A21_Amendment__0001-W90VN9-17-T-0040.pdf
PDF 196 KB Posted
- Attached to
- Installation/Removal of Tent Service
- Solicitation number
- W90VN9-17-T-0040
About this file
See the attached Amendment #0001.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A21_RFQ-W90VN9-17-T-0040.pdf | ||
| A21_Attachment_1-Site_Layout_(Tents).pptx | PPTX presentation |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0010990635
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
A. The purpose of this amendment is to change the size of tent at LSA 2, Pier #9 from 24 March 2017 through 29 April 2017 as show n below . (See Performance Work Statement below ).
FROM: 1 Each/Size: 65 W x 32 H x 130 L (Feet) TO: 1 Each/Size: 32 W x 32 H x 70 L (Feet).
B. The closing date/time is extended from 2 March 2017, 01:00 PM to 7 March 2017, 01:00 PM.
C. All other terms and conditions of the solicitation remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 03-Mar-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W90VN9-17-T-0040
X 9B. DATED (SEE ITEM 11)
23-Feb-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Mar-2017
CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
RCO DAEGU, UNIT #15682
APO AP 96218-5682
UNITED STATES OF AMERICA (THE)
W90VN9 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W90VN9-17-T-0040
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 02-Mar-2017 01:00 PM to 07-Mar-2017 01:00 PM.
The following have been modified:
PWS
PERFORMANCE WORK STATEMENT
Installation/Removal of Tent Service for Operation Pacific Reach 17
1.0. General. The Contractor is to provide two (2) Tents of different size as specified in Para 6 of PWS for field exercise Operation Pacific Reach at Pohang (ROK Marine Base) and Pier #9 from 19 March-2017 through 29 April 2017.
1.1. Scope of Work. The period of performance is 19 March 2017-29 April 2017 at Pohang ROK Marine Base and Pier 9. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and management necessary to deliver, install, manage, and remove dining tents during period of performance as defined in this Performance Work Statement (PWS) except as specified in paragraph 3.0 as Government furnished. Each dining tent must be have floors, adequate lighting, fire extinguishers, smoke detectors, heating/AC, and 110V outlets (Minimum 24 outlets), tables and chairs to feed 450 people at a time at Logistic Support Area (LSA) 1 and 300 people at a time at LSA 2, Pier #9. Contractor is to provide generators to power the lighting, heater/AC, and power outlets. Location, start, and end days specified in paragraph 1.6.
1.2. Qualification of Contractor:
a. Contractor Manager (CM). The Contractor shall provide a qualified CM who shall be responsible for the overall performance of the work. The CM shall be able to read, write, speak and understand English and shall fully understand the requirements of this contract. The CM has at minimum of one (1) prior year experience within the last five (5) years for this type of services or similar type of services as specified in PWS. This may be commercial market or US Government requirement.
b. The Contractor(s) shall submit evidence proving that they have had a minimum of two (2) prior years experience within the last five (5) years for this type of services or similar type of services as specified in PWS. This may be commercial market or US Government requirement.
c. The Contractor shall provide adequate personnel to complete this requirement in the time period required.
Contractor’s employees and representatives shall be required to have proper identification prior to entering a Government installation. Such identification shall be controlled as prescribed by the Security Section, Provost Marshal, or equivalent security control authority at the installation concerned.
d. The Contractor shall possess a valid Business Registration (사업자등록증) granted by the Republic of
Korea (ROK) authorities and translate the registration into English, and provide a copy of both the English and Korean version with offeror’s initial proposal.
e. All Contractor employees and representatives shall have in their possession a Korean Citizen Identification Card while on any U.S Government installation.
f. The Contractor shall ensure that employees have a current and valid driver’s license before allowing the employee to operate a Contractor-owned vehicle on the base. The Contractor and its employees shall comply with all security requirements imposed by the local installation commander at all times while on the military installation. Any Contractor traffic violations may result in the denial of driving privileges on the installations. A copy of all licenses shall be provided to the COR or Contracting Officer within ten (10) days after contract award
g. The Contractor shall ensure all employees that operate on U.S. Installations have approved access and that service vehicles are registered with installation provost marshal.
