G2-43 Drawing.location.pdf
PDF 2 MB Posted
- Solicitation number
- W90VN920R0010
View the file
Other files
| File | Type | Posted |
|---|---|---|
| G2-13 RFP-W90VN920R0010.MATOCCONTRACTORONLY.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Construction Site (공사위치) 대구남구중앙대로 22길 19-2 앞
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
R-11SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
O & M
HOUSING DIV.
REVIEWED BY
UNITED STATES ARMY GARRISON DAEGU
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
DIRECTORATE OF PUBLIC WORK
HGFEDCBA
D - 19 - 19
CHON, HYON TAE
DESIGN REVIEW SIGNATURE
ORGANIZATION
USING AGENCY
36TH SIGNAL
MASTER PLN.
ENVIRONMENTAL
NAME SIGNATURE
O&M DIV.
FIRE DEPT.
SAFETY OFFICE
DPTMS(AT/FP)
188TH MP COM.
IND. HYGENIST
J1-00528-9J
UNIT #15746, APO AP 96218-5746
C - 2
R - 1
DRAWING NO.
CHIEF,
DESIGN & TECH. REVIEW Br.
TITLE SHEET
2 C - 1
YI, TONG KI
T I T L E S H E E T
AS SHOWN
C - 34
DATE: 09 SEP 19
C - 45
CIVIL
LOCATION PLAN
SITE LAYOUT PLAN
BETWEEN CAMP WALKER AND CAMP GEORGE
REPAIR LEAKING EMERGENCY WATER LINE
OFF POST
BETWEEN CAMP WALKER AND CAMP GEORGE
REPAIR LEAKING EMERGENCY WATER LINE
PROJECT NO. J1-00528-9J, OFF POST
GENERAL, REMOVAL NOTES AND REQUIREMENTS
MISCELLANEOUS DETAIL
DISTRICT OFFICE
NAM-DAEGU
LOCATION PLAN
LOCATION PLAN
AS SHOWN
OFF POST
SCALE : 1 / 3000
60 120 (METERS)
SCALE: 1 : 3000
C-1
DAEGU HIGH SCHOOL
CAMP WALKER
CAMP GEORGE
N
SEE SITE LAYOUT PLAN
2-
THIS PROJECT
SHEET OF
CIVIL
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
GRAPHIC SCALE
J1-00528-9J
1 4
KU, HUN MO
CHI. K. K.
09 SEP 19
S-21 S-22
T-20
JUNGANG-DAERO 22-GIL
B O
N G
D E
O K R
O
G
IL
- 3
BETWEEN CAMP WALKER AND CAMP GEORGE
REPAIR LEAKING EMERGENCY WATER LINE
PROJECT NO.
D - 19 - 19
KU, HUN MO
CIVIL
AS SHOWN
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
CHI, K. K.
GENERAL NOTES:
14.
13.
10.
11.
12.
C-2
OFF POST
J1-00528-9J
GENERAL, REMOVAL NOTES AND REQUIREMENTS
IN ACCORDANCE WITH LOCAL LAWS AND REGULATIONS.
DISPOSAL OF WASTE MATERIALS SHOULD BE OUTSIDE U.S. GOVERNMENT LEASED PROPERTY
AND TECHNICAL REVIEW BRANCH FOR APPROVAL PRIOR TO COMMENCING THE WORK.
THE CONTRACTOR SHOULD PREPARE AND SUBMIT MATERIAL SUBMITTAL TO THE DESIGN
TRAFFIC AND OPERATIONS.
NECESSARY PRECAUTIONS FOR THE PROTECTION AND SAFETY OF THE PUBLIC AND/OR MILITARY
BARRICADES, MARKERS, CONES AND OTHER PROTECTIVE FACILITIES AND SHALL TAKE ALL
CONTRACTOR SHALL PROVIDE, INSTALL AND MAINTAIN ALL NECESSARY SIGNS, LIGHTS, FLARES, THE WORK BOUNDARY.
