260217_DWG.pdf
PDF 26 MB Posted
- Attached to
- MATOC DFAC REPAIR CASEY
- Solicitation number
- W90VN824R0070
About this file
This document appears to be a Request for Proposal (RFP) for a MATOC (Multiple Award Task Order Contract) DFAC (Dining Facility) Repair contract at Camp Casey. The solicitation is for repainting the interior and exterior of two DFAC buildings (S-33 and S-747) in accordance with the provided Statement of Work, specifications, drawings, and contract terms and conditions. The contracting agency is the Department of the Army Materiel Command, Army Contracting Command. The contract opportunity requires the contractor to provide all necessary resources to complete Project No. 260217. No additional details are provided regarding the response due date, award date, pricing terms, set asides, or incumbents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation 0070_DFAC.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF DRAWINGS
RING NO. REF. NO.REVISION STATUSDWG. NO. SHT. NO.REF. NO.
T - 1
RING NO. DESCRIPTION OF DRAWINGS
TITLE SHEET
DWG. NO. SHT. NO. DESCRIPTION OF DRAWINGS REVISION STATUS
TITLE SHEET
T-1
A - 1
A - 2
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
DPW, ENGINEERING SERVICES DIVISON, DESIGN BRANCH
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN-CASEY
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
FEWR NO. 260217, CP CASEY
FLOOR PLAN(S-33) AND GENERAL NOTES
A - 3
A - 4
A - 5
A - 6
A - 7
A - 8
PICTURES AND SCOPE OF WORK (BLDG. S-33)
INTERIOR FINISH SCHEDULE (BLDG. S-33)
MATERIAL & COLOR SCHEDULE AND EXTERIOR FINISH SCHEDULE (BLDG. S-33)
FLOOR PLAN AND SCOPE OF WORK (BLDG. S-747)
INTERIOR FINISH SCHEDULE (BLDG. S-747)
MATERIAL & COLOR SCHEDULE AND EXTERIOR FINISH SCHEDULE (BLDG. S-747)
ARCHITECTURAL (BLDG. S-33)
ARCHITECTURAL (BLDG. S-747)
260217
BLDG. S-33 & 747
REPAINT INTERIOR & EXTERIOR OF DFAC
CAMP CASEYKIM, YK
BLDG. S-33 & 747
REPAINT INTERIOR & EXTERIOR OF DFAC
CROSS SECTIONS AND PICTURES (BLDG. S-747)
A-1
ARCHITECTURAL
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
DPW, ENGINEERING SERVICES DIVISON, DESIGN BRANCH
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN-CASEY
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
MANUFACTURES INDICATED.
PURPOSES ONLY. AND NOT INTENDED TO LIMIT SELECTIONS TO PRODUCTS OF THE
COLORS AND PATTERNS LISTED BY MANUFACTURES ARE FOR BIDDING IDENTIFICATION 1.
FOR APPROVAL.
CONTRACTOR ACCORDING TO ACTUAL FIELD CONDITION AND SUBMITED TO COR
CONDITION. IN THAT CASE, SHOP DRAWINGS SHALL BE PREPARED AT THE SITE BY THE
SOME DETAILS SHOWN ON CONTRACT DRAWINGS MAY NOT COINCIDE WITH THE FIELD
8.
FOR APPROVAL.
CONTRACTOR SHALL SUBMIT MANUFACTURER'S INSTALLATION SHOP DRAWINGS TO COR
2.
3.
4.
5.
6.
7.
CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER.
IF THERE ARE ANY CONFLICTS WITHIN THE CONTRACT DOCUMENT. THE GENERAL
AND DIMENSIONS PRIOR TO COMMENCING ANY CONSTRUCTION OR RENOVATION.
THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING CONDITION
9.
10.
11.
12.
13.
14.
BE AS A PART OF THE CONTRACT DOCUMENT OF THIS PROJECT.
STANDARD DETAIL DRAWINGS FOR O&MA PROJECT, KOREA, DATED OCTOBER 1, 2003 SHALL
NUMBERS ARE FROM TM-5-807-7 AND FEDERAL STANDARD NO. 595b, COLORS.
COLOR OF MATERIALS & PAINTS SHALL BE SELECTED BY USING AGENCY AND COLOR
WALL : 2.29 SM. DEG K/W
ROOF : 5.30 SM. DEG K/W
R-VALUE :
GENERAL NOTES
SPECIFICATION 15181.
ITEMS REQUIRING MAINTENANCE/OPERATION IAW THE SECTION 3.1.14, OMA STD
PROVIDE ACCESS DOORS FOR ALL CONCEALED VALVES, VENTS, CONTROLS AND OTHER
OFFICE, DPW. PER DIRECTION FROM COR.
