A. THIS IS A NON-WORK PLAN TASK ORDER RFP TO MATOC IDIQ General Construction, Area IV.
This RFP is in accordance w ith terms and conditions of 1st option year of MATOC IDIQ General Construction Contract Numbers;
W91QVN-18-D-0080, W91QVN-18-D-0082, W91QVN-18-D-0084, W91QVN-18-D-0085, W91QVN-18-D-0089 through W91QVN-18-D-0092, and W91QVN-18-D-0113, W91QVN-18-D-0115, W91QVN-18-D-0116, and W91QVN-18-D-0118 through W91QVN-18D-0121, and W91QVN-18-D-0124.
B. Site Visit: Offerors w ho intend to propose on this solicitation are strongly encourage to attend site visit. See site visit clause FAR
52.236-27 in Section L. Offerors are required to have a valid Korean Identif ication card w hen attending the site visit orientation.
C. If the contractor is unable to submit the proposal in response to this RFP, the contractor shall submit the "No-Offer Letter" by date and time specif ied in this solicitation.
D. The pricing proposal shall be submitted by 1300hrs on the closing date of the RFP through the Federal Business Opportunities w ebstie https://beta.sam.gov.
E. Section K: Offerors must complete all portions of Section K, and submit this section at https://beta.sam.gov.
MR. HONG, YUN PYO 315-763-5685
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
10-Jan-2020
(RFP)
(IFB)
X
CALL:
Repair Munition Admin, B-119, Daegu AB, Korea
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________360 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
YES X NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________07 Feb 2020 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
RCO DAEGU, UNIT #15682
APO AP 96218-5682
UNITED STATES
W90VN9
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
01:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
WPAZQ 17-1201
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W90VN920R0011 31
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued)
(Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W90VN920R0011
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Repair Munition Admin
FFP
Project WPZQ 17-1201, Repair Munition Admin B-119, Daegu Air Base, Korea
The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as listed in the schedule and in accordance with the drawings, statement of work, specifications and terms and conditions contained herein.
FOB: Destination
MFR PART NR: Null
PURCHASE REQUEST NUMBER: F3J6SG9336AW01
PSC CD: C1GC
NET AMT
Section C - Descriptions and Specifications
SOW
TECHNICAL PROVISIONS – I
STATEMENT OF WORK
PROJECT NO TITLE LOCATION
WPZQ 17-1201 Repair Munition Admin, B-119 Daegu Air Base (AB)
a. DESCRIPTION: The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as listed in the schedule and in accordance with the drawings, statement of work, specifications and terms and conditions contained herein.
(1) The contractor shall provide shop drawings after award of the contract.
(2) Contract performance period will be 360 days from the notice to proceed.
(3) All work shall be completed by tailored specification and attached drawings.
(4) The contractor shall request, in writing addressed to the Contracting Officer (KO) through the
Contracting Officer Representative (COR), the release of these facilities no less than 30 days prior to the start of work scheduled for the buildings.
b. PRINCIPAL FEATURES: This project includes, but shall not be limited to the following principal features:
0001. CIVIL WORK – SITE WORK & EXTERIOR UTILITIES
1. Install water distribution line including soil excavation, backfill/compaction, cushion layer, pipes, insulation, fittings, and concrete thrust blocks as shown on the drawings.
2. Install fire hydrants including form work, concrete, gravel for drain, guard post, pipes, and concrete post as shown on the drawings.
3. Install valves with boxes including form work, concrete base, and rebar tie rod as shown on the drawings.
4. Apply the asphalt concrete pavement including subgrade grading and compaction, subbase course compaction, base course compaction, prime coat, pouring asphalt concrete, finish, compaction for asphalt pavement, joints, tack coat, saw cutting, and striping as shown on the drawings.
5. Install the concrete wheel stop including concrete, form work, and re-bar work as shown on the drawings.
6. Install the concrete sidewalks including excavation, backfill/compaction, disposal, Non Frost Susceptible
Materials (NSFM), vapor barrier, concrete work, form work, contraction joint and expansion joint as shown on the drawings.
7. Install the concrete ramp with handrails including excavation, backfill/compaction, disposal, Non Frost
Susceptible Materials (NSFM), vapor barrier, concrete work, form work, expansion joint, wire mesh work, re-bar work, handrail, and paint as shown on the drawings.
8. Install concrete steps including excavation, backfill/compaction, disposal, Non Frost Susceptible Materials
(NSFM), vapor barrier, concrete work, form work, and re-bar work as shown on the drawings.
9. Install concrete curb including excavation, backfill/compaction, disposal, concrete, form, and expansion joint as shown on the drawings.
10. Install concrete taper including excavation, backfill/compaction, disposal, concrete, form, and expansion joint as shown on the drawings.
11. Install concrete pad including excavation, backfill/compaction, disposal, gravel fill and compaction, concrete, form, re-bar work, and disposal as shown on the drawings.
