Text version

0011375244

Soldier Support Center Construcition & Demolition Work for AAFES, Vault and Partitions in BLDG # S-330 & S-338

A. THIS IS A NON-WORK PLAN TASK ORDER RFP TO MATOC IDIQ General Construction, Area IV.

This RFP is in accordance w ith terms and conditions of 1st option year of MATOC IDIQ General Construction Contract numbers;W91QVN-18-D-0080, W91QVN-18-D-0082, W91QVN-18-D-0084,W91QVN-18-D-0085, W91QVN-18-D-0089 through W91QVN-18-D-0092, and W91QVN-18-D-0113, W91QVN-18-D-0115, W91QVN-18-D-0116, and W91QVN-18-D-0118 through W91QVN-18-D-0121, and W91QVN-18-D-0124..

B. Site Visit: Offerors w ho intend to propose on this solicitation are strongly encourage to attend site visit. See site visit clause FAR 52.236-27 in Section L. Offerors are required to have a valid Korean Identif ication card w hen attending the site visit orientation.

C. If the contractor is unable to submit the proposal in response to this RFP, the contractor shall submit the “No-Of fer Letter’ by date and time specif ied in this solicitation.

D. The pricing proposal shall be submitted by 1300hrs on the closing date of the RFP through the Federal Business Opportunities w ebsite https://w w w .fbo.gov.

E. Section K: Offerors must complete all portions of Section K, and submit this section at http://w w w .fbo.gov.

MR. PAK, SANG KU 315-763-5690

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

29-Jul-2019

(RFP)

(IFB)

X

CALL:

Soldier Support Center

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________120 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES X NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________19 Aug 2019 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

RCO DAEGU, UNIT #15682

APO AP 96218-5682

UNITED STATES

W90VN9

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

01:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

J1-00525-9J

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W90VN919R0063 29

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W90VN919R0063

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Repair Soldier Support Center (K)

FFP

for AAFES, Vault and Partitions in BLDG # B330 & B338 at Camp Walker. The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as indicated in the drawings the specifications.

FOB: Destination

PURCHASE REQUEST NUMBER: 0011375244

PSC CD: 3895

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Job Construct concrete curb (L)

FFP

for Soldier Support Center for AAFES, Vault and Partitions in BLDG # S330 &S338. The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as indicated in the drawings the specifications.

FOB: Destination

PURCHASE REQUEST NUMBER: 0011375244

PSC CD: 3895

NET AMT

Section C - Descriptions and Specifications

SOW

SPECIFICATIONS

FOR

SOLDIER SUPPORT CENTER CONSTRUCTION &

DEMOLITION WORK FOR AAFES, VAULT AND

PARTITIONS IN BLDGS. NO. S-330 & S-338

CAMP WALKER

PROJECT NO. J1-00525-9J

TABLE OF CONTENTS

1. Technical Provisions - I: Statement of Work

2. Technical Provisions - II: Technical Detail Specifications

3. Technical Provisions - III: Special Conditions

4. Appendix "A": List of Applicable Contract Drawings

TECHNICAL PROVISIONS - I

STATEMENT OF WORK

PROJECT NO TITLE LOCATION

J1-00525-9J Soldier Support Center Construction & Demolition Work for Camp Walker AAFES, Vault and Partitions in Bldgs. No. S-330 & S-338

DESCRIPTION: The work to be performed shall be in accordance with all drawings and specifications provided under this contract.

a. Work by Contractor:

(1) The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as indicated in the drawings the specifications.

(2) The contractor shall perform soldier support center construction & demolition work for AAFES, vault and partitions in Bldgs. No. S-330 & S-338, Camp Walker in accordance with the specifications and drawings.

b. Work by In-House Labor: Not applicable to this project.

c. Work by Troop Labor: Not applicable to this project.

(3) Performance Period: Shall be 180 calendar days, including 120 days for procurement of US origin materials after Notice to Proceed (NTP) is issued.

PRINCIPAL FEATURES: This project shall include the following:

General Services:

The contractor shall submit completed material lists and shop drawings to DPW, Engineering Division, Design & Technical Review Branch for approval prior to commencement of work at the jobsite.

Schedule #I, Construction (L): All work shall be in accordance with the attached drawings and specifications.

A. Civil Work (Drawing No. C-2)

1. Construct concrete curb.

Schedule #II, Repair (K): All work shall be in accordance with the attached drawings and specifications.

A. Civil Work (Drawing No. C-2)

TP I-1

1. Remove existing concrete pads.

2. Remove existing wooden fence.

3. Remove existing canopy.

4. Remove existing concrete pads, steel pipes, trees, shrub and all other items.

5. Replace existing asphalt concrete pavement including base course and subbase course.

6. Sod with top soil and solid sodding.

B. Architectural Work

#338 Sector

1. Replace all existing ceiling system with new including ceiling access door. (Drawing No. AE-2, AE-3, AE-10, AE-15)

2. Replace all existing ceiling insulation and necessary accessories with new. (Drawing No. AE-2, AE-9, AE-10)

3. Block the roof opening with insulation, waterproofing after mechanical work. (Drawing No. AE-2, AE-10)

4. Replace all existing floor finish with new. (Drawing No. AE-2, AE-5, AE-15)

5. Block-up existing door / window opening. (Drawing No. AE-2, AE-6, AE-10)

6. Reinforce existing wall for new opening. (Drawing No. AE-2, AE-6, AE-10)

7. Remove existing cement masonry unit wall for new opening. (Drawing No. AE-2, AE-4)

8. Remove existing tray slide with supporting. (Drawing No. AE-2, AE-4)

9. Remove existing shutter with shutter box. (Drawing No. AE-2, AE-4)

10. Remove existing wall and finish with wall frame. (Drawing No. AE-2, AE-4)

11. Replace existing interior wall finish with new including metal frame, gypsum board and necessary accessories.

(Drawing No. AE-2, AE-8, AE-13)

