Repair infiltration & seal air leaking in barracks
Solicitation number
W90VN819R0001
Issued by

About this file

Revised Drawing

View the file

Other files

File Type Posted
Submittal_Register.pdf PDF
W90VN8-19-R-0001.pdf PDF
Drawing_files.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M-1

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

GENERAL NOTES & SCOPE OF WORK

DUCTWORK SHALL BE PATCHED OR RESTORED TO MATCH ADJACENT SURFACE OR AREAS.

ACCORDING TO SMACNA STATIC PRESSURE CALSS 500PA AND DUCTWORK SHALL MEET

7. ALL SUPPLY, RETURN AND EXHAUST AIR DUCTWORK SHALL BE CONSTRUCTED

THE REQUIREMENTS OF SEAL CLASS C.

3. CONNECT TO EXISTING SYSTEM SHALL BE DONE IN SUCH A MANNER AS NOT DAMAGE

THE EXISTING EQUIPMENT ANY EQUIPMENT, DUCT WORK, PIPING ETC. DAMAGED DUE TO

THE WORK PERFORMED UNDER THIS CONTRACT SHALL BE REPAIRED OR REPLACED BY

1. THE CONTRACTOR SHALL VISIT THE SITE AND SHALL FAMILIARIZE HIMSELF WITH

THE EXISTING CONDITIONS, EQUIPMENT, FINISHES, ETC., PRIOR TO START OF WORK.

IF ANY DISCREPANCY IS DETECTED, IT SHOULD BE BROUGHT TO THE CONTRACTING

OFFICER'S REPRESENTATIVE ATTENTION WITH RECOMMENDATIONS FOR PROPER

2. LOCATION AND SIZES OF EXISTING EQUIPMENT, DUCTWORK, PIPING, ETC. APPROXIMATE

SHOP DRAWING SHALL NOT BE THE EXACT DUPLICATION OF THE CONTRACT DRAWING.

5. NO MECHANICAL WORK CAN BE STARTED WITHOUT AN APPROVED SHOP DRAWINGS.

4. ANY PIPES THAT PENETRATE FIRE RATED WALL (EXISTING/ NEW) SHALL BE SEALED

6. ALL WALL/FLOOR/ROOF OPENINGS RESULTED FROM THE REMOVAL OF PIPING AND

CORRECTIONS FOR CONTRACTING OFFICER'S APPROVAL.

AND SHALL BE VERIFIED AT THE JOB SITE.

THIS CONTRACTOR.

PER SPEC.

GENERAL NOTES

SHALL BE PATCHED OR RESTORED TO MATCH ADJACENT SURFACE OR AREA.

8. ANY OPENING RESULT FROM THE REMOVAL WORK THAT'S NOT TO BE RE-USED

9. ALL HVAC PIPING/DUCTWORK TO BE REMOVED SHALL INCLUDE ALL IT'S ACCESSORIES

SUCH AS ANCHORS, HANGERS/SUPPORT, ETC.

10. SOME DETAILS SHOWN ON THIS CONTRACT DRAWINGS MAY NOT MATCH EXACTLY

FIELD CONDITIONS. SUCH DETAILS SHALL BE PREPARED IN THE FIELD BY THE

CONTRACTOR ACCORDING TO ACTUAL FIELD CONDITIONS AND SUBMITTED TO THE

CONTRACTING OFFICER FOR APPROVAL.

REMOVE THE EXIST DUCTWORK AND INSTALL NEW DUCTWORK AND MAKE ALL

IF THE EXIST DUCT ELEVATION IS CONFLICTED WITH NEW PIPING INSTALLATION,

COORDINATE WITH THE EXIST DUCTWORK AND PIPING ELEVATION/LOCATION.

11. PRIOR TO INSTALL NEW HVAC AND PLUMBING PIPING CONTRACTOR MUST

NECESSARY DUCT CONNECTION TO FUNCTION AS ORIGINALLY INTENDED.

13. CONCRETE REMOVAL AND RESTORATION SHALL CONFORM TO SPECIFICATION.

12.

CHANGES REQUIRED TO MAKE THIS

CONTRACTOR SHALL PROVIDE NECESSARY SHOP DRAWINGS FOR ANY

REQUIREMENT FOR GAS ONLY BURNERS MAY BE JUSTIFIABLE. THE

PACKAGE, PRIOR TO THE START OF CONSTRUCTION, THEREFORE THE

PROVIDE NATURAL GAS ACCESS TO THE BUILDING UNDER THIS DESIGN

CONCURRENT NATURAL GAS CONVERSION PROJECT PACKAGES MAY

HEATING SYSTEMS WITH DPW PRIOR TO THE START OF CONSTRUCTION.

AND OIL) BURNERS FOR HEATING HOT WATER AND DOMESTIC HOT WATER

THE CONTRACTOR SHALL COORDINATE THE USAGE OF DUAL FUEL (GAS

REQUEST SEALING ALL PIPE, ELECTRICAL

CONDUIT AND DUCTWORK PENETRATIONS

AT ALL BARRACKS

CAMP CASEYCHONG, ST

200800

SCOPE OF WORK

QUALIFICATION OF AIR LEAKAGE TESTING

1.

CONTRACTOR'S POINT - OF - CONTRACT INFORMATION.

INCLUDE BUILDING NAME, ADDRESS, AND NAME OF PRIME CONSTRUCTION CONTRACTOR AND

THAT THE AGENCY HAS TESTED WITHIN THE PAST 2 YEARS.

SUBMIT THE LIST OF AT LEAST TEN COMMERICAL/INDUSTRIAL FACILITIES WITH BUILDING ENVELOPES

TESTING COMMERICAL AND/OR INDUSTRIAL BUILDINGS.

FOR BUILDING AIR LEAKAGE TESTING, VERIFY 2 YEARS OF EXPERIENCE AS AN AGENCY IN PRESSURE

2.

3.

-. CERTIFICATE FOR THERMOGRAPHER LEVEL 1

-. CERTIFICATE FOR AIR BARRIER INSPECTION LEVEL 3

-. CERTIFICATE FOR AIR LEAKAGE TEST LEVEL 3

FOR THE ABOVE WORKS, A TESTING AGENCY SHOULD HAS THE BELOW CERIFICATE OR EQUIVALENT.

3. PROVIDE FINAL-AIR LEAKAGE TEST REPORT.

4. REFER TO "3S KOREA CO., LTD, TEL : 02-896-9474" OR APPROVED EQUAL.

REPAIR AND MAINTENANCE WORK(K-WORK)

IN THE INSTALLATION JOINING AN SEALING OF AIR BARRIER MATERIALS AND COMPONENTS.

THE AGENCY SHALL HAVE EXPERIENCE COORDINATING AND INSTRUCTING SUBCONTRACTORS INVOLVED IN JOINING AND SEALING VARIOUS COMPONENTS, AND SEALING OF PENETRATIONS OF AIR BARRIERS.

IN THE INSTALLATION OF AIR BARRIER MATERIALS AND ASSEMBLIES INCLUDING THE EXPERIENCE

FOR LEAKAGE DETECTION AND REPAIR WORK, THE AGENCY SHALL HAVE 2 YEARS EXPERIENCE

2. REPAIR INFILTRATION AND SEAL AIR LEAKING PORTIONS INCLUDING CLEARANCE BETWEEN WALL. CEILING

AND PENETRATORS (DUCT, WATER PIPE, CONDUIT PIPE, FLUE VENT PIPE AND ETC) AT MECHANICAL ROOMS.

1. PRE-AIR LEAKING TEST IS REQUIRED PRIOR TO REPAIR INFILTRATION AND SEALING AT MECHANICAL ROOMS.

5. REFER TO "SINJI E-TEC CO., LTD, TEL : 031-312-8731" OR APPROVED EQUAL.

REPAIR AIR LEAKING OF SOUND ABSORPTION WALL PANELS LEAK WITH WATER BASED POLYURETHANE FORM

ON THE SURFACE OF THE SOUND PANELS.

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

BRUSH

BRUSH

BRUSH

BRUSH

BRUSH

W A L L

TOWER

GUARD

TOWER

GUARD

GUARD T

OWER

BRUSH

BRUSH

BRUSH

BRUSH

BRUSH

GUARD

TOWER

GUARD TOWER

T E

N N

IS

C O

U R T

C O

U R T

B A S

K E T B

A L L

BRUSH

BRUSH

W A L L

W A L L

WALL

WALL

WALL

W A L L

W A L L

W A L L

WALL

WALL

GRAVES

WALL

WALL

WALL

WALL

WALL

WALL

WALLWALL

WALL

WALL

W A

L L

WALL

COURT

BASKETBALL

PLANTER

BOARD

BULLETIN

S T

O R

A G E

WALL

W A L

LW

A L L

WALL

W A L L

W A L L

W A L L

W A L

LW

A L L

W A L L

WALL

W A L L

TOWER

GUARD

BRUSH

BRUSH

BRUSH

BRUSH

BRUSH

BRUSH

BRUSH

BRUSH

CURB

CURB

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

W A L L

W A L L

W A L L

WALL

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

RACK

WASH

POST

GUARD

U G

B

N K

E R

G R

A T

E

I R

O N

TOWERGUARD

T O

W E R

G U

A R

D

T O

W E

R

G U

A R

D

S H E

D

.8

.5

S T

R C

BRUSH

BRUSH

BRUSH

BRUSH

BRUSH

T O

W E R

G U

A R

D

GUARD TOWER

GUAGD TOWER

WALL

WALL

WALL

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

B O

A R

D

B U L L E T

IN

ANTENNA

ELEV. 284.51

1,089,536.89 E 13,773,621.39 N

CC-4

ELEV. 284.51

1,089,536.89 E 13,773,621.39 N

CC-4

E X

C H

A N

G E

S N

A C

K

R

T O

W E

R

G U

A R

D

S H

E D

P L

A N T E R S

PLANTERS WALL

W A L L

W A L L

W A

L L

W A

L L

W A

L L

WALL

WALL

WALL

PLANTER

HOUSEGUARD

W A

L L

LI

FT

STATI

ON

BRUSH

T O

W E

R

G U

A R

D

W A

L L

W A L L

W A L L

W A L L

W A L L

WALL

WALL

WALL

T O

W E R

B E L L

TOWER

GUARD

U/C

B R U S H

SHED

B R U S H

B R U S H

B R U S H

SHED

GUARD

TOWER

TOWER

GUARD

G U

A R

D

H O

U S E

WALL

W A

L L

W A

L L

W A

L L

B R U S H

W A

L L

W A

L L

W A

L L

WALL

W

ALL

WALL

BASKETBALL

COURT

ACC

WALL

SHED

W A L L

W O

O D

E N

F O

T

R I D

G E

WALL

WALL

WALL

WALL

WALL

W A

L L

W A L L

W A L L

WALL

WALL

F O

I D

G E

W O

O D

E N 20

W A

L L

W A

L L

W A

L

LW

A L

L

WALL

W A

L L

W A

L L

W A

L L

W A

L L

WALL

PAGODA

S

IG

N

MONUMENT

M O

N U

M E

N T

GARDEN

BRIDGE

C O

U R T

T E

N N

IS

ELEV. 265.25

1,088,736.76 E 13,773,230.73 N

CC-3

R O

O M

B O

IL

E R

2 445

PARKING

BULLETIN

BOARD

W A

L L

W A

L L

W A

L L

W A

L L

6 PVC

ST

S

M

S T

W A L L

W A L L

268.6

STREAM

DISCHARGE TO

W A L L

WALL

TOWER

TOWER

GUARD

GUARD

HOUSE

GUARD

S H

E D

SHED

BOILERROOM

TOWER

GUARD

TOWER

GUARD

SHED

TOWERGUARD

LIFT

STATION

GUARDHOUSE

LIFT

STATION

S H

A C

K

G R

E A

C K

PARKING

P A

R K I N

G

P A

R K I N

G

W A L L

W A L L

W A L L

W A L L

65-A

12 CM

ST

ROOM

BOILERROOM

BOILER

STREAM

WALL

WALL

W

ALLW

ALL

WALL

WALL

WALL

WALL

FOOT

BRI

DGE

WALL

WALL

W

ALL

W

ALL

BOARD

B U L L E T

IN

B O

A R

D

GRAVEL

TOWER

GUARD

SHED

T O

W E

R

G U

A R

D

GUARDPOST

W

ALL

WALL

WALL

WALL

W A L L

WALL

WALL

W A

L L

WALL

W A

L L

W A

L L

W A

L L

W A

L L

WALL

W A

L L

RM.

BOILER

RM.

BOILER

BOILER RM.

RM.

BOILERA

R

D

N S

T R

U C

T I O

N

24 18

W A L L

W A L L

BOARD

BULLETI

N

T O

W E R

G U

A R

D

C E

N T E R

A M

U S E

M E

N T

BULLETINBOARD

G U

A R

D

T

O W E R

LIFT

STATIO

N

GUARD TOWER

SHACK

BOILER ROOM

SHED

BOILER RM.

B U

L L

E

IN

A

R D

BULLETIN

BOARD

WALL

WALL

WALL

W A

L L

WALL

WALL

WALL

W A

L L

W A L L

W A

L L

W A

L L

W A

L L

W A

L L

WALL

T R

A S

H

ENCLOSURE

B O

IL

B O

IL

TRASHENCL.

BRABO

13,773,882.50 N 1,086,994.59 E

ELEV. 245.77

B U

L L

E T I N

B O

A R

D

B L E

A C

H E

R S

B L E

A C

H E

R S

B L E

A C

H E

R S

S O C C

IE

L D

BLEACHERS

BULLETIN

BOARD

WALL

W A

L L

WALL

WALL

WALL

WALL

WALL

WALL

WALL

WALL

WALL

W A

L L

W A

L L

ELEV. 245.77

1,086,994.59 E 13,773,882.50 N

BRABO

W

ALL

ST

BLEACHER

SOCCER

FIE

LD

HOUSE

GUARD

S H E

D

P V C

BOX

GUARD

WALL

W A

L L

WALL

CIRCUIT RECLOSER

S H

E D

227.5

J-4

BOILER RM

BOILER RM

BOILER RM

T R

A S

H

E N

C L

BEAR

HOUSE

GUARD

SHED

S H E

D

S H E

D

N E

W

BULLETIN

BOARD

ECHO

13,774,410.71 N 1,085,056.63 E

ELEV. 224.88'

CC-2

1,085,356.93 E

ELEV. 226.15'

PLANTER

AREA

UNDERCONSTRUCTION

SIGN

BOARD

BASCKET

COURT

AREA

UNDER

CONSTRUCTION

GRAVEL

WALL

WALL

W A

L L

W A

L L

W A

L L

W A

L L

WALL

W A L L

WALL

W A

L L

W A

L L

W A

L L

W A L L

WALL

WALL

WALL

WALL

W A

L L

W A

L L

WALL

WALL

WALL

WALL

GRAVEL

CONSTRUCTION

AREA

UNDER

B O

A R

D

B U

L L

E T I N

BOARD

SIGN

B U I L

D I N

G

S H

E D

SHED

500,000 GAL.

TANK

STORAGE

WATER

ST

36 CM

C O

U R T

T E

N N

IS

B A S

K E T

B A L

U R T

TREES

W A

L L

W

ALL

W A L L

W A L L

WALL

W A

L L

W A

L L

W A

L L

W

ALL

WALLWALL

WALL

T O

W E R

G U

A R

D

H O

U S E

G U

A R

D

GUARD

SNACK

GUARD

TOWER

TOWER

GUARD

.5

.9

H E

L I P

A D

7 19

57958

G U

A R

D

T O

W E

R

GAS STATION

grandstand bleachers

WALL

WALL

WALL

WALL

WALL

WALL

WALL

WALL

WALL

WALL

W A L L

W A L L

W A

L L

W A

L L

W A

L L

WALL

WALL

RAMP

POND

SIGN

GREEN

S A

N D

T R

A P

T E

E

GUARD RAIL

GUARD RAIL

SAND TRAP

GREEN

GOLF COURSE

S A

D

A P

GREEN

BACKSTOP

TEE

T E

E

GREEN

SAND TRAP

STEPS

S T

E P

S

S A

N D

T R

A P

GREEN

TEE

BACKSTOP

TEE

BACKSTOP

C A

P

T H

F O

O T

B R I D

G E

SHED

GUARD TOWER

BOILER

B

O I L

O M

G U

A R

D

S H

E D

A M

M O

S T

O R

A G

E

SNACK

BAR

WALL

W A

L L

WALL

WALL

W A

L L

WALL

W A

L L

WALL

WALL

WALL

W A

L

LWALL

WALL

WALL

W A

L L

WALL

W

ALL

W

ALL

WALL

WALL

W A L L

WASH

RACK

W A

S H

R A

C K

WASH

PLATFORM

WALL

W A

L L

LIFT

STATIONSLUDGE

PUMP

U/G

S H

E D

STORE

UNIT

FI

ELD

STATIO

N

DOG

HOUSE

S H

E D

FLAGPOLE

W E

IR

W

ATER

IN

TAKE

IN

TAKE

W

ATER

G R

E A

S E

R A

C K

CC-1

13,774,417.48 N 1,084,495.89 E

ELEV. 220.85

BRIDGE

F O

I D

G E

WALL

WALL

W A L L

W

ALL

W A L L

W A L L

WALL

S L I D I

T E

SNACK

OLD LIFT

STATIO

N

WALL

WALL

W A

L L

W A

L L

WALL

WALL

W A

L L

GREEN

S A

A P

SAND TRAP

GREEN

SAND TRAP

I E

C

O R

E B

O A

R D

COURT

BASKETBALL

B O

A R

D

B U

L L

E T I N

A B

A N

D O

N E

D

GOLF COURSE

G R

E E

N

GREEN

SAND TRAP

GREEN

TEE

W A

L L

W A

L L

W A

L L

W A L L

WALL

W A L L

W A

L L

W A

L L

W A

L L

W A

L L

E N

C L

T R

A S

H

TOWER

JUMP

S H

A C

K

32471

REFRIGERATOR

AIR

CONDITIONER

GUARD HOUSE

W A L L

WALL

WALL

BULLETIN

BOARD

BULLETIN

BOARD

T R

A S

H

E

N C L

GUARD

TOW

ER

W A

L L

W A

L L W

A L

L

W A

L L

R

MB

O

IL

E R

TIRE

STORAGE

S E R

V

IC

E

S T

O R

A G E

T R

A S

H

E N C L

S T

O R

A G

E

S N

A C

K B

A

R TRASH

ENCL

W A

L L

W A L L

WALL

WALL

WALL

W A

L L

W A L L

WALL

WALL

WALL

M A

N H

O L E

B U L L E

IN

A R

D

PRACTI

CE

GREEN

PLANTER

GOLF DRIVING RANGE

HOTEL

13,773,399.77 N 1,082,819.61 E

ELEV. 230.80

GRAVEYARD

ELEV.

.8

,0

,3

.4

E

,7

,6

.0

N

GOLF

ANTENNAE

S A

A P

S A

A P

G R

E E

N

S A

N D

T R

A P

P O

O L

P O

O L

WALL

WALL

W A

L L

WALL

BOARD

BULLETIN

SOCCER

FIE

LD

CONSTRUCTION

AREA UNDER

WALL

W A

L L

WALL

WALL

WALL

WALL

WALL

W A L L

WALL

WALL

WALL

TOWER

GUARD

HOUSE

GUARD

TOWERGUARD

R O

O M

B O I L

I L

BOI

LER

ROOM

ROOMBOI

LER

SHED

GUARD TOWER

B O I L

E R

R O

O M

9 238

7 238

PL

A T F

O R

M

W A S

H

GREASE RACK

TOWER

GUARD

PICNIC AREA

(HOUSE)

GUARD

HOUSE

SNACK

BAR

TEL.

BLDG.

UG CABLE

DOG

KENNEL

T O

O L

R O

O M

HOUSE

GUARD

WALL

W A L L

W A L L

W A L L

W A L L

W A L L

W A L L

W A

L L

W A

L L

WALL

W A

L L

W

ALL

WALL

WALL

W A

L L

W A

L L

WALL

W A L L

W A L L

GUARD TOWER

WASH

RACK

PLANTER

PLANTER

PLANTER

PLANTERS

PLANTER

W A

L L

W A

L L

HOUSE

GUARD

GUARD TOWER

BASKETBALL COURT

WALL

BOARD

BULLETIN

HOUSE

GUARD

GUARD

POST

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

W A

L L

CHIMNEY

GUARD

HOUSE

HOUSEGUARD

G U

A R

D

T O

W E R

S H E

D

R E F R

IG

E R

A T

O R

ANTENNA

W A L L

WALL

W A

L L

WALL

WALL

W A

L L

W A

L L

S T E P S

S T E P S

STEPS

STEPS

STEPS

S T

E P S

CONTROL

BOOTH

WALL

RIFLE RANGE

S T

E P

WALL

WALL

BRUSH

BRUSH

BRUSH

BRUSH

BRUSH

TOWER

GUARD

6101504

GUARD

TOWER

S H

E D

SHED

GUARD

TOWER

GUARDTOWER

GUARD

HOUSE

RAMP

RAMP

GUARD TOWER

F O

I D

G E

LIFT

STATION

STATION

LIFT

SIGN

BEAR

HOUSE

GUARD TOWER

STORAGE

G U

A R

D

T

O W E R

S H E

D

S H E

D

GUARD

TOWER

W A

L L

W A

L L

W A

L L

WALL

WALL

W A L L

WALL

W A

L L

F O

O T

P

A T

H

SIGN

U/C

WASH

RACK

S T

E P

F O

O T

PA

T H

GUARD T

OWER

GUARD

TOWER

STORAGE

BULLETIN

BOARD

BULLETIN

BOARD

BUS

STOP

BULLETIN

BOARD

W A

L L

WALL

W A

L L

WALL

WALL

WALL

WALL

W A

L L

W A L L

FENCE W/WALL

T E

N N I S

C O

U R

T

WALL

WALL

228.4

ST

GAL275

W A

L L

FENCE W/WALL

W A

W

F E

N C

E

W A

L L

WALL

W A L L

WALL

W A

L L

W A

L L

WALL

WALL

BRIDGE

WOODEN

SHED

BOARD

BULLETIN

GUARD TOWER

S T

O R

A G E

22409

871 799

P O

O

LP

O O L

BASKETBALL

COURT

WALL

1021 1056

TEE

W A

L L

W A

L L

W

ALL

BOI

LER

ROOM

ROOMBOI

LER

H O

U S E

G U

A R

D

456A

1821 1863

TRAINING SITE

U-COFT

SSSC TSAK MILES / 2000

SIMNET

CCTT

478-A478-B

A 2

B

L

IF

T

S T

A T

IO

L

IF

T

S T

A T

IO

N

INFO-BOARD

INFO-BOARD

M

RAILLINE

FOOT BR

FOOT BR

VEH BR

VEH BR

FOOT BR

VEH BR

VEH BR

VEH BR

VEH BR

VEH BR

VEH BR

VEH BR

1848 FOOT BR

VEH BR

VEH BR

FOOT BR

VEH BR

VEH BR

VEH BR

VEH BR

FOOT BR

FOOT BR

VEH BR

VEH BR

VEH BR

FOOT BR

FOOT BR

477A

A

26GUARD

TOWER

T7-T

T

GUARD

TOWER

GUARD TOWER

GUARD

TOWER

TOWER

GUARD

2646264

TOWER

GUARD

GUARD TOWER

640(?)

1546 600

746A

746B

A

2039B

2039A

2006B

2006A

SHED

202A

213 212

214215 219

MATCH LINE 'C'

86M

3T

4M

A

C

G

DL FAC - 1F

DL FAC - 2F

KSC UTIL

WH-1

B&G

WH-2

LAUNDRY

PEST

3 524

174Z

25A

25B

GRAVES

GRAVES

CCTT

00-49341

3-48PN

00-49341

4-200PN

00-49341

00-49341

4-200PN

01-49550

02-XXXXX

02-49549

8114T

8120T

2051I 1

L

T

T

M

M

M B

A

A

B

I

48T

T

1880I

8214T

00-49341

477B

B

A

B

A

B

06-55649

06-55649

06-59073

06-59073

651A

463Z

B A

S K

E T

B A

U R

T

1G

161M

SCALE IN FEET

200 0 200 400 600

S-133S-134

S-162

S-450

S-473S-509S-527

S-566

S-715

S-753

S-823

S-827

S-1115

S-1147

S-1152

S-1834

S-1854

S-1864

S-1872

S-1987

S-2005

S-2026

S-2040

S-2218

S-2308

S-2361

S-2362

S-2473

S-2514

S-134

S-551

S-651

S-691

S-726

S-745 S-756

S-811

S-1130

WALL

S-1716

S-1807

S-1839

S-1844 S-1968

S-1974

S-2024

S-2025

S-2213

S-2626

S-155

S-157

S-452

S-563

S-1009

S-1023

S-1107

S-1731 S-1732

S-1733

S-1741

S-1840

S-1871

S-2231

S-2402

S-2452

S-2471

S-2601

CP CASEY MAP

: PROJECT BUILDING

NOT TO SCALE

M-2

CP CASEY MAP

M2

S-17

S-61

S-67S-68 S-72

S-73 & S-74

S-77

& S-80

S-82, S-81

& S-654

S-645

S-655

S-1875

S-2135

& S-2141

S-2139,S-2140

& S-2212

S-2210, S-2211

& S-2143

S-2142

S-2607

S-1727

CAMP CASEYCHONG, ST

200800

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

M-3

NO BUILDING NO. USAGE

EM QTRS (22 RMS)

EM QTRS (22 RMS)

EM QTRS (16 RMS)

BOQ (22 RMS)

SEQ (8 RMS)

BOQ (16 RMS)

BOQ (16 RMS)

BOQ (16 RMS)

SEQ (12 RMS)

SEQ (12 RMS)

SEQ (12 RMS)

BOQ (16 RMS)

BOQ (16 RMS)

SEQ (11 RMS)

ARMY LODGING

BOQ (9 RMS)

SBEQ (12 RMS)

BOQ (11 RMS)

SEQ (12 RMS)

TOTAL LEAK TEST

NO BUILDING NO. USAGE

EM QTRS (93 RMS)

BOQ (48 RMS)

BOQ (32 RMS)

BOQ (48 RMS)

2626 GUEST HOUSE20

BOQ (45 RMS)

EM QTRS (64 RMS)

EM QTRS (93 RMS)

EM QTRS (49 RMS)

EM QTRS (93 RMS)

EM QTRS (46 RMS)

EM QTRS (70 RMS)

EM QTRS (73 RMS)

BOQ (48 RMS)

EM QTRS (70 RMS)

BOQ (48 RMS)

EM QTRS (64 RMS)

EM QTRS (32 RMS)

EM QTRS (46 RMS)

BOQ (48 RMS)

20EA

NO BUILDING NO. USAGE

EM QTRS (92 RMS)

EM QTRS W/ADMIN (88 RMS)

EM QTRS (100 RMS)

EM QTRS W/ADMIN (88 RMS)

EM QTRS W/AS (88 RMS)

EM QTRS (92 RMS)

EM QTRS (41 RMS)

EM QTRS (92 RMS)

EM QTRS (100 RMS)

EM QTRS W/ADMIN (88 RMS)

EM QTRS (100 RMS)

EM QTRS (92 RMS)

EM QTRS (100 RMS)

EM QTRS W/AS (88 RMS)

EM QTRS W/AS (88 RMS)

EM QTRS (100 RMS)

EM QTRS (92 RMS)

EM QTRS (92 RMS)

EM QTRS (100 RMS)

EM QTRS W/AS (84 RMS)

EM QTRS (76 RMS)

EM QTRS (100 RMS)

EM QTRS (100 RMS)

EM QTRS W/AS (88 RMS)

EM QTRS W/AS (88 RMS)

EM QTRS W/AS (44 RMS)

EM QTRS (100 RMS)

EM QTRS (100 RMS)

2218 EM QTRS (100 RMS)

31EA

AND NOTES

FLUE VENT SCHEDULE-1, FLUE VENT

LEAK TEST BUILDING LIST (4-STORY BARRACKS) LEAK TEST BUILDING LIST (3-STORY BARRACKS) LEAK TEST BUILDING LIST (2-STORY BARRACKS)

NO BUILDING NO. USAGE

EM QTRS (22 RMS)

EM QTRS (22 RMS)

EM QTRS (16 RMS)

BOQ (22 RMS)

SEQ (8 RMS)

BOQ (16 RMS)

BOQ (16 RMS)

BOQ (16 RMS)

SEQ (12 RMS)

SEQ (12 RMS)

SEQ (12 RMS)

BOQ (16 RMS)

SEQ (11 RMS)

ARMY LODGING

BOQ (9 RMS)

SBEQ (12 RMS)

BOQ (11 RMS)

SEQ (12 RMS)

LEAK TEST BUILDING LIST (1-STORY BARRACKS)

SEQ (11 RMS)

SBEQ (12 RMS)

BOQ (11 RMS)

SEQ (12 RMS)

23EA

ARMY LODGING

19EA

TOTAL LEAK TEST

TOTAL LEAK TEST

TOTAL LEAK TEST

NOT TO SCALEM3

CAMP CASEYCHONG, ST

200800

BLDG LISTS (MECHANICAL ROOMS)

EM QTRS (88 RMS)

EM QTRS (88 RMS)

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

M-4

AND NOTES

FLUE VENT SCHEDULE-2, FLUE VENT

THE ACCURATE ENCLOSURE AREA SHOULD BE CALCULATED.

IN ORDER TO OBTAIN ACCURATE TEST RESULTS,

PRELIMINARY TESTING DAY'S WEATHER CONDITION

VERIFICATION OF PRE TEST SCHEDULE & CHECK THE

CONSTRUCTION CHECK.

CONSTRUCTION PERSONNEL WITH MEETING &

- DEPRESSURIZATION TEST

- PRESURIZATION TEST

PERFORM THE AIR LEAKAGE TEST

IN ACCORDANCE WITH TEST PROTOCOL

TESTING DAY'S WEATHER CONDITION.

CHECK BUILDING'S STATE & CHECK THE FINAL

PRELIMINARY TEST

- DEPRESSURIZATION TEST

- PRESURIZATION TEST

PERFORM THE AIR LEAKAGE TEST

IN ACCORDANCE WITH TEST PROTOCOL

TO COMFORM THE LEAK AREA

SUBMIT THE TEST REPORT

OF THE TEST LOCATION

DRAWINGS REVIEW AND DETERMINATION

PERSONNEL WITH MEETING

PRE TEST INSPECTION AND CONSTRUCTION

TEST SET UP

PRELIMINARY TEST

PRE TEST INSPECTION

FINAL TEST

TEST END

SUBMIT COMPLETE REPORT

SMOKE TEST

INFRARED THERMOGRAPHY TESTING,

SMOKE TEST

INFRARED THERMOGRAPHY TESTING,

1.

2.

AIR BARRIERS

THE AIR BARRIER SHALL BE CONTINOUS AROUND THE ENTIRE

BUILDING ENVELOPE.