12. Apply the sodding including solid sodding, top soil treatment, and soil fill as shown on the drawings.
13. Remove the existing asphalt concrete pavements including base course, and disposal as shown on the drawings.
14. Remove the existing concrete sidewalk including base course, and disposal as shown on the drawings.
15. Remove the existing concrete curb including disposal as shown on the drawings.
16. Remove the existing concrete pad including disposal as shown on the drawings.
17. Transplant two trees as shown on the drawings.
0002. STRUCTURAL WORK
1. Remove the existing concrete including saw cut, and disposal as shown on the drawings.
2. Install the temporary external, internal scaffolding including steel pole, connecting metal pin, fastening metal, supporting metal, rigger, excavation, backfill/compaction, disposal, Non Frost Susceptible Materials (NSFM), sand, vapor barrier, concrete, form, re-bar, welded wire mesh, expansion joint, crack control joint as shown on the drawings.
3. Install/block-up concrete masonry unit (CMU) including block, cement, sand, block mesh, and re-bar as shown on the drawings.
4. Replace the existing super structure with new steel frame as shown on the drawings.
5. Replace the existing roof with standing seam metal roofing (SSMR) as shown on the drawings.
0003. ARCHITECTURAL WORK
A. Temporary and Removal work
1. Remove existing metal roofing, metal siding, wall partition with studs, wall lining with furring, suspended ceiling system, ceiling texture, gypsum wall board, insulation, floor mortar, wall tiling, floor tiling, wood and vinyl bases, flooring tile, doors, windows, toilet fixtures, and counters as shown on the drawings.
2. Dispose and haul waste material off the base.
B. Moisture protection and damp proofing work
1. Install new SSMR including panel, metal sheet, corrugation, closure strip, sealant, pipes, caps, caulking, and bolt as shown on the drawings.
2. Install new metal lining and flashing including metal sheet, corrugation, closure strip, tapping screw, and caulking as shown on the drawings.
3. Install new gutters and downspouts with all necessary accessories as shown on the drawings.
4. Install new insulation, vapor barrier, vensulation including self-adhesive air, membrane, glass mat gypsum, rigid insulation, stud partition, and fiberglass as shown on the drawings.
5. Install exterior insulation and finish system (EIFS) including boards, bond, mesh, finish coat, primer, weather seal, start track, flashing, and sealant as shown on the drawings.
6. Install moisture and damp proofing including fiber cement board wall finishing, nail, and adhesive as shown on the drawings.
C. Doors and windows work
1. Replace existing door and door frame with thermal insulated metal blast door and metal frame as shown on the drawings.
2. Replace existing door and door frame with metal hollow core door and metal frame as shown on the drawings.
3. Replace existing door and door frame with acoustical wood solid core door and metal frame (natural oak factory finish) as shown on the drawings.
4. Replace existing door and door frame with wood solid core door and metal frame (natural oak factory finish) as shown on the drawings.
5. Replace existing door and door frame with thermal insulated metal door and metal frame as shown on the drawings.
6. Add door and door frame with metal hollow core door and metal frame as shown on the drawings.
7. Add door and door frame with thermal insulated metal door and metal frame as shown on the drawings.
8. Replace existing window and window frame with fixed/casement aluminum blast window with insect screen
(thermal break type) as shown on the drawings.
9. Add window and window frame with fixed/casement aluminum blast window with insect screen (thermal break type) as shown on the drawings.
10. Add aluminum louver with bird & insect screen as shown on the drawings.
D. Finish work
1. Provide metal furring and studs work for wall including expansion bolts as shown on the drawings.
2. Provide suspension ceiling system with molding and trims including bolus, angles, clips, and wires as shown on
3. Provide gypsum wall board lining and partition work including joint compound, screws, metal trims, plastic control joint tape, and sealants as shown on the drawings.
4. Provide troweling, plastering, and spraying work including hardener finishing, leveling, and skim coat of plaster as shown on the drawings.
5. Provide new floor finishes including ceramic mosaic tile, vinyl composition tile, quarry tile, glazed ceramic cove base with trims, glazed ceramic wall tile with mortar, and mortar bed as shown on the drawings.
6. Provide resilient, carpet, textile work including vinyl composition tile, vinyl cove base, acoustical tile, and sound absorption wall panel with screw as shown on the drawings.
7. Paint interior and exterior finishes as shown on the drawings.
E. SPECIALITIES WORK
1. Provide toilet, shower, bath room partition, hardware, and all accessories including tissue dispensers, napkin disposers, paper towel dispenser, mirror with back panel, urinal baffles, metal lockers, and steel shelving as shown on the drawings.