1.3. Quality Assurance. FAR Part 46 governs the Contractor’s Quality Assurance/Quality Control Relationship.
The Contractor should understand the roles that the Government assumes as far as the execution of particular quality assurance methods to monitor the contract. The Contractor shall understand the Quality Control Methods that they shall employ to insure the fewest services delays and product/service deficiencies. The Government shall audit, or use inspection methods or other methods to assure that the Contractor is providing the services or products required by the contract. The Contractor shall not present goods or services to the Government which the Contractor has failed to perform appropriate Quality Control methods as generally outlined by FAR Clause 52.246-4 and as dictated by the particular services or products.
a. The Government bases, but does not limit, its primary quality assurance procedures on random sampling of the recurring critical output products of the contract using the concepts of MIL-STD-105D. The Contracting Officer Representative (COR) will monitor some of the contract requirements using Contractor reports and customer complaints (DA Form 5477). The Government reserves the right to perform 100% inspection or other inspection methods as might be applicable to the circumstances.
b. For areas monitored by sampling: The Criteria is derived from MIL-STD-105D based on the lot size, sample size and AQL for each contract requirement. When the number of defects in the Contractor’s performance are discovered by the Quality Assurance Evaluator (QAE) and exceed the unacceptable level, the COR shall be required to complete a Contract Deficiency Report (CDR) DD form 2772. The CDR requires the Contractor to explain in writing why performance was unacceptable, how they will return performance to acceptable levels, and how the Contractor will prevent the recurrence of the problem(s) in the future. CDRs should answer the following questions in the Corrective Action Plan (CAP) which is to be provided as part of the answer to the CDR.
1) What is the Root Cause of the Deficiency?
2) What action was taken to correct the specific deficiency?
3) What action was taken to correct and prevent recurrence of the Root Cause of the Deficiency?
4) What action was taken to determine if other product is affected by the same or similar deficiency and action taken regarding other susceptible product?
5) What action was taken to correct the weakness which allowed deficient product to be presented to the Government or COR for acceptance?
6) What are the target dates for implementation of the Contractor’s identified corrective action?
Other requirements. The criteria for non-sampled requirements were derived from estimates of the level of performance experienced when Government personnel did the service or are the level of performance deemed acceptable to the Government. The use of the CDR as described above applies to these requirements as well.
1.4. Quality Control Program (QCP). The Contractor shall institute the U.S. Military’s Quality Assurance Methods insuring that the Quality Control system meets the requirements of FAR Clause 52.246-4 and FAR Part 46 previously mentioned. The Contractor shall develop and maintain a Quality Control plan which is applicable to the processing of product IAW this Performance Statement of Work which shall meet the requirements of the FAR clause 52.246-4 previously mentioned. The QCP must be forwarded to and accepted by the Contracting Officer’s Representative (COR). The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of deficiencies and previously discussed in par 1.3 above. The Contractor’s QCP is the means by which the Contractor assures that the work complies with the requirement of the contract. A copy of the Quality Control Program shall be provided to the COR within 10 days after contract award date or no later than the post award conference. The Contractor shall institute and ensure a viable customer comment system is in place utilizing DA Form 5477, Customer Complaint Record and applicable methods which would allow for customer satisfaction of the particular service outlined in the contract.
1.5. Physical/Operational Security Antiterrorism.
a. This provision and / or contract text is for Contractor employees with an area of performance within an Army controlled installation, facility, or area. All Contractor employees, to include subContractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level I awareness training with 15 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The Contractor shall submit certificates of completion for each affected Contractor employee and subContractor employee to the Receiving Officer or to the Contracting Officer, if a Receiving Officer is not assigned, within 30 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: https//atlevel1.dtic.mil/at.
b. Access and General Protection / Security Policy and Procedures. Contractor and all associated sub-
Contractors employees shall comply with applicable installation, facility and area commander installation facility access and local security policies and procedures (provided by Government representative). The Contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and /or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Conditions (FPCON) at any individual facility or installation change, the Government may require changes in Contractor security matters or processes.
c. iWATCH Training. The Contractor and all associated sub-Contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activities to the Receiving Officer. This training shall be completed within 15 calendar days of contract award and with 15 days of new employees commencing performance with the results reported to the COR NLT 30 days after contract award.
d. The Contractor and his employees must comply with all security requirements imposed by the local installation commander at all times while performing the requirements of this contract on all military installations or exercise areas.
