317499_CIVIL_DWG.pdf
PDF 3 MB Posted
- Solicitation number
- W90VN824R0059
About this file
This document is a Request for Proposal (RFP) for the repair of deteriorated pavement at Camp Casey, Project #317499. The RFP is issued only to existing Area I & II General Construction Multiple Award Indefinite Delivery Indefinite Quantity (MAIDIQ) Contractors under Contract Number W91QVN-24-D-0001 through 0020, 0082, 0099, 0103 and 0107. The scope of work includes approximately 4,500 square meters of milling and overlay of existing asphalt pavement, replacement of concrete sidewalks and curbs, construction of retaining walls and handrails, and landscaping with sod and plantings. The RFP is issued by the Department of the Army Materiel Command Army Contracting Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation W90VN824R0059.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 T - 1 1 OF 1 TITLE SHEET
CIVIL
A
B C D
E F G H
SCHEDULE OF DRAWINGS
RING NO. RING NO.DWG. NO. DWG. NO.SHT. NO. SHT. NO.DESCRIPTION OF DRAWINGS DESCRIPTION OF DRAWINGSREF. NO. REF. NO.REVISION STATUS REVISION STATUS
SYMBOL BY
DESIGNED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENERGY MANAGER
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
ENVIRONMENT
FORCE PROTECTION
CIVIL
T-1
TITLE SHEET
CASEY
FEWR NO. 317499
LOCATION PLAN AND GENERAL NOTESC - 1
C - 2
C - 3
C - 4
C - 5
C - 6
C - 7
C - 8
CHAIN LINK FENCE AND GATE
SITE LAYOUT PLAN - 1 AND SCOPE OF WORK
SITE LAYOUT PLAN - 2 AND SCOPE OF WORK
SITE LAYOUT PLAN - 3 AND SCOPE OF WORK
SITE LAYOUT PLAN - 4 AND SCOPE OF WORK
MISC. DETAILS
SITE LAYOUT PLAN - 5 AND SCOPE OF WORK
SITE LAYOUT PLAN - 6 AND SCOPE OF WORK
SITE LAYOUT PLAN - 7 AND SCOPE OF WORK
SITE LAYOUT PLAN - 8 AND SCOPE OF WORK
SYNTHETIC WOOD HANDRAIL
RAMP DETAILS
HIGHLAND STONE DETAILS
VEHICLE GUARD RAIL
C - 9
C - 10
C - 11
C - 12
C - 13
C - 14
C - 15
REPAIR DETERIORATED PAVEMNET
CAMP CASEY
REPAIR DETERIORATED PAVEMENT
PAK, CS
317499
- 1 100 0 100 200 300M
SCALE IN METERS
SCALE = 1 : 3,000
THIS PROJECT
N
GENERAL NOTES :
LOCATION PLAN
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
AS SHOWN
12 CM
ST
ST
S T
P V C
.5
.9
W A
L L
GAL
6 PVC
ST
12 CM
ST
GRAVES
GRAVES
65-A
STREAM
227.5
J-4
ST
36 CM
W A
L L
W A
L L
WALL
W A
L L
WALL
228.4
ST
MATCH LINE 'C'
00-49341
3-48PN
00-49341
4-200PN
00-49341
4-200PN
01-49550
00-49341
LAUNDRY
KSC
PEST
647667
UTIL
B&G
WH-1
WH-2
DPW HQ
A
B
629 685
651A
833T
808 811
746 715 726
A B
00-49341
A
B
1149 1151
10291144
A
B
1918 1879
A
B
A
B
A
B
2372A
2373T
A C
2451 2400
A
B
A
B
2648 2605
2609T
2514 2540
8008T
2540T
26462645
1991 1963
A B
18331832
1962 1812
456A
CCTT
CCTT
SIMNET
463Z
SSSC
TSAK MILES 2000
549 546
8114T
560G
A B
86M
48T
A
B
39 55
134 133
186 192
202A
208 215 214
213 212
259 245
FOOT BR
VEH BR
FOOT BR
VEH BR
VEH BR
VEH BR
VEH BR
VEH BR 1821
VEH BR
VEH BR
VEH BR
VEH BR
FOOT BR
VEH BR
VEH BR
FOOT BR
FOOT BR
VEH BR
VEH BR
VEH BR
FOOT BR
FOOT BR
VEH BR
VEH BR
VEH BR
VEH BR
FOOT BR
1158A
1158B
RAILHEAD
.8
.5
S T
R C
T
M
S T
268.6
STREAM
DISCHARGE TO
65-A
STREAM
MATCH LINE 'C'
447A
F
F
497A
497B
458Z
2372?
QA00894-0J
QA00893-0J
QA00892-0J
ADMIN
EXER W/LAT
EXER W/LAT
QA00138-9J
QA01300-8J
00-54151 BUP 020122
00-54152 BUP 020122
00-54132 BUP 010801
00-54127 BUP 040430
00-54158 BUP 030104
00-54129 BUP 011109
00-54157 BUP AFTER 2026
00-54156 BUP 031030
00-54130 BUP 020330
00-54131 BUP 020929
00-54155 BUP 030506
03-57200 REPAIR 041007
99-47353
4-200PN
01-QA00604 BUP
XX-QA00606 BUP 0310XX
95-44142
4-184PN
95-44066
4-184PN
96-QA00466 BUP
95-44066
4-184PN
95-44066
4-184PN
95-44066
4-184PN
01-55893 BUP
99-QA00603 BUP
XX-QA00602 BUP 0310XX
99-47353
4-200PN
96-43269
4-184PN
97-44592
4-200PN
XX-QA00287 BUP
01-55894 BUP
99-51682
4-200PN
99-51820
3-48PN
97-44592
4-200PN
99-51682
4-200PN
99-51682
4-200PN
01-55882 BUP
A
B
A B
2022(?)