2. Provide fire extinguisher cabinet as shown on the drawings.
3. Provide new signage as shown on the drawings.
4. Replace existing blind as shown on the drawings.
5. Replace existing bulletin board.
0004. MECHANICAL WORK
A. HVAC EQUIPMENT WORK
1. Install single-packaged rooftop heat pump unit with all accessories as shown on the drawings.
2. Install roof mounted exhaust fans with all accessories as shown on the drawings.
3. Install wall mounted electric wall heaters with all accessories as shown on the drawings.
B. HVAC DUCT WORK
1. Install new ducts with galvanized metal sheet including insulation, supply diffusers, balancing dampers, motorized dampers, smoke detectors, back draft dampers, transfer grilles, registers, volume dampers, turning vanes, intake louvers with bird screen, goose neck with bird screen, flexible connectors, liners, and sleeve cores as shown on the drawings.
C. HVAC DEMOLITION WORK
1. Remove existing supply air diffuser, return air register, outside air register, warm air furnace, exhaust air fan and associated duct work as shown on the drawings.
2. Remove existing split air conditioning unit, Air Conditioning Units, fuel oil piping, and associated duct work as shown on the drawings.
D. PLUMBING WORK (EQUIPMENT)
1. Install electric hot water heater, electric water cooler, water closet with flush valves, urinals with flush valves, lavatories with faucets, and service sink as shown on the drawings.
E. PLUMBING WORK
1. Install copper tubes, insulations, vapor barrier jackets, aluminum bends, elbows, tees, reducers, sockets, caps, unions, adapters, gate valves, check valves, ball valves, strainers, thermostatic mixing valves, back flow preventer, pressure reducing valve, pressure relief valve, air vent, pressure gage, water hammers, wall hydrant, water meter, pipe hangers, flanges, flexible pipe connector, copper tube brazing, welding rods, and fire-stop sealants as shown on
F. SEWER & VENT WORK
1. Install galvanized steel pipes, elbows, tees, reducers, cast iron pipes, bends, Y-branches, YT-branches, clean outs, traps, fitting joints, floor drain & indirect drains, open sight drain, floor sink, and pipe hangers as shown on the drawings.
G. PLUMBING DEMOLITION WORK
1. Remove existing electric hot water heater, water closet, urinals, lavatories, service sink, and electric water cooler with associated piping as shown on the drawings.
2. Remove existing cold water and hot water piping, and floor drain piping with associated sewer piping as shown
0005. ELECTRICAL WORK
A. LIGHTING (MAINTENANCE and REPAIR WORK)
1. Install light fixtures with lamp, support, toggle switches, ceiling mounted dual occupancy sensor switches, wall mounted dual occupancy sensor switches, momentary contactor switches, photocell, three position selector switch galvanized rigid steel conduits, wires, supports, hanger rods, conduit clamps, and boxes with all accessories as shown on the drawings.
2. Remove existing fluorescent lights, down lights, pendant mounted lights, light switches, outdoor lights, exit lights, emergency lights, wiring as shown on the drawings.
B. POWER (MAINTENANCE and REPAIR WORK)
1. Install duplex receptacles, quad-flex receptacles, ground fault protected duplex receptacles with cover plate, ground fault protected duplex receptacles with weather proof cover plate, single receptacles with cover plate, toggle switches, safety switches, surge suppressors, manual motor starters, ground rod, advanced digital watthour meter, magnetic motor starters, combination motor starters as shown on the drawings.
2. Install panel boards, main switchboard including main/branch circuit breakers, galvanized rigid steel conduits with fittings, wires, bends, flexible conduits, flexible connectors, electric cables, grounding wire, junction boxes, outlet boxes, supports with cover, pull boxes, enclosure circuit breaker, and heating cables as shown on the drawings.
3. Remove existing panel boards, receptacles, enclosure circuit breakers, safety switches, pull boxes, magnetic motor starter, manual motor starter, combination motor starters, junction boxes, control boxes, and wiring as shown
C. FIRE ALARM/MASS NOTIFICATION
1. Install combined addressable fire alarm/mass notification control panel with programmable module, relays, LCD annunciator, synchronization control module, power supply, digital voice module, microphone, battery, battery charger, power modules panel, amplifier, back-up amplifier, and NEMA 1 enclosure as shown on the drawings.
2. Install building transmitter, lightning arrester, fire alarm antenna, coaxial cable, local operating console, addressable type fire alarm manual pull station, weather proof type addressable type fire alarm manual pull station, wall mounted speakers, weather proof type wall mounted speakers, weather proof type fire alarm/mass notification speakers, addressable photoelectric smoke detectors, carbon monoxide detectors, end-of-line resisters, addressable module boxes, duct smoke detectors, surge protection cabinet, junction boxes with cover, box supports, device covers, conduits with fittings, wires, supports, electric cables, grounding wire, grounding rods, flexible conduits, and flexible connectors as shown on the drawings.
3. Remove existing detectors, bells, manual pull station, control panel, building transmitter, antenna, wiring as shown on the drawings.
4. Perform the final acceptance test and test reports, inspection reports for fire alarm system.
5. Provide an Operations and Maintenance (O&M) training for fire alarm system on a specified date and time by
RA.
D. CATV
1. Install cable TV distribution cabinet as shown on the drawings.
2. Install pull box, television outs, outlet box with cover, box supports, conduits, wires, conduit supports, bends, electric cables, coaxial cables, and grounding wire as shown on the drawings.
