachment A (Carroll Area).

2001AF 6 Months OPTION Cleaning Service-Busan Area

FFP

Provide the services one time per two month for 2 Buildings (1,095 SF) listed in Attachment A (Busan Area).

2001AG 12 Months OPTION Cleaning Service- Camp Mujuk

FFP

Provide the services once a month for Bldg #1104 (1,400 SF) listed in Attachment A (Camp Mujuk).

OPTION War Hazard

OPTION CLEANING SERVICE-AREA IV

3001AA 12 Months OPTION Cleaning Service-Daegu Area

FFP

Provide the services once a month for 10 Buildings (10,757 SF) listed in Attachment A (Daegu Area).

3001AB 10 Months OPTION Cleaning Service- C/W, C/G -School

FFP

Provide the services once a month for 2 Buildings (2,985 SF) listed in Attachment A (C/W, C/G - School) (Delete two months during vacation).

3001AC 6 Months OPTION Cleaning Service- Camp Henry

FFP

Provide the services one time per two month for 1 Building#1669 (251 SF) listed in Attachment A (Camp Henry).

3001AD 12 Months OPTION Cleaning Service- Camp Carroll

FFP

Provide the services once a month for 3 Buildings#117, 138, 303 (7,406 SF) listed in Attachment A (Carroll Area).

3001AE 6 Months OPTION Cleaning Service-Camp Carroll

FFP

Provide the services one time per two month for 3 Buildings#170, 301, 904 (794 SF) listed in Attachment A (Carroll Area).

3001AF 6 Months OPTION Cleaning Service-Busan Area

FFP

Provide the services one time per two month for 2 Buildings (1,095 SF) listed in Attachment A (Busan Area).

3001AG 12 Months OPTION Cleaning Service- Camp Mujuk

FFP

Provide the services once a month for Bldg #1104 (1,400 SF) listed in Attachment A (Camp Mujuk).

OPTION War Hazard

OPTION CLEANING SERVICE-AREA IV

4001AA 12 Months OPTION Cleaning Service-Daegu Area

FFP

Provide the services once a month for 10 Buildings (10,757 SF) listed in Attachment A (Daegu Area).

4001AB 10 Months OPTION Cleaning Service- C/W, C/G -School

FFP

Provide the services once a month for 2 Buildings (2,985 SF) listed in Attachment A (C/W, C/G - School) (Delete two months during vacation).

4001AC 6 Months OPTION Cleaning Service- Camp Henry

FFP

Provide the services one time per two month for 1 Building#1669 (251 SF) listed in Attachment A (Camp Henry).

4001AD 12 Months OPTION Cleaning Service- Camp Carroll

FFP

Provide the services once a month for 3 Buildings#117, 138, 303 (7,406 SF) listed in Attachment A (Carroll Area).

4001AE 6 Months OPTION Cleaning Service-Camp Carroll

FFP

Provide the services one time per two month for 3 Buildings#170, 301, 904 (794 SF) listed in Attachment A (Carroll Area).

4001AF 6 Months OPTION Cleaning Service-Busan Area

FFP

Provide the services one time per two month for 2 Buildings (1,095 SF) listed in Attachment A (Busan Area).

4001AG 12 Months OPTION Cleaning Service- Camp Mujuk

FFP

Provide the services once a month for Bldg #1104 (1,400 SF) listed in Attachment A (Camp Mujuk).

OPTION War Hazard

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 N/A N/A N/A N/A 0001AA Destination Government Destination Government 0001AB Destination Government Destination Government 0001AC Destination Government Destination Government 0001AD Destination Government Destination Government 0001AE Destination Government Destination Government 0001AF Destination Government Destination Government 0001AG Destination Government Destination Government 0002 N/A N/A N/A N/A

0003 Destination Government Destination Government 1001 N/A N/A N/A N/A 1001AA Destination Government Destination Government 1001AB Destination Government Destination Government 1001AC Destination Government Destination Government 1001AD Destination Government Destination Government 1001AE Destination Government Destination Government 1001AF Destination Government Destination Government 1001AG Destination Government Destination Government 1002 N/A N/A N/A N/A 2001 N/A N/A N/A N/A 2001AA Destination Government Destination Government 2001AB Destination Government Destination Government 2001AC Destination Government Destination Government 2001AD Destination Government Destination Government 2001AE Destination Government Destination Government 2001AF Destination Government Destination Government 2001AG Destination Government Destination Government 2002 N/A N/A N/A N/A 3001 N/A N/A N/A N/A 3001AA Destination Government Destination Government 3001AB Destination Government Destination Government 3001AC Destination Government Destination Government 3001AD Destination Government Destination Government 3001AE Destination Government Destination Government 3001AF Destination Government Destination Government 3001AG Destination Government Destination Government 3002 N/A N/A N/A N/A 4001 N/A N/A N/A N/A 4001AA Destination Government Destination Government 4001AB Destination Government Destination Government 4001AC Destination Government Destination Government 4001AD Destination Government Destination Government 4001AE Destination Government Destination Government 4001AF Destination Government Destination Government 4001AG Destination Government Destination Government 4002 N/A N/A N/A N/A