12. Add interior wall with new including metal frame, gypsum board, insulation and necessary accessories.

(Drawing No. AE-2, AE-8)

13. Add door and door frame with new including necessary accessories, and replace window with new including necessary accessories. (Drawing No. AE-7, AE-14, AE-15)

TP I-2

14. Replace existing h-bar of tempered glass door, floor hinge, hinge box and all necessary accessories with new.

(Drawing No. AE-7, AE-14)

15. Repair existing exterior insulation and finish system and add exterior insulation and finish system. (Drawing No.

AE-2, AE-7, AE-10)

16. Paint on all interior & exterior surface. (Drawing No. AE-2, AE-15)

17. Replace existing deteriorated fascia board, soffit and nailer with new including necessary accessories. (#114, #115) (Drawing No. AE-2, AE-7)

18. Apply acrylic fluid-applied waterproofing system including necessary accessories. (#114, #115) (Drawing No.

AE-2, AE-7)

19. Replace existing sheet metal flashing and water drip with new (#114, #115) and add metal flashing on the roof of between #114 and #115. (Drawing No. AE-2, AE-7)

20. Replace existing rain gutter and downspouts with new including splash blocks and necessary accessories. (#115) (Drawing No. AE-2, AE-7)

21. Replace existing knee brace of wooden column including necessary accessories. (#114) (Drawing No. AE-2, AE-7)

#330 1F Sector (Housing) (Drawing No. AE-2, AE-11)

22. Remove and reinstall existing door and door frame of DPW Housing office (#116B).

23. Replace existing partition wall with new for reinforcing work.

24. Replace existing vinyl cove base with new. (Working area only)

25. Remove and reinstall existing ceiling system of room #116B, #116 as required.

26. Paint on interior surface. (Working area only)

27. Reinforce existing concrete slab with steel structure.

#330 2F Sector (MP) (Drawing No. AE-2, AE-11)

28. Anchor two (2) safes to the floor of MP safe room (#209C).

29. Provide security grill on the exterior side of window of MP disbursing office (#209D).

30. Provide security grill on the exterior side of window of MP disbursing window (#209E).

31. Restore existing exterior insulation and finish system.

32. Restore existing partition wall.

TP I-3

33. Paint on interior surface. (Working area only)

34. Install two (2) safes (GFM) in the safe room. (#209C)

#330 2F Sector (ACS)

35. Add partition wall with new at army community services 3, 4 (#220, #221). (Drawing No. AE-12, AE-13)

36. Add door and door frame with new including necessary accessories. (Drawing No. AE-12, AE-14)

37. Add vinyl cove base with new. (Drawing No. AE-12, AE-15)

38. Remove and reinstall existing ceiling system as required. (Drawing No. AE-12)

39. Paint on interior surface. (Working area only) (Drawing No. AE-12, AE-15)

C. Mechanical Work

Bldg. #330 - RM. #116

1. Replace existing sprinkler pipes and heads as indicated. (Drawing No. M-5, M-6)

2. Replace existing ventilation air ducts with register and anti-collision safety cushions. (Drawing No. M-7, M-8, M- 26)

3. Replace existing refrigerant pipes with aluminum jackets. (Drawing No. M-7, M-8, M-25)

Bldg. #330 - RM. #220, #221

1. Replace existing sprinkler pipes and heads as indicated. (Drawing No. M-9, M-10)

2. Replace existing ventilation air ducts with registers and anti-collision safety cushions. (Drawing No. M-11, M-12, M-26)

3. Provide new heat pump units complete with refrigerant pipes, condensate pipes, thermostats, concrete pad and all necessary accessories & parts. (Drawing No. M-13, M-25)

4. Provide new temperature controllers for existing heat pump units. (Drawing No. M-13)

Bldg. #338

1. Replace existing sprinkler pipes and heads as indicated. (Drawing No. M-14, M-15)

2. Provide new up-right type sprinkler heads for RM. #114. (Drawing No. M-14, M-15)

3. Abandon existing roof fans, heating / ventilating units and air ducts on the roof. (Drawing No. M-16, M-17)

TP I-4

4. Remove existing air handling unit with associated ductwork, diffusers, registers, thermostats as indicated.

(Drawing No. M-16, M-17)

5. Remove existing air cooled condensing unit, heat pump units and window type A/C unit with concrete pad and associated pipes. (Drawing No. M-16)

6. Remove existing freezers & outdoor units with associated pipes and concrete pad. (Drawing No. M-16)

7. Remove existing air curtains, wall exhaust fans and kitchen hoods as indicated. (Drawing No. M-16, M-17)

8. Remove existing HVAC system including hot water boiler, concrete pads, pumps, expansion tank, air separator, pipes, gauges, valves, damper, thermostats, outdoor air reset controller, gas line & train assembly, smoke stack, chemical feeder, insulation and associated accessories & parts in the mechanical room. (Drawing No. M-16, M-17)

9. Provide new heat pump units and energy recovery ventilators complete with associated ductwork, refrigerant pipes, condensate pipes, central controller, thermostats, concrete pad and all necessary accessories & parts.