CUT AND FILLED AREA SHALL BE COVERED WITH TOP SOIL AND SOLID SODDING WITHIN
PROJECT LIMIT WITH COR CAREFULLY TO DETERMINE PROPER MATERIAL HANDING METHODS.
CONTRACTOR SHOULD COORDINATE ANY SALVAGEABLE/RECYCLABLE MATERIALS WITHIN
PROJECT SITE ORIENTATION PRIOR TO SUBMISSION OF CONTRACT PROPOSAL.
THE CONTRACTOR SHOULD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS AT THE
COMMENCING WORK ON THE PROJECT.
BY THE COR AND SHOULD BE APPROVED BY THE CONTRACTING OFFICER PRIOR TO
THE CONTRACTOR SHOULD SUBMIT SHOP DRAWINGS FOR ANY PORTION OF THE JOB
OFFICER.
REMOVING AT THE CONTRACTORS EXPENSE TO THE SATISFACTION OF THE CONTRACTING
ORIGINAL CONDITIONS OF THE ITEMS DAMAGED BY DISMANTLING, DEMOLISHING, OR
THE CONTRACTOR SHOULD BE RESPONSIBLE FOR REPAIR/ RESTORATION TO THEIR
LINES, AND OTHER ITEMS WHICH WILL INTERFERE WITH THE CONSTRUCTION OPERATIONS.
OF ALL NATURAL OBSTRUCTIONS, SUCH AS UNDERGROUND ROCK BASE, EXISTING UTILITY
THE SITE INDICATED ON THE DRAWING SHOULD BE GRADED AND CLEARED/REROUTED
VEHICLES DURING CONSTRUCTION PERIOD IF REQUIRED.
CONTRACTOR SHOULD PROVIDE TEMPORARY ACCESS ROAD AND DETOUR ROAD FOR
MARKERS IN THE PROJECT LIMIT.
CONTRACTOR SHALL RESTORE/REESTABLISH SURVEY MONUMENTS AND OTHER UTILITY
UTILIZED TO ACCOMPLISH THE CIVIL SCOPE OF WORK.
MANAGEMENT COMMAND" FORM AS A PART OF THIS PROJECT.THE DETAILS WILL BE
PROJECT, KOREA, REVISION1, 30 OCTOBER 2015, DEPARTMENT OF THE ARMY INSTALLATION
MANAGEMENT COMMAND" AND "STANDARD TECHNICAL SPECIFICATIONS FOR O & MA
O & MA PROJECT, KOREA, 30 NOVEMBER 2015, DEPARTMENT OF THE ARMY INSTALLATION
THE CIVIL STANDARD DRAWINGS SHOWN IN THE "STANDARD DETAIL DRAWINGS, FOR
OTHERWISE NOTED.
WATER AND SEWER LINE SHOULD HAVE A MINIMUM COVER OF FROST DEPTH UNLESS
SUCH AS FORMWORKS AND SHORING WITHOUT ANY ADDITIONAL COST.
CONTRACTOR SHOULD PROVIDE ANY NECESSARY RESOURCES INCLUDING FALSEWORK
DOWN AREA SHALL BE PROVIDED FOR THE CONTRACTOR BY THE GOVERNMENT.
FIELD OFFICES AND STORAGE AREAS SHALL BE WITHIN THE CONSTRUCTION AREA AND NO LAY
ACCORDING TO O&MA SPEC. AT THE LOCATION APPROVED/INDICATED BY C.O.R. ADMINISTRATIVE
CONTRACTOR SHOULD PROVIDE AND MAINTAIN THE CONTRACTOR’S TEMPORARY FACILITIES
AND ELEVATIONS ARE IN METERS.
UNLESS OTHERWISE NOTED ALL THE DIMENSIONS ARE IN MILLIMETERS AND STATIONS
16.
15.
9.
8.
7.
6.
5.
4.
3.
2.
1.
GENERAL REQUIREMENTS
REMOVAL NOTES:
1.
2.
3.
4.
OTHERWISE NOTED.