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 N/A N/A N/A N/A

0001AA POP 01-OCT-2022 TO

31-AUG-2023

N/A DPW, USAG DAEGU

DAEGU - AREA 4

APO AP 96218

KOREA, SOUTH

WT4KB6

0001AB POP 01-OCT-2022 TO

31-AUG-2023

N/A (SAME AS PREVIOUS LOCATION)

0001AC POP 01-OCT-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

0001AD POP 01-OCT-2022 TO

N/A DPW USAG DAEGU

DAEGU - AREA 4

APO AP 96218

KOREA, SOUTH

W90YG3

0001AE POP 01-OCT-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

0001AF POP 01-OCT-2022 TO

N/A DAEGU - AREA 4

DAEGU - AREA 4

KOREA, SOUTH

WT4KB4

0001AG POP 01-OCT-2022 TO

N/A DPW, USAG DAEGU

DAEGU - AREA 4

APO AP 96218

KOREA, SOUTH

0002 N/A N/A N/A N/A

0003 POP 01-SEP-2022 TO

30-SEP-2022

N/A DPW, USAG DAEGU

DAEGU - AREA 4

APO AP 96218

KOREA, SOUTH

1001 N/A N/A N/A N/A

1001AA POP 01-SEP-2023 TO

31-AUG-2024

N/A DPW, USAG DAEGU

DAEGU - AREA 4

APO AP 96218

KOREA, SOUTH

1001AB POP 01-SEP-2023 TO

31-AUG-2024

N/A (SAME AS PREVIOUS LOCATION)

1001AC POP 01-SEP-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

1001AD POP 01-SEP-2023 TO

N/A DPW USAG DAEGU

DAEGU - AREA 4

APO AP 96218

KOREA, SOUTH

1001AE POP 01-SEP-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

1001AF POP 01-SEP-2023 TO

N/A DAEGU - AREA 4

DAEGU - AREA 4

KOREA, SOUTH

1001AG POP 01-SEP-2023 TO

N/A DPW, USAG DAEGU

DAEGU - AREA 4

APO AP 96218

KOREA, SOUTH

1002 N/A N/A N/A N/A

2001 N/A N/A N/A N/A

2001AA POP 01-SEP-2024 TO

31-AUG-2025

N/A DPW, USAG DAEGU

DAEGU - AREA 4

APO AP 96218

KOREA, SOUTH

2001AB POP 01-SEP-2024 TO

31-AUG-2025

N/A (SAME AS PREVIOUS LOCATION)

2001AC POP 01-SEP-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

2001AD POP 01-SEP-2024 TO

N/A DPW USAG DAEGU

DAEGU - AREA 4

APO AP 96218

KOREA, SOUTH

2001AE POP 01-SEP-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

2001AF POP 01-SEP-2024 TO

N/A DAEGU - AREA 4

DAEGU - AREA 4

KOREA, SOUTH

2001AG POP 01-SEP-2024 TO

N/A DPW, USAG DAEGU

DAEGU - AREA 4

APO AP 96218

KOREA, SOUTH

2002 N/A N/A N/A N/A

3001 N/A N/A N/A N/A

3001AA POP 01-SEP-2025 TO

31-AUG-2026

N/A DPW, USAG DAEGU

DAEGU - AREA 4

APO AP 96218

KOREA, SOUTH

3001AB POP 01-SEP-2025 TO

31-AUG-2026

N/A (SAME AS PREVIOUS LOCATION)

3001AC POP 01-SEP-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

3001AD POP 01-SEP-2025 TO

N/A DPW USAG DAEGU

DAEGU - AREA 4

APO AP 96218

KOREA, SOUTH

3001AE POP 01-SEP-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

3001AF POP 01-SEP-2025 TO

N/A DAEGU - AREA 4

DAEGU - AREA 4

KOREA, SOUTH

3001AG POP 01-SEP-2025 TO

N/A DPW, USAG DAEGU

DAEGU - AREA 4

APO AP 96218

KOREA, SOUTH

3002 N/A N/A N/A N/A

4001 N/A N/A N/A N/A

4001AA POP 01-SEP-2026 TO

31-AUG-2027

N/A DPW, USAG DAEGU

DAEGU - AREA 4

APO AP 96218

KOREA, SOUTH

4001AB POP 01-SEP-2026 TO

31-AUG-2027

N/A (SAME AS PREVIOUS LOCATION)

4001AC POP 01-SEP-2026 TO

N/A (SAME AS PREVIOUS LOCATION)

