316760-ARCH_DWG.pdf

PDF 2 MB Posted

Attached to
Repair Multi-Purpose Center and Paint Exterior S-3015, Camp Casey (MATOC ONLY)
Solicitation number
W90VN824R0054
Issued by

About this file

This document appears to be a set of architectural drawings and specifications related to a federal contract opportunity for the repair of Building S-3015, a multi-purpose center located at Camp Casey, South Korea.

The key details are: The project scope includes replacement of the existing basketball court surface with artificial turf and rubber flooring, removal of existing bleachers and basketball equipment, and related architectural work. The contract opportunity is solicitation W90VN824R0054 issued by the Department of the Army Materiel Command, Army Contracting Command, and is only available to Area I&II MATOC contractors. The drawings provide details on the required flooring materials, layout, and demolition work.

View the file

Other files

File Type Posted
ELEC_316760_DWG.pdf PDF
Solicitation.pdf PDF
261817-ARCH_DWG.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C-1

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

LAUNDRY

KSC

PEST

647667

WH-1

WH-2

DPW HQ

A

B

651A

851 860

833T

808 811

715 726

A B

A

B

778 794

1149 1151

A

B

A

B

A

B

A

B

2372A

2373T

A

C

A

B

A

B

2609T

2514 2540

8008T

2540T

1991 1963

A B

497486

456A

463Z

549 546

8114T

1752 1758

560G

A

B

86M

48T

A

B

39 55

134 133

202A

258252

1785 235

FOOT BR

VEH BR

FOOT BR

VEH BR

VEH BR

VEH BR

VEH BR

VEH BR

VEH BR

VEH BR

VEH BR

VEH BR

FOOT BR

VEH BR

VEH BR

FOOT BR

FOOT BR

VEH BR

VEH BR

VEH BR

FOOT BR

FOOT BR

VEH BR

VEH BR

VEH BR

VEH BR

FOOT BR

1158A

1158B

447A

F

F

497A

497B

458Z

A

B

A B

VEH BR

VEH BR

472?

455?

BARRIER

635A

2002B

A B

48A

A

B

A B

A

B

A

B

A

B

A

B

B A

S K

E T

B A

L L

C O

U R

T

706(707A)

(2298)

1071?

A B

1760?

VEH BR?

VEH BR?

BARRIER

FLAG

FO

O

TBALL

FIELD

(SYN

TH

ETIC

TU

R F

AR

EA)

1919LIFT STATION

VEH BR

BARRIER

B

UTILITY

BLDG

65-A

12 CM

ST

STREAM

S T

S T

P V C

227.5

J-4

ST

CM

.5

.9

W A

L L

W A

L L

W A

L L

WALL

W A

L L

WALL

228.4

ST

GAL275

.8

.5

S T

R C

6 PVC

ST

T

C M

S T

268.6

STREAM

DISCHARGE TO

65-A

12 CM

ST

STREAM

GRAVES

GRAVES

O.S.

O.S.

PARKING

TT

GATE 2

GATE 1

#2299

FIRE STATION

: BUILDING LOCATION

SCALE: N/A

LOCATION MAP, CP CASEY

S e a r c h r e a

S e a r c h e a

G u a d

H o u s e

ARCHITECTURAL

PED BR

LOCATION MAP

BLDG S-3015

REPAIR MULTI PURPOSE CENTER,

CAMP CASEYYI, SC

316760

USAG YONGSAN-CASEY, KOREA

BLDG S-3015

REPAIR MULTI PURPOSE CENTER,

PROJECT NO. 316760,

THIS PROJECT

MANUFACTURES INDICATED.

PURPOSES ONLY. AND NOT INTENDED TO LIMIT SELECTIONS TO PRODUCTS OF THE

COLORS AND PATTERNS LISTED BY MANUFACTURES ARE FOR BIDDING IDENTIFICATION 1.

ADJACENT AREAS AS DIRECTED BY THE CONTRACTING OFFICER REPRESENTATIVE (COR).

CAUSED BY THIS PROJECT AND SHALL REPAIR THE DAMAGES TO MATCH UP TO

CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES MADE TO EXISTING AREAS

FOR APPROVAL.

