Questions and Answers.pdf

PDF 402 KB Posted

Attached to
Container Door Bars
Solicitation number
W90VN9-21-R-0088
Issued by

View the file

Other files

File Type Posted
W90VN9-21-R-0088 Container Door Bars Solicitation.pdf PDF
Drawing.pdf PDF
Picture.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS

QUESTION 1. Can the ends of the tubes be capped? There is no real effective way to paint the inside of the tube water running into the tube will result in corrosion that cannot be prevented.

Answer: The end of the tube does not need to be capped. The door-bar is mounted in the containers.

QUESTION 2. Can the parts be powder coated? This coating is more durable when handled and is less likely to scratch of peel.

Answer: The Government has no issues with the paint as long it is rust proof.

QUESTION 3. Can shipping be arranged through the defense logistics agency first destination program?

Answer: The shipment must be received at the destination provided in the solicitation within 45 days upon receipt of the contract. Please also note instructions in General Information Section of RFQ – items can be procured locally and transportation from CONUS will likely exceed 45 day requirement.

QUESTION 4: Is there any flexibility in the 45 day delivery schedule for Container Door Bars, W90VN9-

21-R-0088? Steel is still difficult to get right now and the freight time from the states to Korea can consume a majority of that time.

Answer: Please also note instructions in General Information Section of RFQ – items can be procured locally and transportation from CONUS will likely exceed 45 day requirement.

File details come from the government source that posted it. Updated .