SEAL THE FOLLOWING AIR LEAKAGE PATHWAYS AND GAPS:

THE AIR BARRIER SHALL BE INSTALLED HEREIN TO BRIDGE AND

ALL OTHER AIR LEAKAGE PATHWAYS IN THE BUILDING ENVELOPE

MASONRY TIES, SCREWS, BOLTS AND SIMILAR PENETRATIONS

PIPING, CONDUCT, DUCT AND SIMILAR PENETRATIONS

OPENINGS AND PENETRATIONS OF WINDOW AND DOOR FRAMES

SEISMIC AND EXPANSION JOINTS

CONNECTIONS OF THE WALLS TO THE FOUNDATIONS

CONNECTIONS OF THE WALLS TO THE ROOF AIR BARRIER

3.

TESTED IN ACCORDANCE WITH ASTM E2178.

NOT TO EXCEED 0.004cfm/sf @0.3" wg(0.02L/sm @75Pa) WHEN

AIR BARRIER FUNCTION MUST HAVE AN AIR PERMEANCE

AND SELF ADHESIVE AIR BARRIER MEMBRANE WITH

CONCRETE, WATER RESISTIVE BARRIER COAT, DAMPPROOFING

4.

OF THESE ASSEMBLES AND COMPONENTS.

OF ADJACENT ASSEMBLES, ALLOWING FOR THE RELATIVE MOVEMENT

AND SEALED IN A FLEXIBLE MANNER TO THE AIR BARRIER NATERIAL

THE AIR BARRIER MATERIAL OF EACH ASSEMBLY SHALL BE JOINED

5.

6.

7.

8.

PENETRATIONS OF THE AIR BARRIER MUST BE SEALED.

SERVICE LIFE OF THE ASSEMBLY.

THE AIR BARRIER MUST BE DURABLE TO LAST THE ANTICIPATED

INDICATED IN DRAWINGS.

SYSTEMS AND AT THE INTERFACE OF DISSIMILAR MATERIALS AS

COLUMNS, FLOOR SLABS AND FOUNDATION WALLS, ROOFING

AT TRANSITION AREA, SUCH AS TIE-IN TO STRUCTURAL BEAMS,

INSTALL SELF-ADHESIVE AIR BARRIER TRANSITION MEMBRANE

THE LOAD TO THE STRUCTURE.

THE BUILDING WITHOUT DISPLACEMENT OR DAMAGE, AND TRANSFER

MAXIMUM POSITIVE(75Pa) AIR PRESSURE TO BE PLACED ON

THE AIR BARRIER MUST BE SUPPORTED SO AS TO WITHSTAND THE

M4

MECH ROOM AIR LEAKAGE TEST FLOW CHART

CAMP CASEYCHONG, ST

200800

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

M-5

AND NOTES

FLUE VENT SCHEDULE-3, FLUE VENT

M5

PIPE PENTRATION

- M5

DUCT PENTRATION2

D U

C T

RUBBER OR PLASTIC)

FLEXIBLE FOAM

(CLOSED CELL

BACK UP MATERIAL

SUPPLIED IN PRE-MEASURED KIT FORM FOR ON-THE-JOB MIXING.

CONFORMING TO FS TT-S-227, TYPE II, CLASS B. THE COMPOUND SHALL BE

NO. 2 SEALANT SHALL BE A TWO-COMPONENT, ELASTOMERIC TYPE COMPOUND

TYPE I OR II.

NO. 3 SEALANT SHALL BE A SINGLE-COMPONENT CONFORMING TO FS TT-S-1657,

CLASS A OR B.

CONFORMING TO FC TT-S-230, TYPE II, CLASS A OR B OR FS TT-S-1543,

NO. 4 SEALANT SHALL BE A ONE-COMPONENT, ELASTOMERIC TYPE COMPOUND3.

2.

1.

NOTE:

SEALANT

PLASTIC)

RUBBER OR

FLEXIBLE FOAM

(CLOSED CELL

BACK UP MATERIAL

SEALANT

MASONRY WALL

CONCRETE OR

RUBBER OR PLASTIC)

FLEXIBLE FOAM

(CLOSED CELL

BACK UP MATERIAL

MECH ROOM INTERIOR

BACK UP MATERIAL

SEALANT

SEALANT

PIPE

P

IP

E

INTERIOR

MECH ROOM

MECH ROOM INTERIOR

CAMP CASEYCHONG, ST

200800

- M5

SOUND ABSORPTION WALL PANELS

SPRAY POLYURETHANE FOAM

CAN BE THE AIR BARRIER

SOUND ABSORPTION WALL PANEL

200800_Request leak test and sealing all barracks_M1
200800_Request leak test and sealing all barracks_M2
200800_Request leak test and sealing all barracks_M3
200800_Request leak test and sealing all barracks_M4
200800_Request leak test and sealing all barracks_M5

File details come from the government source that posted it.