| RFI # | DOC/REFERENCE | REQUEST DESCRIPTION | DATE REQUESETD | RESPONSE | |
| BLDG 1305 | | | | | |
| 1 | Survey / SOW para 2.1 | The survey did not cover cameras beyond the mantrap. Please verify that the SOW is accurate, 5 fixed cameras and 4 PTZ cameras. | 09/04/2022 | SOW is correct | M2 Comments |
| 2 | Survey / SOW para 2 | The SOW calls for Cisco 3950 48 port switches, please validate that 48 ports are or are not needed. The government stated in the survey that 24 ports were sufficient. Please specify the number of ports required? | 09/04/2022 | 24 ports are sufficient | |
| 3 | Survey / SOW para 2 | It was identified in the survey that a switch will need to be replaced, what uplink speed is required by the government 1Gb, 10Gb? | 09/04/2022 | 10Gb is perferred | JNCC Comments |
| 4 | Survey / SOW para 2.1 | The site survey did not include seeing the coms closet. Is a new equipment rack required? If so, is a full sized rack required or half rack? | 09/04/2022 | A new rack is not required | USACISA-P NETOPS Comments |
| 5 | Survey / SOW para 2.1 | The survey did not include seeing the coms closet. Is a new patch panel required? | 09/04/2022 | A new patch panel is not required | SAIC STA Comments |
| 6 | Survey / SOW para 2.1 | Does this location require a new UPS? | 09/04/2022 | A new UPS is required | |
| 7 | Survey / SOW para 2 | During the survey Koreans were not allowed inside the building past a certain point. During the install will Koreans be allowed to pull cable and install cameras, or only US citizens? | | A request will have to be made through PACAF for any non-US personel to be allowed within the facility. | |
| BLDG 2834 | | | | |
| 8 | Survey / SOW para 2.2 | Please verify that the SOW is accurate, 3 fixed cameras and 2 PTZ cameras. | 09/04/2022 | The requested camera amount is correct |
| 9 | Survey / SOW para 2 | The SOW calls for Cisco 3950 48 port switches, please validate that 48 ports are or are not needed. The government stated in the survey that 24 ports were sufficient. Please specify the number of ports required? | 09/04/2022 | 24 ports are sufficient |
| 10 | Survey / SOW para 2 | It was identified in the survey that a switch will need to be replaced, what uplink speed is required by the government 1Gb, 10Gb? | 09/04/2022 | 10Gb is perferred |
| 11 | Survey / SOW para 2.2 | Is a new equipment rack required? If so, is a full sized rack required or half rack? | 09/04/2022 | A new rack isn't required |
| 12 | Survey / SOW para 2.2 | Is a new patch panel required? | 09/04/2022 | Not required if RMAG project is completed first |
| 13 | Survey / SOW para 2.2 | Does this location require a new UPS? | 09/04/2022 | Not required if RMAG project is completed first |
| BLDG 2843 | | | | |
| 14 | Survey / SOW para 2.3 | Please verify that the SOW is accurate, 4 fixed cameras and no PTZ cameras. | 09/04/2022 | The requested camera amount and type are correct |
| 15 | Survey / SOW para 2 | The SOW calls for Cisco 3950 48 port switches, please validate that 48 ports are or are not needed. The government stated in the survey that 24 ports were sufficient. Please specify the number of ports required? | 09/04/2022 | 24 ports are sufficient |
| 16 | Survey / SOW para 2 | It was identified in the survey that a switch may not be needed at this location, please verify if a switch is needed or not needed? | 09/04/2022 | A switch will not be required if the RMAG project is completed before this project. |
| 17 | Survey / SOW para 2.3 | The site survey did not include seeing the coms closet. It was stated that another project already planning to upgrade the switch and equipment at this location. Please verify that no rack is required? | 09/04/2022 | COMM Rack is not required if RMAG project is conducted before the CCTV Project. |
| 18 | Survey / SOW para 2.3 | The survey did not include seeing the coms closet. It was stated that another project already planning to upgrade the switch and equipment at this location. Please verify that no new patch panel is required? | 09/04/2022 | See line 17 |