ALL REMOVAL WORKS SHALL BE CONFINED WITHIN THE PROJECT LIMITS INDICATED, UNLESS
THE ITEMS WITHIN THE PROJECT BOUNDARY SHALL BE REMOVED AS INDICATED AND REQUIRED.
I.E. EDGE OF PAVEMENT, EDGE OF ROADWAY, EXISTING CHAIN-LINK FENCE, ETC.
EXISTING GROUND FEATURES SHALL BE USED AS A DEMARCATION FOR THE PROJECT LIMITS,
1.
THE SAME TIME.
THE CONTRACTOR WILL NOT BE ABLE TO PERFORM WORK WITH BOTH LANES BLOCKED AT
INTERFERENCE WITH AN EXISTING UTILITY LINES.
C-815 AND C-816, WHEN IT IS NECESSARY TO REVISE THE WATER LINE DEFLECTION CAUSED BY CONTRACTOR SHALL REPLACE THE WATER LINE ACCORDING TO OMA STD, DET CIVIL C-812, C-813, PAID TO THE CONTRACTOR FOR THIS WORK.
NAMGU-OFFICE IN DAEGU CITY PRIOR TO START THE WORK. NO ADDITIONAL AMOUNT WILL BE
CONTRACTOR SHALL OBTAIN THE APPROVAL OF THE ROAD MANAGEMENT REVIEW COMMITTEE OF
CITY FOR EXCAVATION.
CONTRACTOR SHALL OBTAIN REQUIRED LOCAL DIGGING PERMITS FROM NAMGU-OFFICE IN DAEGU
CONSTRUCTION WORKS.
ON THE TOTAL EMERGENCY WATER LINE OF CAMP WALKER TO CAMP GEORGE DURING
PAVEMENT AREAS WHERE HAVE BEEN DAMAGED AS A RESULT OF HYDRAULIC PRESSURE TEST
CONTRACTOR VERIFY AN ANOTHER LEAKING LOCATIONS AND SHALL EMERGENCY REPAIR THE
2.
3.
4.
5.
6.
NOTES:
OF WATER LINE.
CONTRACTOR SHALL EXCAVATE TEMPORARY TRENCH CROSS THE ROAD TO VERIFY EXACT LOCATION
OTHER BURIED OBSTRUCTION, EXCAVATE BY HAND.
CONSTRUCTION. FOR WORK IMMEDIATELY ADJACENT TO OR FOR EXCAVATIONS EXPOSING A UTILITY OR POWER-DRIVEN EQUIPMENT IS NOT PERMITTED WITHIN 600 MM OF KNOWN UTILITY OR SUBSURFACE THE LOCATIONS OF UNDERGROUND UTILITIES PRIOR TO THE EXCAVATION. EXCAVATION MADE WITH CONTRACTOR SHALL COORDINATE WITH INSTALLATION UTILITY DEPARTMENTS AND PHYSICALLY VERIFY
GAS LEAK TEST.
CONTRACTOR SHALL COORDINATE WITH DAESUNG ENERGY FOR THE PROJECT AND THE NATURAL
WATER LINE AS REQUIRED.
FITTINGS AND COUPLINGS TO MEET THE DESIGN, OMA SPECIFICATION, AND THE ACTUAL EXISTING PURPOSE. CONTRACTOR SHALL CONFIRM THE WATER LINE PROPERTIES, AND PROVIDE APPROPRIATE EXISTING WATER LINES ARE ASSUMED 200MM. DIA PVC PIPE AND THAT IS ONLY FOR THE ESTIMATION
CONSTRUCTION FACILITIES, FENCES, AND OTHER SAFETY MEASURES.
SEE GENERAL NOTE AND OMA SPECIFICATIONS FOR THE SAFETY REQUIREMENTS TEMPORARY
CONSTRUCTION PERIOD.
SEE GENERAL NOTE NO.5 FOR TEMPORARY ACCESS ROAD AND DETOUR FOR VEHICLES DURING
OR NOT, CONTRACTOR SHALL VERIFY THE LOCATION OF UTILITY LINES.