SALVAGE OR SERVICEABLE MATERIALS SHALL BE RETURNED TO SUPPLY OR STORAGE
FROM THE MANUFACTURE SHOWING THE PRODUCT IS LEAD FREE.
A CERTIFICATE OR MATERIAL SAFETY DATA SHEET (MSDS), WRITTEN IN ENGLISH,
DURING THE EXECUTION OF THIS PROJECT. THE CONTRACTOR SHALL PROVIDE
WITH LESS THAN 0.05 PERCENT LEAD BY WEIGHT OF THE NON-VOLATILE SOLIDS)
THE CONTRACTOR SHALL USE "LEAD FREE" COATINGS (LIQUID PAINTS OR COATINGS
ADJACENT AREAS AT HIS OWN EXPENSE.
CAUSED BY THIS PROJECT AND SHALL REPAIR THE DAMAGES TO MATCH UP TO
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES MADE TO EXISTING AREAS
HEATING, EQUIPMENT, ETC), ELECTRICAL, TELEPHONE AND FIRE ALARM SYSTEM.
REQUIRED FOR THE INSTALLATION AND/OR REPLACEMENT OF MECHANICAL (PLUMBING,
OBSTRUCTED ITEMS, CUT, PATCH AND RESTORE WALLS, FLOORS AND CEILING WHERE
THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL/REINSTALLATION OF ANY
DOCUMENTATION TO 8 CES/CEAN.
THE CONTRACTOR SHALL PROVIDE THE NEW SURVEY REPORT AND ASBESTOS REMOVAL
ACCORDANCE WITH THE KOREA ENVIRONMENTAL GOVERNING STANDARD (KEGS).
PRIOR TO ANY WORK TO ASSURE THAT APPROPRIATE ASBESTOS CONTROL IS IN
AREA SHALL BE RESURVEYED AND ASBESTOS MATERIALS SHALL BE REMOVED
WORK IN THE AFFECTED AREA AND NOTIFY THE CONTRACTING OFFICER. THE WORK
ASBESTOS CONTAINING MATERIAL ARE DISCOVERED, THE CONTRACTOR SHALL CEASE
IS NOT PRESENT IN THE AREAS AFFECTED BY THIS WORK: IF SUSPECTED
VERIFYING THE PRODUCT IS ASBESTOS FREE. TESTS HAVE INDICATED THAT ASBESTOS
SHALL PROVIDE A CERTIFICATE OR MSDS, WRITTEN IN ENGLISH, FROM THE MANUFACTURER
PERCENT BY WEIGHT) DURING THE EXECUTION OF THIS PROJECT. THE CONTRACTOR
THE CONTRACTOR SHALL USE "ASBESTOS FREE" MATERIALS (LESS THAN 0.1
SCALE:
FLOOR PLAN (BLDG. S-33)
N/A
FLOOR PLAN(S-33) AND GENERAL NOTES
260217
BLDG. S-33 & 747
CAMP CASEYKIM, YK
A-2
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
DPW, ENGINEERING SERVICES DIVISON, DESIGN BRANCH
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN-CASEY
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
REPAIR / MAINTENANCE (K) WORK
SCOPE OF WORK (ARCHITECTURAL WORK)
1.1
1.2
1.3
1.4
1.5
1.6
(BLDG. S-33)
PICTURES AND SCOPE OF WORK
BLDG. S-33
CLEAN ALL THE EXTERIOR AL. WINDOWS AND FRAMES.
REPAIR AND PATCH UP DAMAGED EXISTING EIFS AS SHOWN ON PICTURES.
FLOOR PLAN AND FINISH SCHEDULE.
GUARD RAILS, WOODEN MOULDINGS AND WOODEN BASE AS SHOWN ON
PAINT AS REQUIRED ALL INTERIOR WALL AND CEILING SURFACES INCLUDING
SURFACE OF THE BUILDING AS SHOWN ON FLOOR PLAN AND PICTURES.
SURFACES, METAL ROOF EAVE SURFACES AND OTHER COMPONENTS OF EXTERIOR
PAINT ALL EXTERIOR WALLS INCLUDING EIFS, CMU, METAL, WOODS, CONCRETE
EIFS SURFACE
PAINT ON EXST
PAINT ON EXST EAVE SURFACES
AND STAIR SURFACES
PAINT ON EXST HAND RAILS
EIFS SURFACE
PAINT ON EXST
REPAIR AND PATCH UP DAMAGED EXISTING EIFS
EIFS SURFACE
PAINT ON EXST
EAVE SURFACES
PAINT ON EXST
(REPLACE DOOR AND INSECT SCREENS)
REPAIR EXST TRASH BIN FACILITY
260217
BLDG. S-33 & 747
REPAINT INTERIOR & EXTERIOR OF DFAC
CAMP CASEYKIM, YK
SYSTEM WITH NEW
REPLACE EXST BROKEN SIGNAGE
BICYCLE RACK
PAINT ON EXST
AND GWB CEILING SURFACES
PAINT ON WOODEN MOULDING
AND GWB WALL SURFACES
PAINT ON WOODEN GUARD RAILS PAINT ON WOODEN GUARD RAILS
INCLDUING SANDING SURFACES.