CONTRACTOR ACCORDING TO ACTUAL FIELD CONDITION AND SUBMITED TO COR

CONDITION. IN THAT CASE, SHOP DRAWINGS SHALL BE PREPARED AT THE SITE BY THE

SOME DETAILS SHOWN ON CONTRACT DRAWINGS MAY NOT COINCIDE WITH THE FIELD

8.

FOR APPROVAL.

CONTRACTOR SHALL SUBMIT MANUFACTURER'S INSTALLATION SHOP DRAWINGS TO COR

2.

3.

4.

5.

6.

7.

CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER

IF THERE ARE ANY CONFLICTS WITHIN THE CONTRACT DOCUMENT. THE GENERAL

AND DIMENSIONS PRIOR TO COMMENCING ANY CONSTRUCTION OR RENOVATION.

THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING CONDITION

BE AS A PART OF THE CONTRACT DOCUMENT OF THIS PROJECT.

STANDARD DETAIL DRAWINGS FOR O&MA PROJECT, KOREA, DATED OCTOBER 1, 2003 SHALL

GENERAL NOTES

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

ARCHITECTURAL

A-1

1/200

SCALE:

W

D

D

W

W

FEC

FEC

FEC

UP

STORAGE OFFICE, DPW. PER DIRECTION FROM THE INSPECTOR IN CHARGE OR COR

SALVAGE OR SERVICEABLE MATERIALS SHALL BE RETURNED TO USING AGENCY, SUPPLY OR

BASKETBALL COURT

THIS PROJECT

GROUND FLOOR PLAN @ BLDG S-3015

REPAIR / MAINTENANCE (K) WORK

SCOPE OF WORK (ARCHITECTURAL WORK)

FINISH SCHEDULE.

REPLACE ARTIFICIAL TURF ON EXST WOODEN FLOORING AS SHOWN ON FLOOR PLAN & INTERIOR 1.

FINISH SCHEDULE.

REPLACE RUBBER FLOORING ON EXST WOODEN FLOORING AS SHOWN ON FLOOR PLAN & INTERIOR 2.

3.

4. REMOVE EXST BLEACHERS AS SHWON ON FLOOR PLAN.

AND SCOPE OF WORKS

GROUND FLOOR PLAN, GENERAL NOTES

REMOVE EXST BASKETBALL STANDS AS SHWON ON FLOOR PLAN.

BLDG S-3015

REPAIR MULTI PURPOSE CENTER,

CAMP CASEYYI, SC

316760

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

ARCHITECTURAL

A-2

1/100

SCALE:

5,00030,4053,000

38,405

,0

,2

,0

,2

(TYP)

REMOVE EXST BLEACHERS

ARTIFICIAL TURF ON EXST WOODEN FLOORING

RUBBER FLOORING ON EXST WOODEN FLOORING

ENLARGED FLOOR PLAN @ BASKETBALL COURT

AND FINSIH MATERIAL LIST

ENLARGED FLOOR PLAN

MOUNTED BASKETBALL STANDS (TYP)

REMOVE EXST ROOF STRUCTURE

BASKETBALL STANDS (TYP)

REMOVE EXST MOVABLE

MOUNTED BASKETBALL STANDS (TYP)

REMOVE EXST ROOF STRUCTURE

(TYP)

REMOVE EXST BLEACHERS

WWW.PERFORMBETTER.COM

WITH 5mm FORM BACKING

FIRST PLACE TURF 15' GREEN

2624-15-GREEN

1. TURF :

RUBBER FLOORING BASIC BLACK

PB EXTREME 8mm ROLL OUT

2601-BASIC BLACK

2. RUBBER FLOORING :

4 GALLON BUCKET 44 EA

E GRIP FLOORING ADHESIVE

2601-01

3. ADHESIVE :

IMAGE CUTS @ BASKETBALL COURT

MATERIALS INFORMATION

MOUNTED BASKETBALL STANDS (TYP)

REMOVE EXST ROOF STRUCTURE

BASKETBALL STANDS (TYP)

REMOVE EXST MOVABLE

BLDG S-3015

REPAIR MULTI PURPOSE CENTER,

CAMP CASEYYI, SC

316760

316760-Repair multi purpose center, bldg S-3015, Cp Casey-C1
316760-Repair multi purpose center, bldg S-3015, Cp Casey-A1
316760-Repair multi purpose center, bldg S-3015, Cp Casey-A2

File details come from the government source that posted it. Updated .