260217_DWG.pdf

PDF 26 MB Posted

Attached to
MATOC DFAC REPAIR CASEY
Solicitation number
W90VN824R0070
Issued by

About this file

This document appears to be a Request for Proposal (RFP) for a MATOC (Multiple Award Task Order Contract) DFAC (Dining Facility) Repair contract at Camp Casey. The solicitation is for repainting the interior and exterior of two DFAC buildings (S-33 and S-747) in accordance with the provided Statement of Work, specifications, drawings, and contract terms and conditions. The contracting agency is the Department of the Army Materiel Command, Army Contracting Command. The contract opportunity requires the contractor to provide all necessary resources to complete Project No. 260217. No additional details are provided regarding the response due date, award date, pricing terms, set asides, or incumbents.

View the file

Other files

File Type Posted
Solicitation 0070_DFAC.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF DRAWINGS

RING NO. REF. NO.REVISION STATUSDWG. NO. SHT. NO.REF. NO.

T - 1

RING NO. DESCRIPTION OF DRAWINGS

TITLE SHEET

DWG. NO. SHT. NO. DESCRIPTION OF DRAWINGS REVISION STATUS

TITLE SHEET

T-1

A - 1

A - 2

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15333, APO AP 96205-5333

DPW, ENGINEERING SERVICES DIVISON, DESIGN BRANCH

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN-CASEY

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

FEWR NO. 260217, CP CASEY

FLOOR PLAN(S-33) AND GENERAL NOTES

A - 3

A - 4

A - 5

A - 6

A - 7

A - 8

PICTURES AND SCOPE OF WORK (BLDG. S-33)

INTERIOR FINISH SCHEDULE (BLDG. S-33)

MATERIAL & COLOR SCHEDULE AND EXTERIOR FINISH SCHEDULE (BLDG. S-33)

FLOOR PLAN AND SCOPE OF WORK (BLDG. S-747)

INTERIOR FINISH SCHEDULE (BLDG. S-747)

MATERIAL & COLOR SCHEDULE AND EXTERIOR FINISH SCHEDULE (BLDG. S-747)

ARCHITECTURAL (BLDG. S-33)

ARCHITECTURAL (BLDG. S-747)

260217

BLDG. S-33 & 747

REPAINT INTERIOR & EXTERIOR OF DFAC

CAMP CASEYKIM, YK

BLDG. S-33 & 747

REPAINT INTERIOR & EXTERIOR OF DFAC

CROSS SECTIONS AND PICTURES (BLDG. S-747)

A-1

ARCHITECTURAL

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15333, APO AP 96205-5333

DPW, ENGINEERING SERVICES DIVISON, DESIGN BRANCH

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN-CASEY

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MANUFACTURES INDICATED.

PURPOSES ONLY. AND NOT INTENDED TO LIMIT SELECTIONS TO PRODUCTS OF THE

COLORS AND PATTERNS LISTED BY MANUFACTURES ARE FOR BIDDING IDENTIFICATION 1.

FOR APPROVAL.

CONTRACTOR ACCORDING TO ACTUAL FIELD CONDITION AND SUBMITED TO COR

CONDITION. IN THAT CASE, SHOP DRAWINGS SHALL BE PREPARED AT THE SITE BY THE

SOME DETAILS SHOWN ON CONTRACT DRAWINGS MAY NOT COINCIDE WITH THE FIELD

8.

FOR APPROVAL.

CONTRACTOR SHALL SUBMIT MANUFACTURER'S INSTALLATION SHOP DRAWINGS TO COR

2.

3.

4.

5.

6.

7.

CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER.

IF THERE ARE ANY CONFLICTS WITHIN THE CONTRACT DOCUMENT. THE GENERAL

AND DIMENSIONS PRIOR TO COMMENCING ANY CONSTRUCTION OR RENOVATION.

THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING CONDITION

9.

10.

11.

12.

13.

14.

BE AS A PART OF THE CONTRACT DOCUMENT OF THIS PROJECT.

STANDARD DETAIL DRAWINGS FOR O&MA PROJECT, KOREA, DATED OCTOBER 1, 2003 SHALL

NUMBERS ARE FROM TM-5-807-7 AND FEDERAL STANDARD NO. 595b, COLORS.

COLOR OF MATERIALS & PAINTS SHALL BE SELECTED BY USING AGENCY AND COLOR

WALL : 2.29 SM. DEG K/W

ROOF : 5.30 SM. DEG K/W

R-VALUE :

GENERAL NOTES

SPECIFICATION 15181.

ITEMS REQUIRING MAINTENANCE/OPERATION IAW THE SECTION 3.1.14, OMA STD

PROVIDE ACCESS DOORS FOR ALL CONCEALED VALVES, VENTS, CONTROLS AND OTHER

OFFICE, DPW. PER DIRECTION FROM COR.