EXISTING UTILITY LINES (WATER, SEWER, STORM DRAIN, AND ELEC, GAS) ARE SHOWN ON THE DRAWING
AND PAVEMENT ELEVATION TO WITHIN 5 MILLIMETERS.
HEIGHT OF MANHOLE COVERS, SURFACE INLETS, AND VALVE BOXES SHALL MATCH THE FINISHED GRADE
DURING THE CONSTRUCTION PERIOD, CONTRACTOR SHALL PROVIDE FLAG MAN TO CONTROL THE TRAFFIC.
1.
2.
3.
4.
5.
6.
7.
8.
9.
COVERING THE METAL PLATE ON THE EXCAVATION AREAS.
- AFTER WORKING HOURS, THE CONTRACTOR SHALL OPEN THE FLOW OF TRAFFIC AFTER
HOURS SHOULD BE APPROVED BY CONTRACTING OFFICER’S REPRESENTATIVE (COR).
FOR THE BONGDEOK-RO AND JUNGANG-DAERO AREAS, ANY PROPOSED CHANGE IN WORKING
WORK HOURS: THE WORK WILL BE ACCOMPLISHED FROM 2200 HOURS THROUGH 0500 HOURS
GOVERNING STANDARDS FOR KOREA AND USFK PAM 200-1.
ALL DISPOSAL WORK SHALL BE IN ACCORDANCE WITH THE APPLICABLE KOREAN ENVIRONMENTAL
2 4
BETWEEN CAMP WALKER AND CAMP GEORGE
REPAIR LEAKING EMERGENCY WATER LINE
09 SEP 19
KU, HUN MO
CIVIL
AS SHOWN
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
CHI, K. K.
LEGEND:
ITEM TO REMOVE
OFF POST
J1-00528-9J
N
GRAPHIC SCALE
SCALE: 1 : 100
2000 4000
72.831
AC
72.805
AC
72.902
AC
72.962
AC
72.856
AC
72.656
AC
72.599
AC
72.491
AC
72.622
AC
72.854
AC
72.957
AC
72.848
AC
72.858
AC
72.939
AC
72.949
SMH
72.575
SMH
72.581
SMH
72.609
SMH
72.613
SMH
73.031
SMH
73.018
SMH
72.541
SMH
72.555
SMH
72.487
SMH
72.479
SMH
72.965
WV
73.011
WV
72.653
TMH
72.788
TMH
72.795
TMH
72.783
TMH
73.037
TMH
73.068
TMH
72.679
INLET
72.821
INLET 72.889
INLET
72.906
INLET
72.881
INLET
72.859
INLET
72.885
INLET
72.845
INLET
73.058
MH
73.044
MH
73.007
MH
72.983
MH
73.012
MH
73.036
MH
72.995
MH
72.97
MH
73.051
MH
73.051
MH 73.056
MH
73.028
MH
73.103
CMU
73.08
CMU
73.054
CMU
73.039
CMU
73.03273.051
CMU73.057
CMU
73.09
CMU73.099
CMU
73.101
CMU
73.127
CMU
73.015
SWALK
73.091
SWALK
73.116
SWALK
72.967
SWALK
72.882
SWALK 72.971
SWALK
72.947
SWALK
72.918
SWALK
72.915
SWALK
73.042
SWALK
72.944
SWALK
72.904
SWALK
72.973
SWALK
72.987
SWALK
72.919
SWALK 72.972
SWALK
73.066
SWALK
73.048
SWALK
73.002
SWALK 73.012
SWALK
73.079
SWALK
73.079
SWALK
73.087
SWALK
73.072
SWALK
73.014
SWALK
73.016
SWALK
73.061
PIPE
73.074
PIPE
73.075
PIPE
73.058
PIPE
73.078
PIPE
73.096
PIPE
73.108
PIPE
73.125
PIPE
72.947
LP
72.598
STO
72.478