(Drawing No. M-18 ~ 22, M-25, M-26)

10. Provide new exhaust system in the bathroom. (Drawing No. M-19)

11. Remove and replace existing unit heaters and radiant heaters as indicated. (Drawing No. M-16, M-19)

12. Remove existing domestic water pipes & plumbing fixtures and blank off exist floor drains. (Drawing No. M- 16)

13. Adjust existing floor clean outs and floor valve plates at new floor level. (Drawing No. M-16)

14. Provide new domestic water pipes, sewer & vent pipes with sewer hand-hole, valves and all necessary accessories and parts. (Drawing No. M-23, M-24)

C. Electrical Work

Bldg. #330 2nd Floor

Electrical

1. Relocate existing interior lighting fixtures including additional toggle switches, wires and conduits as shown in drawings. (Drawing No. E-2)

2. Add new receptacles and wirings for new rooms as shown in drawings. (Drawing No. E-3, E-4)

3. Add new electrical power and control circuit including wirings and safety switch for new HVAC system as shown in drawings. (Drawing No. E-7)

TP I-5

Communication

4. Add new LAN outlets and cables for new rooms as shown in drawings. (Drawing No. E-5)

Fire alarm and mass notification

5. Add new fire alarm and mass notification equipment and wirings for new rooms as shown in drawings. (Drawing No. E-6)

Auxiliary system

6. Relocate existing wall mount speakers and wiring as shown in drawings. (Drawing No. E-7)

Intrusion detection system

7. Remove existing receptacles to make dedicated power circuit for IDS. (Drawing No. E-8, E-9)

Bldg. #330 1st Floor

8. Remove and reinstall existing electrical power system, fire alarm system, communication system and controller as shown in drawings. (Drawing No. E-10, E-11)

9. Relocate existing CATV outlet including wiring as shown in drawings. (Drawing No. E-11)

Bldg. #338

Electrical

10. Replace deteriorated existing interior lighting fixtures, exit signs, toggle switches, occupancy sensor switches including wires and conduits with new ones as shown in drawings. (Drawing No. E-12, E-13)

11. Replace deteriorated existing interior power system including circuit breakers, receptacles, outlets, safety switches, junction boxes, panel boards and associated wiring system with new ones as shown in drawings. (Drawing No. E-14, E-15, E-21 ~ 23)

12. Replace deteriorated existing electrical power and control wiring for new HVAC system with new ones as shown in drawings. (Drawing No. E-16 ~ 18)

Communication

13. Remove existing deteriorated communication system including telephone/LAN outlets, copper cables, and conduits and install new cable tray, conduit, telephone/LAN outlets and boxes as shown in drawings. (Drawing No.

E-19)

14. Extend existing cable tray to connect new Tel/ LAN wiring to communication room as shown in drawings.

(Drawing No. E-19)

TP I-6

Fire alarm and mass notification

15. Replace existing deteriorated fire alarm and mass notification system in work area with new manual pull stations, combo audio/visual signal speaker, and connect to existing fire alarm system with new ones as shown in drawings. (Drawing No. E-20)

TP I-7

TECHNICAL PROVISIONS - II

TECHNICAL DETAIL SPECIFICATIONS

AAFES, Vault and Partitions in Bldgs. No. S-330 & S-338

GENERAL: The specifications are from the "Standard Technical Specifications for O&MA Projects, Korea", dated 30 October 2015, issued by the Department of the Army, Installation Management Command. The most current specifications are available (for referral purposes only) on the USFK’s Web Page http://www.usfk.mil/Resources/Contracting-with-USFK. The electronic version of the specifications are Acrobat® PDF format and can be read with the Acrobat Reader® software.

TP II – 1

TECHNICAL PROVISIONS - III

SPECIAL CONDITIONS

AAFES, Vault and Partitions in Bldgs. No. S-330 & S-338

1. GENERAL: In addition to the requirements specified under "GENERAL PROVISIONS" for the Fixed Price Construction Contract for this project, the Contractor shall comply with the following "SPECIAL CONDITIONS" which form a part of the contract.

2. WORK HOURS: The work will be accomplished from 0730 hours through 1730 hours (Monday through Saturday) except for Korean Legal Holidays. Any proposed change in working hours should be approved by the Contracting Officer (KO) and Contracting Officer's Representative (COR).

3. NOTIFICATION OF INSPECTION SECTION: The contractor shall also give the project inspector seven (7) working days notice prior to each concrete placement, field test, weld application, protective coating application, or any other work deemed to require inspection.

4. COORDINATION: The contractor shall coordinate his work with all others (subcontractor and government agencies) involved in this project and shall cooperate with all other contractors and government agencies so as to facilitate the general progress of the work. Before proceeding with any work, the contractor and/or subcontractor shall consult applicable drawings and specifications for each trade involved.