4001AD POP 01-SEP-2026 TO

N/A DPW USAG DAEGU

DAEGU - AREA 4

APO AP 96218

KOREA, SOUTH

4001AE POP 01-SEP-2026 TO

N/A (SAME AS PREVIOUS LOCATION)

4001AF POP 01-SEP-2026 TO

N/A DAEGU - AREA 4

DAEGU - AREA 4

KOREA, SOUTH

4001AG POP 01-SEP-2026 TO

N/A DPW, USAG DAEGU

DAEGU - AREA 4

APO AP 96218

KOREA, SOUTH

4002 N/A N/A N/A N/A

PWS

Performance Work Statement (PWS) Cleaning Service of Food Exhaust Fans and Ducts in Area IV, USAG Daegu

1.0 Introduction.

This is a non-personal services contract to provide Base Operation and Support Services for the U.S. Army Garrison Daegu. The Government will not exercise any supervision or control over the contract service providers. The Contractor shall perform to the standards specified in this Performance Work Statement (PWS). Contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary as defined in this PWS.

1.1 Background. US Army Garrison Daegu is responsible for this cleaning service of food exhaust fans and ducts for twenty-two (22) dining facilities from various locations in Daegu, Waegwan, Busan and Pohang area, DPW, USAG Daegu.

1.2 Objectives.

The Contractor shall ensure all work accomplished in the performance of this PWS meets all maintenance and repair standards consistent with the original equipment manufacturer’s recommendations; all applicable Federal, State, and local laws, regulations, and directives to include, but not limited to, the applicable publications listed in Section 7.0, Related Documents. The Government is committed to provide a safe, periodic and timely services of cleaning service for food exhaust fans and ducts, USAG Daegu. A many number of kitchen hoods, ducts and fans are being utilized on a daily basis for the unit missions. The safe, periodic and timely cleaning service of food exhaust fans and ducts of dining facilities are critical to maintaining the overall life expectancy and safe operating conditions of the hoods/ducts/fans as an action of fire prevention. Without this contract, dining facilities would have to be taken out of service and may have fire hazard due to a lack of maintenance.

1.2.1 The Contractor shall ensure all work in support of mission requirements tendered to the Government for acceptance conforms to the measurable performance standards of quality, timeliness, and quantity specified in the PWS of this contract. Without additional expense to the Government, the Contractor shall obtain/ensure subcontractors obtain all licenses, and permits required to perform this work under this contract. The intent is to establish work requirements that are performance-based and results oriented. This approach is intended to allow the Contractor to determine the best and most cost effective ways to fulfill base operations and their component needs, emphasizing innovation and commercial best practices.

1.3 Climatic Conditions. N/A

1.4 Facility Access.

The Contractor shall ensure access to all fire detection and suppression systems in case of emergencies or for other Fire Department purposes. The Contractor shall inform the Camp Walker/Carroll/Busan Storage Center (BSC) Fire Department point-of-contact (POC), prior to outages that will impact the function of the system, special problems or circumstances, which require Camp Walker/Carroll/BSC Fire Department inspection. The Fire Department will reset alarm systems to operational status.

1.5 Traffic Flow. N/A

1.6 Drainage. N/A

1.7 Restoration of Landscape Damage. N/A

1.8 Dust Suppression. N/A

1.9 Utility Location. N/A

1.10 Excavation Permits. N/A

2.0 Requirements

2.1 Description of Services. See Section 5.0 for the specific Common Level of Support (CLS).

2.1.1 Non-Personal Services.

The personnel rendering the services are not subject; either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. Non-personal service contracts are authorized by the Government in accordance with (IAW) Federal Acquisition Regulation (FAR) Subpart 37.104, under general contracting authority, and do not require specific statutory authorization.

2.2 General Information.

Period of Performance (POP). The POP consists of five (5) years. The POP is as follows:

Phase-in/out Period 1 September 2022 – 30 September 2022 Base Period 1 October 2022 – 31 August 2023 Option Period I 1 September 2023 – 31 August 2024 Option Period II 1 September 2024 – 31 August 2025 Option Period III 1 September 2025 – 31 August 2026 Option Period IV 1 September 2026 – 31 August 2027

2.2.1 Transition (Phase In/Phase Out).

The Contractor shall prepare and submit (within ten (10) business days after contract award), a Phase- In/Phase-Out Plan to be implemented by the Contractor. The Contractor shall provide sufficient experienced personnel during the phase-in and phase-out period to ensure that the services are maintained at the required level of proficiency. During the phase-in, the Contractor shall observe all operations pertinent to the requirements of the PWS, to include office functions, procedures, and operations, repair/maintenance operations, and any other operations as deemed necessary by the Contractor that will enable Contractor personnel to become both knowledgeable in, and familiar with, their assigned areas of responsibility. The Contractor shall commence all operations required by this PWS as of the first day of the contract period. Therefore, on the initial day of performance, the Contractor shall provide a work force which is fully qualified and capable of performing all work required under this contract.