SALVAGE OR SERVICEABLE MATERIALS SHALL BE RETURNED TO SUPPLY OR STORAGE

FROM THE MANUFACTURE SHOWING THE PRODUCT IS LEAD FREE.

A CERTIFICATE OR MATERIAL SAFETY DATA SHEET (MSDS), WRITTEN IN ENGLISH,

DURING THE EXECUTION OF THIS PROJECT. THE CONTRACTOR SHALL PROVIDE

WITH LESS THAN 0.05 PERCENT LEAD BY WEIGHT OF THE NON-VOLATILE SOLIDS)

THE CONTRACTOR SHALL USE "LEAD FREE" COATINGS (LIQUID PAINTS OR COATINGS

ADJACENT AREAS AT HIS OWN EXPENSE.

CAUSED BY THIS PROJECT AND SHALL REPAIR THE DAMAGES TO MATCH UP TO

CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES MADE TO EXISTING AREAS

HEATING, EQUIPMENT, ETC), ELECTRICAL, TELEPHONE AND FIRE ALARM SYSTEM.

REQUIRED FOR THE INSTALLATION AND/OR REPLACEMENT OF MECHANICAL (PLUMBING,

OBSTRUCTED ITEMS, CUT, PATCH AND RESTORE WALLS, FLOORS AND CEILING WHERE

THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL/REINSTALLATION OF ANY

DOCUMENTATION TO 8 CES/CEAN.

THE CONTRACTOR SHALL PROVIDE THE NEW SURVEY REPORT AND ASBESTOS REMOVAL

ACCORDANCE WITH THE KOREA ENVIRONMENTAL GOVERNING STANDARD (KEGS).

PRIOR TO ANY WORK TO ASSURE THAT APPROPRIATE ASBESTOS CONTROL IS IN

AREA SHALL BE RESURVEYED AND ASBESTOS MATERIALS SHALL BE REMOVED

WORK IN THE AFFECTED AREA AND NOTIFY THE CONTRACTING OFFICER. THE WORK

ASBESTOS CONTAINING MATERIAL ARE DISCOVERED, THE CONTRACTOR SHALL CEASE

IS NOT PRESENT IN THE AREAS AFFECTED BY THIS WORK: IF SUSPECTED

VERIFYING THE PRODUCT IS ASBESTOS FREE. TESTS HAVE INDICATED THAT ASBESTOS

SHALL PROVIDE A CERTIFICATE OR MSDS, WRITTEN IN ENGLISH, FROM THE MANUFACTURER

PERCENT BY WEIGHT) DURING THE EXECUTION OF THIS PROJECT. THE CONTRACTOR

THE CONTRACTOR SHALL USE "ASBESTOS FREE" MATERIALS (LESS THAN 0.1

SCALE:

FLOOR PLAN (BLDG. S-33)

N/A

FLOOR PLAN(S-33) AND GENERAL NOTES

260217

BLDG. S-33 & 747

CAMP CASEYKIM, YK

A-2

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15333, APO AP 96205-5333

DPW, ENGINEERING SERVICES DIVISON, DESIGN BRANCH

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN-CASEY

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

REPAIR / MAINTENANCE (K) WORK

SCOPE OF WORK (ARCHITECTURAL WORK)

1.1

1.2

1.3

1.4

1.5

1.6

(BLDG. S-33)

PICTURES AND SCOPE OF WORK

BLDG. S-33

CLEAN ALL THE EXTERIOR AL. WINDOWS AND FRAMES.

REPAIR AND PATCH UP DAMAGED EXISTING EIFS AS SHOWN ON PICTURES.

FLOOR PLAN AND FINISH SCHEDULE.

GUARD RAILS, WOODEN MOULDINGS AND WOODEN BASE AS SHOWN ON

PAINT AS REQUIRED ALL INTERIOR WALL AND CEILING SURFACES INCLUDING

SURFACE OF THE BUILDING AS SHOWN ON FLOOR PLAN AND PICTURES.

SURFACES, METAL ROOF EAVE SURFACES AND OTHER COMPONENTS OF EXTERIOR

PAINT ALL EXTERIOR WALLS INCLUDING EIFS, CMU, METAL, WOODS, CONCRETE

EIFS SURFACE

PAINT ON EXST

PAINT ON EXST EAVE SURFACES

AND STAIR SURFACES

PAINT ON EXST HAND RAILS

EIFS SURFACE

PAINT ON EXST

REPAIR AND PATCH UP DAMAGED EXISTING EIFS

EIFS SURFACE

PAINT ON EXST

EAVE SURFACES

PAINT ON EXST

(REPLACE DOOR AND INSECT SCREENS)

REPAIR EXST TRASH BIN FACILITY

260217

BLDG. S-33 & 747

REPAINT INTERIOR & EXTERIOR OF DFAC

CAMP CASEYKIM, YK

SYSTEM WITH NEW

REPLACE EXST BROKEN SIGNAGE

BICYCLE RACK

PAINT ON EXST

AND GWB CEILING SURFACES

PAINT ON WOODEN MOULDING

AND GWB WALL SURFACES

PAINT ON WOODEN GUARD RAILS PAINT ON WOODEN GUARD RAILS

INCLDUING SANDING SURFACES.