3. Remove existing cable TV outlets as shown on the drawings.
E. TELEPHONE WORK
1. Install the new telecommunication backboard including entrance terminal, cross connect terminals, wall type single modular telephone outlets, protector modules, ladder cable tray, terminal blocks, patch panel, joint connector, grounding jumpers, conduits with supports, fiber optic cables, cables, wires, boxes, fire stopping materials, ground bus bars, and fittings and all other necessary accessories as shown on the drawings.
2. Remove existing telephone terminal cabinet as shown on the drawings.
F. TRANSFORMER STATION
1. Provide pad mounted transformer station including seal around base, ground rod, wire, conduits, concrete pad, and test as shown on the drawings
G. EXTERIOR RPIMARY POWER
1. Provide exterior primary power including cable, conduits, wire connector, normal steel bend, fuse cutout switch, terminations, seal bushing 3 hole, duct installation, and high-power testing as shown on the drawings.
H. EXTERIOR SECONDARY POWER
1. Provide exterior secondary power including cable, conduits, wire connector, normal steel bend, duct installation, and couplings as shown on the drawings.
I. EXTERIOR LIGHTING
1. Install exterior light fixtures with lamp, ground rod, electric cables, grounding wire, conduits, wire connector, and
PVC conduits as shown on the drawings.
J. EMERGENCY POWER
1. Install emergency power system including manual transfer switch, electrical cable, wire, conduit, wrapping tape, solid sodding, and duct installation as shown on the drawings.
2. Remove PCC pavement and restore PCC pavement as shown on the drawings.
TECHNICAL PROVISIONS – II
STANDARD TECHNICAL DETAIL SPECIFICATIONS
PROJECT NO TITLE LOCATION
WPZQ 17-1201 Repair Munition Admin, B-119 Daegu Air Base (AB)
GENERAL: The project shall comply with attached tailored specification and attached drawings.
The Tailored specification electronic files are available at the USFK website -
(http://www.usfk.mil/LinkClick.aspx?fileticket=T04DOvOMmXs%3d&tabid=19646&portalid=105).
DIVISION 01 - GENERAL REQUIREMENTS
01 22 00 PAYMENT
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS, AND
MISCELLANEOUS PROVISIONS
01 57 19.00 31 TEMPORARY ENVIRONMENTAL CONTROLS (DAEGU ONLY)
01 62 35 RECYCLED/RECOVERED MATERIALS
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 82 13.00 10 ASBESTOS ABATEMENT
DIVISION 03 - CONCRETE
03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 52 00 METAL RAILINGS
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 13 BOARD AND BLOCK INSULATION
http://www.usfk.mil/LinkClick.aspx?fileticket=T04DOvOMmXs%3d&tabid=19646&portalid=105
07 21 16 MINERAL FIBER BLANKET INSULATION
07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 13 SELF-ADHERED MEMBRANE AIR BARRIER, VAPOR IMPERMEABLE
07 41 14 PROTECTED METAL
07 60 00 FLASHING AND SHEET METAL
07 61 14.00 20 STEEL STANDING SEAM ROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 37 73 SOUND CONTROL DOOR ASSEMBLIES
08 39 54 BLAST RESISTANT DOORS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL LOUVERS
DIVISION 09 – FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 68 00 CARPETING
09 84 13 SOUND ABSORPTION WALL PANELS
09 90 00 PAINTS AND COATINGS
DIVISION 10 – SPECIALTIES
10 11 00 VISUAL DISPLAY UNITS
10 14 00 10 EXTERIOR SIGNAGE
10 14 00 20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
DIVISION 12 – FURNISHINGS
12 21 00 WINDOW BLINDS
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT
13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT
DIVISION 22 – PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 53.00 20 SPACE TEMPERATURE CONTROL SYSTEMS
23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT
23 83 00.00 20 ELECTRIC SPACE HEATING EQUIPMENT
DIVISION 26 – ELECTRICAL
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 08 00 APPARATUS INSPECTION AND TESTING
26 12 1910 THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 – COMMUNICATIONS
27 05 14.00 10 COMMUNITY ANTENNA TELEVISION (CATV) SYSTEMS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 – EARTHWORK
31 00 00 EARTHWORK
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 20 SUBBASES FOR FLEXIBLE PAVING
32 11 23 AGGREGATE BASE COURSE
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 16 13 CONCRETE SIDEWALKS, CURBS, GUTTERS, SWALES AND DITCHE
32 17 23 PAVEMENT MARKINGS
32 92 23 SODDING
32 96 00 TRANSPLANTING EXTERIOR PLANTS
DIVISION 33 – UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
TECHNICAL PROVISIONS - III
General Requirements
1. SPECIFICATIONS: The project shall comply with tailored specification for WPZQ 17-1201, Repair Munition
Admin, B-119, Daegu AB, Korea, The specification electronic files are available at the 607th Materiel Maintenance
Squadron, Civil Engineering Branch, Daegu Air Base. The Tailored specification electronic files are available at the
USFK website (http://www.usfk.mil/LinkClick.aspx?fileticket=T04DOvOMmXs%3d&tabid=19646&portalid=105).