2.2.2 Phase-out.

During the thirty (30) business day transition period immediately prior to the end of the previous contract, the Contractor shall permit the successor Contractor (and the successor Contractor's employees) to observe and become familiar with any and all operations under the contract. The Contractor shall not defer any needed repairs or maintenance for the purpose of transferring responsibility to the successor Contractor.

The Contractor shall fully cooperate with the successor Contractor and the Government so as not to interfere with their work or duties.

2.2.3 Place of Performance and Hours of Operation.

2.2.3.1 Place of Performance (expanded description).

The work to be performed under this requirement will be performed throughout the entire area occupied by Camps Henry/George/Walker/Carroll/BSC/Mujuk and at any pertinent locations in Area IV. A location information for Camps Henry/George/Walker/Carroll/BSC/Mujuk is located at Technical Exhibit (TE) 1, Building List with Work Schedule.

2.2.3.2 Hours of Operation.

The Contractor shall conduct business, between the hours of 0600 to 2100, Monday through Friday, excluding Federal holidays or when the Government facilities are closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor shall maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. A Direc to ra te o f Publ ic Work (DPW) Work Reception (WR, from 08:00~17:00 hours in normal workdays) and Fire Department (FD, work order reception function will be made during 17:00~08:00 hours in normal workdays and 24 hours in holidays.) will be operated 24 hours a day, 7 days a week and be capable of response to DMOs and/or customer requests outside of standard working hours.

2.2.3.3 Installation Closures.

When an unforeseen installation closure occurs on a regularly scheduled day of work, the Contractor shall reschedule the work to be performed the following day unless the following day is a Saturday, Sunday, a recognized Federal holiday, and when routine work is not scheduled for that day; or reschedule the work for the next business day following the closure.

2.2.3.4 Inclement Weather Delay.

If the Contractor determines unsafe weather conditions for continued operations, the Contractor shall notify the Contracting Officer (KO) or designated Government representative/Contracting Officer’s Representative (COR) two

(2) hours prior to curtailing operations due to inclement weather. The Contractor shall obtain KO/COR approval to resume operations.

2.2.3.5 The Contractor shall coordinate with DPW in preparation for and during emergency operations situations such as inclement weather, flood, active shooter, fire or other emergency situations. The Contractor may be called upon to deliver a wide variety of services to the installation through an emergency Demand Maintenance Order (DMO)/Project Work Order (PWO) in support of emergency response. The Contractor shall be required to provide all normal services during an emergency response unless otherwise directed by the KO, however emergency response requirements will take precedence over normal DMO/PWO activities.

2.2.3.6 Federal Holidays.

The Contractor’s performance shall not be required on the Federal public holidays listed below. Holidays occurring on weekends will be observed as directed by the Federal calendar (5 U.S.C. 6103).

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day Juneteenth National Independence Day

ROK Legal Holidays

(1) 1 January (New Year)

(2) Lunar New Year (31 December, 1 and 2 January on the Lunar Calendar)

(3) 1 March (Independence Movement Day)

(4) 1 May (Labor Day)

(5) 5 May (Children's Day)

(6) Buddha's Birthday (8 April on the Lunar Calendar)

(7) 6 June (Memorial Day)

(8) 17 July (Constitution Day)

(9) 15 August (Liberation Day)

(10) Chu-Suk (14, 15, and 16 August on the Lunar Calendar)

(11) 3 October (National Foundation Day)

(12) 9 October (Hangul Proclamation Day)

(13) 25 December (Christmas Day)

2.2.3.7 Travel/Temporary Duty. N/A

2.3 Emergency Services.

2.3.1 Emergency Medical Treatment.

The Contractor or their employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The Contractor shall notify the KO or designated Government representative/COR no later than (NLT) two (2) hours of the incident. The Contractor shall be responsible for the emergency medical treatment services for Contractor personnel. However, the Government will provide, on an emergency basis, medical services for injuries incurred while an employee is performing under the contract. The Contractor shall reimburse the Government for emergency medical services provided, upon receipt of invoice from the medical facility. Reimbursement shall be made to the US Government.

2.3.2 Accident Reporting.

The Contractor shall comply with Operational Safety and Health Administration (OSHA) for record keeping and reporting of all accidents resulting in death, injury, occupational disease, or adverse environmental impact. The Contractor shall provide a verbal report to the KO or designated Government representative/COR within one (1) hour of each such occurrence. A completed typed original plus one (1) copy of ENG Form 3394 United States Army Corps of Engineers Accident Investigation Report (or equivalent reporting form) shall be delivered to the KO or designated Government representative/COR within five (5) business days of occurrence, whenever an accident involving personal injury or Government owned property occurs.

2.4 Contract Administration and Management.

2.4.1 Post Award Conference/Performance Evaluation Meetings.

The Contractor shall attend the post award conference convened by the Contracting Activity or Contract Administration Office as agreed upon and stated in the contract award document. The KO, COR and DPW management will meet monthly with the Contractor to review the Contractor's performance. Written minutes of meetings will be recorded by the Contractor and signed by both the Project Manager (PM) and the KO. The written minutes will be distributed within five (5) business after the meeting. If the Government does not concur with any portion of the minutes, recorded by the Contractor, the non-concurrence shall be provided in writing by the KO/COR within two (2) workdays following receipt of the minutes. Notwithstanding the Contractor’s responsibility for total management during the performance of this contract, the administration of the contract requires maximum coordination and cooperation between the Government and the Contractor.

2.4.2 The following provides the roles and their respective authority during the performance of the contract:

2.4.2.1 Contracting Officer (KO).

The KO is the only person authorized to make any changes in any of the requirements listed on this PWS;

notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the KO. In the event the Contractor makes any change at the direction of any person other than the KO, the change will be considered to have been made without authority and solely at the risk and expense of the Contractor. All contract administration will be effected by the KO. Communications pertaining to contractual administrative matters shall be addressed to the KO. No changes in or deviations from the terms and conditions shall be effected without a written modification to the contract, executed by the KO authorizing such changes. The KO will approve all submittals and plans required in this

PWS.

2.4.2.2 Contracting Officer’s Representative (COR).

The KO will appoint a COR during the performance of this requirement. Additional Government personnel may be designated to assist in contract oversight IAW (Army Regulation) AR 70-13, Management and Oversight of Service Acquisitions. Other surveillance personnel may be designated as COR and shall be trained and appointed IAW Department of Defense Instruction (DoDI) 5000.72, Department of Defense (DoD) Standard for Contracting Officer’s Representative (COR) Certification. The COR will provide assistance in identification and resolution of problems, conflicts in priority, subtask requirement definitions, and other operations type problems. The COR will perform IAW the responsibilities and duties identified in the appointment letter.

2.4.2.3 COR Authority.

A letter of designation will be issued to the COR by the KO. A copy of the letter will be sent to the Contractor. The letter of designation states the responsibilities and limitations of the COR, especially with regard to changes in cost, price estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions with regard to cost, quantity, or schedule of the resulting order.

2.4.2.4 COR or Designated Government Representative Functions.

The COR or designated Government representative shall monitors all technical aspects of the contract and assists in contract administration. The COR or designated Government representative is authorized to perform the following functions: assure the Contractor performs the technical requirements of the contract;

perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements; monitor, document, and report Contractor's performance and notify both the KO and Contractor of any deficiencies; coordinate availability of Government-Furnished Property, and provides direction or assistance for site entry requests of Contractor personnel.

2.4.2.4.1 The Contractor shall not in any way represent the United States (U.S.) Government, or that it has the authority to contract or procure supplies for the account of the United States of America (USA).

2.4.3 Contractor Key Personnel.

Shall be designated in writing to the KO at the start of the contract. These key personnel shall be available 24/7/365 including Federal holidays. These individuals designated as key personnel shall be able to understand, speak, read, and write the English language.

2.4.3.1 Project Manager (PM) or Contract Manager (CM).

The Contractor shall provide a Project Manager (PM) or Contract Manager (CM) who is responsible for the performance of the work. The PM or CM shall have full authority to act for the Contractor on all contract matters relating to daily operation of the contract. The PM or CM shall have a baccalaureate degree from an accredited College or University and five (5) years of experience in base support management or a contract similar in scope and breadth to this solicitation. The name of the PM or CM shall be provided to the KO and shall be present and on-site and available during normal duty hours. In the circumstances when the PM or CM is not available, the Contractor shall designate an alternate who can perform the same duties during the absence.

2.4.3.2 Operations and Maintenance Superintendent (O&M Superintendent) N/A

2.4.3.3 Quality Control Manager (QCM)

The Contractor shall designate a full time QCM on site during normal duty hours. As a minimum, the QCM shall possess work experience in process control, quality data analysis, quality auditing, statistical sampling, and subcontractor quality control. The QCM shall have at least two (2) years of relative experience, and shall be responsible for the overall management and implementation of the Contractor's Quality Control Plan.

2.4.3.4 Quality Control Inspectors (QCI)

The Contractor shall designate QCI personnel sufficient to monitor Contract work to assure compliance with Government requirements. QCIs shall have two (2) years of documented experience in quality control of construction and/or maintenance of building equipment.

2.4.3.5 General Fund Enterprise Business System (GFEBS) Project Manager Coordinator.

N/A

2.4.3.5.1 GFEBS Certification. N/A

2.4.4 Contractor Requirements.

2.4.4.1 U.S. Residency. N/A

2.4.4.2 Common Access Card (CAC) to access Government systems. N/A

2.4.4.3 Qualification Standards.

The Contractor shall inspect, repair, and maintain systems and components associated with facilities listed in real property records as required throughout this contract utilizing properly trained, skilled, and qualified employees or subcontractor personnel.

A) Prime Contractor’s License/Registration: The Prime Contractor shall possess (i) a current and valid business license (사업자등록증), (ii) a valid Hygiene management permission license under Management of Public Health Act (공중위생영업 중 위생관리 용역업 신고증) issued by the Republic of Korea (ROK) Government, and (iii) a valid Annual Hygiene Training Certificate (정기 위생교육필증) issued by Korean Facility Hygiene Management Association within the date of solicitation to provide cleaning service for food exhaust fans and ducts at dining facilities. The subcontractor’s license & certificate cannot be substituted for the Prime Contractor’s license. These licensing and certification shall maintain throughout the life of contract, and shall provide as a part of technical evaluation factor when submitting the proposal. The Contractor shall have at least one (1) 2nd Class Licensed Electrical Technician for the performance of this contract.

B) Prime Contractor’s Prior Experience: The Contractor shall have at least two (2) years of experience within last five (5) years from the closing date of the solicitation in performing cleaning of exhaust fans and ducts services for U.S Government or Commercial Business Company in ROK of similar size and same scope or larger than this contract.

Relevant past performance shall be the “same or similar” as determined by the U.S Government, for services on size, scope and complexity. The Contractor shall provide all necessary information of prior experience as a part of technical evaluation factor when submitting the proposal. The experience of a Subcontractor cannot be substituted for the Prime Contractor’s experience. The offeror shall provide evidence of relevant past experience as required below:

- Title of the contract/project

- A brief description of work completed

- Amount of contract

- Length of contract/project (year/month/date – year/month/date)

- Complete name of point of contact for client organization.

C) Key Personnel: In addition to provide a CM stated in para. 2.4.3.1, the Contractor shall provide at least one (1) 2nd Class Licensed Electrical Technician who shall have at least two (2) years of experience within five (5) years from the closing date of the solicitation in the repair/inspection/maintenance of electrical components for the performance of this contract. The Contractor shall provide a CM’s resume whom has experience as a CM at least two (2) years within the last five (5) years from the issuance date of this solicitation. The CM shall have a full authority to act for the Contractor on all contract matters relating to operation of this contract and an employee of the Prime Contractor.

The Contractor shall provide a Management Plan that demonstrates a clear understanding of manpower requirements by identifying the required number of personnel by labor category and installation to perform this contract requirements. Additionally, the Management Plan shall include an organizational chart that identifies personnel and configuration of exhaust fans and hood cleaning services, which clearly demonstrates the capability to manage and perform in accordance with this PWS. The minimum manpower for this requirement shall be provided; CM (1 person), Foreman (1 person who possess 2nd Class Licensed Electrical Technician) and Common Labor (7 people).

Dependent on the area for work accomplishment, the Contractor is required to utilize their maximum resources for satisfactory completion as determined by the government.

2.4.4.4 Contractor Identification.

The Contractor shall ensure that personnel be identified as a Contractor to distinguish themselves (e.g., badge, company logo, or uniform) from Government employees. The Contractor shall ensure all correspondence and reports produced are marked as Contractor products or that Contractor participation is disclosed. Contractor owned/leased vehicles and equipment should be identified.

2.4.4.5 Standards of Conduct.

Contractor personnel’s conduct shall not reflect discredit upon the Government. The Contractor shall ensure all personnel present a professional appearance while working on the Government installation. The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance. The Contractor shall ensure all Contractor employees, providing services under this contract, conduct themselves and perform services in a professional, safe, and responsible manner. The Contractor shall remove, from the job site, any employee for reasons of misconduct or security. The Contractor shall ensure employee conduct complies with 41 USC 423, Procurement Integrity. The Contractor shall also ensure that no Contractor employees conduct political related activities or events on the installation. The removal of such a person shall not relieve the Contractor of the requirement to provide personnel to perform adequate and timely service.

2.4.4.6 Contractor Hiring Restrictions.

The Contractor shall not hire or sub-contract with off-duty or former Government employees whose employment would result in a conflict with AR 600-50, Standards of Conduct.

2.4.5 Business Relations.

The Contractor shall successfully integrate and coordinate all activity needed to execute the requirement of this PWS. The Contractor shall manage the timeliness, completeness, and quality of problem identification to a degree acceptable to the Government. The Contractor shall provide to the KO corrective action plans, timely identification of issues, and effective management of subcontractors. The Contractor shall ensure customer satisfaction and professional and ethical behavior of all Contractor personnel.

2.4.6 Manual Operations. N/A

2.4.7 Interactive Customer Evaluation (ICE). N/A

2.5 Work Management.

2.5.1 Coordination.

As a part of the work scheduling process, the Contractor shall coordinate all work with the Building/Facility Manager in charge of the facility where the work is to be done.