WITH TRANSPARENT LACQUER

GUARD RAILS WILL BE PAINTED

* WOODEN MOULDING & WOODEN

FLOOR PLANS AND PICTURES. (APPROX. 3 EA.)

REPLACE EXSTING CONCRETE SPLASH BLOCKS WITH NEW AS SHOWN ON

REPAIR AND PAINT EXISTING RAIN GUTTERS AND DOWNSPOUTS AND

FLOOR AND WALL SURFACES

PAINT ON RECEIVING DOCK

TRASH BIN AND SIGNAGE SYSTEM AROUND BUILDING AS SHOWN ON PICTURES.

REPAIR AND PAINT ON EXISTING SUB FACILITIES INCLUDING BICYCLE RACK,

A-3

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15333, APO AP 96205-5333

DPW, ENGINEERING SERVICES DIVISON, DESIGN BRANCH

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN-CASEY

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

260217

CAMP CASEYKIM, YK

FREEZER

KITCHEN

KITCHEN

VESTIBULE

CORRIDOR

VCT

CMU

DINING AREA

HGT

ROOM NAMESRM NOS

NEW

BASE

EXIST

MATL

NEW

FNSH

FLOOR

EXIST

CLR

MATL MATL

CLRFNSH

EXIST

FNSH

WAINSCOT

NEW

CLR

INTERIOR WALL

FNSH

INSIDE OF EXT WALL

MATL

EXIST NEW

CLR

EXIST

MATL

NEW

FNSH CLR

EXIST

CEILING

MATL

NEW

FNSH CLR HGT

REMARKS

2795VESTIBULE101

CMU

VCT

VCT

QT

QT - -

QT - -

QT -

- - -VCB

VWC

- - - CONC -

- PAINT P-2

- P-2

- P-2

- -ATC

- -ATC

- CLEAN

GWB

- PAINT P-4

METAL

-FRP

131 WOMEN

CMT

QT

QT

GWB

GWB

GWB

PAINT

PAINT

PAINT

P-2

P-2

P-2

- - - - - - - - - ATC -

CONC - - WD - - - - - -

(BLDG. S-33)

INTERIOR FINISH SCHEDULE

I N T E R I O R F I N I S H S C H E D U L E (BLDG. S-33)