2. LOCATION OF WORK: Work to be performed under this contract will be at Daegu Air Base, Republic of
Korea.
3. WORKING HOURS: Work to be performed under this contract shall be performed between the hours of 0700 and 1700, Monday through Friday, exclusive of Saturdays, Sundays, and holidays. Extended work hours, Saturday, Sunday, or holiday work may only be performed with written approval of the COR. Request for extended work hours, Saturday, Sunday, or holiday work shall be forwarded to the COR for approval, no later than 1200 hours, one and a half (1-1/2) days prior to the requested work day.
4. ALERTS: During military alerts or special operations, anticipated not to exceed forty (40) working days per year of contract duration, the contractor may be denied access to the base or the work areas. When the contractor is prohibited from access to the base or worksite for one (1) day or less per month, no adjustment in the contract time shall be made. When the contractor is prohibited access for more than one (1) day per month, an adjustment to the contractor’s schedule will be made by the KO.
5. PROJECT MANAGER: The contractor shall provide a project manager who shall be responsible for overseeing the performance of work. The name of this person shall be submitted in writing at least three (3) calendar days prior to the pre-construction conference for review and approval by the Contracting Officer. Project Manager shall be hired by prime contractor. During the course of the contract, if it is determined that the project manager cannot perform his/her duties, the Contractor will be notified by the KO, in writing, to provide a qualified replacement. The project manager shall be available at the work site at all times to coordinate with representative of the U.S.
Government.
6. DAILY REPORTING: It shall be the responsibility of the project manager to report to the COR or Government project inspector every workday at 0800 hours. The project manager shall provide the COR or Government project inspector with a daily report detailing the work which is being accomplished at the worksite. Failure on the project manager’s part to report to the COR or Government project inspector will result in a letter of concern, cure notice or
Contract Discrepancy Report (CDR) requesting an immediate corrective action to prevent recurrence for lack of coordinating the daily work report.
7. NOTIFICATION OF INSPECTIONS: Prior to starting work at the work site, the contractor shall advise the chief of 607th Materiel Maintenance Squadron Civil Engineering Section of the actual date that the contractor intends to start work. The contractor shall also give the COR or project inspector no less than two (2) work day notice prior to each concrete placement, asphalt placement field test, protective coating, or any other work deemed necessary by the
COR or project inspector. The contractor shall also give at least a seven (7) work day written notification of the pre-final and final inspections. The 607th Materiel Maintenance Squadron Civil Engineering Section is located in building #5007, Daegu Air Base, Korea, base phone extension is 766-4547 or commercial (053) 980-4547.
8. CLOSE-OUT/TURNOVER MATERIALS: The contractor shall be responsible for providing the following material as part of final turnover to the U.S. Government. :
a. AS-built drawings shall be submitted to COR for review and acceptance in electronic format utilizing
AutoCAD 2006 or higher and submitted on CD/DVD format (3 copies).
b. O&M training shall be provided to U.S. Government personnel on new mechanical systems NLT 5 days prior to final acceptance. O&M Manuals shall be submitted in both electronic and hard copy format (3 copies each) in
Hangul and English.
c. Turnover of all new facility keys and salvageable material (if any) shall be submitted to COR.
http://www.usfk.mil/LinkClick.aspx?fileticket=T04DOvOMmXs%3d&tabid=19646&portalid=105
d. Contractor shall prepare DD 1354 (Transfer and Acceptance of DoD Real Property) with type and quantity of construction material installed including DD Form 1149, Requisition and Invoice/Shipping Document. When all materials have been turned over, the COR will notify the KO so that the final payment may be released. Up to five
(5%) percent of the total contract amount may be withheld pending complete turnover of material stated in this paragraph.
9. AIR FORCE MATERIALS: All salvageable materials removed from the worksite shall remain the property of the U.S. Government. All other non-salvageable materials shall be disposed of by the contractor, upon coordination with the COR.
10. CONTRACTOR’S EQUIPMENT: All contractor equipment used in the performance of this contract shall be subject to a functional and safety inspection(s) at any time by the COR in accordance with U.S. Air Force Safety
Regulations and EM 385-1-1, U.S. Army Corps of Engineers Safety and Health Requirements Manual. Any equipment found not to be functional or safe as determined by the Government shall be immediately repaired, replaced, or removed from the worksite by the contractor.
11. MATERIAL COMPLIANCE: The contractor shall be responsible to ensure that all materials used in the performance of the contract meet the specifications and requirements of this contract. Material(s) not meeting the specifications or not approved on AF Form 3000, Material Approval Submittal shall not be transported to the worksite. The COR shall be the approving authority for all materials used in the performance of this contract. All material(s) shall be new and the standard product of a manufacturer who is regularly engaged in the manufacturing of such products. Any materials used in the performance of this contract that have been damaged or that have not been approved on an AF Form 3000 shall be removed and replaced, at the expense of the contractor, and not the
U.S. Government.