72.493
72.826
BLDG
72.842
BLDG
73.195
BLDG
72.844
BLDG
72.894
BLDG73.047
BLDG
72.826
GAS
72.988
GAS
72.922
ELEC
72.875
ELEC
72.909
ELEC
72.952
ELEC
72.998
TREE
73.06
MIRR
73.007
LINE
72.942
LINE
72.986
CROSS
72.967
CROSS
71.90
71.38
CMU
71.39
CMU
71.41
CMU 71.36
CMU
71.39
CMU 71.40
CMU
71.34
CMU CMU 71.99
CMU
71.36
CMU
71.35
CMU 71.35
CMU 71.48
71.58
CMUCMU
71.36
CMU
71.35
CMU
71.05
71.60
BOTTOM
71.59
BOTTOM
71.37
DITCH
71.37
DITCH
71.39
DITCH
71.36
DITCH
71.31
DITCH
71.28
DITCH
71.50
DITCH
71.53
DITCH 71.54
DITCH
71.52
DITCH71.50
DITCH
71.3
DITCH
72.22
CONTAIN
72.08
CONTAIN
72.13
CONTAIN
72.11
CONTAIN
72.18
CONTAIN72.28
CONTAIN
72.04
EP
71.88
EP
72.11
PCC
72.03
PCC
71.92
PCC
72.13
PCC
72.96
BLDG
72.15
BLDG
72.21
AC
72.24
AC 72.28
AC
72.16
AC
71.93
AC
72.10
PAD
71.93
PAD
72.21
MH
72.06
PIPE
72.48
PIPE
71.00
PIPE
71.06
PIPE
72.10
VPIT
72.11
VPIT
72.03
VPIT
72.12
VPIT
71.98
HWALL 71.98
HWALL
71.55
HWALL
71.75
HWALL
71.82
ODITCH
71.09
RCP
71.80
RCP
W/V
FHT
E/P
L/P
E/P
E/P
E/P
E/P
W/V
E/P
E/P
B O
N G
D E
O K R
O
G
IL
JUNGANG-DAERO 22 GIL
INLET
INLET
S
S
S
S
EE
G
G
L/P
DITCH
CMU
CONTAINER
CONTAINER
T-20
W (P
V C
D
A S S
U M
E D
W/V
W/V
(P V C
D
A S S
U M
E D
W
SITE LAYOUT PLAN
SCALE : 1 / 100
73.141
71.58
CMU
PIPE
(R C
P
D
D
SITE LAYOUT PLAN
JUNGANG-DAERO 13 GIL
9 GIL
JUNGANG-DAERO
W (P
V C
D
THE LOCATION OF WATER LINE
EXCAVATE TEMPORARY TRENCH TO VERIFY
PHASE 1
REMOVE EXISTING WATER LINE
ITEM TO ABANDON
IN ACCORDANCE WITH THE GUIDANCE OF COR
RELOCATE EXISTING CONTAINER TO THE LOCATION
AND BASE COURSE SAME AS EXIST.
REPLACE EXISTING CONCRETE BRICK SIDEWALK
REPLACE EXISTING ASPHALT CONCRETE PAVEMENT
PHASE 3
INSTALL NEW WATER LINE
PHASE 2
DRAIN LINE, (RCP, D=600)
REPLACE EXISTING STORM
PHYSICAL SECURITY PLAN AND HAVE APPROVAL BEFORE THE CONSTRUCTION.
SECURITY OFFICER. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND
THE CONSTRUCTION PERIOD IN ACCORDANCE WITH THE GUIDANCE OF
TEMPORARY PERIMETER FENCE SHALL BE INSTALLED DURING
SEE SECTION DETAILS
BLACK BASE (T=50) AND SUBBASE COURSE (T=400)
REPLACE EXISTING ASPHALT CONCRETE PAVEMENT (T=50),
REPLACE EXISTING STORM DRAIN LINE, (RCP, D=600).
#1 (CONSTRUCTION/ALTERATION)
SCOPE OF WORK
#2 (REPAIR/MAINTENANCE)
#3 (GENERAL REQUIREMENTS)
1.
1.
2.
3.
REMOVE EXISTING WATER LINE.
BASE (T=50) AND SUBBASE COURSE (T=400).
REPLACE EXISTING ASPHALT CONCRETE PAVEMENT (T=50), BLACK
RELOCATE EXISTING CONTAINER.
3.
2.
1.
4.
11.
PROJECT WORK LIMITS
SOD WITH TOP SOIL AND SOLID SODDING.
YIELD LINE, SAME AS EXIST.
PAINT EXISTING CROSSWALK, DOTTED LINE,
W/V
REPLACE EXISTING CONCRETE MANHOLE SAME AS EXIST.
S
REPLACE EXISTING WATER GATE VAVLE AND VALVE BOX.
REPLACE EXISTING CONCRETE BRICK SIDEWALK AND BASE COURSE.
REPLACE EXISTING CONCRETE MANHOLES.
REPLACE EXISTING CONCRETE OPEN DITCH.
5.
6.
7.
8.
9.
10.
12.
13.
SOD WITH TOP SOIL AND SOLID SODDING
PAINT EXISTING CROSSWALK, DOTTED LINE, YIELD LINE.
SEE GENERAL AND REMOVAL NOTES ON DRAWING REF. NO. C-2.
2.SEE GENERAL REQUIREMENTS ON DRAWING REF. NO. C-2.
NOTE:
C-3
SEE GENERAL NOTES
THE UTILITY LINES ARE NOT SHOWN
TELEPHONE, GAS LINES (AS REQUIRED)
SUCH AS WATER, IRRIGATION, ELEC. POWER,
REROUTE EXISTING UNDER GROUND UTILITY LINES
(AS REQUIRED)
REPLACE EXISTING WATER GATE VAVLE AND VALVE BOX
CITY NATURAL GAS LINE, (ASSUMED) EXISTING WATER LINE TO ABANDON, (ASSUMED)
CONCRETE GUTTER SAME AS EXIST.
REPLACE EXISTING GRANITE CURB AND
REPLACE EXISTING GRANITE CURB AND CONCRETE GUTTER.
SAME AS EXIST. (AS REQUIRED)
REPLACE EXISTING CONCRETE MANHOLE
CONCERTINA WIRE SAME AS EXIST.
INCLUDING STEEL ARM, BARBED WIRE AND
REPLACE EXISTING CMU PERIMETER FENCE
BARBED WIRE AND CONCERTINA WIRE.
REPLACE EXISTING CMU PERIMETER FENCE INCLUDING STEEL ARM,
4-
2SEE DETAIL
INSTALL CONCRETE PROTECTION SLAB/ ENCASEMENT
REPLACE EXISTING SURFACE INLET AND STORM PIPE.
PIPE SAME AS EXIST.
REPLACE EXISTING SURFACE INLET AND STORM
INSTALL CONCRETE PROTECTION SLAB/ ENCASEMENT.
SEE THE SECTION DETAILS
OTHER ACCESSORIES
COUPLINGS, THRUST BLOCKS, ANCHOR BLOCKS AND
INSTALL WATER LINE (PVC, D=200) INCLUDING FITTINGS,
REMOVE EXISTING ASPHALT CONCRETE PAVEMENT.
(PVC, D=200)
W
14.
PAVEMENT
REMOVE EXISTING ASPHALT CONCRETE
REROUTE EXISTING UNDER GROUND UTILITY LINES.
BASE AND SUBBASE COURSE
REPLACE AC PAVEMENT,
THRUST BLOCKS, ANCHOR BLOCKS AND OTHER ACCESSORIES.
INSTALL WATER LINE (PVC, D=200) INCLUDING FITTINGS, COUPLINGS,
4-
4-
4-
3 4
SAME AS EXIST.
REPLACE EXISTING CONCRETE OPEN DITCH
BETWEEN CAMP WALKER AND CAMP GEORGE
REPAIR LEAKING EMERGENCY WATER LINE
EXST. AC SURFACE
SUBBASE COURSE (T=400)
NOT TO SCALE
AC PAVEMENT TRANSITION DETAIL
EXST. SUBBASE COURSE
NEW AC PAVED
SECTION
COAT
BITUMINOUS TACK
SAW CUT & APPLY
NEW AC PAVEMENT
EXST. BASE COURSE
EXST. AC PAVEMENT
MIN.
PRIME COAT
TACK COAT
HOT-MIXED ASPHALT CONCRETE #78)
ASPHALT WEARING COURSE (T=50,
HOT-MIXED ASPHALT CONCRETE #467)
BLACK BASE COUSRE (T=50,
O.D
TW
M
IN
M
IN
SATISFACTORY BACKFILL
OR MISC. AREAS
OR SEEDED AREAS,
SIDEWALK, TURFED
OF SOIL
TO ANGLE OF REPOSE
TRENCH WALLS CUT
EARTH TRENCH BOTTOM UNYIELDING MATERIAL TRENCH BOTTOM
FINISHED GRADE
INITIAL BACKFILL
BE FREE OF ROCK 13mm OR LARGER
GRANULAR MATERIAL, SHALL
BEDDING - SELECT
UNYIELDING MATERIAL
O.D. + 600 FOR 900 OR MORE I.D. PIPE
O.D. + 450 FOR 600 OR LESS I.D. PIPE
OF SOIL
EARTH
FIRM UNDISTURBED
NOTE: TW =
NOT TO SCALE
1 TYPICAL PIPE TRENCH SECTION
2. REINFORCING STEEL; YIELD STRENGTH, Fy= 300 MPa
1. CONCRETE; MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS, Fc’= 24 Ma
MATERIAL PROPERTIES
PROTECTION SLAB
SUBBASE COURSE (T=400)
(T=50, HOT-MIXED ASPHALT CONCRETE #467)
BLACK BASE COUSRE
(T=50, HOT-MIXED ASPHALT CONCRETE #78)
ASPHALT SURFACE
NOT TO SCALE
1,000
EACH WAY
D13@300 SLAB
PROTECTION
MATERIAL)
(SATISFACTORY
BACK FILL
MATERIAL
GRANULAR SAND WATER LINE
(T Y P
KU, HUN MO
CIVIL
AS SHOWN
HGFEDCBA
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
UNITED STATES ARMY GARRISON DAEGU
DIRECTORATE OF PUBLIC WORKS
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
UNIT #15746, APO AP 96218-5746
DATE:
CHI, K. K.
OFF POST
J1-00528-9J
C-4
PVC, C.I. OR D.I. PIPE
C.I. OR D.I. FITTING WITH BELL END
PVC C.I. OR D.I. PIPE
HUB(RING) TYPE COUPLING
INSTALL POSITION
JOINT AT READY TO
INSTALLED POSITION
MECHANICAL JOINT AT
MECHANICAL JOINT END
OR PIPE WITH
C.I. OR D.I. FITTING
PLUG WITH EARS
C.I. OR C.I.
THREAD PIPE AS REQUIRED
TAPPED TEE WITH BELL ENDS (TYP.)WATER MAIN
COPPER
CORPORATION STOP
BELL END
W/BELL END
C.I. OR D.I. CAP
THREAD
CORPERATION STOP
FOR 150mm & SMALLER PIPE
SINGLE STRAP TYPE MAY BE USED
CLAMP 200mm & LARGER PIPE.
COPPER PIPE
SERVICE LINE FOR
MISCELLANEOUS PIPE INSTALLATION DETAILS
- 4
- 4
- 4
- 4
MISCELLANEOUS DETAILS
4 4
BETWEEN CAMP WALKER AND CAMP GEORGE
REPAIR LEAKING EMERGENCY WATER LINE
| G2-43 Drawing |
| J1-00528-9J_T01 |
| J1-00528-9J_C01 |
| J1-00528-9J_C02 |
| J1-00528-9J_C03 |
| J1-00528-9J_C04 |
| G2-43 Project Site |
| Slide Number 1 |
| Slide Number 2 |
File details come from the government source that posted it. Updated .