VEH BR
VEH BR
472?
455?
1839T
1840T
BARRIER
1564 1566
635A
2002B
A B
48A
A
B
A B
A B
A
B
A
B
A
B
174 Z
B A
S K
E T
B A
L L
O
U R
T
T E
N N I
U R
T
706(707A)
(2298)
1071?
A B
1760?
VEH BR?
VEH BR?
C-1
CIVIL
LOCATION PLAN AND GENERAL NOTES
COMMENCING WORK ON THE PROJECT.
INDICATED BY THE COR AND SHALL BE APPROVED PRIOR TO
UNDETAILED PORTION OF THE JOB INCLUDING OTHER AREAS
2. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR ANY
COVERED WITH TOP SOIL AND CARPET SODDED.
4. ALL UNPAVED AREAS WITHIN THE GRADING LIMIT LINES SHALL BE
A CLEAN CONDITION ACCEPTABLE TO THE COR.
MATERIALS, EQUIPMENT AND DEBRIS AND LEAVE THE PREMISES IN
ALL TIMES AND AT COMPLETION OF WORK, REMOVE ALL SURPLUS
8. THE CONTRACTOR SHALL KEEP THE CONSTRUCTION AREA CLEAN AT
SUBMISSION OF CONTRACT PROPOSAL.
DIMENSIONS AT THE PROJECT SITE ORIENTATION PRIOR TO
1. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND
EXPENSE TO THE SATISFACTION OF THE CONTRACTING OFFICER.
DISMANTLING, DEMOLISHING, OR REMOVING AT THE CONTRACTOR'S
TO THEIR ORIGINAL CONDITIONS OF THE ITEMS DAMAGED BY
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR/RESTORATION
ITEMS WHICH WILL INTERFERE WITH THE CONSTRUCTION OPERATIONS.
UNDER GROUND ROCK BASE, EXISTING UTILITY LINES, AND OTHER
CLEARED/REROUTED OF ALL NATURAL OBSTRUCTIONS, SUCH AS
5. THE SITE INDICATED ON THE DRAWINGS SHALL BE GRADED AND
TO THE PROJECT CONTRACT.
TO ACCOMPLISH THE CIVIL SCOPE OF WORK AT NO ADDITIONAL COST
FORM ARE A PART OF THIS PROJECT. THE DETAILS SHALL BE UTILIZED
OF THE INSTALLATION MANAGEMENT AGENCY, KOREA REGION OFFICE"
DRAWINGS, FOR OM&A PROJECTS, KOREA, OCTOBER 2015, DEPARTMENT
6. THE CIVIL STANDARD DRAWINGS SHOWN IN THE "STANDARD DETAIL
EXISTING SITE CONDITIONS PRIOR TO START OF WORK.
CHECK THE OTHER CONSTRUCTION REQUIREMENTS IN MEETING THE
FOR GOOD SURFACE RUN-OFF DISCHARGE CONDITIONS AND ALSO
7. THE CONTRACTOR SHALL PERFORM TOPOGRAPHIC SURVEY TO VERIFY
CAMP CASEY
REPAIR DETERIORATED PAVEMENT
.6
.9
.0
.7
.8
.2
.0
.1
.1
.4
.0
.4
.8
.0
.2
.4
.3
.7
.2
.9
.6
.7
.7
.7
.9
.1
.5
.6
.7
.7 s id e w a lk
.7
.7 ro a d
.6
.6
.7
.7
.7 ro a d
.7
.8
.8
.8
.9
.0
.0
.2
.1
.2
.0
.2
.2
.1
.1
.0
.0
.9
.6
.8
.6 s to n e w a ll
.2
.3
.2
.3
.2
.2
.2
.1
.3
.6
.7
.6
.6
.6
.7
.8
.5
.3
.3
.3
.6
8 P
O
IN
T te le c o m
.5 te le g ra p h p o le
.4
.2
.1
.2
.3
.0
.2
.3
.2
.2
7 c h e rry tre e
.9
.7
.8
.9
.7
.2
.6
.2
.0
.9 g a te
.3 g a te
.2
.5
.4 b o lla rd
.3 c o n ,c
.5
.5
.5
.6
.6
.6
.6
.6
.6
.6
.6
.6
.7
.7
.9
.7
.6
.6
4 6 .6
3 6
.6
.6
.5
.5
.4 d o o r
.6 d o o r
.6 b u ild in g
.8
.9
.7
.9
.0
.8
.7
.8
.2
.0
.2
.2
.0
.1
.2
.0
.9
.8
.7
.6
.9
.7
.7
.8
.0
.1
.9
.9
.2
.9
.3 p la n te r
.5
.7 s h e lte r s to n e w a lls to n e w a ll s to n e w a ll s to n e w a ll s to n e w a ll s to n e w a ll s to n e w a ll s to n e w a ll s to n e w a ll s to n e w a ll s to n e w a ll s to n e w a ll s to n e w a ll s to n e w a ll s to n e w a ll s to n e w a ll s to n e w a ll s id e w a lk s id e w a lk s id e w a lk s id e w a lk s id e w a lk s id e w a lk s id e w a lk s id e w a lk s id e w a lk s id e w a lk s id e w a lk ro a d ro a d ro a d ro a d ro a d ro a d ro a d ro a d
.3