CRAWL SPACE

CORRIDOR

DINING AREA

DINING AREA

SEVERY AREA

DISH WASHING

VESTIBULE

SERVING AREA

MECHANICAL

ELECTRICAL

SYSTEM

WASTING PULPING

DRY STORAGE

REF

REF

REF

RECEIVING DOCK

CAN WASH

STORAGE

CORRIDOR

OFFICE

OFFICE

STORAGE

STORAGE

FIELD FEEDING

HALLWAY

MEN

JANITOR

CORRIDOR

KITCHEN

CARRY OUT

STORAGE

CARRY OUT

CARRY OUT

VESTIBULE

MEN

WOMEN

JANITOR

MECHANICAL

CONC

QT

QT

VCT

QT

QT

QT

QT

QT

CONC

CONC

QT

QT

QT

QT

CONC

CONC

VCT

QT

VCT

VCT

VCT

QT

QT

CMT

QT

QT

QT

QT

CMT

CMT

QT

CONC

QT

WD

WD

QT

QT

QT

QT

QT

QT

QT

QT

QT

QT

QT

QT

QT

VCB

QT

WD

WD

VCB

QT

QT

QT

QT

QT

QT

QT

QT

CMT

CMT

QT

P-3

P-3

P-3

P-3

P-3

VWC

VWC

VWC

VWC

VWC

VWC

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

VWC

REMOVED

VWC

REMOVED

VWC

REMOVED

VWC

REMOVED

VWC

REMOVED

VWC

REMOVED

P-1 792

P-1 792

P-1 792

P-1 792

P-1 792

P-1 792

CONC CONC

GL/AL

GL/AL

VWC

REMOVED

PAINT P-1

VWC

VWC

REMOVED

PAINT P-1

VWC

VWC

REMOVED

PAINT P-1

VWC

VWC

REMOVED

PAINT P-1

VWC

VWC

REMOVED

PAINT P-1

VWC

VWC

REMOVED

PAINT P-1

VWC

VWC

REMOVED

PAINT P-1

VWC

VWC

REMOVED

PAINT P-1

VWC

VWC

REMOVED

PAINT P-1

VWC

VWC

REMOVED

PAINT P-1

VWC

VWC

REMOVED

PAINT P-1

VWC

VWC

REMOVED

PAINT P-1

- - -GL/AL

GCWT

GCWT

GCWT

GCWT

VWC

VWC

REMOVED

PAINT P-1

GCWT GCWT- - - - - -

GCWT GCWT- - - - - -

CMU - - - - - -CMU

CMU

CMU

CMU

CMUPAINT

PAINT

P-1

P-1

PAINT

PAINT

P-1

P-1

CMU

CMU

CMU

CMU

GCWT

AL/GWB

GWB

CMU

CMU

GCWT

CMU

CMU

CMU

CMU

GCWT

AL/GWB

GWB

CMU

CMU

GCWT - - -- -

PAINT P-1

PAINT P-1

PAINT P-1

PAINT P-1

PAINT P-1

PAINT P-1

PAINT P-1

PAINT P-1

PAINT P-1

PAINT P-1

PAINT P-1

PAINT P-1

PAINT P-1

PAINT P-1

PAINT P-1

PAINT P-1

PAINT P-1

PAINT P-1

GCWT GCWT- - - - - -

GCWT GCWT- - - - - -

GCWT GCWT- - - - - -

GCWT GCWT- - - - - -

GCWT GCWT- - - - - -

GCWT GCWT- - - - - -

AL/GL GCWT- - - - - -

AL/GL - - - VWC

VWC

REMOVED

PAINT P-1

GCWT GCWT- - - - - -

GCWT GCWT- - - - - -

GCWT GCWT- - - - - -

CMU CMU- -P-1PAINT P-1PAINT

GWB/ATC

GWB/ATC

GWB

GWB/ATC

GWB/ATC

PAINT/-

PAINT/-

- PAINT/-

PAINT/-

P-2

P-2

GWB - PAINT P-2 2795

FRP

FRP

2743CLEAN

- CLEANFRP 2743-

- CLEANFRP 2743-

- -METAL - VARIES

- -METAL - VARIES

GWB - PAINT P-2 3048

GWB - PAINT P-2 2743

- - - 2743

FREEZER & REF

FREEZER & REF

FREEZER & REF

FREEZER & REF

VARIES

PAINT P-2

CPL

FRP

ATC

CLEAN -

CLEAN -

-GWB PAINT P-2

-GWB PAINT P-2

-GWB PAINT P-2

VARIES

VARIES

-FRP CLEAN -

-FRP CLEAN -

-FRP CLEAN -

-FRP CLEAN -

GWB

GWB

GWB

PAINT

PAINT

PAINT

P-2

P-2

P-2

GWB - PAINT P-2

-METAL - -

PAINT

PAINT

PAINT

PAINT

PAINT

BLDG. S-33 & 747

EPOXY EP-1 * SEE PICTURES

A-4

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15333, APO AP 96205-5333

DPW, ENGINEERING SERVICES DIVISON, DESIGN BRANCH

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN-CASEY

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

SURFACES FNSH COLOR REMARKS

A B B R E V I A T I O N

LAVATORY COUNTERTOP

GYPSUM WALL BOARD

GLAZED CERAMIC WALL TILE

AL ALUMINUM

BUILDING

CEILING

COLOR

BLDG

CLG

CLR

ACOUSTICAL TILEACST

FIRE EXTINGUISHER CABINET

EXTERIOREXT

& FINISH SYSTEM

EXTERIOR INSULATIONEIFS

DR DOOR

FEC

CERAMIC MOSAIC TILECMT

CONC CONCRETE

HARDENER

LC

HGT

GWB

GCWT

VINYL COMPOSITION TILE

VINYL COVE BASE

MECH MECHANICAL

MIRROR

PLASTIC LAMINATE

MR

PL

MATERIALMATL

STEELSTL

VCT

VARIOUSVAR

VCB

WALL

HEIGHT

HDR

FIRE EXTINGUISHER CABINET

QUARRY TILEQT

WITHOUTW/O

ROOF

DOOR

ROOFING/ BUR

AL

TB TILE BRICK

FACE BRICKFB

BUR BUILT-UP ROOFING

RUBBER TILERT

APS ACRYLE PLASTIC SKYLIGHT

WINDOW -

FASCIA / SOFFIT PROTECTED METAL

STANDING SEAM METAL

METAL PAINT -

FLASHING PROTECTED METAL

AL

SURFACES FNSH COLOR

FEC

REMARKS

PROTECTED METAL

* CLEAN EXIST BRICK SURFACE

FLOOR MATERIAL/COLOR

BASE MATERIAL/COLOR

WALL MATERIAL/COLOR

CEILING MATERIAL/COLOR

MISC MATERIAL/COLOR

MATERIAL & COLOR SCHEDULE (BLDG. S-33)