12. CONTRACTOR-FURNISHED MATERIAL AND CONTRACTOR-FURNISHED EQUIPMENT (CFM/CFE):
All CFM/CFE, including construction equipment, shall not be permitted to enter Gwangju Air Base unless each item is approved on a DD Form 1149, Requisition and Invoice/Shipping Document. The contractor shall be responsible to notify the COR at least three (3) work days prior to the arrival of, or removal of, any CFM/CFE at Gwangju Air
Base.
13. WARRANTY OF CONSTRUCTION: In addition to any other warranties set out elsewhere in this contract, the contractor warrants that the work performed under this contract conforms to the contract requirements and is free of any defect of equipment, material, or design furnished, or workmanship performed by the contractor or any of his subcontractors or suppliers at any tier. Such warranty shall continue for a period of one (1) year from the date of final acceptance of the work, but with respect to any part of the work which the U. S. Government takes possession of prior to final acceptance, such warranty shall continue for a period of one (1) year from the date the U. S.
Government takes possession. Under this warranty, the contractor shall remedy at his own expense, any such failure to conform or any other such defect. In addition, the contractor shall remedy at his own expense, any damage to U.
S. Government owned or controlled real or personal property, when that damage is the result of the contractor’s failure to conform to the contract requirements or any such defect of equipment, materials, workmanship, or design.
The contractor shall also restore any work damaged in fulfilling the terms of this clause. The contractor’s warranty with respect to work repaired or replaced hereunder will run for one (1) year from the date of such repair or replacement.
14. CONTRACTOR’S TEMPORARY FACILITES: Erection of any facility by the contractor shall be coordinated with the COR. An approved U.S. Government Real Estate Permit from the Base Civil Engineer (BCE) shall be in the contractor’s possession prior to start of any such work. Any contractor erected facility shall be removed and the area cleaned, within seven (7) calendar days after completion of the contract requirements and prior to final invoice payment.
15. UTILITIES: All reasonable quantities of water and electricity necessary to perform the requirements of this contract shall be furnished to the contractor at no charge. Temporary connections shall be made and removed at the contractor’s own expense. Experienced and qualified craftsmen shall make all connections and this effort shall be coordinated with 607 MMS/CE, in Bldg. 5007, DSN 766-4204. The contractor shall pay for all costs to repair utility lines damaged by the contractor.
16. FIRE PROTECTION: The contractor shall comply with the provisions of the Base Fire Protection program, 607
ASGI 32-2001. The contractor shall provide suitable fire extinguishers at any material storage area constructed by the contractor as well as at the work site(s). The contractor shall ensure that all contractor employees understand that there will be no smoking inside of any U.S. Government facility, at any time, during the performance of work under this contract. The COR will identify to the contractor the designated smoking area for the contractor’s employees prior to starting any work. The contractor shall ensure that all contractor employees are aware of the designated smoking area and shall ensure that all contractor employees use the designated smoking area. Any contractor employee found smoking in any U.S. Government facility, at any time, shall be removed from the work site by the
COR. The COR will notify the KO for the removal of any contractor employee for violation of the no smoking policy.
17. BURNING/WELDING OPERATIONS: The contractor shall be responsible to obtain a burning/ welding permit prior to any burning or welding operation. The contractor shall notify the COR not less than five (5) work days prior to such operations and shall return the permit to the U.S. Government inspector at the completion of the permit period. Contractor shall provide fire watch during all open flame/welding work.
18. VERIFICATION OF ACTUALITIES: It shall be the responsibility of the project manager to visit the worksite and thoroughly familiarize himself with all details of the work and working conditions. In the event that any field changes are required due to discrepancies between the contract drawings and actualities, it shall be the responsibility of the contractor to submit shop drawings of the required field change(s) to the COR. The contractor shall submit these shop drawings to the COR. The contractor shall not be authorized to perform any field changes without proper notification in writing from the KO.
19. BASE ACCESS: The contractor shall be required to obtain base access to Gwangju AB to perform the requirements of this contract. The contractor shall be responsible to submit a base access request letter no later than five (5) calendar days after the award of this contract. It shall be the responsibility of the contractor to prepare the necessary base pass paperwork using ROKAF base pass templates including ROKAF background check sheet for each individual requiring access to Gwangju AB. The contractor shall also be authorized to receive vehicle passes for each of the contractor’s vehicles used in the performance of this contract. It shall be the responsibility of the contractor to prepare the necessary paperwork using ROKAF vehicle registration, copy of driver’s license, for each vehicle requiring access to Gwangju AB. Coordination of these documents should be coordinated with the COR.
20. EMPLOYEE QUALIFICATIONS: It shall be the responsibility of the contractor to employ key personnel such as Central Point of Contact (CPOC), Project Manager (PM), Quality Control Manager (QM), and Safety Manager
(SM). All key personnel shall be qualified to perform the types of work required under the terms of this contract and required to maintain satisfactory performance under the contract.