WITH TRANSPARENT LACQUER
GUARD RAILS WILL BE PAINTED
* WOODEN MOULDING & WOODEN
FLOOR PLANS AND PICTURES. (APPROX. 3 EA.)
REPLACE EXSTING CONCRETE SPLASH BLOCKS WITH NEW AS SHOWN ON
REPAIR AND PAINT EXISTING RAIN GUTTERS AND DOWNSPOUTS AND
FLOOR AND WALL SURFACES
PAINT ON RECEIVING DOCK
TRASH BIN AND SIGNAGE SYSTEM AROUND BUILDING AS SHOWN ON PICTURES.
REPAIR AND PAINT ON EXISTING SUB FACILITIES INCLUDING BICYCLE RACK,
A-3
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
DPW, ENGINEERING SERVICES DIVISON, DESIGN BRANCH
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN-CASEY
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
260217
CAMP CASEYKIM, YK
FREEZER
KITCHEN
KITCHEN
VESTIBULE
CORRIDOR
VCT
CMU
DINING AREA
HGT
ROOM NAMESRM NOS
NEW
BASE
EXIST
MATL
NEW
FNSH
FLOOR
EXIST
CLR
MATL MATL
CLRFNSH
EXIST
FNSH
WAINSCOT
NEW
CLR
INTERIOR WALL
FNSH
INSIDE OF EXT WALL
MATL
EXIST NEW
CLR
EXIST
MATL
NEW
FNSH CLR
EXIST
CEILING
MATL
NEW
FNSH CLR HGT
REMARKS
2795VESTIBULE101
CMU
VCT
VCT
QT
QT - -
QT - -
QT -
- - -VCB
VWC
- - - CONC -
- PAINT P-2
- P-2
- P-2
- -ATC
- -ATC
- CLEAN
GWB
- PAINT P-4
METAL
-FRP
131 WOMEN
CMT
QT
QT
GWB
GWB
GWB
PAINT
PAINT
PAINT
P-2
P-2
P-2
- - - - - - - - - ATC -
CONC - - WD - - - - - -
(BLDG. S-33)
INTERIOR FINISH SCHEDULE
I N T E R I O R F I N I S H S C H E D U L E (BLDG. S-33)
CRAWL SPACE
CORRIDOR
DINING AREA
DINING AREA
SEVERY AREA
DISH WASHING
VESTIBULE
SERVING AREA
MECHANICAL
ELECTRICAL
SYSTEM
WASTING PULPING
DRY STORAGE
REF
REF
REF
RECEIVING DOCK
CAN WASH
STORAGE
CORRIDOR
OFFICE
OFFICE
STORAGE
STORAGE
FIELD FEEDING
HALLWAY
MEN
JANITOR
CORRIDOR
KITCHEN
CARRY OUT
STORAGE
CARRY OUT
CARRY OUT
VESTIBULE
MEN
WOMEN
JANITOR
MECHANICAL
CONC
QT
QT
VCT
QT
QT
QT
QT
QT
CONC
CONC
QT
QT
QT
QT
CONC
CONC
VCT
QT
VCT
VCT
VCT
QT
QT
CMT
QT
QT
QT
QT
CMT
CMT
QT
CONC
QT
WD
WD
QT
QT
QT
QT
QT
QT
QT
QT
QT
QT
QT
QT
QT
VCB
QT
WD
WD
VCB
QT
QT
QT
QT
QT
QT
QT
QT
CMT
CMT
QT
P-3
P-3
P-3
P-3
P-3
VWC
VWC
VWC
VWC
VWC
VWC
PAINT
PAINT
PAINT
PAINT
PAINT
PAINT
VWC
REMOVED
VWC
REMOVED
VWC
REMOVED
VWC
REMOVED
VWC
REMOVED
VWC
REMOVED
P-1 792
P-1 792
P-1 792
P-1 792
P-1 792
P-1 792
CONC CONC
GL/AL
GL/AL
VWC
REMOVED
PAINT P-1
VWC
VWC
REMOVED
PAINT P-1
VWC
VWC
REMOVED
PAINT P-1
VWC
VWC
REMOVED
PAINT P-1
VWC
VWC
REMOVED
PAINT P-1
VWC
VWC
REMOVED
PAINT P-1
VWC
VWC
REMOVED
PAINT P-1
VWC
VWC
REMOVED
PAINT P-1
VWC
VWC
REMOVED
PAINT P-1
VWC
VWC
REMOVED
PAINT P-1
VWC
VWC
REMOVED
PAINT P-1
VWC
VWC
REMOVED
PAINT P-1
- - -GL/AL
GCWT
GCWT
GCWT
GCWT
VWC
VWC
REMOVED
PAINT P-1
GCWT GCWT- - - - - -
GCWT GCWT- - - - - -
CMU - - - - - -CMU
CMU
CMU
CMU
CMUPAINT
PAINT
P-1
P-1
PAINT
PAINT
P-1
P-1
CMU
CMU
CMU
CMU
GCWT
AL/GWB
GWB
CMU
CMU
GCWT
CMU
CMU
CMU
CMU
GCWT
AL/GWB
GWB
CMU
CMU
GCWT - - -- -
PAINT P-1
PAINT P-1
PAINT P-1
PAINT P-1
PAINT P-1
PAINT P-1
PAINT P-1
PAINT P-1
PAINT P-1
PAINT P-1
PAINT P-1
PAINT P-1
PAINT P-1
PAINT P-1
PAINT P-1
PAINT P-1
PAINT P-1
PAINT P-1
GCWT GCWT- - - - - -
GCWT GCWT- - - - - -
GCWT GCWT- - - - - -
GCWT GCWT- - - - - -
GCWT GCWT- - - - - -
GCWT GCWT- - - - - -
AL/GL GCWT- - - - - -
AL/GL - - - VWC
VWC
REMOVED
PAINT P-1
GCWT GCWT- - - - - -
GCWT GCWT- - - - - -
GCWT GCWT- - - - - -
CMU CMU- -P-1PAINT P-1PAINT
GWB/ATC
GWB/ATC
GWB
GWB/ATC
GWB/ATC
PAINT/-
PAINT/-
- PAINT/-
PAINT/-
P-2
P-2
GWB - PAINT P-2 2795
FRP
FRP
2743CLEAN
- CLEANFRP 2743-
- CLEANFRP 2743-
- -METAL - VARIES
- -METAL - VARIES
GWB - PAINT P-2 3048
GWB - PAINT P-2 2743
- - - 2743
FREEZER & REF
FREEZER & REF
FREEZER & REF
FREEZER & REF
VARIES
PAINT P-2
CPL
FRP
ATC
CLEAN -
CLEAN -
-GWB PAINT P-2
-GWB PAINT P-2
-GWB PAINT P-2
VARIES
VARIES
-FRP CLEAN -
-FRP CLEAN -
-FRP CLEAN -
-FRP CLEAN -
GWB
GWB
GWB
PAINT
PAINT
PAINT
P-2
P-2
P-2
GWB - PAINT P-2
-METAL - -
PAINT
PAINT
PAINT
PAINT
PAINT
BLDG. S-33 & 747
EPOXY EP-1 * SEE PICTURES
A-4
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
DPW, ENGINEERING SERVICES DIVISON, DESIGN BRANCH
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN-CASEY
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
SURFACES FNSH COLOR REMARKS
A B B R E V I A T I O N
LAVATORY COUNTERTOP
GYPSUM WALL BOARD
GLAZED CERAMIC WALL TILE
AL ALUMINUM
BUILDING
CEILING
COLOR
BLDG
CLG
CLR
ACOUSTICAL TILEACST
FIRE EXTINGUISHER CABINET
EXTERIOREXT
& FINISH SYSTEM
EXTERIOR INSULATIONEIFS
DR DOOR
FEC
CERAMIC MOSAIC TILECMT
CONC CONCRETE
HARDENER
LC
HGT
GWB
GCWT
VINYL COMPOSITION TILE
VINYL COVE BASE
MECH MECHANICAL
MIRROR
PLASTIC LAMINATE
MR
PL
MATERIALMATL
STEELSTL
VCT
VARIOUSVAR
VCB
WALL
HEIGHT
HDR
FIRE EXTINGUISHER CABINET
QUARRY TILEQT
WITHOUTW/O
ROOF
DOOR
ROOFING/ BUR
AL
TB TILE BRICK
FACE BRICKFB
BUR BUILT-UP ROOFING
RUBBER TILERT
APS ACRYLE PLASTIC SKYLIGHT
WINDOW -
FASCIA / SOFFIT PROTECTED METAL
STANDING SEAM METAL
METAL PAINT -
FLASHING PROTECTED METAL
AL
SURFACES FNSH COLOR
FEC
REMARKS
PROTECTED METAL
* CLEAN EXIST BRICK SURFACE
FLOOR MATERIAL/COLOR
BASE MATERIAL/COLOR
WALL MATERIAL/COLOR
CEILING MATERIAL/COLOR
MISC MATERIAL/COLOR
MATERIAL & COLOR SCHEDULE (BLDG. S-33)
EXTERIOR FINISH SCHEDULE (BLDG. S-33)
EXTERIOR FINISH SCHEDULE (BLDG. S-33)
MATERIAL & COLOR SCHEDULE AND
VWC VINYL WALL COVERING
VCB-1
OR APPROVED EQUAL
DARK BROWN, 100 HGT, 3THK
LG HAUSYS
VINYL COVE BASE
PT-3
OR APPROVED EQUAL
LATEX, 100 HGT
EX8816-BLACK COLOR
ANTI-MOLD & MILDEW
KCC SUPRO HOME & WELLBEING
PAINT COLOR
PT-1
OR APPROVED EQUAL
LATEX
EX8816-IVORY
ANTI-MOLD & MILDEW
KCC SUPRO HOME & WELLBEING
PAINT COLOR
ACST-1
PT-4
MTL PANNEL OR APPROVED EQUAL
FOR ROOF MET DECK & MET TRUSS
ALKYD, SEMI-GROSS
NOROO NR7066
PAINT COLOR
PT-2
OR APPROVED EQUAL
LATEX
EX8816-SNOWWHITE
ANTI-MOLD & MILDEW
KCC SUPRO HOME & WELLBEING
PAINT COLOR
OR APPROVED EQUAL
WHITE
MT 410
"KCC MITONE"
603MM x 603MM x 15MM THK
ACOUSTICAL CEILING TILE
EP-1
ABRASIVE GRAIN FINISH
OR APPROVED EQUAL
CLEANPOXY 3100
NOROO PAINT & CO
EPOXY PAINT
EIFS
LOUVERS
RAINGUTTER/DOWNSPOUT
HANDRAILS
FOUNDATION
SIDEWALK
STAIR
PAINT SAND STONE
CLEAN -
CHOCOLATE
PAINT CHOCOLATE
CLEAN -
PAINT CHOCOLATE
AL/GLASS CLEAN
PAINT CHOCOLATE
PAINT CHOCOLATE
MATERIAL(EXST) MATERIAL(EXST)
CONC
CONC
CONC
STEEL
LOADING DECK CONC PAINT - MATCHING TO EXISTING
260217
BLDG. S-33 & 747
A-5
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
DPW, ENGINEERING SERVICES DIVISON, DESIGN BRANCH
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN-CASEY
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
REPAIR / MAINTENANCE (K) WORK
SCOPE OF WORK (ARCHITECTURAL WORK)
1.1
1.2
1.3
1.4
1.5
1.6
4000mm200010000
SCALE: 1:100
1260"
32004
.4
.6
.6
.6
.4
.2
.6
.6
.6
96"
2438.4
1632"
41452.8
576"
14630.4
480"
12192
96"
2438.4
216"
5486.4
168"
4267.2
4a 5 6 7 9 122a
A
A1
A2
A3
B
D
E
F
G
H
J
K
L
A
B
F
H
K
L
C
.2
.6
.8
100"
76"
1930.4
784"
19913.9
300"
7619.7
N
DN
104 8
MECHANICAL
VEST-5
CORRIDOR-3
JC
RECEIVING DOCK
F.F.S
STORAGE
OFFICE 1
OFFICE 2
VEST-4
FREEZER
FREEZER
FREEZER
DRY STORAGE
ELECTRICAL
MECHANICAL/
KITCHEN
SERVERY
VEST-3
DINING AREA
VEST-2
VEST-1
SCULLERY
CORRIDOR-1
TOILET-2
M.
CORRIDOR-4
TOILET-2
W.
SERVING AREA-1
SERVING AREA-2
CORRIDOR-2
CARRY-OUT
KITCHEN
CARRY-OUT
FD
FD
FDFD
FD
FD
FD
DASHED LINE
FOR BULKHEAD
(ABOVE)-TYP
DASHED LINE
FOR BULKHEAD
(ABOVE)-TYP
DASHED LINE
FOR ROOF & PARAPET
(TYP)
EXISTING BLDG : 1297.45 SM
BUILDING AREA
(13960 SF)
JC
TOILET-1
W.
TOILET-1
M.
JC
CORRIDOR-4
TOILET-2
W.
KITCHEN
CARRY-OUT
STORAGE
CARRY-OUT
JC
.4
.6
.6
A
A1
A2
A3
B
D
E
F
G
.2
.6
.8
N
DN
VEST-5
CORRIDOR-3
JC
RECEIVING DOCK
F.F.S
STORAGE
OFFICE 1
OFFICE 2
VEST-4
CORRIDOR-1
TOILET-2
M.
CORRIDOR-4
TOILET-2
W.
CORRIDOR-2
CARRY-OUT
KITCHEN
CARRY-OUT
FD
TOILET-1
W.
M.
JC
CORRIDOR-4
TOILET-2
W.
KITCHEN
CARRY-OUT
STORAGE
CARRY-OUT
JC
SCALE:
FLOOR PLAN (BLDG. S-747)
BLDG. S-747
(BLDG. S-747)
FLOOR PLAN AND SCOPE OF WORK
1/100
A-6
A-6
A-6
CLEAN ALL THE EXTERIOR AL. WINDOWS AND FRAMES.
SCHEDULE AND PICTURES.
SURFACE OF THE BUILDING AS SHOWN ON FLOOR PLAN, FINISH
CONCRETE SURFACES AND OTHER COMPONENTS OF EXTERIOR
PAINT ALL EXTERIOR WALLS INCLUDING EIFS, CMU, METAL, WOODS,
CLEAN AND POLISH EXSITING BRONZE SIGNAGES.
ON PICTURES.
BICYCLE RACK AND TRASH BIN AROUND BUILDING AS SHOWN
REPAIR AND PAINT ON EXISTING SUB FACILITIES INCLUDING
260217
BLDG. S-33 & 747
REPAINT INTERIOR & EXTERIOR OF DFAC
CAMP CASEYKIM, YK
AS SHOWN ON FLOOR PLAN AND PICTURES. (APPROX. 14 EA.)
AND REPLACE EXSTING CONCRETE SPLASH BLOCKS WITH NEW
REPAIR AND PAINT EXISTING RAIN GUTTERS AND DOWNSPOUTS
AS SHOWN ON FLOOR PLAN AND FINISH SCHEDULE.
SURFACES, GUARD RAILS, WOODEN MOULDINGS AND WOODEN BASE
INCLUDING BOTTOM OF THE METAL DECK SURFACES, STEEL TRUSS
PAINT AS REQUIRED ALL INTERIOR WALL AND CEILING SURFACES
A-6
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
DPW, ENGINEERING SERVICES DIVISON, DESIGN BRANCH
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN-CASEY
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
4a 5 6 7 9 11 12
AA1A2A3BDEFGHJKL
4a 5 6 7 9 11 122a
SCALE:
CROSS SECTION-2
1/100
SCALE:
CROSS SECTION-3
1/100
OFFICE 2STORAGE
126 119 118
TO REMAIN (TYP)
EXIST CONC SLAB
C L
G
H
G T
SCALE:
CROSS SECTION-1
1/100
TOILET-2
M.
KITCHEN
CRAWL SPACE
KITCHEN
SCULLERY
JC 2
STORAGE
CARRY-OUT
C L
G
H
G T
0TO REMAIN
(TYP)
EXISTING WALL
2a
TOILET-1
M.
CORRIDOR-1
DINING AREA
C L
G
H
G T
C L
G
H
G T
AL WINDOW (TYP.)
CLEAN EXISTING
PAINT EXISTING
ROOF DECK
PAINT EXISTING
STL TRUSS (TYP)
PAINT EXISTING
ROOF DECK
PAINT EXISTING
STL TRUSS (TYP) 1
TO REMAIN
(TYP)
EXISTING WALL
CRAWL SPACE
FREEZER
KITCHEN
SERVERY
DINING AREA
TO REMAIN
EXISTING WALL
PAINT EXISTING
ROOF DECK
PAINT EXISTING
STL TRUSS (TYP)
AL WINDOW (TYP.)
CLEAN EXISTING
AREA-1
SERVING
EXISTING GCWT
TO REMAIN
C L
G
H
G T
2 3 4
260217
BLDG. S-33 & 747
REPAINT INTERIOR & EXTERIOR OF DFAC
CAMP CASEYKIM, YK
(BLDG. S-747)
CROSS SECTIONS AND PICTURES
WALLS AND GUARD RAILS
PAINT ON RECEIVING DOCK
PAINT ON CANOPY STRUCTURES
SPLASH BLOCKS
& REPLACE CONC
W/ CEMENT MORTAR
FILL THE JOINT
AND ROOF
PAINT ON BICYCLE RACKS
AND STEEL STRUCTURES
PAINT ON ROOF DECK
AND CEILING SURFACES
PAINT ON EXST GWB WALLS
A-7
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
DPW, ENGINEERING SERVICES DIVISON, DESIGN BRANCH
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN-CASEY
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
OFFICE-1
OFFICE-2
VEST-2
DINING AREA
VEST-1
JANITOR CLOSET
W. TOILET-1
VEST-3
SCULLERY
MECHANICAL/
KITCHEN
DRY STORAGE
FREEZER
CORRIDOR-3
SERVERY
CORRIDOR-2
CONC
QTB
QTB
CMU
CMU
QTB
QTB
M. TOILET-1 QTB
HGT
I N T E R I O R F I N I S H S C H E D U L E
ROOM NAMESRM NOS
NEW
BASE
EXIST
MATL
NEW
FNSH
FLOOR
EXIST
CLR
MATL MATL
CLRFNSH
EXIST
FNSH
WAINSCOT
NEW
CLR
INTERIOR WALL
FNSH
INSIDE OF EXT WALL
MATL
EXIST NEW
CLR
EXIST
MATL
NEW
FNSH CLR
EXIST
CEILING
MATL
NEW
FNSH CLR HGT
REMARKS
VARMECH ROOM CONC CMU101
CORRIDOR-1
ELECTRICAL
VEST-4
CORRIDOR-4
JANITOR CLOSET
128 RECEIVING DOCK CONC
QTB
QTB
GCWT
CMU
CMU
PANEL
CMU
MET
CMU
CMU
CMU
CMUCMU
CMU
VAR
VAR
FMF - -
VCT - -
CMT
CMT
FT
FT
FT
VCT/
FT
QT - -
QT - -
VCT - -
VCT - -
VCT - -
QT - -
QT - -
VCT - -
QT - -
CMT
CMT
- - P-3
VCB - -
FTB - -
FTB - -
FTB - -
VCB - -
QTB - -
- - P-3
QTB - -
VCB - -
VCB - -
VCB - -
QTB - -
QTB - -
VCB - -
QTB - -
AL
DOOR
- PAINT P-1
GCWT
GCWT
VWC
VWC
VWC
AL
DOOR
AL
DOOR
- PAINT P-3
- PAINT P-3
GCWT
GCWT
- PAINT P-1
GCWT - -
GCWT - -
BRICK/
AL DOOR
- PAINT P-1
- PAINT P-1
GCWT
GCWT
GCWT/
VWC
VWC
GCWT
VWC
BRICK/
AL DOOR
BRICK/
AL DOOR
- PAINT P-1
GCWT - -
- PAINT P-1
PANEL - - -
- PAINT P-1
- PAINT P-1
GCWT
GCWT
- PAINT P-1
- PAINT P-1
GCWT - -
GCWT - -
GWB - PAINT P-2
METAL
DECK
- PAINT P-4
- PAINT P-2
- PAINT P-2
- PAINT P-2
- -ACST
- -ACST
- -ACST
GWB/GWB
- PAINT
P-2 2650/2750
/VAR
- PAINT P-2GWB
- PAINT P-2GWB
- -ACST
METAL
DECK
- PAINT P-4
- -ACST
- PAINT P-2GWB
PANEL - - -
- -ACST
- -ACST
- -ACST
- PAINT P-2GWB
- PAINT P-2
- PAINT P-2GWB
- PAINT
- PAINT P-2
FMF
FMF
M. TOILET-2
W. TOILET-2
SERVING AREA
SERVING AREA-2
2750FT - - FTB - - - - - - - - - - - GCWT - - - -ACST
2750FT - - FTB - - - - - - - - - - - GCWT - - - -ACST
131 VEST-5
132 CARRY-OUT
133 CARRY OUT KITCHEN
134 CARRY OUT STORAGE
135 JANITOR CLOSET
FMF
QT
QT
QT
VCT
QTB
QTB
QTB
QTB
VCB
AL
DOOR
GCWT
GCWT
GCWT
CMU
PAINT
P-1
BRICK/
AL DOOR
CMU
GCWT
GCWT
GCWT
PAINT
P-1
GWB
GWB
GWB
GWB
PAINT
PAINT
PAINT
PAINT
PAINT
P-2
P-2
P-2
P-2
P-2 2750
FIELD FEEDING STORAGE VCT - - VCB - - - - - - - - - - - CMU - PAINT P-1 GWB - PAINT P-2 2750
CMU 2750VCT - - VCB - - - - - - - - - - - - PAINT P-1 - PAINT P-2GWBSTORAGE
FREEZER CONC PANEL VAR- - - - - - - - - - - - - - PANEL - - - PANEL - - -
FREEZER CONC PANEL VAR- - - - - - - - - - - - - - PANEL - - - PANEL - - -
(BLDG. S-747)
INTERIOR FINISH SCHEDULE
PAINT
PAINT
VWC
REMOVED
PAINT P-1
VWC
REMOVED
PAINT P-1
VWC
REMOVED
PAINT P-1
GCWT GCWT
CLEAN
CLEAN
FREEZER & REF
FREEZER & REF
FREEZER & REF
CLEAN
CLEAN CLEAN
VWC
REMOVED
-/PAINT-/P-1
VWC
REMOVED
PAINT P-1
VWC
REMOVED
PAINT P-1
CLEAN
CLEAN
CLEAN
GWB
GWB
GWB
/P-4
GWB
GWB
GWB
P-2
VARIESPAINT P-4
GWB
260217
BLDG. S-33 & 747
REPAINT INTERIOR & EXTERIOR OF DFAC
EPOXY EP-1 * SEE PICTURES
A-8
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
DPW, ENGINEERING SERVICES DIVISON, DESIGN BRANCH
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN-CASEY
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
SURFACES MATERIAL FNSH COLOR REMARKS
A B B R E V I A T I O N
LAVATORY COUNTERTOP
GYPSUM WALL BOARD
GLAZED CERAMIC WALL TILE
AL ALUMINUM
BUILDING
CEILING
COLOR
BLDG
CLG
CLR
ACOUSTICAL TILEACST
FIRE EXTINGUISHER CABINET
EXTERIOREXT
& FINISH SYSTEM
EXTERIOR INSULATIONEIFS
DR DOOR
FEC
CERAMIC MOSAIC TILECMT
CONC CONCRETE
HARDENER
LC
HGT
GWB
GCWT
VINYL COMPOSITION TILE
VINYL COVE BASE
MECH MECHANICAL
MIRROR
PLASTIC LAMINATE
MR
PL
MATERIALMATL
STEELSTL
VCT
VARIOUSVAR
VCB
WALL
HEIGHT
HDR
FIRE EXTINGUISHER CABINET
QUARRY TILEQT
WITHOUTW/O
ROOF
DOOR
ROOFING/ BUR
AL
TB TILE BRICK
FACE BRICKFB
BUR BUILT-UP ROOFING
RUBBER TILERT
APS ACRYLE PLASTIC SKYLIGHT
ALWINDOW
FASCIA / SOFFIT PROTECTED METAL -
STANDING SEAM METAL
METAL PAINT
EIFS W/O INSUL
FLASHING PROTECTED METAL
SURFACES MATERIAL FNSH COLOR
FEC
REMARKS
DOWNSPOUT PROTECTED METAL
ROOF ACCESSORY PROTECTED METAL
EXTERIOR FINISH SCHEDULE (BLDG. S-747)
MATERIAL & COLOR SCHEDULE AND
FLOOR MATERIAL/COLOR
BASE MATERIAL/COLOR
WALL MATERIAL/COLOR
CEILING MATERIAL/COLOR
MISC MATERIAL/COLOR
VCB-1
OR APPROVED EQUAL
DARK BROWN, 100 HGT, 3THK
LG HAUSYS
VINYL COVE BASE
PT-3
OR APPROVED EQUAL
LATEX, 100 HGT
EX8816-BLACK COLOR
ANTI-MOLD & MILDEW
KCC SUPRO HOME & WELLBEING
PAINT COLOR
PT-1
OR APPROVED EQUAL
LATEX
EX8816-IVORY
ANTI-MOLD & MILDEW
KCC SUPRO HOME & WELLBEING
PAINT COLOR
ACST-1
PT-4
MTL PANNEL OR APPROVED EQUAL
FOR ROOF MET DECK & MET TRUSS
ALKYD, SEMI-GROSS
NOROO NR7066
PAINT COLOR
PT-2
OR APPROVED EQUAL
LATEX
EX8816-SNOWWHITE
ANTI-MOLD & MILDEW
KCC SUPRO HOME & WELLBEING
PAINT COLOR
OR APPROVED EQUAL
WHITE
MT 410
"KCC MITONE"
603MM x 603MM x 15MM THK
ACOUSTICAL CEILING TILE
EP-1
ABRASIVE GRAIN FINISH
OR APPROVED EQUAL
CLEANPOXY 3100
NOROO PAINT & CO
EPOXY PAINT
MATERIAL & COLOR SCHEDULE (BLDG. S-747)
EXTERIOR FINISH SCHEDULE (BLDG. S-747)
CLEAN -
CLEAN -
FACE BRICK
PAINT
SAND STONEPAINT
CHOCOLATE
PAINT CHOCOLATE
PAINT CHOCOLATE
HANDRAILS
FOUNDATION
SIDEWALK
STAIR
PAINT CHOCOLATE
CONC
CONC
CONC
STEEL
LOADING DECK CONC PAINT - MATCHING TO EXISTING
260217
BLDG. S-33 & 747
| T-01 |
| A-01 |
| A-02 |
| A-03 |
| A-04 |
| A-05 |
| A-06 |
| A-07 |
| A-08 |
File details come from the government source that posted it. Updated .