5. CONSTRUCTION: The contractor shall submit a request for the construction permit at least ten (10) working days prior to the starting of work. The request shall be submitted to the COR for approval.

6. MATERIALS COMPLIANCE: The contractor shall make certain all materials used meet the requirements of the contract and proof thereof upon request of the COR. Materials not meeting the requirements of the contract shall not be brought to the job site. All materials shall be new and the standard products of a manufacturer regularly engaged in the manufacturing of such materials.

7. HOISTING AND MOVING EQUIPMENT: The Contractor and each subcontractor shall provide and be responsible for all cranes, lifts, etc., necessary for the proper and efficient movement of materials. The equipment shall be provided with proper guys, bracing, safety devices, etc., as required by law.

8. EQUIPMENT: All contractor equipment shall be subject to functional and safety inspection by the COR.

Equipment not completely safe or functional shall be repaired before work is started.

9. RECORD DRAWINGS: During performance of work, the contractor shall accurately record and delineate on a set of full-size blue line prints of contract drawings all changes in such work which constitute departures from the original contract drawings. The set of drawings (one original and one blue line print), thus corrected and changed, usually referred to as “As-Built Drawings”, shall be delivered to the COR at the final acceptance/inspection of the completed work by the Government.

TP III - 1

10. US ORIGIN MATERIALS: If applicable, all US Origin Materials will be ordered immediately after Notice to Proceed.

11. RELEASE OF FACILITIES WITH U.S. ORIGIN MATERIALS: If applicable, Building/facility will not be released to the contractor by the COR until all U.S. origin building construction supplies are available or due within such a time frame that there will be no delay in project completion.

12. UTILITY CUTOVERS AND INTERRUPTIONS: Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and U. S. Government holidays. Conform to procedures required in the paragraph "Work Outside Regular Hours." Ensure that new utility lines are complete, except for the connection, before interrupting existing service. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, compressed air, shall be considered utility cutovers pursuant to the paragraph entitled "Work Outside Regular Hours." Such interruption shall be limited to 4 hours. This time includes for deactivation and reactivation.

13. WORK OUTSIDE REGULAR HOURS: Work outside regular working hours requires Contracting Officer approval. Make application 14 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During the period of darkness, the different parts of the work shall be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours on Saturdays, Sundays, and U. S. Government holidays unless directed otherwise.

14. WINTERIZATION: The contractor may be required to perform the work during the winter season, which may cause the contractor for additional cost. These additional costs are the contractor’s responsibility in the event of working during this period. The Contractor shall reflect these costs in the preparation of his proposal.

15. SAFETY: The safety plan must be approved before any work can be performed on this contract. Hard hats, suitable work boots and other necessary personnel protective gear are mandatory. Contractors are required to get a written permission from safety office (POC: Mr. To, Pong Uk, DSN: 768-8971) and fire & Emergency Service (POC: Fire Communication office, DSN: 768-4120) prior to enter confined spaces (i.e. manholes). Contractors should be properly trained and equipped with PPEs, calibrated air monitoring instrument, to work at confined spaces to insure compliance with OSHA (Occupational Safety and Health Administration) 29 CFR 1910.146.

16. SECURITY: All prime contractor and subcontractor personnel will be required to obtain a station pass from the Base Security Office. It is the prime contractor’s responsibility to supply information to security regarding all prime and subcontractor personnel and a list of all vehicles that will be driven on the site.

17. WARRANTY: The contractor shall be responsible for remedy of failure in government contract during the one

(1) year warranty time. The contractor shall be refurnishing services or/and repair and replacement for remedy. The one (1) year warranty starts the day after final inspection approval from the authorized personnel.

TP III – 2

18. ANTITERRORISM/OPRATIONS SECURITY REQUIREMENTS.

18.1. AT Level 1 Training: This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable and annually thereafter. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 05 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil.

18.2. Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable and annually thereafter. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 05 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil

18.3. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

18.4. iWATCH TRAINING. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 05 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.

19. ENVIRONMENTAL MANAGEMENT SYSTEM (EMS): Recycling all eligible material, including glass, paper (including magazines), plastic, aluminum, and cardboard to the maximum extent practicable;

Reducing the amount of hazardous material and/or solvent used by purchasing fewer hazardous materials and by increasing the use of products with recycled content;

Reducing the amount of solid waste from construction and demolition debris, and scrap metal sent to municipal and rubble landfills by reducing, reusing, and recycling;

Conserving energy and water usage by turning off lights and equipment when not in use and using only the necessary amount of water needed to complete the required tasks. Continuous conservation of our natural resources is a must;

TP III – 3

20. CONTAMINATION FIND CLAUSE: When contaminated soil is encountered during excavation work, contractor shall report the findings to the Environmental Office immediately and contractor will segregate contaminated soil from clean soil.

21. INADVERDENT FIND CLAUSE: When potential cultural or historic items are inadvertently found during construction activities, contractor shall cease activities in the vicinity of the discovery and report the findings to the Environmental Office immediately. (Reference: USFK Reg 201-1, Environmental Governing Standard (EGS) Ch.