2.5.2 Work Clearance. N/A

2.5.3 Work Status. N/A

2.5.4 General Fund Enterprise Business System (GFEBS). N/A

2.5.4.1 N/A

2.5.4.2 N/A

2.5.5 Work Standards.

The technical specifications within this PWS define the quality of maintenance and repair accomplished under this Contract. When a standard is not directed, the Contractor shall perform required work to meet industry trade customs and practices and manufacturer's recommendations. If floors, cabinets, appliances, foundations, and other items are removed in order to gain access to the system component to be repaired, the Contractor shall return any repaired area to a condition comparable to the original construction after work is completed. Any Government- or occupant-owned property damaged by the Contractor shall be repaired or replaced immediately at contractor’s expense.

2.5.6 Disposal. N/A

2.5.6.1 N/A

2.5.7 Environmental Requirements.

The Contractor shall meet all requirements of the DPW Environmental (ENV) as identified in below:

The Contractor shall perform work consistent with the relevant policy and objectives identified in Installation’s Environmental Management System (EMS). The Contractor shall perform work in a manner that conforms to all appropriate Environmental Management Programs and Operational Controls identified by Installation’s EMS, including pollution prevention, waste reduction, energy use, and natural resource protection. The Contractor shall provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals. In addition, the

Contractor shall advise their employees of their roles and responsibilities identified by the EMS and how these requirements affect their work performed under this contract.

In the event of any environmental nonconformance or noncompliance associated with the contracted services, the contractor shall take corrective and/or preventative actions. In the event of any noncompliance with any federal, state, or local environmental law, regulation or requirement, the Contractor shall immediately respond by taking all appropriate corrective action and notifying the Contracting Officer’s Representative (COR) and the EMS Manager.

For any nonconformance with the EMS, the Contractor shall take corrective action and initiate further preventative action, as required by the EMS Manager.

All on-site contractor personnel shall complete necessary safety and environmental training specified for the type of work conducted on-site. Upon contract award, the COR will notify the EMS Manager to arrange EMS training for appropriate staff.

Additionally, when ordering supplies for use on Installation, all contractor personnel must favor energy-efficient, recycled or reclaimed material whenever practicable.

The responsibilities of all contractor personnel include, but are not limited to:

(1) Recycling all eligible material, including glass, paper (including magazines), plastic, aluminum, and cardboard to the maximum extent practicable;

(2) Reducing the amount of hazardous material and/or solvent used by purchasing fewer hazardous materials and by increasing the use of products with recycled content;

(3) Reducing the amount of solid waste from construction and demolition debris, and scrap metal sent to municipal and rubble landfills by reducing, reusing, and recycling; and

(4) Conserving energy and water usage by turning off lights and equipment when not in use and using only the necessary amount of water needed to complete the required tasks. Continuous conservation of our natural resources is a must.

Any questions regarding EMS may be directed to the Installation EMS Manager or COR.

2.5.7.1 Particulate Matter.

The Contractor shall use water, or suitable oil or chemicals approved by DPW-ENV, to control dust in the demolition of structures, work operations, work performed on a road, street, or parking area, in the clearing of land.

2.5.7.2 Construction (Storm Water) permits. N/A

2.5.7.3 Utility Clearances. N/A

2.5.7.4 As-Built Drawings. N/A

2.5.7.5 Maintenance of Work Site.

The Contractor shall remove from the work area, at the end of each day and completion of the job, all waste, material, and by-products resulting from work performed. If applicable, the Contractor shall return usable material to a designated storage area for reuse. The Contractor shall ensure all job sites are secured during inclement weather to avoid damages or windblown materials.

2.5.7.6 Installation Recycling Program.

The Installation Recycling Program is a resources conservation effort managed and operated by the DPW-ENV IAW DoD regulations.

2.5.7.7 Actions and Delivery. N/A

2.5.7.8 Facilities, Systems, and Equipment Identified for Future Replacement.

Regardless of whether specific facilities, systems, or equipment have been identified for future replacement by the Government, the Contractor shall perform maintenance and repair of the equipment as outlined in this PWS, unless otherwise directed by the KO.

2.5.7.9 New Components.

New components shall match or exceed existing components in both manufacture and quality. The Contractor shall consider aesthetics (i.e., color, texture, and quality) in material selection. If existing aesthetics cannot be matched, the Contractor shall submit variations to the KO/COR for acceptability prior to installation. New components for Historic Buildings need to be reviewed and approved by DPW-ED, historic resources. Buildings identified in TE 1 of this PWS, Historic Real Property Inventory as a historic building or structure will have all work comply with the National Historic Preservation Act, Section 106 (http://www.achp.gov/work106.html) and the Secretary of Interior Standards of Treatment of Historic Properties (https://www.nps.gov/tps/standards.htm).