21. INVOICING: Seven (7) work days prior to submitting any invoice(s), it shall be the contractor’s responsibility to provide the COR with a written letter designating the authorized individual to submit invoices and receive payments under the term of this contract. The contractor shall submit six (6) copies of the invoice with carbon paper.
22. PRE-CONSTRUCTION CONFERENCE: It shall be the responsibility of the contractor to contact the COR within five (5) work days after award of this contract. The COR shall then schedule a pre-construction conference within three (3) work days with the using agency and any other base agencies having a direct impact by the work being performed by the contractor under the terms of this contract. Failure on the contractor’s part to contact the
COR within five (5) working days after award of this contract may result in termination of this contract.
23. REPAIR WORK: It shall be the contractor’s responsibility to repair all areas of patch work to match existing areas. This work will include all areas inside of the facility as well as any other areas that the contractor may have damaged during performance of work under the terms of this contract.
24. TEMPORARY SECURITY MEASURES: Whenever a facility or area is breached to perform work, it shall be the contractor’s responsibility to provide temporary measures in order to assure security is maintained at the appropriate levels that existed prior to construction.
25. CONTRACTOR’S RESPONSIBILITIES: It shall be the responsibility of the contractor to have full control of all contractor personnel during performance of work under the terms of the contract. The contractor shall be responsible to ensure that no contractor personnel receive any instructions for additional work from any Government personnel including the COR or project inspector. Any instructions for additional work shall only be issued by the
KO. The contractor will be responsible for any cost incurred for any additional work, which is not identified in the contract specifications or on the contract drawings. The contractor shall be responsible to inform the COR or project inspector of any request form any Government personnel for additional work. The contractor shall provide the COR with name of the individual requesting the additional work and the type of additional work being requested. The
COR will take the necessary actions to inform the KO to prevent such situation.
26. PROGRESS SCHEDULE: The contractor shall prepare and submit AF Form 3064, Contract Progress Schedule no less than ten (10) calendar days after notice to proceed is issued. The contractor shall submit three (3) copies of the AF Form 3064 for approval by the COR and KO.
27. UTILITY OUTAGES/ROAD CLOSURES: It shall be the responsibility of the contractor to request, in writing, to the COR, a minimum of twenty-one (21) calendar days in advance for any water outage, electrical outage, or road closure. The contractor shall provide a requested date and estimated time for the water outage, electrical outage, or road closure. The COR shall be responsible for determining the impact of the water outage, electrical outage, or road closure. The COR shall also be responsible for the processing of the contractor’s request for a water outage, electrical outage, or road closure, the contract shall have written approval for the COR.
28. DEBRIS ON SITE: The contractor will weigh all construction debris removed from Gwangju AB and report these quantities to 607th Materiel Maintenance Squadron Civil Engineering Section.
29. ASBESTOS CONTAINING MATERIALS: No asbestos containing materials (ACM) shall be used under this contract. ACM is any material containing more than 1% asbestos by weight, either along or mixed with other fibrous on non-fibrous materials.
30. OZONE DEPLETING SUBSTANCES: No Class I ODS shall be used in the performance of this contract, nor be provided as a part of the equipment. This prohibition shall prevail over any other provision, specification, drawings or referenced documents.
31. HAZARDOUS MATERIAL (HAZMAT) HANDLING, STORAGE AND DISPOSAL REQUIREMENTS:
The contractor is required to submit HAZMAT approval request forms (AF Form 3000) and Material Safety Data
Sheets (MSDSs) for all HAZMAT brought onto the installation; track current HAZMAT inventories; properly store and dispose all HAZMAT; report spills of HAZMAT; and arrange an environmental inspection of the staging areas and areas where HAZMAT was stored before contract close-out IAW 51 FWI 32-7085 (Gwangju AB Hazardous
Material Management Process Operating Instruction).
a. MATERIAL SAFETY DATA SHEETS (MSDS): It shall be the responsibility of the contractor to furnish Material Safety Data Sheets (MSDS), in English and Korean, for all hazardous material(s) used under the terms and conditions of this contract. The type of materials that the contractor shall submit MSDSs for will include, but is not limited to paint, primer, lacquer, stain, joint compound, caulking, exterior insulation systems, emergency exit lights, cleaning fluids, oil, fuel, etc., and any other type of product deemed necessary by the Contracting
Officer’s Representative (COR), required by U.S. Government Environmental Laws and Regulations, Korean
Environmental Laws and Regulations and the 51 FWI 32-7085.