1.6. Hours of Operation. Billeting service dates and times are as follows:
Location Period of Performance Number of Tents & Size at Minimum
LSA 1 at Pohang (ROK Marine Base) 19 March 2017 through 29 April 2017 1 Each/Size: 65 W x 32 H x 130 L (Feet)
LSA 2 at Pier #9 24 March 2017 through 29 April 2017 1 Each/Size: 32 W x 32 H x 70 L (Feet)
1.7. Conservation of Utilities. Not Applicable
1.8. Environmental Controls. Not Applicable
1.9. Government Observations. At any time deemed appropriate by the COR, he or she may inspect the Contractor’s facilities for compliance with this contract, however, the COR may set up dates and times with the
Contractor for routine inspections and quality assurance visits. The Contractor will be notified at least 24 hours in advance of any other civilian or military personnel associated with the US Army Garrison Daegu desiring to view the Contractor’s facilities and or operations.
2.0. Safety Requirements. The Contractor will comply with all U.S. Occupational Safety & Health Administration (OSHA) regulations and is subject to the 19th ESC Safety Officer inspections of all Government Owned/Contractor Operated (GOCO) property for compliance with governing regulations.
2.1. Definitions. None.
2.2. Technical definitions. Acceptable Quality Level (AQL). AQL is a designated value of percent defective (or defects per hundred units) for which lots will be accepted most of the time by the sampling procedure being used.
3.0. Government Furnished Property and Services. The Government shall provide all fuel for generators.
4.0. Contractor Furnished Items and Services. The Contractor shall furnish all items and services necessary to provide tents as defined in this PWS except as specified in paragraph 3.0 as Government furnished.
4.1. General. Except for those items or services specifically stated to be Government furnished in Section 3.0; the Contractor shall furnish everything required to perform this contract.
4.2. Minimum Quality Standards. All tents must meet the following criteria,
a. All tents must be clean and serviceable upon setup
b. All tents must be weatherproof (generally free of water/wind leakage)
c. All tents shall have double doors front and back which shall be serviceable through the exercise.
d. All tents must have flooring for the entire inside of the tent space.
e. All tents must have lighting, to provide for illumination where an individual shall be able to read a standard text book at any location within the tent where seating is provided.
f. All tents must have the minimum required number of fire extinguishers as required by fire code and smoke detectors to cover the area of the entire tent and provide an alarm audible in the local area of the tent.
g. All tents must have tables and chairs to seat 450 people at LSA 1 and 300 and Pier 9.
h. All tents must have heated/Air Conditioned and provide air circulation to allow for a temperature between
65 and 80 degrees Fahrenheit.
i. All tents must have 110Voltage Alternating Current (VAC) outlets (minimum 24 outlets in each unit)
j. Contractor must provide power generation to all tents. All electrical systems will be each grounded via single point earth ground to insure safety. See Recommended methods as per CECOM TR-96-2 Earth Grounding Pamphlet on the DITEC website www.dtic.mil
4.3. Government Reimbursements. Not Applicable
5.0. Specified Task: Set Up Tents/: The Contractor shall install the tents as the requirements specified in paragraph 4.2 above into the requirements specified in para 5.0 thru 5.3. Tents shall be established at times in locations and in requisite quantities as specified in paragraph 1.6. Contractor ensures heating, air conditioning, flooring, fire extinguishers, smoke detectors, and minimum 24 110V outlets per tent. Provide tables and chairs to seat 450 people at a time at LSA 1 and 300 people at a time at Pier 9. Each tent must be connected to power generation.
5.1 Service Power Generators: Ensure power generators are properly maintained, monitor fuel levels and refill as applicable.
5.2 Specified Task: Remove Tents: Remove all Tents on dates specified in paragraph 1.6.
5.3 Quality Control: The Contractor shall annotate and initial/sign a service log at each location each time service is performed
5.4 Fire Prevention: The Contractor shall comply with the provisions of the installations’ Fire Protection Program and NFPA 70 (National Fire Protections Agency).