12, Para 12-3 J)

22. FUEL TANK AND LINES: If applicable, when underground piping associated with POL storage containers shall be tested for integrity and leaks at the time of installation, modification, construction, relocation, or replacement. New underground piping must be protected against corrosion IAW recognized industry standards.

(Reference: USFK Reg 201-1, Environmental Governing Standard (EGS) Ch. 9, Para 9-3.b.(5))

23. Non-PCB TRANSFORMER CERTIFICATION: If applicable, before contractor replace/install any transformer at USAG Daegu, contractor shall submit two copies of non-PCB transformer certification to COR for each to be installed transformer. New transformer will be installed after COR's approval for non-PCB transformer certification for each to be installed transformer.

24. CONTRACTING MANPOWER REPORTING

24.1 (CMR) Requirement: The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor will report ALL Contractor manpower (including sub-contractor manpower) required for performance of this contract. The Contractor is required to completely fill in all the CMR information in the format using the following web address:

https://cmra.army.mil. However, before the Contractor can begin reporting CMR data in this website, he or she must first register as a User. In order to register, the Contractor must have a Cage Code.

24.2 How to Obtain Cage Code for Korean Company: If you are a Korean company needing a Cage Code, at Telephone #82-2-2079-4639, FAX 82-2-773-7587, EMAIL CAGEKR@dapa.go.kr , Address: The Standard Planning Team of the Standard Management Bureau Defense Acquisition Program Division (23 Yongsangogyogil), #2-15 Yongsan 2 ga dong, Yongsan-gu, Seoul (140-841), Republic of Korea.

신청 절차

1. 방위사업청 국방전자조달 홈페이지(www.d2b.go.kr)에 접속 합니다.

2. 방위사업청 국방전자조달 홈페이지 메인화면의 민원서비스 – 나토 생산자 (Ncage) 부호 신청을 클릭

합니다. 로긴(Login) 없이 접속 가능

3. 나토생산자부호 (Ncage) 부여요청을 위한 Login 화면에서 회원가입을 합니다.

*유의사항: 아이디와 비밀번호는 요청및 결과확인용으로 가능하며 국방전달조달 메뉴에 있는 기타

다른 업무에는 사용할 수 없습니다.

TP III – 4

4. 회원가입시 번호 부여 대상이 회사인 경우에는 사업자등록증번호, 개인일 경우에는 DUNS번호를

기입합니다.

5. 가입한 아이디와 비밀번호로 로긴하여 접속 후 온라인 나토생산자부호 요청서에 해당업체에 대한

정보를 기록합니다.

6. 회사인 경우에는 사업자등록증, 개인일 경우에는 DUNSNUMBER 부여결과서를 스캔하여 EDM에 jpg

파일로 첨부합니다.

7. 등록한 후 재 조회를 하여 업체자료가 정상적으로 신청이 되었는지 확인합니다.

8. 신청서의 접수 및 진도는 요청서 상단의 진행 상태를 확인 합니다.

*진행상태: 신청완료, 접수완료, 작업완료등 빨간색으로 변경

*처리소요기간: 1일-2일 *비용: 무료

Once the CAGE code is issued for your company, your company is ready to do CMR registration. For CMR registration, please follow the instruction in the solicitation/contract titled ―Accounting for Contract Services.

After your company‘s CMR registration application is reviewed by U.S Department of Army. You will receive e-mail notification within 2 to 3 working days whether your CMR registration application is approved or not. If it is disapproved, please read carefully the comments provided by DA and correct registration application as commented.

After your company‘s CMR registration is approved, your company is ready to do CMR report. There will be short lesson giving how you report CMR on the web site.

24.3 CMR Reporting: The information required to be reported in the CMR website includes: (1) Contracting Office, Contracting Officer, Contracting Officer’s Technical Representative (COTR) or Contracting Officer’s Representative (COR); (2) Contract Number, including Task and Delivery Order Number(s); (3) Beginning and Ending dates covered by reporting period; (4) Contractor Name, Address, Phone Number, E-Mail Address, Identity of Contractor Employee entering data; (5) Estimated Direct Labor Hours (including sub-Contractors’ hours); (7) Total Payments (including sub-Contractors’ payments); (8) Predominant Federal Service Code (FSC) reflecting services provided by Contractor (and separate Predominant FSC for each sub-Contractor if different); (9) Estimated data collection cost; (10) Organizational Title associated with the Unit Identification Code (UIC) for the Army Requiring Activity reporting this information (the Army Requiring Activity (RA) is responsible for providing the Contractor with its UIC for purposes of reporting this information); (11) Locations where Contractor and sub- Contractors perform the work (specified by zip code in the United States and nearest City and Country when in an overseas location, using standardized nomenclature provided on website); (12) Presence of Deployment or Contingency Contract language; and (13) Number of Contractor and sub-Contractor employees deployed in theater this reporting period (by Country).

TP III – 5

As part of its submission in response to a solicitation or a modification request which includes a contract line item number (CLIN) for this CMR reporting requirement, the Contractor shall also provide the estimated total cost (if any) incurred to comply with this reporting requirement on the associated CMR CLIN. Reporting period will be the period of performance not to exceed 12 months ending September 30 of each Government fiscal year and must be reported by 31 October of each calendar year. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a Contractor’s systems to the secure website without the need for separate data entries for each required data element at the website. The specific formats for the XML direct transfer may be downloaded from the website.