b. AF Form 3000, HAZARDOUS MATERIAL APPROVAL REQUEST: The contractor shall submit AF Form
3000, Material Approval Submittal to the COR no later than fifteen (15) calendar days after the Notice to Proceed
(NTP) is issued by the Contracting Officer (KO). Resubmission or revisions of material submittals shall be accomplished within seven calendar days after receipt of the material submittal package. Materials shall be ordered within two calendar days after receipt of written approval of material submittals. The contractor shall submit four (4) copies of the AF Form 3000 with carbon paper. The contractor shall submit the AF Form 3000 to the COR for review prior to submitting the AF Form 3000 for approval. It shall be the responsibility of the COR to verify the AF
Form 3000 to ensure that all hazardous materials are submitted in the proper format. It shall be the responsibility of the contractor to list each type of hazardous material on the AF Form 3000. The contractor shall also be responsible to list the quantity, unit of measure (i.e.: each, liter, gallon, etc.), and size of container(s). It shall be the responsibility of the COR to verify these quantities and containers prior to initialing off on the AF Form 3000.
c. AF Form 3000, MATERIAL APPROVAL: After verification of all hazardous materials by the COR and the contractor, the COR shall then be responsible to process AF Form 3000 through 1) 607MMS/CEAN, Environmental Section located in Building 5007, DAEGU AB, DSN 766-4986, commercial telephone (053) 980-
4986, 51st FW/SE; and 2) 51 AMDS/SGPB, Bioenvironmental Engineering located in Building 768, DSN 784-
2326/4685, commercial telephone (031) 661-2326/4685 prior to bringing any hazardous materials onto Gwangju Air
Base, Korea. After receiving approval for all hazardous materials, it shall be the responsibility of the COR to provide the KO and the contractor with a copy of the signed AF Form 3000 for the official files.
d. The contractor is required to track the HAZMAT brought onto the installation by registering the HAZMAT with the HAZMART Pharmacy and applying bar-codes to all HAZMAT IAW 51 FWI 32-7085. When registering
HAZMAT with HAZMART Pharmacy (Building #1631, DSN 784-9285/9286, commercial telephone (031) 661-
9285/9286), the contractor must submit the MSDSs in English, request bar-codes for all HAZMAT, affix the barcodes to the HAZMAT, and clear out the bar-codes when the material is consumed or removed from the base.
The contractor shall be responsible to keep a current inventory of HAZMAT in addition to posting an approved copy of the AF Form 3000 at the worksite storage area as well as keep a signed copy of the AF Form 3000 in the contractor’s field office. It shall be the responsibility of the contractor to provide the COR with a new AF Form
3000 for any additional hazardous materials brought onto Gwangju Air Base throughout the term of the contract.
This shall include any new materials as well as any additional quantities over and above the originally approved quantities.
In lieu of tracking HAZMAT with barcodes issued from the HAZMART Pharmacy, the contractor can agree to submit a HAZMAT inventory each month IAW an alternative 51 FW/CC approved method of tracking the volume of HAZMAT on the installation. When agreeing to track current volumes of HAZMAT, the contractor is required to submit the inventory of hazardous materials by the 15th of each month and ensure MSDSs in English are also submitted for all hazardous materials. The monthly inventory must include:
1. Name of HAZMAT and a common name, if applicable.
2. Major use of HAZMAT (e.g. paint, primer, lacquer, stain, joint compound, caulking).
3. Number of containers and volume of each container.
The monthly inventories can be submitted by email to mu_song.so.kr@us.af.mil, or by delivery to 607
MMS/CEAN, in Bldg 5007, DAEGU AB, DSN 766-4986.
e. HAZARDOUS MATERIALS STORAGE: It shall be the responsibility of the contractor to keep a current inventory posted at the hazardous material storage area. The storage area may be a cage or other area that is locked or secured when not in use as well as at the end of each workday. The inventory must be updated daily as the
HAZMAT is consumed.
f. HAZARDOUS MATERIAL SPILLS: In the event that the contractor accidentally spills any hazardous materials at the worksite, it shall be the responsibility of the contractor to immediately notify 607 MMS/CEAN, in
Bldg 5007, Daegu AB, DSN 766-4986. The contractor shall be responsible for identifying the location of the spilled material, the quantity of spilled material, and the type of spilled material. The contractor shall also be responsible to notify the COR. The contractor shall not, under any conditions, remove and dispose of any spilled hazardous material(s) without prior approval of 607 MMS/CEAN.
g. DISPOSAL REQUIREMENTS FOR HAZARDOUS MATERIALS: It shall be the responsibility of the contractor to remove all hazardous materials from the installation, at the contractor’s own expense, upon completion of the contract including the removal of hazardous materials from the worksite as well as the contractor’s field office area. The contractor must notify the COR prior to disposing of any hazardous materials off the installation to ensure that all hazardous materials are properly handled and disposed of correctly. After use or final disposal of all hazardous materials, it shall be the responsibility of the COR to notify the HAZMART Pharmacy of the final disposition of the hazardous materials in order to clear out the barcodes from the HAZMAT tracking system in the
AF-EMIS database. Prior to contract close-out, the contractor must make an appointment with 607 MMS/CEAN to perform an environmental inspection of the staging areas and areas where HAZMAT was stored.
32. EROSIONAL CONTROL MEASURES: All…