0 fa n c e fa n c e fa n c e fa n c e fa n c e fa n c e b o lla rd b o lla rd c o n ,c c o n ,c c o n ,c c o n ,c c o n ,c c o n ,c c o n ,c c o n ,c c o n ,c c o n ,c c o n ,c c o n ,c c o n ,c c o n ,c c o n ,c c o n ,c c o n ,c c o n ,c c o n ,c c o n ,cc o n ,c c o n ,c c o n ,c b u ild in g b u ild in g b u ild in g b u ild in g b u ild in g b u ild in g b u ild in g b u ild in g b u ild in g b u ild in g b u ild in g b u ild in g b u ild in g b u ild in g b u ild in g b u ild in g b u ild in g b u ild in g s id e w a lk s id e w a lk s id e w a lk s id e w a lk s id e w a lk s id e w a lk s id e w a lk s id e w a lk s id e w a lk s id e w a lk s id e w a lk te le g ra p h p o le c h e rry tre e c h e rry tre e c h e rry tre e c h e rry tre e c h e rry tre e c h e rry tre e c h e rry tre e c h e rry tre e c h e rry tre e c h e rry tre e c h e rry tre e p la n te r s h e lte r s h e lte r s h e lte r s h e lte r s h e lte r s h e lte r s h e lte r
R O
A D
UP
HIGHLAND STONE STEP
52.0LM-HIGHLAND STONE WALL
(W2.0 x 11ea) c o n ,c s id e w a lk
51.0SM-CON,C SIDE WALK
� A
133.0SM-SOD
51.0SM-CON,C PAVEMENT
52.0LM-HANDRAIL
200.0SM-SOD
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
CIVIL
APPROX. 54.0 SM
REPLACE EXST CON'C SIDEWALK W/ NEW,
APPROX. 52.0 LM
REPLACE HIGHLAND STONE WALL AND 2.0M W HIGHLAND STEP,
4APPROX, 333.0 SM
RESTORE CARPET SODDING W/ TOP SOIL,
APPROX. 52.0 LM
REPLACE SYNTHETIC WOOD HANDRAIL,
SCOPE OF WORK
SCHEDULE #1 (REPAIR/MAINTENANCE)
2. REPLACE EXST CON'C SIDEWALK W/ NEW.
3. RESTORE CARPET SODDING W/ TOP SOIL.
4. REPLACE SYNTHETIC WOOD HANDRAIL.
2.0M W HIGHLAND STEP.
1. REPLACE HIGHLAND STONE WALL AND
N
S-2151
SCALE = 1 : 1002
C-2
SITE LAYOUT PLAN - 1
SCOPE OF WORK
SITE LAYOUT PLAN - 1 AND
1~4
CAMP CASEY
REPAIR DETERIORATED PAVEMENT
st ep
~SOD~
cp
.1
PO
IN
T cp
.4 ga te
.0
.9
.9
.0
.1
.1
.1
.9
.9
.9
.8
.8
.8
.7
.8
.0
.0
.0
.1
.1
.1
.0
.6
.6
.7
.8
.8
.8
.8
.9
.8
.9
.9
.8
.8
.7
.6
.7
.7
.7 bo tt om
.8
.8
.9
.9
.9
.9
.9
.9
.9
.0
.9
.9
.9
.9
.9
.9
.8
.7 85 58
.7
.6
.6
.6
.6
.7
.7
.7
.8
.9
.9
.9 84 60
.0
.0
.9
.9
.9
.1
.1
.1
.1
.0
.0
.1
.9
.7
.7
.7
.5 si de w al k
.2
.5
.7 st ep
.7 86 59
.7 78 59
.7
.7
.5
.5
.7
.7
.7
.7
.5
.5
.5
.5
.2
.2
.2
.9
.8
.9
.9 co n, c co ve r di tc h
.9
.1
.1
.1
.1
.3
.3
.1
.6
.0
.0
.2
.1
.1
.5
.6
.5
.6
.7
.7
.7
.8
.0
.0
.0
.9
.0
.9
.9
M .H
.9
UP
UP
st ep st ep st ep st ep st ep st ep st ep st ep si de w al k si de w al k si de w al k si de w al k si de w al k si de w al k si de w al k ro ad ro ad ro ad ro ad ro ad ro ad ro ad ro ad ro ad ro ad ro ad ro ad ro ad ro ad ro ad ro ad ro ad ro ad ro ad ro ad si de w al k si de w al k si de w al k si de w al k si de w al k bu ild in g si de w al k si de w al k bu ild in g
M .H
M .H si de w al k si de w al k si de w al k co n, c co ve r di tc h co n, c co ve r di tc h co n, c co ve r di tc h co n, c co ve r di tc h fe nc e fe nc e fe nc e fe nc e fe nc e fe nc e fe nc e fe nc e fe nc e fe nc e fe nc e fe nc e fe nc e fe nc e ga te ga te si de w al k si de w al k si de w al k si de w al k si de w al k st ea l c ov er st ea l c ov er st ea l c ov er si de w al k si de w al k si de w al k fe nc e fe nc e st ea l c ov er d itc h st ea l c ov er d itc h st ea l c ov er d itc h st ea l c ov er d itc h w al l t op w al l t op w al l t op w al l t op w al l t op st ea l c ov er d itc h st ea l c ov er d itc h st ea l c ov er d itc h st ea l c ov er d itc h st ea l c ov er d itc h st ea l c ov er d itc h bo tt om bo tt om bo tt om bo tt om si de w al k si de w al k si de w al k si de w al k si de w al k
M .H st ea l c ov er d itc h st ea l c ov er d itc h si de w al k st ea l c ov er d itc h st ea l c ov er d itc h st ea l c ov er d itc h st ea l c ov er d itc h st ea l c ov er d itc h
+60.10 +58.80
S-2532 S-2514
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
CIVIL
C-3
3. RESTORE CARPET SODDING W/ TOP SOIL.
- 3
N
MP MOTOR POOL
APPROX. 47.0 SM
REPLACE EXST CON'C SIDEWALK W/ NEW,
APPROX. 52.0 LM
0.2M W GRANITE CURB,
REPLACE EXST CON'C CURB W/
AND RECON RETAINING WALL, APPROX. 35.0 SM
CONTRUCT VEHICLE RAMP, APPROX. 45.0 SM
APPROX. 52.0 LM
CONSTRUCT 1.5M W HIGHLAND STEP,
4APPROX, 115.0 SM
RESTORE CARPET SODDING W/ TOP SOIL,
APPROX. 14.0 LM
ONE(1) 3.6M W VEHICLE GATE,
REPLACE CHAIN LINK FENCE AND
-CONSTRUCT VEHICLE GUARD RAIL, APPROX. 82.0 LM
APPROX. 10.0 LM
CONSTRUCT SYNTHETIC WOOD HANDRAIL,
SCOPE OF WORK
SCHEDULE #2 (REPAIR/MAINTENANCE)
SCHEDULE #1 (CONSTRUCT/ALTERATION)
RETAINING WALL.
1. CONTRUCT VEHICLE RAMP W/ RECON
2. CONSTRUCT VEHICLE GUARD RAIL.
3. CONSTRUCT 1.5M W HIGHLAND STEP.
4. CONSTRUCT SYNTHETIC WOOD HANDRAIL.
1. REPLACE EXST CON'C SIDEWALK W/ NEW.
GRANITE CURB.
2. REPLACE EXST CON'C CURB W/ 0.2M W
3.6M W VEHICLE GATE.
4. REPLACE CHAIN LINK FENCE AND ONE(1)
SCALE = 1 : 100
SITE LAYOUT PLAN - 2
SCOPE OF WORK
SITE LAYOUT PLAN - 2 AND
1~4
CAMP CASEY
REPAIR DETERIORATED PAVEMENT
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
CIVIL
- SCALE = 1 : 250
N
H H
H H
C
C
E
X
X
C B
D
D
D
D
D
P N
6. THE CONTACTOR SHALL PAINT SIDE LINE ON ALL NEW PAVED AREA.
IF ROAD WIDE IS MORE THAN 6.8 LM.
5. THE CONTACTOR SHALL PAINT CENTER LINE ON NEW PAVEMENT AREA,
4. THE CONTRACTOR SHALL RESTORE PAINTING ON NEW PAVED AREA.
3. THE CONTRACTOR SHALL COORDINATE WITH COR FOR TREE TRANSPLANT.
PAVEMENT AREA.
2. CONTACTOR SHALL MATCH FINAL GROUND LEVEL WITH TBM, EXISTING
WITH COR.
IN CASE OF DIFFERENT CONDITION, CONTRACTOR SHALL COORDINATE
1. CONTRACTOR SHALL CONFIRM THE UTILITIES BEFORE REMOVE.
NOTE:
APPROX. 742.0 SM
MILL/OVERAY W/ 50MM THK AC SURFACE COURSE,
SCOPE OF WORK
SCHEDULE #1 (REPAIR/MAINTENANCE)
COURSE.
1. MILL/OVERAY W/ 50MM THK AC SURFACE
C-4
SITE LAYOUT PLAN - 3
SCOPE OF WORK
SITE LAYOUT PLAN - 3 AND
CAMP CASEY
REPAIR DETERIORATED PAVEMENT
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
CIVIL
- SCALE = 1 : 250
C
C
C
C
E
D D
D
D
D
D
D
DD
6. THE CONTACTOR SHALL PAINT SIDE LINE ON ALL NEW PAVED AREA.
IF ROAD WIDE IS MORE THAN 6.8 LM.
5. THE CONTACTOR SHALL PAINT CENTER LINE ON NEW PAVEMENT AREA,
4. THE CONTRACTOR SHALL RESTORE PAINTING ON NEW PAVED AREA.
3. THE CONTRACTOR SHALL COORDINATE WITH COR FOR TREE TRANSPLANT.
PAVEMENT AREA.
2. CONTACTOR SHALL MATCH FINAL GROUND LEVEL WITH TBM, EXISTING
WITH COR.
IN CASE OF DIFFERENT CONDITION, CONTRACTOR SHALL COORDINATE
1. CONTRACTOR SHALL CONFIRM THE UTILITIES BEFORE REMOVE.
NOTE:
SCOPE OF WORK
SCHEDULE #1 (REPAIR/MAINTENANCE)
COURSE.
1. MILL/OVERAY W/ 50MM THK AC SURFACE
APPROX. 883.0 SM
MILL/OVERAY W/ 50MM THK AC SURFACE COURSE,
C-5
SITE LAYOUT PLAN - 4
N
SCOPE OF WORK
SITE LAYOUT PLAN - 4 AND
CAMP CASEY
REPAIR DETERIORATED PAVEMENT
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
CIVIL
- SCALE = 1 : 250
C
C
C
C
E
C B
CB
CB
CB
D
D
6. THE CONTACTOR SHALL PAINT SIDE LINE ON ALL NEW PAVED AREA.
IF ROAD WIDE IS MORE THAN 6.8 LM.
5. THE CONTACTOR SHALL PAINT CENTER LINE ON NEW PAVEMENT AREA,
4. THE CONTRACTOR SHALL RESTORE PAINTING ON NEW PAVED AREA.
3. THE CONTRACTOR SHALL COORDINATE WITH COR FOR TREE TRANSPLANT.
PAVEMENT AREA.
2. CONTACTOR SHALL MATCH FINAL GROUND LEVEL WITH TBM, EXISTING
WITH COR.
IN CASE OF DIFFERENT CONDITION, CONTRACTOR SHALL COORDINATE
1. CONTRACTOR SHALL CONFIRM THE UTILITIES BEFORE REMOVE.
NOTE:
SCOPE OF WORK
SCHEDULE #1 (REPAIR/MAINTENANCE)
COURSE.