CMR reporting is a requirement mandated by the Department of Army. Failure of the Contractor to comply with this requirement will be noted as Past Performance information about the Contractor to be used on future procurements for the same or similar services.

TP III – 6

APPENDIX "A"

LIST OF APPLICABLE CONTRACT DRAWINGS

AAFES, Vault and Partitions in Bldgs. No. S-330 & S-338

GENERAL: The work shall conform to the standard detail drawings (dated 30 November 2015, issued by the Department of the Army, Installation Management Agency, Korea Region Office and located USFK’s Web Page http://www.usfk.mil/Resources/Contracting-with-USFK), all of which form a part of the specifications.

Drawing No. Ref. No. Sheet No. Description Date

D-19-10 R-1 1 of 1 TITLE SHEET 28 Jun 19

“ C-1 1 of 66 Location Plan “

“ C-2 2 of 66 Site Layout Plan “

“ AE-1 3 of 66 Existing Floor Plan, #330, #338, Existing Partial 2F Floor Plan (MP), #330, General Notes “

“ AE-2 4 of 66 Scope of Work “

“ AE-3 5 of 66 Existing Ceiling Removal Plan, #338, Key Plan “

“ AE-4 6 of 66 Existing Wall Removal Plan, #338, Key Plan “

“ AE-5 7 of 66 Existing Floor Removal Plan, #338, Key Plan “

“ AE-6 8 of 66 CMU Wall Opening / Block-Up Plan, #338, Key Plan “

“ AE-7 9 of 66 New Floor Plan, #338, Notes, Key Plan “

“ AE-8 10 of 66 Partition Wall Plan, #338, Key Plan “

“ AE-9 11 of 66 Ceiling Insulation Plan, #338 “

“ AE-10 12 of 66 Cross Section Detail, CLJ Detail, Slab Detail, CMU Wall Opening Detail, CMU Block-Up Detail, Notes “

A-1

Drawing No. Ref. No. Sheet No. Description Date

D-19-10 AE-11 13 of 66 #330 1F Sector Partial Floor Plan (Housing), 28 Jun19 Structural Reinforcing Plan (Housing), #330 2F Sector Partial Floor Plan (MP), Security Grill, Safe Eye Bolt

“ AE-12 14 of 66 #330 2F Sector Partial Floor Plan (ACS), #330 2F Sector Partial Floor Dimension (ACS), Key Note “

“ AE-13 15 of 66 Partition Wall Type “

“ AE-14 16 of 66 Door Schedule, Door Types, Hardware Schedule, Glazing Schedule, Door Stop Detail, Astragal “

“ AE-15 17 of 66 Window Schedule, Interior Finish Schedule, Abbreviation, Material & Color Schedule, Exterior Finish Schedule, Notes “

“ M-1 18 of 66 Legend and Abbreviations “

“ M-2 19 of 66 Equipment Schedule “

“ M-3 20 of 66 General Notes “

“ M-4 21 of 66 Scope of Work ‘

“ M-5 22 of 66 Existing / Removal Fire Protection Piping Plan (Bldg. #330 - 1st Fl.) “

“ M-6 23 of 66 New Fire Protection Piping Plan (Bldg. #330 - 1st Fl.) “

“ M-7 24 of 66 Existing / Removal HVAC Plan (Bldg. #330 - 1st Fl.) “

“ M-8 25 of 66 New HVAC Plan & Section (Bldg. #330 - 1st Fl.) “

“ M-9 26 of 66 Existing / Removal Fire Protection Piping Plan (Bldg. #330 - 2nd Fl.) “

“ M-10 27 of 66 New Fire Protection Piping Plan (Bldg. #330 - 2nd Fl.) “

“ M-11 28 of 66 Existing / Removal HVAC Duct Plan (Bldg. #330 - 2nd Fl.) “

A-2

D-19-10 M-12 29 of 66 New HVAC Duct Plan (Bldg. #330 - 2nd Fl.) 28 Jun 19

“ M-13 30 of 66 New HVAC Piping Plan (Bldg. #330 - 2nd Fl.) “

“ M-14 31 of 66 Existing / Removal Fire Protection Piping Plan “ (Bldg. #338)

“ M-15 32 of 66 New Fire Protection Piping Plan (Bldg. #338) “

“ M-16 33 of 66 Existing / Removal HVAC & Plumbing Plan (Bldg. #338) “

“ M-17 34 of 66 Existing / Removal Section & Partial Plan “

“ M-18 35 of 66 New HVAC Duct Plan - 1 (Bldg. #338) “

“ M-19 36 of 66 New HVAC Duct Plan - 2 (Bldg. #338) “

“ M-20 37 of 66 New HVAC Piping Plan (Bldg. #338) “

“ M-21 38 of 66 HPU & ERV Flow Diagram (Bldg. #338) “

“ M-22 39 of 66 HPU & ERV Control Schematic Diagram (Bldg. #338) “

“ M-23 40 of 66 New Sewer and Vent Piping Plan & Isometric Diagram “

“ M-24 41 of 66 New Domestic Water Piping Plan & Isometric Diagram “

“ M-25 42 of 66 Detail Drawings – 1 “

“ M-26 43 of 66 Detail Drawings – 2 “

“ E-1 44 of 66 Legend, Notes and Scope of Works “

“ E-2 45 of 66 Existing and New Lighting Plan (Bldg. 330 - 2nd Floor) “

“ E-3 46 of 66 Existing and New Lighting Plan (Bldg. 330 - 2nd Floor) “

“ E-4 47 of 66 New Power Plan – Receptacle and Existing Panel Location Plan (Bldg. 330 - 2nd Floor) “