6.0 Applicable Publications:
6.1 The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.
- Useful reference documents for Contractors working with the U.S. Government are available at http://www.aca.army.mil/
- Federal Joint Ethics Regulation (JER) 5500.7-R is available at www.dod.mil/dodgc/defense_ethics/ethics_regulation/
- Overseas Environmental Baseline Guidance is available at www.dtic.mil/
- Federal Acquisition Regulations are available at https://www.acquisition.gov/far/
- AR 385-10, Army Safety Program
6.2 Documents are available upon request to the COR
7.0 Technical Exhibit / Attachment Listing:
7.1 Technical Exhibit 1: Performance Requirements Summary
Performance Objective Standard
PERFORMANCE
THRESHOLD
Method of
Surveillance
PRS # 1
The Contractor shall provide dining service tents for Operation Pacific Reach
PWS paragraph 5.1, 5.2, 5.3
The Contractor ensures tents are set up, secured against wind, and ensure there is no low availability of electrical power
Zero deviation on set up
Periodic inspections / validated customer complaint
PRS # 2
The Contractor shall service generators at Dining Tents
PWS paragraph 5.2
The shall Contractor conduct routine maintenance, monitor fuel levels of, and fix or replace broken generators
Generators shall not be “down” for more than an hour a day if possible
Periodic inspections complaint
PRS #3
The Contractor shall annotate and initial/sign a service log at each location each time service is performed
PWS paragraph 5.4
The Contractor shall ensure crew checks in and out with mayor cell or COR prior to servicing the location.
No more than one reported violation each month
Periodic inspections / validated customer complaint
PRS #4
The Contractor shall ensure all employees that operate on U.S.
Installations have approved access and that service vehicles are registered with installation provost marshal.
PWS paragraph 1.2
The Contractor ensures all employees meet minimum requirments for entry on US/ROK facilities and that Entry Access Lists are submitted to US/ROK Government
Zero deviation from standard
Periodic inspections complaint
7.2 Attachment Listing:
a. Site Layout for Tents
8. Accounting for Contract Services:
Contractor Manpower Reporting (CMR) Requirement
The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor will report ALL Contractor manpower (including subContractor manpower) required for performance of this contract. The Contractor is required to completely fill in all the CMR information in the format using the following web address: https://cmra.army.mil. However, before the Contractor can begin reporting CMR data in this website, he or she must first register as a User. In order to register, the Contractor must have a Cage Code.
Cage Code
If you are a Korean company needing a Cage Code, at Telephone #82-2-2079-4639, FAX 82-2-773-7587, EMAIL CAGEKR@dapa.go.kr , Address: The Standard Planning Team of the Standard Management Bureau Defense Acquisition Program Division (23 Yongsangogyogil), #2-15 Yongsan 2 ga dong, Yongsan-gu, Seoul (140-841), Republic of Korea.
If you are a U.S. company needing a Cage Code, you must register with the Central Contractor Registration (CCR) at www.ccr.gov. Once your company registration is activated in CCR, a Cage Code notification will be mailed to your company address via the U.S. Postal Service.
CMR Reporting
The information required to be reported in the CMR website includes: (1) Contracting Office, Contracting Officer, Contracting Officer’s Technical Representative (COTR) or Contracting Officer’s Representative (COR); (2) Contract Number, including Task and Delivery Order Number(s); (3) Beginning and Ending dates covered by reporting period; (4) Contractor Name, Address, Phone Number, E-Mail Address, Identity of Contractor Employee entering data; (5) Estimated Direct Labor Hours (including sub-Contractors’ hours); (7) Total Payments (including sub-Contractors’ payments); (8) Predominant Federal Service Code (FSC) reflecting services provided by Contractor (and separate Predominant FSC for each sub-Contractor if different); (9) Estimated data collection cost;
(10) Organizational Title associated with the Unit Identification Code (UIC) for the Army Requiring Activity reporting this information (the Army Requiring Activity (RA) is responsible for providing the Contractor with its UIC for purposes of reporting this information); (11) Locations where Contractor and sub-Contractors perform the work (specified by zip code in the United States and nearest City and Country when in an overseas location, using standardized nomenclature provided on website); (12) Presence of Deployment or Contingency Contract language;
and (13) Number of Contractor and sub-Contractor employees deployed in theater this reporting period (by Country).
As part of its submission in response to a solicitation or a modification request which includes a contract line item number (CLIN) for this CMR reporting requirement, the Contractor shall also provide the estimated total cost (if any) incurred to comply with this reporting requirement on the associated CMR CLIN. Reporting period will be the period of performance not to exceed 12 months ending September 30 of each Government fiscal year and must be reported by 31 October of each calendar year. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a Contractor’s systems to the secure website without the need for separate data entries for each required data element at the website. The specific formats for the XML direct transfer may be downloaded from the website.
CMR reporting is a requirement mandated by the Department of Army. Failure of the Contractor to comply with this requirement will be noted as Past Performance information about the Contractor to be used on future procurements for the same or similar services.