1. MILL/OVERAY W/ 50MM THK AC SURFACE
APPROX. 1146.0 SM
MILL/OVERAY W/ 50MM THK AC SURFACE COURSE,
C-6
SITE LAYOUT PLAN - 5
N
SCOPE OF WORK
SITE LAYOUT PLAN - 5 AND
CAMP CASEY
REPAIR DETERIORATED PAVEMENT
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
CIVIL
- SCALE = 1 : 250
C
C
C
C
E
E
E
CB
D
D
D
D
D
D
D
D
D
D
D
DD
D
X P
S
D
6. THE CONTACTOR SHALL PAINT SIDE LINE ON ALL NEW PAVED AREA.
IF ROAD WIDE IS MORE THAN 6.8 LM.
5. THE CONTACTOR SHALL PAINT CENTER LINE ON NEW PAVEMENT AREA,
4. THE CONTRACTOR SHALL RESTORE PAINTING ON NEW PAVED AREA.
3. THE CONTRACTOR SHALL COORDINATE WITH COR FOR TREE TRANSPLANT.
PAVEMENT AREA.
2. CONTACTOR SHALL MATCH FINAL GROUND LEVEL WITH TBM, EXISTING
WITH COR.
IN CASE OF DIFFERENT CONDITION, CONTRACTOR SHALL COORDINATE
1. CONTRACTOR SHALL CONFIRM THE UTILITIES BEFORE REMOVE.
NOTE:
APPROX. 2037.0 SM
MILL/OVERAY W/ 50MM THK AC SURFACE COURSE,
SCOPE OF WORK
SCHEDULE #1 (REPAIR/MAINTENANCE)
COURSE.
1. MILL/OVERAY W/ 50MM THK AC SURFACE
COVER
REPLACE THREE(3) 0.7M X 0.7M STEEL GRATING
COVER.
2. REPLACE 0.7M X 0.7M STEEL GRATING
C-7
SITE LAYOUT PLAN - 6
N
SCOPE OF WORK
SITE LAYOUT PLAN - 6 AND
CAMP CASEY
REPAIR DETERIORATED PAVEMENT
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
CIVIL
- SCALE = 1 : 250
N
XX
X
CB
D
X
X
CB
D
S
S
S
XPS
6. THE CONTACTOR SHALL PAINT SIDE LINE ON ALL NEW PAVED AREA.
IF ROAD WIDE IS MORE THAN 6.8 LM.
5. THE CONTACTOR SHALL PAINT CENTER LINE ON NEW PAVEMENT AREA,
4. THE CONTRACTOR SHALL RESTORE PAINTING ON NEW PAVED AREA.
3. THE CONTRACTOR SHALL COORDINATE WITH COR FOR TREE TRANSPLANT.
PAVEMENT AREA.
2. CONTACTOR SHALL MATCH FINAL GROUND LEVEL WITH TBM, EXISTING
WITH COR.
IN CASE OF DIFFERENT CONDITION, CONTRACTOR SHALL COORDINATE
1. CONTRACTOR SHALL CONFIRM THE UTILITIES BEFORE REMOVE.
NOTE:
APPROX. 676.0 SM
MILL/OVERAY W/ 50MM THK AC SURFACE COURSE,
SCOPE OF WORK
SCHEDULE #1 (REPAIR/MAINTENANCE)
COURSE.
1. MILL/OVERAY W/ 50MM THK AC SURFACE
C-8
SITE LAYOUT PLAN - 7
SCOPE OF WORK
SITE LAYOUT PLAN - 7 AND
CAMP CASEY
REPAIR DETERIORATED PAVEMENT
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
CIVIL
- SCALE = 1 : 250
C
E
D
D
D
D
D
C
6. THE CONTACTOR SHALL PAINT SIDE LINE ON ALL NEW PAVED AREA.
IF ROAD WIDE IS MORE THAN 6.8 LM.
5. THE CONTACTOR SHALL PAINT CENTER LINE ON NEW PAVEMENT AREA,
4. THE CONTRACTOR SHALL RESTORE PAINTING ON NEW PAVED AREA.
3. THE CONTRACTOR SHALL COORDINATE WITH COR FOR TREE TRANSPLANT.
PAVEMENT AREA.
2. CONTACTOR SHALL MATCH FINAL GROUND LEVEL WITH TBM, EXISTING
WITH COR.
IN CASE OF DIFFERENT CONDITION, CONTRACTOR SHALL COORDINATE
1. CONTRACTOR SHALL CONFIRM THE UTILITIES BEFORE REMOVE.
NOTE:
SCOPE OF WORK
SCHEDULE #1 (REPAIR/MAINTENANCE)
COURSE.
1. MILL/OVERAY W/ 50MM THK AC SURFACE
APPROX. 728.0 SM
MILL/OVERAY W/ 50MM THK AC SURFACE COURSE,
C-9
SITE LAYOUT PLAN - 8
N
SCOPE OF WORK
SITE LAYOUT PLAN - 8 AND
CAMP CASEY
REPAIR DETERIORATED PAVEMENT
SCALE: NONE
SIDEWALK
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
JOINT
SEALER
JOINT
FILLER
R=3
TYP
R=3
TYP
SHALL BE SPACED SO THAT RATIO
OF SLAB LENGTH TO WIDTH WILL
NOT EXCEED 1.25. THE DEPTH OF
THE CONTRACTION JOINT WILL BE
AT LEAST ONE-FOURTH OF THE
SIZE OF THE AGGREGATE USED. PROVIDE EXP JOINTS AT MAX 9.0 M
INTERVALS FOR STRAIGHT SECTIONS,
AT ALL RETURNS OF WALKS,
AND WHERE WALKS ABUT OTHER
CONCRETE STRUCTURES.
BROOM
FINISH FIN GRADE
2A S E C T I O N
2B
EXPANSION JOINT
2C
CONTRACTION JOINT
COMPACTED
NON-FROST-SUSCEPTIBLE
MATERIAL BASE
0.06
#8-150X150 WWF
MIN
300TACK COAT
EXISTING PAVEMENT
SAWCUT & BITUMINOUS
PRIME COAT
NEW AC PAVEMENTEXST. AC PAVEMENT
NEW PAVEMENT
EXISTING SUBGRADE
C
2% SLOPE
EXISTING BASE COURSE
EXISTING SUBBASE COURSEC
2% SLOPE
TO REMAIN
VARIES
EXISTING SUBGRADE
TACK COAT
EXISTING BASE COURSE
VARIES
TO REMAIN
EXISTING SUBBASE COURSE
2% SLOPE
2% SLOPE
TO REMAIN
REPLACE EXISTING 50mmTHK. AC PAVEMENT
W/NEW 50mm THK AC
TO REMAIN
EXISTING AC PAVEMENT
NOT TO SCALE
REPLACE EXISTING 50mmTHK. AC PAVEMENT
W/NEW 50mm THK AC
PRIME COAT
100% LABORATORY MAX. DENSITY
COMPACTED TO AT LEAST
1B
BASE COURSE NOT EXPOSED
MILLING & OVERLAY
1C
BASE COURSE EXPOSED
MILLING & OVERLAY
1A
NEW A/C PAVEMENT
C
2% SLOPE
VARIES
2% SLOPE
PRIME COAT
100% LABORATORY MAX. DENSITY
COMPACTED TO AT LEAST
50mmTHK. AC PAVEMENT
TACK COAT
BASE COURSE
100% LABORATORY MAX. DENSITY
COMPACTED TO AT LEAST
SUBBASE COURSE
1D
(NEW TO EXIST)
AC PAVEMENT JOINT
95% LABORATORY MAX. DENSITY
COMPACTED TO AT LEAST
EXISTING SUBGRADE
1 TYPICAL AC PAVEMENT SECTION
SCALE: NONE
GRANITE CURB
GRANITE CURB
CONCRETE 25-18-8
SUBGRADE
R
P
C P
A V
E M
E N
T
S E
C T
IO
N
SIDEWALK
TRANSVERSE CONTRACTION JOINTS
SIDEWALK SLAB THICKNESS,BUT NOT
LESS THAN THE MAXIMUM NOMINAL
BLANKET
SOLID SOD
50 THK MIN
TOP SOIL
100 THK MIN
COMPACTED SUBGRADE
SCARIFIED AND
SCALE: NONE
CARPET SODDING
CIVIL
C-10
MISC. DETAILS
PITCH OF
CROSS BAR
BEARING BAR
PIT
CH O
F
BEARIN
G B
AR
10 SQ CROSS BAR
TWISTED
TYP
NOTES:
1. STEEL GRATINGS FOR CONCRETE DITCHES SHALL
COMPLY WITH SPECS. MINIMUM TRAFFIC LOAD FOR
STEEL GRATINGS ON CONCRETE DITCHES SHALL BE
FOR 20-TON DESIGN TRUCK LOAD:
WHEEL LOAD = 79 KN(8.0 TONS).
5A
STEEL GRATINGS
STEEL GRATING SCHEDULE
H
B
C
D
150 L70x70x6
ANGLE BARTRENCH WIDTH
H
GRATIN
G LE
NGTH
GRATING WIDTH
H
B
C
- SCALE: NONE
2. DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE NOTED.
5 STEEL GRATINGS COVER
700 X 700
CAMP CASEY
REPAIR DETERIORATED PAVEMENT
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
SCALE: NONE
1 HANDRAIL ELEVATION
SCALE: NONE
HANDRAIL SECTION2
25x25x1.6Tx1300 GALV STL TUBE (4EA) 40x85x1040 RAIL (4EA) POST CAP
120x120x1200 COLUMN
BOTTOM MOLDING
WELDING
M8x40 STS. B/N(8EA)
75x75 STEEL COLUMN
SCALE: NONE
HANDRAIL DETAIL
M4x40 STS. SCREW M8x40 STS. B/N 40x85x1300 Rail
120x120x1200 COLUMN 75x75 STEEL COLUMN
CONNECTION DEVICE #2(8EA)
CONNECTION DEVICE #1(8EA)
CONNECTION DEVICE #1
CONNECTION DEVICE #3
CONNECTION DEVICE #2
SCALE: NONE
CONNECTION DETAIL
HANDRAIL
38MM DIA STS PIPE
CIVIL
C-11
SYNTHETIC WOOD HANDRAIL
CAMP CASEY
REPAIR DETERIORATED PAVEMENT
1,50 m11,59 m
13,09 m
,2 m
,4 m
,1 m
,7 m
11,59 m
13,09 m
1,50 m m ,4 m
,1 m
,0 m ,7 m ,2
3,66 m 3,05m 4,88 m 6,10 m
17,69 m
3,66 m 3,05m 4,88 m 2,94 m
15,86 m
1,33m
V A
R
0,80
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
CIVIL
+58.80
UP
~sidewalk
1.5x9EA - HIGHLAND STEP
UP
1.5LMx2EA - GRANITE STONE
RECON WALL BLOCK
+60.10
CF/E F/M F/M X
FHCE F/M F/M F/M F/M F/M F/M F/M F/M
F/M F/M F/MFHCE
F/M F/M F/MFHCE
F/M
FHCE F/M
F/M
F/M
X
F/M F/M F/M
F/M X
F/M F/M
X
X
F/M F/M F/M
F/M F/M
F/M F/M F/M F/M
F/M F/M
F/M F/M
F/M
F/E
F/E
F/M F/M F/M F/M F/M F/M F/M F/M F/M
FHCE
FHCE
FHCE
FHCE
+58.80
+60.10
+58.80
TURNING POINT
+60.55
LAMP
RECON WALL BLOCK
THK300MM-CONCRETE FOUNDATION
12.6LMx2EA -KERBSTONE (200x300)
KERBSTONE
CF/E F/M F/M
FHCE F/M F/M F/M F/M F/M F/M F/M F/M
F/M F/M F/MFHCE
F/M F/M F/MFHCE
F/M
FHCE F/M
F/M
F/M
X
F/M F/M F/M
F/M X
X
X
X
F/M
F/M
F/M FHCE
F/M
FHCE
FHCE
FHCE
FHCE F/E
F/M F/M F/M F/M F/M F/M
FHCE
FHCE
FHCE
FHCE
+58.80 +58.80
+60.10
TURNING POINT
+60.55
LAMP
KERBSTONE
RECON WALL BLOCK
THK300MM-CONCRETE FOUNDATION
KERBSTONE (200x300)MIXTURE GRAVEL, 40mm
ASCON (#78), T=50mm
TACK COATING (RSC-4) 40/a
CON'C, THK200mm
RECON WALL
EXISTING CON'C WALL
SD300 �150 x L700mm
ASCON (#78), T=50mm +1.30
0.00
CONCRETE
MORTAR
HIGHLAND BLOCK
CAP BLOCK
� STEP
FHC
GL
CONCRETE(300x1200)
BACKFILL FILTER
NON WOVEN FABRIC)2T/300g)
FHC
FHC
SCALE: NONE
CROSS SECTION (L)
SCALE: NONE
CROSS SECTION (R)
SCALE: NONE
CROSS SECTION (R)
RAMP SECTION
SCALE: NONE
CONNECT JOIN
SCALE: NONE
HIGHLAND STEP
SCALE: NONE
RECON WALL DETAIL
C-12
SCALE: NONE
SCALE: NONE
RAMP DETAILS
RAMP DETAILS
OR APPROVED EQUAL.
www.inoblock.co.kr (010-3767-5900)
INOBLOCK CO., LTD.
THE INFORMATION OF MATERIAL IS BELOW
* NOTE:
CAMP CASEY
REPAIR DETERIORATED PAVEMENT
3300 (300x11ea)
292 2993 158150
Grid 60 kN H=0.15, L=2.75m
CON'C(THK200x700)
THK30 LEVELING MORTER
BACKFILL FILTER
PERFORATED PIPE(D=100mm)
NON WOVEN FABRIC(2t/300g)
GL : 65.00
GL : 66.69
R E T
A
IN
IN
G W
A L L
Grid 60 kN H=0.60, L=2.75m
Grid 60 kN H=1.05, L=2.75m
Grid 60 kN H=1.50, L=2.75m
HIGHLLAND STONE BLOCK
HIGHLLAND CAP
HIGHLAND BLOCK
CAP BLOCK
� STEP
CONCRETE
MORTAR
+65.00
1 2 3 4 5 6 7 8 9 1
MIXED AGGREGATE
CONCRETE
PE FILM
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
CIVIL
SCALE: NONE
SCALE: NONE
SCALE: NONE
HIGHLAND STONE BLOCK
STEP DETAIL
C-13
HIGHLAND STONE DETAILS
HIGHLAND STONE DETAILS
OR APPROVED EQUAL.
www.inoblock.co.kr (010-3767-5900)
INOBLOCK CO., LTD.
THE INFORMATION OF MATERIAL IS BELOW
* NOTE:
CAMP CASEY
REPAIR DETERIORATED PAVEMENT
FILL OR CUT SLOPE
LAP IN TRAFFICC POST BOLT HOLEL
DIRECTION
FLARED
TYPICAL ELEVATION
1A
SPACER BLOCK
TYPICAL SECTION
1C
LAP
PLAN
RAIL ELEMENT SECTION
SAME AS
1D
ELEVATION
FLARED END
†" x 2" BOLT, RAIL BOLT
W6 x 85 x 5' - 9" MIN.
METAL POST
ONE REQUIRED
NUT & WASHER
0 °
L
L
12 GAGE
C SYMMETRICAL
ABOUT C
RAIL ELEMENT SECTION
METAL POST WITHOUT SPACER BLOCK
1E
1B
3000 3000 3000
IN
METAL POST
WITHOUT
IN
3MM SHEET
106 106
DELINEATOR
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
VEHICLE GUARD RAIL
SCALE: NONE
CIVIL
VEHICLE GUARD RAIL
C-14
CAMP CASEY
REPAIR DETERIORATED PAVEMENT
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
CONCRETE BASE
TRUSS ROD BAND
FENCE POST
TRUSS ROD
(10 0 MIN) FENCE POST
BRACE RAIL
BAND
10 TRUSS ROD
FLEXIBLE
COPPER
BRAID
NOT TO SCALE
2.10 H CHAIN LINK FABRIC FENCE AND GATE
#8 AWG SOLID
COPPER WIRE
COPPER CLAD STEEL
GROUND ROD
19 0x3050 LENGTH/
10 0 STD
TRUSS ROD
CONNECTOR
3 STRANDS
4 POINTS
STRETCHER
BAR
9 GAGE WIRE
FABRIC 50 MESH
STRETCHER
BAR BAND
STANDARD
TRUSS ROD
BAND
13x50x363 STRAP BENT
AS SHOWN
FABRIC
TIE WIRES
TIE WIRE
(375 OC MAX AND
WITHIN 100 FROM
TOP AND BOTTOM
OF FABRIC)
FENCE
POST
FABRIC
9-GAGE TIE WIRES
(600 OC MAX)
FABRIC
TOP & BOTTOM
KNUCKLED
P L A N 5A
ELEVATION
5B
NOT TO SCALE
LINE POST ATTACHMENTS
NOT TO SCALE
WIRE TIES FOR
TOP OR BRACE RAIL
HANDLE
GATE FRAME HANDLE 25x100
STEEL BAR
/32 0 HOLE
(2 EA)
32 0 HOLE
PLUNGER-25x500 MIN
STEEL BAR
M I
N
P L A N 4A
ELEVATION
4B
NOT TO SCALE
PLUNGER BAR
GATE FRAME
(TYP)
013x85 BOLT
W/NUT
7 0 REMOVABLE
PIN (TO LOCK IN
UP POSITION)
CORNER POST
7A
GATE
7B
NOT TO SCALE
GROUNDING DETAILS
NOT TO SCALE
GATE FRAME
NOT TO SCALE
TRUSS ROD & BAND
NOT TO SCALE
CLAMP FOR BRACE RAIL
FABRIC
FENCE POST
TENSION BAND
(375 OC MAX AND
WITHIN 100 FROM
TOP AND BOTTOM
OF FABRIC)
NOT TO SCALE
STRETCHER BAR BAND
6x20
STRETCHER BAR
TO ENGAGE EACH
FABRIC LINK
NOT TO SCALE
LINE POST DETAIL
100 GATE POST
50 PIPE
GATE FRAME
25 PL 100 0
GATE POST
13x25x138 STRAP
13x38 STRAP BENT
AS SHOWN-2EA-LEGEND
VARIES
13 0 HOLE FOR PADLOCK
(EACH SIDE)
LATCH MOVEMENT
DIRECTION
GATE FRAME
(TYP)
GATE FRAME
(TYP)
2 WASHER
(TYP)
LATCH
PEEN END (TYP)
DRILL 14 FOR
013 BOLT
P L A N 2A
ELEVATION
2B
NOT TO SCALE
POST HINGE
P L A N 3A
ELEVATION
3B
NOT TO SCALE
GATE LATCH
013x100 BOLT WITH
NUT & 6 WASHERS
013x88 BOLT WITH
NUT & 3 WASHERS
13x88x50 PLATE
NOTCHED EACH SIDE
013 BOLT USS THREAD
100 LONG, HEX HEAD
W/NUT
R16
FENCE
FABRIC
NOTES :
1. ALL FABRIC SHALL BE #9 GAGE GALVANIZED STEEL
WOVEN IN A 50 MESH.
2. ALL DIMENSIONS SHOWN HEREON ARE IN MILLIMETERS.
3. FENCE GROUNDING
a. ALL FENCES SHALL BE GROUNDED AT EACH TERMINATION, EACH CORNER (EXCEEDING 60^), EACH SIDE OF EACH
GATE, AND AT 300 METER INTERVALS.
b. FENCE CROSSED BY PRIMARY POWER LINES IN EXCESS OF
600 VOLTS SHALL BE GROUNDED AT A POINT DIRECTLY
BELOW THE CROSSING AND 45 METER ON EACH SIDE
OF CROSSING.
c. FENCES PARALLEL TO OR WITHIN 30 METER OF A PRIMARY
POWER LINE IN EXCESS OF 600 VOLTS SHALL BE GROUNDED
EVERY 150 METER.
4. ALL CHAIN-LINK FENCING MATERIALS SUCH AS FABRIC,
POSTS, RAILS, ETC. SHALL BE GALVANIZED FINISHED,
UNLESS OTHERWISE NOTED.
BOLTED
SOLDERLESS
CLAMP
FUSION WELDING
GATE
CHAIN LINK FENCE
600 DIA-(1)CONCERTINA
BARBED TYPE WIRE
G.L
100 100
D13 @200 O.C
NOT TO SCALE
SECURITY CURB
ELEVATION
SECTION
SCALE: NONE
CHAIN LINK
FABRIC
(SEE NOTE 1)
GATE DOUBLE SWING
WIRE
TIES
SEE DETAIL
STRETCHER
BAR
TRUSS
ROD
PLUNGER
BAR
GATE
LATCH
WIRE
TIES
STRETCHER
BAR
TRUSS ROD
10 0 MIN
TRUSS ROD
10 0 MIN
50 LINE POST
(TYP)
40 0
BRACE
100 0
GATE POST
50 0 PIPE
(GATE FRAME)
60 0
CORNER
POST
POST
HINGE
FABRIC TOP SELVAGE TO
BE TWISTED AND BARBED
40 0 TOP RAIL-
EXPANSION COUPLING
@ 6000 OC MAX
TRUSS ROD
10 0 MIN
40 0 TOP RAIL-EXPANSION COUPLING
@ 6000 OC. MAX
6 5
100 0 GATE POST/
GROUNDING
BAND
WIRE TIES
BAND
LINE POST
FIN GR
BOT RAIL
MULTIPLES OF 3000SEE PLAN3000
30003000
BARBED TYPE WIRE
600 DIA-(1)CONCERTINA
21 MPa
CONCRETE D13 @ 300mm OC EW
CIVIL
SCOPE OF WORK
SITE LAYOUT PLAN AND
C-15
CAMP CASEY
REPAIR DETERIORATED PAVEMENT
| T-1 |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 7 |
| 8 |
| 9 |
| 10 |
| 11 |
| 12 |
| 13 |
| 14 |
| 15 |
File details come from the government source that posted it. Updated .