A-3

D-19-10 E-5 48 of 66 Existing and New Communication Plan 28 Jun 19 (Bldg. 330 - 2nd Floor)

“ E-6 49 of 66 Existing and New FA/ Mass Notification System Plan (Bldg. 330 - 2nd Floor) “

“ E-7 50 of 66 Existing/ New HVAC Power/ Control and Auxiliary System Plan (Bldg. 330 - 2nd Floor) “

“ E-8 51 of 66 Existing/ New IDS Power Plan and Location Diagram of Safe Room Door Side Wall (Bldg. 330 - 2nd Floor) “

“ E-9 52 of 66 Enlarged Existing/ New IDS Power Plan (Bldg. 330 - 2nd Floor) “

“ E-10 53 of 66 New Electrical Plan 1 (Bldg. 330 - 1st Floor) “

“ E-11 54 of 66 New Electrical Plan 2 (Bldg. 330 - 1st Floor) “

“ E-12 55 of 66 New Lighting Plan and Ceiling Mount Occupancy Sensor Wiring Diagram (Bldg. 338) “

“ E-13 56 of 66 Lighting Fixture Schedule and Non Standard Lighting Fixture Detail (Bldg. 338) “

“ E-14 57 of 66 New Power Plan - Receptacle1 (Bldg. 338) “

“ E-15 58 of 66 New Power Plan - Receptacle2 (Bldg. 338) “

“ E-16 59 of 66 New Power Plan - HVAC (Bldg. 338) “

“ E-17 60 of 66 New Control Plan 1 - HVAC (Bldg. 338) “

“ E-18 61 of 66 New Control Plan 2 - HVAC (Bldg. 338) “

“ E-19 62 of 66 New Communication Plan - (Bldg. 338) “

“ E-20 63 of 66 New Fire Alarm Plan and Enlarged Mech. Rm Fire Alarm Plan- (Bldg. 338) “

“ E-21 64 of 66 Remove/ New Electrical Power Single Line Diagram “

A-4

D-19-10 E-22 65 of 66 Panel Schedule "PA" and "PB" 28 Jun 19

“ E-23 66 of 66 Panel Schedule "MD", "H" and "PC" “

A-5

Section F - Deliveries or Performance

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 120 days after the receopt of Notice to Proceed (NTP).

(End of clause)

Section G - Contract Administration Data

Section J - List of Documents, Exhibits and Other Attachments

DRAWINGS

Drawing, J1-00525-9J-1 Drawing, J1-00525-9J-2

Section K - Representations, Certifications and Other Statements of Offerors

52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APR 1985)

(a) The offeror certifies that --

(1) The prices in this offer have been arrived at independently, without, for the purpose of restricting competition, any consultation, communication, or agreement with any other offeror or competitor relating to –

(i) Those prices,

(ii) The intention to submit an offer, or

(iii) The methods of factors used to calculate the prices offered:

(2) The prices in this offer have not been and will not be knowingly disclosed by the offeror, directly or indirectly, to any other offeror or competitor before bid opening (in the case of a sealed bid solicitation) or contract award (in the case of a negotiated solicitation) unless otherwise required by law; and

(3) No attempt has been made or will be made by the offeror to induce any other concern to submit or not to submit an offer for the purpose of restricting competition.

(b) Each signature on the offer is considered to be a certification by the signatory that the signatory --

(1) Is the person in the offeror's organization responsible for determining the prices offered in this bid or proposal, and that the signatory has not participated and will not participate in any action contrary to subparagraphs (a)(1) through (a)(3) of this provision; or

(2) (i) Has been authorized, in writing, to act as agent for the following principals in certifying that those principals have not participated, and will not participate in any action contrary to subparagraphs (a)(1) through (a)(3) of this provison ______________________________________________________ (insert full name of person(s) in the offeror's organization responsible for determining the prices offered in this bid or proposal, and the title of his or her position in the offeror's organization);

(ii) As an authorized agent, does certify that the principals named in subdivision (b)(2)(i) above have not participated, and will not participate, in any action contrary to subparagraphs (a)(1) through (a)(3) above; and

(iii) As an agent, has not personally participated, and will not participate, in any action contrary to subparagraphs (a)(1) through (a)(3) of this provision.

(c) If the offeror deletes or modifies subparagraph (a)(2) of this provision, the offeror must furnish with its offer a signed statement setting forth in detail the circumstances of the disclosure.

(End of Provision)

5152.204-4032 REPRESENTATIONS AND CERTIFICATIONS

(a) SUBCONTRACTING:

If the offeror contemplates subcontracting, it must obtain prior written approval of subcontractor from the PCO or ACO, and list below: (1) the names and addresses of the subcontractor(s), (2) the type of subcontracting, and (3) the estimated price for each subcontract.

(b) AFFILIATED OFFERORS:

(1) Business concerns are affiliates of each other when, either directly or indirectly, one concern controls or has the power to control the other, or a third party controls or has the power to control both.

(2) Each offeror shall furnish, below, the following information:

(i) Whether the offeror has any affiliates;

(ii) The names and addresses of all affiliates of the offeror; and

(iii) The names and addresses of all persons and concerns exercising control or ownership of the offeror and any or all of its affiliates, and whether they are common officers, directors, stockholders holding controlling interest, or otherwise.

AFFILIATED CONCERNS. : (Name, location and, in detail, controlling interest in each)

(c) PRINCIPAL OWNER(S) OR STOCKHOLDER(S):

Each offeror shall list below the name(s) and address(es) of the principal owner(s) or stockholder(s) of the company and percentage of ownership. If a major portion is publicly traded and/or otherwise widely distributed, state that, with the percentage so affected.

(d) STANDARDS OF CONDUCT CERTIFICATION:

This is to certify that, to the best of my knowledge and belief, except as described below, no representative of this firm who deals with US Government employees on any aspect of this procurement is a former US Government employee, to include former US military personnel. I understand that this certification is continuing in nature and places a duty on me and my firm to notify the Contracting Officer of any additional individual(s) who fit the above description prior to the individual's assuming duties.

(i) Name ______________________________________________ Former rank/grade ____________________________________ Last US Government position ___________________________

(ii) Name ______________________________________________ Former rank/grade ____________________________________ Last US Government position ___________________________

(iii) Name ______________________________________________ Former rank/grade ____________________________________ Last US Government position ___________________________

Firm ____________________________________________________ Name _____________________________________________________ Signature __________________________________________________

Title _____________________________________________________ Date of Execution ____________________________________________

(e) TAXES:

(1) References:

(i) Contract clause entitled "FAR 52.229-06 Taxes—Foreign Fixed-Price Contracts (Jan 1991)."

(ii) US-ROK Status of Forces Agreement (SOFA), Articles IX and XVI.

(iii) ROK Customs Law, Law No. 1976, promulgated on 29 November 1967, as amended.

(iv) ROK Value Added Tax Law, Law No. 2934, promulgated on 22 December 1976 (effective date 1 July 1977), as amended.

(v) ROK Special Excise Tax Law, Law No. 2935, promulgated on 22 December 1976 (effective date 1 July 1977), as amended.

(2) Contractor shall state the types and estimated amount of taxes that would normally apply to such transactions but are excluded from this proposal.

(i) Customs Tax (except for ROK MND-funded contracts or delivery orders):

Name Number Cost/Unit of Item of Units w/o Tax % of Tax Tax/Unit Tax Total

This item will be imported specifically for this contract? Yes _____ No _____

(ii) Special Excise Tax:

Name Number Cost/Unit of Item of Units w/o Tax % of Tax Tax/Unit Tax Total

Name of item manufacturer

(iii) Value Added Tax (VAT):

Input VAT on materials purchased for this contract. 10% _____ Input VAT on transportation leased/rented for this contract.10% _____ Input VAT on equipment leased/rented for this contract. 10% _____ Input VAT on services purchased for this contract. 10% _____ Output VAT on total contract amount. 10% _____

(iv) Special Excise (Petroleum) Tax:

No. of U/P

Liters w/o Tax Tax/Unit Total Tax Amount Regular Gasoline ________ (L) ________ w________ w_____________ Premium Gasoline ________ (L) ________ w________ w_____________ Diesel ________ (L) ________ w________ w_____________ Other ________ (L) ________ w________ w_____________

(v) Education Tax.

(3) Name of the oil company from which POL products will be purchased:

Oil Company: _________________________________________ (Name only)

(4) I certify by this submission that all supplies and services to be purchased for this contract have been proposed exclusive of Value Added Tax, applicable Customs Tax (except ROK MND-funded contracts and delivery orders), Special Excise Tax, and Education Tax.

Signed (Chop)

(f) CERTIFICATIONS AND REPRESENTATIONS

By submitting an offer, each offeror agrees to be bound by all certifications and representations in this solicitation.

The Government reserves the right to require any and all certifications and representations to be completed and signed in hard copy by the successful offeror prior to contract award. Failure of an offeror to complete the certifications and representations within the time directed by the Contracting Officer may result in a determination that the contractor is not a responsible offeror for this acquisition.

Section L - Instructions, Conditions and Notices to Bidders

INSTRUCITONS TO OFFEROR

Addendum to Instructions to Offeror The Government intends to award without discussion, but reserves the right to conduct discussions if deemed necessary and to establish a competitive range for efficiency in accordance with FAR 52.215-1(f)(4).

Offeror(s) may, at the discretion of the Government, be asked to provide more information and clarification regarding their proposals. The Government may make a final determination as to whether an offer is acceptable or unacceptable solely based on the proposals as submitted, without requesting any further information. However, if it is deemed necessary the Government may, at its sole discretion, request additional information clarifying but not substantially changing any proposal as submitted.

The questions are due No Later Than 7 Aug 2019, 1300…