W90VN9-24-R-0145_Drawings.pdf

PDF 648 KB Posted

Attached to
Install guardrail near B154, Camp Carroll South Korea
Solicitation number
W90VN9-24-R-0145
Issued by

About this file

This document is a set of drawings for a federal contract opportunity to install a new steel guardrail near Building 154 at Camp Carroll in South Korea. The drawings include a location plan, general notes, an existing floor plan, a work plan for installing the new guardrail, and a reference for an existing underground gas pipeline in the project area.

The related federal contract opportunity, Solicitation Number W90VN9-24-R-0145, is for the installation of the guardrail project described in the drawings. This is a non-work plan task order request for proposals (RFP) under a multiple award task order contract (MATOC) held by several contractors. The magnitude of the work is less than $25,000. Proposals are limited to the MATOC contract holders listed in the solicitation. Offerors are required to attend a site visit and submit pricing proposals and required forms by the specified closing date.

View the file

Other files

File Type Posted
W90VN9-24-R-0145.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FEWR NO. : HS-00066-4J

LOCATION : NEAR B154, CAMP CARROLL

LOCATION PLAN 1/6

THIS LOCATION

: NEAR B154, CAMP CARROLL

GENERAL NOTE 2/6

GENERAL NOTE

1. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AS SHOWN ON THE DRAWINGS PRIOR TO THE START OF CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT IMMEDIATELY TO THE ATTENTION OF THE CONTRACTING

OFFICER.

2. THE CONTRACTOR SHALL PROVIDE, INSTALL, AND MAINTAIN ALL NECESSARY SIGNS, LIGHTS, FLARES, BARRICADES, MARKERS, CONES AND OTHER PROTECTIVE FACILITIES AND SAFETY OF THE PUBLIC AND/OR MILITARY TRAFFIC

AND OPERATIONS.

3. THE CONTRACTOR SHALL RESTORE ALL IMPROVEMENTS, DAMAGED OR REMOVED AS A RESULT OF CONSTRUCTION. TO ITS ORIGINAL OR BETTER CONDITION, UNLESS OTHERWISE NOTED. THESE ITEMS INCLUDE, BUT ARE NOT

LIMITED TO PAVEMENTS, CONCRETE SIDEWALKS AND CURBS, AND UTILITIES.

4. WHENEVER CONNECTIONS TO EXISTING UTILITIES OR WHERE NEW UTILITIES CROSS EXISTING UTILITIES ARE SHOWN. THE CONTRACTOR SHALL CAREFULLY EXPOSE THE UTILITY BY HAND EXCAVATION TO VERIFY THEIR LOCATIONS

AND DEPTHS PRIOR TO EXCAVATING TRENCHES FOR THE NEW UTILITY LINES.

5. WHENEVER ANY CHANGE IN ALIGNMENT OR GRADE FOR THE PROPOSED UTILITIES ARE REQUIRED DUE TO UNFORESEEN CONFLICT WITH OTHER UTILITIES, THE CONTRACTOR SHALL NFORM THE CONTRACTING OFFICER

IMMEDIATELY FOR REMEDIAL ACTION.

6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL WATER LINES DURING CONSTRUCTION. THE CONTRACTOR SHALL BE ESPECIALLY CAREFUL WHENEXCAVATING BEHIND WATER LINES, TEES, AND BENDS

WHEREVER THERE IS A POSSIBILITY OF WATER LINE MOVEMENT DUE TO REMOVAL OF THE SUPPORTING EARTH BEYOND THE EXISTING REACTION BLOCKS. THE CONTRACTOR SHALL TAKE WHATEVER MEASURES IS NECESSARY TO

PROTECT THE WATER LINES, SUCH AS CONSTRUCTING SPECIAL REACTION BLOCKS AND / OR MODIFYING CONSTRUCTION METHOD, WITH THE APPROVAL OF THE CONTRACTING OFFICER.

7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY SEWAGE SPILLS CAUSED DURING CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER AND UTILIZE APPROPRIATE MEASURES TO CONTAIN AND

ADEQUATELY CLEANUP THE SPILL. THE CONTRACTING OFFICER SHALL OVERSEE THE CLEANUP EFFORT AND RENDER THE SITE CLEAN. ALL COSTS INCURRED FOR SPILL CONTAINMENT AND CLEANUP SHALL BE THE RESPONSIBILITY

OF THE CONTRACTOR.

8. THE CONTRACTOR SHOULD COORDINATE ANY SALVAGEABLE AND RECYCLABLE MATERIALS WITHIN PROJECT LIMIT WITH COR CAREFULLY TO DETERMINE PROPER MATERIAL HANDING METHODS.

EXISTING FLOOR PLAN 3/6

LEGEND

: EXISTING STEEL GUARD RAIL.

: EXISTING ELECTRIC POLE.

: SPEED LIMIT SIGN BOARD.

: CAUTION BOARD (UNDERGROUND

GAS PIPE LINE).

: EXISTING MANHOLE.

WORK PLAN 4/6

LEGEND

: A NEW STEEL GUARDRAIL

SCOPE OF WORK

1. INSTALL A NEW STEEL GUARDRAIL(77LM) AND

METAL POST (METAL POST WITH SPACER BLOCK

TYPE) FOLLOWING THE EXISTING STEEL

GUARDRAIL AT DESIGNATED AREA.

A NEW STEEL GUARDRAIL

UNIT : MM

REFERENCE FOR GAS PIPE LINE 5/6

LEGEND

: UNDERGROUND GAS PIPE LINE.

SCOPE OF WORK

1. WHEN INSTALL A NEW STEEL GUARD RAIL,

PLEASE CONTACT TO MR.YU, HAN KUN (DSN 763-

2186) DUE TO UNDERGROUND GAS PIPE LINE.

STANDARD DRWAING PLAN 6/6