EXTERIOR FINISH SCHEDULE (BLDG. S-33)

EXTERIOR FINISH SCHEDULE (BLDG. S-33)

MATERIAL & COLOR SCHEDULE AND

VWC VINYL WALL COVERING

VCB-1

OR APPROVED EQUAL

DARK BROWN, 100 HGT, 3THK

LG HAUSYS

VINYL COVE BASE

PT-3

OR APPROVED EQUAL

LATEX, 100 HGT

EX8816-BLACK COLOR

ANTI-MOLD & MILDEW

KCC SUPRO HOME & WELLBEING

PAINT COLOR

PT-1

OR APPROVED EQUAL

LATEX

EX8816-IVORY

ANTI-MOLD & MILDEW

KCC SUPRO HOME & WELLBEING

PAINT COLOR

ACST-1

PT-4

MTL PANNEL OR APPROVED EQUAL

FOR ROOF MET DECK & MET TRUSS

ALKYD, SEMI-GROSS

NOROO NR7066

PAINT COLOR

PT-2

OR APPROVED EQUAL

LATEX

EX8816-SNOWWHITE

ANTI-MOLD & MILDEW

KCC SUPRO HOME & WELLBEING

PAINT COLOR

OR APPROVED EQUAL

WHITE

MT 410

"KCC MITONE"

603MM x 603MM x 15MM THK

ACOUSTICAL CEILING TILE

EP-1

ABRASIVE GRAIN FINISH

OR APPROVED EQUAL

CLEANPOXY 3100

NOROO PAINT & CO

EPOXY PAINT

EIFS

LOUVERS

RAINGUTTER/DOWNSPOUT

HANDRAILS

FOUNDATION

SIDEWALK

STAIR

PAINT SAND STONE

CLEAN -

CHOCOLATE

PAINT CHOCOLATE

CLEAN -

PAINT CHOCOLATE

AL/GLASS CLEAN

PAINT CHOCOLATE

PAINT CHOCOLATE

MATERIAL(EXST) MATERIAL(EXST)

CONC

CONC

CONC

STEEL

LOADING DECK CONC PAINT - MATCHING TO EXISTING

260217

BLDG. S-33 & 747

A-5

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15333, APO AP 96205-5333

DPW, ENGINEERING SERVICES DIVISON, DESIGN BRANCH

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN-CASEY

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

REPAIR / MAINTENANCE (K) WORK

SCOPE OF WORK (ARCHITECTURAL WORK)

1.1

1.2

1.3

1.4

1.5

1.6

4000mm200010000

SCALE: 1:100

1260"

32004

.4

.6

.6

.6

.4

.2

.6

.6

.6

96"

2438.4

1632"

41452.8

576"

14630.4

480"

12192

96"

2438.4

216"

5486.4

168"

4267.2

4a 5 6 7 9 122a

A

A1

A2

A3

B

D

E

F

G

H

J

K

L

A

B

F

H

K

L

C

.2

.6

.8

100"

76"

1930.4

784"

19913.9

300"

7619.7

N

DN

104 8

MECHANICAL

VEST-5

CORRIDOR-3

JC

RECEIVING DOCK

F.F.S

STORAGE

OFFICE 1

OFFICE 2

VEST-4

FREEZER

FREEZER

FREEZER

DRY STORAGE

ELECTRICAL

MECHANICAL/

KITCHEN

SERVERY

VEST-3

DINING AREA

VEST-2

VEST-1

SCULLERY

CORRIDOR-1

TOILET-2

M.

CORRIDOR-4

TOILET-2

W.

SERVING AREA-1

SERVING AREA-2

CORRIDOR-2

CARRY-OUT

KITCHEN

CARRY-OUT

FD

FD

FDFD

FD

FD

FD

DASHED LINE

FOR BULKHEAD

(ABOVE)-TYP

DASHED LINE

FOR BULKHEAD

(ABOVE)-TYP

DASHED LINE

FOR ROOF & PARAPET

(TYP)

EXISTING BLDG : 1297.45 SM

BUILDING AREA

(13960 SF)

JC

TOILET-1

W.

TOILET-1

M.

JC

CORRIDOR-4

TOILET-2

W.

KITCHEN

CARRY-OUT

STORAGE

CARRY-OUT

JC

.4

.6

.6

A

A1

A2

A3

B

D

E

F

G

.2

.6

.8

N

DN

VEST-5

CORRIDOR-3

JC

RECEIVING DOCK

F.F.S

STORAGE

OFFICE 1

OFFICE 2

VEST-4

CORRIDOR-1

TOILET-2

M.