2.5.7.10 Energy Conservation Standards. N/A

2.6 Demand Maintenance Orders (DMOs). N/A

2.6.1 Direc tora te o f Publ ic Work (DPW) Work Reception (WR). N/A

2.6.2 DMO Call Receipt and Entry. N/A

2.6.3 Completed Work. N/A

2.6.4 Materials. N/A

2.7 Preventive Maintenance Orders (PMOs). N/A

2.7.1 N/A

2.7.2. Process. N/A

2.7.2.1 N/A

2.7.3 Approved preventive maintenance schedule. N/A

2.7.4 PMO Stickers/Log. N/A

2.7.5 Operations & Maintenance (O&M) Library. N/A

2.8 Operations Work Orders (OWOs). N/A

2.9 Project Work Orders (PWOs). N/A

2.9.1. N/A

2.9.2 Conversion of DMO to PWO. N/A

2.9.3 Conversion during Execution. N/A

2.9.4 Conversion Prior to Execution. N/A

2.9.5 Cost Estimates for DMO Generated PWOs. N/A

2.9.6 Preparation of Detailed Estimates. N/A

2.9.7 Subcontract Work. N/A

2.9.8 Specialty Subcontracting Work. N/A

2.9.9 Execution of PWO Work. N/A

2.9.10 Wage Rates for PWOs. N/A

2.9.11 PWO Bi-weekly Meetings. N/A

2.9.12 PWO Records. N/A

2.9.13 PWO Reporting Requirements. N/A

2.10 Warranty Program. N/A

2.10.1 Warranty Enforcement Manager. N/A

2.10.2 Warranty Management. N/A

2.10.3 Routing of Warranty DMOs. N/A

2.10.4 Warranty Records. N/A

2.10.5 Exception. N/A

2.11 Technical Document Library Operation.

The Contractor shall store, maintain and make technical documents available to all Government personnel and others approved by DPW upon request. If electronic versions are available, the Contractor shall provide these via e-mail or other electronic media. If no electronic copy is available, the hardcopies will be scanned and sent to the Government personnel and others approved by DPW. Contractor shall obtain and record adequate contact information from the borrower, and the documents will be checked out for no longer than five (5) days. In the case where only one hardcopy exists and the document cannot be scanned; the documents shall be made available for reference or for copies. The Contractor, to the maximum intent possible, shall maintain all warranty documents in an electronic data base.

2.12 Maintain As-Builts. N/A

2.13 Historic Property or Archaeological Site.

Historic properties and archaeological sites are subject to the provisions of the National Historic Preservation Act (NHPA). The Contractor shall maintain the historic properties on the installation IAW the NHPA, 54 United States Code (U.S.C) § 300101, National Preservation; 36 Code of Federal Regulations (CFR) Part 800, Advisory Council on Historic Preservation; and United Facilities Guide Specifications (UFGS). The Contractor shall comply with all applicable Federal historical structure and archeological laws. TE 1 provides more detail on historic properties at Daegu, Waegwan, Busan and Pohang area, DPW, USAG Daegu.

2.13.1 Repair and Replacement.

The Contractor shall report damages to the KO/COR within two (2) hours. Damages can include those found on site during inspections and/or repair of other areas or damages caused by the Contractor during the repairs. The Contractor shall repair or replace parts with products similar in appearance to the original.

Repairs, renovation, or replacement to historic buildings must be approved by the KO and/or COR.

2.14 Security

2.14.1 Access and General Protection/Security Policy and Procedures.

The Contractor and all associated subcontractors employees shall comply with applicable installation, facility, and local security policies and procedures. The Contractor workforce shall comply with all personal identity verification (PIV) requirements as directed by DoD, Headquarters Department of the Army (HQDA), and local policy. The KO/COR will request changes in Contractor security matters or processes if the Force Protection Condition (FPCON) at any individual facility or installation changes.

2.14.2 Rules, regulations, direction, and requirements issued by the Commander apply to the Contractor.

The Contractor shall become acquainted with and comply with all Government regulations as posted, or as required by the KO. Regulations, manuals, and technical documents applicable to this Contract are listed in Section 6.0 of this PWS. Control for classified publications requirements can be located in AR 380-5, Department of The Army Information Security Program, and secured in a filing type cabinet with a built-in locking device with tumblers and General Services Administration (GSA) approved security container.

2.14.3 Government Vehicles. N/A

2.14.4 Contractor Vehicle Registration. The Contractor shall maintain a list of all Contractor-owned or operated vehicles and trailers operating on the installation at all time. The list may be used in case of emergency and/or other contingency. Evidence of vehicle ownership and vehicle liability insurance must be presented upon application of vehicle registration.

2.14.4.1 Contractor and all associated subcontractors employees shall comply with applicable…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .