312706-CIVIL_DWG.pdf
PDF 1 MB Posted
- Attached to
- Repair Military Railroad Camp Casey (MATOC ONLY)
- Solicitation number
- W90VN824R0057
About this file
This document contains civil engineering drawings and details for the "Repair Military Railroad Track at Camp Casey" project. The key details are:
The project scope includes repairing existing rail track by leveling and lining the track, driving in loose spikes, replacing switch ties, replacing ballast stone, realigning guard rails, and adding temporary ballast along the entire track. The solicitation number is W90VN824R0057 and it is open to Area I & II MATOC contractors. The project is being managed by the Department of the Army Materiel Command, Army Contracting Command. The drawings provide site layout plans, a typical ballasted track section, and detailed switch point plans and material schedules. No additional preamble or introduction is provided.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 T - 1 1 OF 1 TITLE SHEET
CIVIL
T-1
TITLE SHEET
A
B C D
E F G H
SCHEDULE OF DRAWINGS
RING NO. RING NO.DWG. NO. DWG. NO.SHT. NO. SHT. NO.DESCRIPTION OF DRAWINGS DESCRIPTION OF DRAWINGSREF. NO. REF. NO.REVISION STATUS REVISION STATUS
SYMBOL BY
DESIGNED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENERGY MANAGER
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
ENVIRONMENT
FORCE PROTECTION
CHOE, S M.
LOCATION MAP AND GENERAL NOTES
CAMP CASEY
CAMP CASEY
FEWR NO. 312706
SITE LAYOUT PLAN, SPECIFIC NOTE AND SCOPE OF WORK
REPAIR MILITARY RAIL ROAD TRACK
REPAIR MILITARY RAIL ROAD TRACK
312706
TYPICAL SECTION (BALLASTED TRACK)
SWITCH POINT PLAN, MATERIAL SCHEDULE AND DETAILSC - 4
C - 3
C - 2
C - 1
- 1
100 0 100 200 300M
SCALE IN METERS
SCALE = 1 : 3,000
THIS PROJECT
N
CAMP CASEY
CIVIL
AS SHOWN
C-1
LOCATION PLAN
CHOE, S M.
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
00-49341
3-48PN
00-49341
4-200PN
00-49341
4-200PN
01-49550
00-49341
LAUNDRY
KSC
PEST
647667
UTIL
B&G
WH-1
WH-2
DPW HQ
A
B
629 685
651A
833T
808 811
746 715 726
A B
00-49341
A
B
11491151
10291144
A
B
A
B
A
B
A
B
2372A
2373T
A C
2451 2400
A
B
A
B
2648 2605
2609T
2514 2540
8008T
2540T
1991 1963
FOOT BR
VEH BR
FOOT BR
VEH BR
VEH BR
VEH BR
VEH BR
1158A
1158B
RAILHEAD
F
2372?
QA00894-0J
QA00893-0J
QA00892-0J
ADMIN
EXER W/LAT
EXER W/LAT
QA00138-9J
QA01300-8J
00-54129 BUP 011109
00-54157 BUP AFTER 2026
00-54156 BUP 031030
00-54130 BUP 020330
00-54131 BUP 020929
00-54155 BUP 030506
03-57200 REPAIR 041007
01-QA00604 BUP
01-55893 BUP
99-QA00603 BUP
XX-QA00602 BUP 0310XX
99-47353
4-200PN
96-43269
4-184PN
97-44592
4-200PN
XX-QA00287 BUP
99-51820
3-48PN
97-44592
4-200PN
99-51682
4-200PN
99-51682
4-200PN
01-55882 BUP
A
B
A B
2022(?)
VEH BR
BARRIER
1564 1566
635A
2002B
706(707A)
(2298)
1071?