CORRIDOR-4

TOILET-2

W.

CORRIDOR-2

CARRY-OUT

KITCHEN

CARRY-OUT

FD

TOILET-1

W.

M.

JC

CORRIDOR-4

TOILET-2

W.

KITCHEN

CARRY-OUT

STORAGE

CARRY-OUT

JC

SCALE:

FLOOR PLAN (BLDG. S-747)

BLDG. S-747

(BLDG. S-747)

FLOOR PLAN AND SCOPE OF WORK

1/100

A-6

A-6

A-6

CLEAN ALL THE EXTERIOR AL. WINDOWS AND FRAMES.

SCHEDULE AND PICTURES.

SURFACE OF THE BUILDING AS SHOWN ON FLOOR PLAN, FINISH

CONCRETE SURFACES AND OTHER COMPONENTS OF EXTERIOR

PAINT ALL EXTERIOR WALLS INCLUDING EIFS, CMU, METAL, WOODS,

CLEAN AND POLISH EXSITING BRONZE SIGNAGES.

ON PICTURES.

BICYCLE RACK AND TRASH BIN AROUND BUILDING AS SHOWN

REPAIR AND PAINT ON EXISTING SUB FACILITIES INCLUDING

260217

BLDG. S-33 & 747

REPAINT INTERIOR & EXTERIOR OF DFAC

CAMP CASEYKIM, YK

AS SHOWN ON FLOOR PLAN AND PICTURES. (APPROX. 14 EA.)

AND REPLACE EXSTING CONCRETE SPLASH BLOCKS WITH NEW

REPAIR AND PAINT EXISTING RAIN GUTTERS AND DOWNSPOUTS

AS SHOWN ON FLOOR PLAN AND FINISH SCHEDULE.

SURFACES, GUARD RAILS, WOODEN MOULDINGS AND WOODEN BASE

INCLUDING BOTTOM OF THE METAL DECK SURFACES, STEEL TRUSS

PAINT AS REQUIRED ALL INTERIOR WALL AND CEILING SURFACES

A-6

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15333, APO AP 96205-5333

DPW, ENGINEERING SERVICES DIVISON, DESIGN BRANCH

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN-CASEY

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

4a 5 6 7 9 11 12

AA1A2A3BDEFGHJKL

4a 5 6 7 9 11 122a

SCALE:

CROSS SECTION-2

1/100

SCALE:

CROSS SECTION-3

1/100

OFFICE 2STORAGE

126 119 118

TO REMAIN (TYP)

EXIST CONC SLAB

C L

G

H

G T

SCALE:

CROSS SECTION-1

1/100

TOILET-2

M.

KITCHEN

CRAWL SPACE

KITCHEN

SCULLERY

JC 2

STORAGE

CARRY-OUT

C L

G

H

G T

0TO REMAIN

(TYP)

EXISTING WALL

2a

TOILET-1

M.

CORRIDOR-1

DINING AREA

C L

G

H

G T

C L

G

H

G T

AL WINDOW (TYP.)

CLEAN EXISTING

PAINT EXISTING

ROOF DECK

PAINT EXISTING

STL TRUSS (TYP)

PAINT EXISTING

ROOF DECK

PAINT EXISTING

STL TRUSS (TYP) 1

TO REMAIN

(TYP)

EXISTING WALL

CRAWL SPACE

FREEZER

KITCHEN

SERVERY

DINING AREA

TO REMAIN

EXISTING WALL

PAINT EXISTING

ROOF DECK

PAINT EXISTING

STL TRUSS (TYP)

AL WINDOW (TYP.)

CLEAN EXISTING

AREA-1

SERVING

EXISTING GCWT

TO REMAIN

C L

G

H

G T

2 3 4

260217

BLDG. S-33 & 747

REPAINT INTERIOR & EXTERIOR OF DFAC

CAMP CASEYKIM, YK

(BLDG. S-747)