CAGE CODE – What it is and How to Obtain One
A CAGE Code is a five-position code that identifies Contractors doing business with the U.S. Federal Government, NATO member nations, and other foreign Governments. The CAGE Code is used to support a variety of mechanized systems throughout the Government and provides for a standardized method of identifying a given facility at a specific location. The Code may be used for a Facility Clearance, a Pre-award survey, automated Bidders Lists, identification of Debarred Contractors, fast pay processes, etc.
(http://www.dlis.dla.mil/cageserv.asp.)
FOR NON-U.S. COMPANIES
Non-U.S. companies are issued NATO Cage Codes (NCAGE) by contacting the designated Point of Contact (POC) at the National Codification Bureau (NCB) of the country where the company is located. For a list of addresses and POCs, go to http://www.dlis.dla.mil/nato_poc.asp .
Please note: Organizations with an address containing APO, FPO or AE do not need an NCAGE assigned by an Allied Nation or NATO-sponsored NCB. Instead, these companies must register in the CCR to receive a U.S. Cage Code.
The POC for South Korea is:
The Standard Planning Team Of the Standard Management Bureau Defense Acquisition Program Division (23 Yongsangogyogil) #2-15 Yongsan 2 ga dong Yongsan-gu SEOUL (140-841) Republic of Korea
TEL: +82-2-2079-4639
FAX: +82-2-773-7587
E-MAIL: CAGEKR@dapa.go.kr
After submitting the Cage Code request application to Ms. Cho, sometimes she is able to provide a NATO Cage Code to the Korean Contractor.
NATO Cage Code 신청 및 주의 사항 (Instruction on Registering for NATO Cage Code)
신청 절차
1. 방위사업청 국방전자조달 홈페이지(www.d2b.go.kr)에 접속 합니다.
2. 방위사업청 국방전자조달 홈페이지 메인화면의 민원서비스 - 나토생산자(Ncage)부호 신청을 클릭 합니다.
로긴(Login) 없이 접속 가능 3.나토생산자부호(Ncage) 부여요청을 위한 Login 화면에서 회원가입을 합니다.
*유의사항: 아이디와 비밀번호는 요청및 결과확인용으로 가능하며 국방전달조달 메뉴에 있는 기타 다른 업무에는 사용할 수 없습니다.
4. 회원가입시 번호부여대상이 회사인 경우에는 사업자등록증번호, 개인일 경우에는 DUNS번호를
기입합니다.
5. 가입한 아이디와 비밀번호로 로긴하여 접속 후 온라인 나토생산자부호 요청서에 해당업체에 대한 정보를 기록합니다.
6. 회사인 경우에는 사업자등록증, 개인일 경우에는 DUNSNUMBER 부여결과서를 스캔하여 EDM에
*.jpg화일로 첨부합니다.
7. 등록한 후 재조회를 하여 업체자료가 정상적으로 신청이 되었는지 확인합니다.
8. 신청서 접수 및 진도는 요청서 상단 진행산태를 확인합니다.
*진행상태: 신청완료, 접수완료, 작업완료등 빨간색으로 변경 *처리소요기간: 1일-2일 *비용: 무료
업무 담당자
1. 담당부서 : 방위사업청 표준관리부 목록체계팀
① 생산자부호 담당 전화번호 : 02)-2079-4639
② 표준관리부 FAX : 02)-2079-4629
③ 목록체계팀 E-mail : cagekr@dapa.go.kr
Once the CAGE code is issued for your company, your company is ready to do CMR registration. For CMR registration, please follow the instruction in the solicitation/contract titled ―Accounting for Contract Services.ǁ After your company‘s CMR registration application is reviewed by U.S Department of Army. You will receive e-mail notification within 2 to 3 working days whether your CMR registration application is approved or not. If it is disapproved, please read carefully the comments provided by DA and correct registration application as commented. After your company‘s CMR registration is approved, your company is ready to do CMR report. There will be short lesson giving how you report CMR on the web site.
CAGE code 가 발급되면 CMR registration 을 할수가 있읍니다. CMR registration 을 위해서는 두번째 첨부를 참조 바랍니다. 귀사의 CMR registration은 미 국방부 에서 검토하고 그 승인 여부 결과를 이 메일로 귀사에 통보 될것입니다. 만약 승인이 거부되면 승인거부 사유를 잘읽어 보시고, CMR registration 부적격한 부분을 수정하시기 바랍니다. 귀사의 CMR registration 이 승이되면 CMR report 를 할수있게 됩니다.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .