1. Subcontractor 의 가스시설공사업1봉, 가스산업기사, 용접산업기사를
모두사용해도되는지, 3개주중1개만 사용해야하는지?
1. Can I use all of Subcontractor's gas facility construction business, gas industry article, and welding industry article, or should I use only one of three states?
==>It is acceptable to submit licenses of the prime contractor and/or subcontractor.
A subcontractor's license may be used as a substitute for one of the prime contractor's license requirements.
2. 가스산업기사대신 상위인 가스기사나 기술사 를 제출해도되는지?
May I submit a top gas engineer or engineer instead of a gas industry engineer?
==> It is acceptable a contractor to submit gas engineer license or gas PE license instead of gas industrial engineer.
3. 용접산업기사 대신 상위인 용접기사나 용접기능장의 자격증을 제출해도되는지?
May I submit a certificate for the top-level welding article or welding function instead of the welding industry engineer?
==> It is acceptable a contractor to submit weld engineer's license or weld master mechanic's license instead of weld industrial engineer license.
4. (iii) SUBFACTOR C -KEY PERSONNEL
(1) CONTRACT MANAGER (CM), (2) ENGINEERING SUPERVISOR & (3) POL
TECHNICIAN 직책들 이 0800-- 1700 까 지 진해기지안에서 근무해야 하나요 또한,
해군 기지안에 사무실을제공 하는지요?
Do I have to work above three (3) position in the 0800 -- 1700 Chinhae Navy base?, and/or do I have to obtain an office in the Navy base?
==>1. The Contractor is responsible for conducting business, between the hours of 0800-1700 hours Monday through Friday except Korean holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
2. Contract Manager (CM), Engineering Supervisor and/or POL Technician don't need to work full workdays in a month.
They need to conduct ITM monthly, quarterly or yearly basis.
3. CFAC wouldn't provide an office to a contractor.