CROSS SECTIONS AND PICTURES

WALLS AND GUARD RAILS

PAINT ON RECEIVING DOCK

PAINT ON CANOPY STRUCTURES

SPLASH BLOCKS

& REPLACE CONC

W/ CEMENT MORTAR

FILL THE JOINT

AND ROOF

PAINT ON BICYCLE RACKS

AND STEEL STRUCTURES

PAINT ON ROOF DECK

AND CEILING SURFACES

PAINT ON EXST GWB WALLS

A-7

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15333, APO AP 96205-5333

DPW, ENGINEERING SERVICES DIVISON, DESIGN BRANCH

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN-CASEY

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

OFFICE-1

OFFICE-2

VEST-2

DINING AREA

VEST-1

JANITOR CLOSET

W. TOILET-1

VEST-3

SCULLERY

MECHANICAL/

KITCHEN

DRY STORAGE

FREEZER

CORRIDOR-3

SERVERY

CORRIDOR-2

CONC

QTB

QTB

CMU

CMU

QTB

QTB

M. TOILET-1 QTB

HGT

I N T E R I O R F I N I S H S C H E D U L E

ROOM NAMESRM NOS

NEW

BASE

EXIST

MATL

NEW

FNSH

FLOOR

EXIST

CLR

MATL MATL

CLRFNSH

EXIST

FNSH

WAINSCOT

NEW

CLR

INTERIOR WALL

FNSH

INSIDE OF EXT WALL

MATL

EXIST NEW

CLR

EXIST

MATL

NEW

FNSH CLR

EXIST

CEILING

MATL

NEW

FNSH CLR HGT

REMARKS

VARMECH ROOM CONC CMU101

CORRIDOR-1

ELECTRICAL

VEST-4

CORRIDOR-4

JANITOR CLOSET

128 RECEIVING DOCK CONC

QTB

QTB

GCWT

CMU

CMU

PANEL

CMU

MET

CMU

CMU

CMU

CMUCMU

CMU

VAR

VAR

FMF - -

VCT - -

CMT

CMT

FT

FT

FT

VCT/

FT

QT - -

QT - -

VCT - -

VCT - -

VCT - -

QT - -

QT - -

VCT - -

QT - -

CMT

CMT

- - P-3

VCB - -

FTB - -

FTB - -

FTB - -

VCB - -

QTB - -

- - P-3

QTB - -

VCB - -

VCB - -

VCB - -

QTB - -

QTB - -

VCB - -

QTB - -

AL

DOOR

- PAINT P-1

GCWT

GCWT

VWC

VWC

VWC

AL

DOOR

AL

DOOR

- PAINT P-3

- PAINT P-3

GCWT

GCWT

- PAINT P-1

GCWT - -

GCWT - -

BRICK/

AL DOOR

- PAINT P-1

- PAINT P-1

GCWT

GCWT

GCWT/

VWC

VWC

GCWT

VWC

BRICK/

AL DOOR

BRICK/

AL DOOR

- PAINT P-1

GCWT - -

- PAINT P-1

PANEL - - -

- PAINT P-1

- PAINT P-1

GCWT

GCWT

- PAINT P-1

- PAINT P-1

GCWT - -

GCWT - -

GWB - PAINT P-2

METAL

DECK

- PAINT P-4

- PAINT P-2

- PAINT P-2

- PAINT P-2

- -ACST

- -ACST

- -ACST

GWB/GWB

- PAINT

P-2 2650/2750

/VAR

- PAINT P-2GWB

- PAINT P-2GWB

- -ACST

METAL

DECK

- PAINT P-4

- -ACST

- PAINT P-2GWB

PANEL - - -

- -ACST

- -ACST

- -ACST

- PAINT P-2GWB

- PAINT P-2

- PAINT P-2GWB

- PAINT

- PAINT P-2

FMF

FMF

M. TOILET-2

W. TOILET-2

SERVING AREA

SERVING AREA-2

2750FT - - FTB - - - - - - - - - - - GCWT - - - -ACST

2750FT - - FTB - - - - - - - - - - - GCWT - - - -ACST

131 VEST-5

132 CARRY-OUT

133 CARRY OUT KITCHEN

134 CARRY OUT STORAGE

135 JANITOR CLOSET

FMF

QT

QT

QT

VCT

QTB

QTB

QTB

QTB

VCB

AL

DOOR

GCWT

GCWT

GCWT

CMU

PAINT

P-1

BRICK/

AL DOOR

CMU

GCWT

GCWT

GCWT

PAINT

P-1

GWB

GWB

GWB

GWB

PAINT

PAINT

PAINT

PAINT

PAINT

P-2

P-2

P-2

P-2

P-2 2750

FIELD FEEDING STORAGE VCT - - VCB - - - - - - - - - - - CMU - PAINT P-1 GWB - PAINT P-2 2750

CMU 2750VCT - - VCB - - - - - - - - - - - - PAINT P-1 - PAINT P-2GWBSTORAGE

FREEZER CONC PANEL VAR- - - - - - - - - - - - - - PANEL - - - PANEL - - -

FREEZER CONC PANEL VAR- - - - - - - - - - - - - - PANEL - - - PANEL - - -

(BLDG. S-747)

INTERIOR FINISH SCHEDULE

PAINT

PAINT

VWC

REMOVED

PAINT P-1

VWC

REMOVED

PAINT P-1

VWC

REMOVED

PAINT P-1

GCWT GCWT

CLEAN

CLEAN

FREEZER & REF

FREEZER & REF

FREEZER & REF

CLEAN

CLEAN CLEAN

VWC

REMOVED

-/PAINT-/P-1

VWC

REMOVED

PAINT P-1

VWC

REMOVED

PAINT P-1

CLEAN

CLEAN

CLEAN

GWB

GWB

GWB

/P-4

GWB

GWB

GWB

P-2

VARIESPAINT P-4

GWB

260217

BLDG. S-33 & 747

REPAINT INTERIOR & EXTERIOR OF DFAC

EPOXY EP-1 * SEE PICTURES

A-8

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15333, APO AP 96205-5333

DPW, ENGINEERING SERVICES DIVISON, DESIGN BRANCH

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN-CASEY

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

SURFACES MATERIAL FNSH COLOR REMARKS

A B B R E V I A T I O N

LAVATORY COUNTERTOP

GYPSUM WALL BOARD

GLAZED CERAMIC WALL TILE

AL ALUMINUM

BUILDING

CEILING

COLOR

BLDG

CLG

CLR

ACOUSTICAL TILEACST

FIRE EXTINGUISHER CABINET

EXTERIOREXT

& FINISH SYSTEM

EXTERIOR INSULATIONEIFS

DR DOOR

FEC

CERAMIC MOSAIC TILECMT

CONC CONCRETE

HARDENER

LC

HGT

GWB

GCWT

VINYL COMPOSITION TILE

VINYL COVE BASE

MECH MECHANICAL

MIRROR

PLASTIC LAMINATE

MR

PL

MATERIALMATL

STEELSTL

VCT

VARIOUSVAR

VCB

WALL

HEIGHT

HDR

FIRE EXTINGUISHER CABINET

QUARRY TILEQT

WITHOUTW/O

ROOF

DOOR

ROOFING/ BUR

AL

TB TILE BRICK

FACE BRICKFB

BUR BUILT-UP ROOFING

RUBBER TILERT

APS ACRYLE PLASTIC SKYLIGHT

ALWINDOW

FASCIA / SOFFIT PROTECTED METAL -

STANDING SEAM METAL

METAL PAINT

EIFS W/O INSUL

FLASHING PROTECTED METAL

SURFACES MATERIAL FNSH COLOR

FEC

REMARKS

DOWNSPOUT PROTECTED METAL

ROOF ACCESSORY PROTECTED METAL

EXTERIOR FINISH SCHEDULE (BLDG. S-747)

MATERIAL & COLOR SCHEDULE AND

FLOOR MATERIAL/COLOR

BASE MATERIAL/COLOR

WALL MATERIAL/COLOR

CEILING MATERIAL/COLOR

MISC MATERIAL/COLOR

VCB-1

OR APPROVED EQUAL

DARK BROWN, 100 HGT, 3THK

LG HAUSYS

VINYL COVE BASE

PT-3

OR APPROVED EQUAL

LATEX, 100 HGT

EX8816-BLACK COLOR

ANTI-MOLD & MILDEW

KCC SUPRO HOME & WELLBEING

PAINT COLOR

PT-1

OR APPROVED EQUAL

LATEX

EX8816-IVORY

ANTI-MOLD & MILDEW

KCC SUPRO HOME & WELLBEING

PAINT COLOR

ACST-1

PT-4

MTL PANNEL OR APPROVED EQUAL

FOR ROOF MET DECK & MET TRUSS

ALKYD, SEMI-GROSS

NOROO NR7066

PAINT COLOR

PT-2

OR APPROVED EQUAL

LATEX

EX8816-SNOWWHITE

ANTI-MOLD & MILDEW

KCC SUPRO HOME & WELLBEING

PAINT COLOR

OR APPROVED EQUAL

WHITE

MT 410

"KCC MITONE"

603MM x 603MM x 15MM THK

ACOUSTICAL CEILING TILE

EP-1

ABRASIVE GRAIN FINISH

OR APPROVED EQUAL

CLEANPOXY 3100

NOROO PAINT & CO

EPOXY PAINT

MATERIAL & COLOR SCHEDULE (BLDG. S-747)

EXTERIOR FINISH SCHEDULE (BLDG. S-747)

CLEAN -

CLEAN -

FACE BRICK

PAINT

SAND STONEPAINT

CHOCOLATE

PAINT CHOCOLATE

PAINT CHOCOLATE

HANDRAILS

FOUNDATION

SIDEWALK

STAIR

PAINT CHOCOLATE

CONC

CONC

CONC

STEEL

LOADING DECK CONC PAINT - MATCHING TO EXISTING

260217

BLDG. S-33 & 747

T-01
A-01
A-02
A-03
A-04
A-05
A-06
A-07
A-08

File details come from the government source that posted it. Updated .