BARRIER
BARRIER
1919LIFT STATION
M
ECH ROOM
HH
HH
HH
HH
HH
HH
HH
HH
HH
HH
HH
HH
HH
HH
HH
HH
HH
HH
HH
HH
HH
HH
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
W
W
W
W
W
W
W
W
W
W
W
LOCATION PLAN AND GENERAL NOTES
REPAIR MILITARY RAIL ROAD TRACK
312706
GENERAL NOTES :
SUBMISSION OF CONTRACT PROPOSAL.
DIMENSIONS AT THE PROJECT SITE ORIENTATION PRIOR TO
1. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND
PRIOR TO COMMENCING WORK ON THE PROJECT.
INDICATED BY THE COR AND SHALL BE APPROVED BY THE COR
UNDETAILED PORTION OF THE JOB INCLUDING OTHER AREAS
2. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR ANY
EXPENSE TO THE SATISFACTION OF THE CONTRACTING OFFICER.
DISMANTLING, DEMOLISHING, OR REMOVING AT THE CONTRACTOR'S
TO THEIR ORIGINAL CONDITIONS OF THE ITEMS DAMAGED BY
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR/RESTORATION
ITEMS WHICH WILL INTERFERE WITH THE REPLACEION OPERATIONS.
UNDER GROUND ROCK BASE, EXISTING UTILITY LINES, AND OTHER
CLEARED/REROUTED OF ALL NATURAL OBSTRUCTIONS, SUCH AS
5. THE SITE INDICATED ON THE DRAWINGS SHALL BE GRADED AND
COVERED WITH TOP SOIL AND SOLID SODDED.
4. ALL UNPAVED AREAS WITHIN THE GRADING LIMIT LINES SHALL BE
REPRESENTATIVE.
A CLEAN CONDITION ACCEPTABLE TO THE OWNER OR OWNER'S
MATERIALS, EQUIPMENT AND DEBRIS AND LEAVE THE PREMISES IN
ALL TIMES AND AT COMPLETION OF WORK, REMOVE ALL SURPLUS
8. THE CONTRACTOR SHALL KEEP THE CONSTRUCTION AREA CLEAN AT
ADDITIONAL COST.
EXISTING SITE CONDITIONS PRIOR TO START OF WORK AT NO
CHECK THE OTHER CONSTRUCTION REQUIREMENTS IN MEETING THE
FOR GOOD SURFACE RUN-OFF DISCHARGE CONDITIONS AND ALSO
7. THE CONTRACTOR SHALL PERFORM TOPOGRAPHIC SURVEY TO VERIFY
TO THE PROJECT CONTRACT.
TO ACCOMPLISH THE CIVIL SCOPE OF WORK AT NO ADDITIONAL COST
FORM ARE A PART OF THIS PROJECT. THE DETAILS WILL BE UTILIZED
OF THE CONSTRUCTION MANAGEMENT COMMAND"
DRAWINGS, FOR OM&A PROJECTS, KOREA, OCTOBER 2015, DEPARTMENT
6. THE CIVIL STANDARD DRAWINGS SHOWN IN THE "STANDARD DETAIL
SCALE 1:1,000
(IN METERS)
GRAPHIC SCALE
20100
1:1,000
CIVIL
C-2
AS SHOWN
CHOE, S M. CAMP CASEY
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
AND SCOPE OF WORK
SITE LAYOUT PLAN, SPECIFIC NOTE
SCOPE OF WORK
SCHEDULE #1 (REPAIR/MAINTENANCE)
312706
SITE LAYOUT PLAN 1
- 2
TR
.6
M W C
O N
C O
P E
N D
IT
C H
SP
A.C.
A.C.
A.C.
A.C.
SP
SP
.6
M W C
O N
C O
P E
N D
IT
C H
.6
M W C
O N
C O
P E
N D
IT
C H
OPEN CONC DITCH
O P
E N C
O N
C D
IT
C H
A /G
O
IL
T
A N
K
A /G
O
IL
T
A N
K
A /G
O
IL
T
A N
K
A/GOIL TANK
C O
V E
R E
D C
O N
C D
IT
C H
COVERED CONC DITCH
0.4M W CONC DITCH W/STEEL GRATINGS
PIV
A/G
OIL TANK
SPSP
SP
C O
V E R E D C
O N C D
ITC
H
A.C.
COVERED CONC DITCH
C O
V E
R E
D C
O N
C D
IT
C H
SP
C O
V E
R E
D C
O N
C D
IT
C H
.6
M W O
P E
N C
O N
C D
IT
C H
.6
M W O
P E
N C
O N
C D
IT
C H
0.3M W CONC DITCH W/STEEL GRATINGS
A /G
O
IL
T
A N
K
C O
V E
R E
D C
O N
C D
IT
C H
PIV
A.C.
A .C
A .C
PIV
A .C
A .C
A .C
A .C
A .C
A .C
A/GOIL TANK
2.350M W OPEN CONC DITCH
A/G
OIL TANK
A.C.
A.C.
J
J
A/G
OIL TANK
A/G
OIL TANK
TOP 19.182
GMH
SV
S-1523
S-1557
S-1546
S-599
S-600
GATE #3 CAMP CASEY
P101
P102
- SWITCH #1
- SWITCH #2
(SONG, U MIN, 010-9140-9576) FOR TRAIN SCHEDULE.
6. THE CONTRACTOR SHALL COORDINATE WITH 662d MCT, 25th TRANS BN
CONSTRUCTION PLAN.
5. THE CONTRACTOR SHALL SURVEY BEFORE CONSTRUCTION AND SUBMIT
AFTER FINAL CONSTRUCTION.
4. THE CONTRACTOR SHALL GET INSPECTION BY KORAIL AND PASS THE RESULT
BY CONTRACTING OFFICER AND KORAIL OFFICER BEFORE CONSTRUCTION.
3. THE LOCATION OF REPAIR AND REPLACING SITE ITEMS SHALL BE CONFIRMED
ARE ESTIMATED FOR BIDDING PROPOSED ONLY.
2. SIZE AND QUANTITIES AS SHOWN ON THE REMOVAL SCHEDULE
1. FOR DESIGN STANDARD OF RAIL TRACK, SEE SHEET NO. C-3.
N
ALL MISSING/LOOSE BOLTS ON EXST TRACK.
2. DRIVE ALL LOOSE SPIKES AND REPAIR/TIGHTEN
CONSTRUCTION LIMIT LINE
1. REPAIR ALL EXST RAIL TRACK LEVELING AND LINING.
3. REPLACE SWITCH TIE INCLUDING NECESSARY ACCESSORIES IN SWITCH #1.
4. REPLACE BALLAST STONE ALONG 10.0 LM TRACK NEAR BLDG#1523 CROSSING.
5. REALIGN GUARD RAIL TO KEEP SPACE 39~45MM IN SWITCH #2.
6. ADD AND TEMP BALLAST STONE ALONG ALL TRACK IN CP CASEY.
REPAIR MILITARY RAIL ROAD TRACK
ALL MISSING/LOOSE BOLTS ON EXST TRACK.
DRIVE ALL LOOSE SPIKES AND REPAIR/TIGHTEN
APPROX. 1,155.0 LM
REPAIR ALL EXST RAIL TRACK LEVELING AND LINING,
REPLACE SWITCH TIE INCLUDING NECESSARY ACCESSORIES, 45 EA.
REPLACE BALLAST STONE(Φ22.4~63MM) ALONG 10.0 LM TRACK, APPROX. 8.0 CM
REALIGN GUARD RAIL TO KEEP SPACE 39~45MM.
APPROX. 55.0 CM
ADD AND TEMP BALLAST STONE(Φ22.4~63MM) ALONG ALL TRACK IN CP CASEY,
TYPICAL SECTION (BALLASTED TRACK)
SCALE
P.C.T
1:
1.
(E
XI
ST)
EXIST 50KG N RAIL (TO REMAIN)
LC
R.L
G.L
1:1.6(EXIST)
3.0%
EXIST FNSH GROUND
NOTES;
4. DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE NOTED.
AND KORAIL OFFICER.
THE CONTRACTOR SHALL COORDINATE REPAIR WORK WITH CONTRACTING OFFICER
3. THE MAIN PURPOSE OF THIS TYPICAL SECTION IS TO PROVIDE REFERENCE OF SECTION.
AND 4% OF BALLAST SPREAD.
2. EXTRA BALLAST SHALL INCLUDE 30% OF BALLAST SPREAD AND TAMPING,
1. EXISTING FNSH FL EL THRU TOP OF RAIL FOR BALLAST TRACK SHALL BE 610MM.
1:10
EXIST GRAVEL BED
PRESTRESSED CONCRETE TIE
(IN MILLIMETERS)
GRAPHIC SCALE
0 100 200 400
1:10
CIVIL
AS SHOWN
CHOE, S M. CAMP CASEY
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
TYPICAL SECTION (BALLASTED TRACK)
450450814
C-3
REPAIR MILITARY RAIL ROAD TRACK
312706
5,700
2x2,500 2x2,500
12x2,800 6x3,100
5x3,400
7x3,700 6x4,000
2x4,300
5x4,600 N = 145
N = 193
N = 145 R = 152,977
6,235
20,000
15,332
15,389
20,000
2x4,300
Φ24
5,700
5,700
20,000
20,000
15,324
15,380
6,237
6,178
Φ28 Φ24
Φ24
Φ28
5,700
L=20,000
L=15,324
L=15,380
CL
CL
L=6,178
L=6,237
Φ28
SCREW SPIKE
150x240x2,500
150x240x2,800
150x240x3,100
150x240x3,400
150x240x3,700
150x240x4,000
150x240x4,300
150x240x4,600
16 5
7 8 9 10
17155
0mm
9mm
6mm
O
I
I
O
O
O
O
I
CIVIL
AS SHOWN
CHOE, S M. CAMP CASEY
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
SWITCH POINT PLAN
SCALE: 1 / 50
POIN
T E
ND
15,389 (CURVE LEAD RAIL, L=15,380)
GUARD R
AIL
DETAIL
DETAIL
SLAG AND RAIL LAYOUT
SCALE: NONE
SCALE: NONE
STANDARD RAIL HOLE POINT
SCALE: NONE
LEAD RAIL HOLE POINT
SKELETON
DETAIL
GUARD R
AIL
LEGEND
INSULATION JOINT GAP
STANDARD JOINT GAP
NO GAP OF JOINT
POINT SIDE CROSSING SIDE
MATERIAL SCHEDULE
COMMON TIE
SWITCH TIE
SWITCH TIE
SWITCH TIE
SWITCH TIE
SWITCH TIE
SWITCH TIE
SWITCH TIE
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
NO DESCRIPTION SIZE QTY REMARK
SCHEDULE AND DETAILS
SWITCH POINT PLAN, MATERIAL
REPLACE
REPLACE
REPLACE
REPLACE
REPLACE
REPLACE
REPLACE
REPLACE
REPLACE
REPLACE
x
,2 x ,1 x ,2 x
,9 x ,3
,6
,4
,5
,0
,1
,1
,4
,8
,4
,0
,3
7 1 ,4
,4
,4
,4
,4
,4
,4
,1
,1
,0
,4
5,051
2,000 3,940
490540x5=2,700490100
270270
2,682
600x5=3,000
2,704
14,040
300300
REPLACE
REMAIN
C-4
REPAIR MILITARY RAIL ROAD TRACK
312706
700EA REPLACERAIL PAD
e2007
WT, 4300
COIL SPRING CLIP
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
File details come from the government source that posted it. Updated .