| 19 | Survey / SOW para 2.3 | The survey did not include seeing the coms closet. It was stated that another project already planning to upgrade the switch and equipment at this location. Please verify that this location does not require a new UPS? | 09/04/2022 | See line 17 |
| ATC BLDG 2829 | | | | |
| 201 | Survey / SOW para 2.4 | The survey did not cover going inside the air traffic control tower. Please verify that the SOW is accurate, there are no fixed cameras and 3 PTZ cameras. | 09/04/2022 | The requested camera amount and types are correct |
| 21 | Survey / SOW para 2 | The SOW calls for Cisco 3950 48 port switches, please validate that 48 ports are or are not needed. The government stated in the survey that 24 ports were sufficient. Please specify the number of ports required? | 09/04/2022 | 24 ports are sufficient |
| 22 | Survey / SOW para 2 | It was identified in the survey that a switch will need to be replaced, what uplink speed is desired by the government 1Gb, 10Gb? | 09/04/2022 | 10Gb is perferred |
| 23 | Survey / SOW para 2.4 | The site survey did not include seeing the coms closet. Is a new equipment rack required? If so, is a full sized rack required or half rack? | 09/04/2022 | An equipment rack will be required |
| 24 | Survey / SOW para 2.4 | The survey did not include seeing the coms closet. Is a new patch panel required? | 09/04/2022 | A patch panel will be required |
| 25 | Survey / SOW para 2.4 | Does this location require a new UPS? | 09/04/2022 | An UPS will be required |
| BLDG 2007 ECP | | | | |
| 26 | Survey / SOW para 2.5 | The survey only identified 2 PTZ cameras, but the SOW states that there are 3 PTZ cameras. Is the 3rd PTZ camera the camera on or near BLDG 2008 that is pointed at the ECP? | 09/04/2022 | The survey ID'd 3 PTZ cameras, Two above the guard shack, and one on the corner of bldg 2004 at eye level. |
| BLDG 2003 VCC | | | | |
| 27 | Survey / SOW para 2.6 | Please verify that the SOW is accurate, 4 fixed cameras and no PTZ cameras. | 09/04/2022 | 4 total cameras is correct |
| 28 | Survey / SOW para 2 | The SOW calls for Cisco 3950 48 port switches, please validate that 48 ports are or are not needed. The government stated in the survey that 24 ports were sufficient. Please specify the number of ports required? | 09/04/2022 | 24 ports are sufficient |
| 29 | Survey / SOW para 2 | It was identified in the survey that a switch will need to be replaced, what uplink speed is desired by the government 1Gb, 10Gb? | 09/04/2022 | 10Gb is perferred |
| 30 | Survey / SOW para 2.6 | During the site survey it was not stated clearly whether a new equipment rack required? If so, is a full sized rack required or half rack? | 09/04/2022 | A new rack is not required |
| 31 | Survey / SOW para 2.6 | Is a new patch panel required? | 09/04/2022 | A patch panel is required |
| 32 | Survey / SOW para 2.6 | Does this location require a new UPS? | 09/04/2022 | An UPS is required |
| Solicitation | | | | |
| 33 | SOW para 2. | For the 5 Cisco switches 3950, 48 does the government have particular model that is required, is POE required, what are the requirements for the uplink (1Gbps, 10Gbps, etc..) what is the maximum distance required? | 09/04/2022 | POE+ is required for all switches to power the cameras |
| 34 | SOW para 2. | For the 5 switches mentioned in the SOW, are Cisco Catalyst 9300 Switches sufficient? C9300-24P-A | 09/04/2022 | Cisco 9300-24P-E switches are required |
| 35 | SOW para 2. | During the site survey it was identified that a switch replacement in building 2843 was not needed. The SOW states that 5 switches were required. Does the switch that is not needed subtract from the total to be 4 switches? | 09/04/2022 | We still request the 5th switch to be used as shelf stock. |
| 36 | SOW para 2. | The solicitation does not mention providing SFP modules. What SFP modules are required as related to type, speed, and distance? | 09/04/2022 | GLC-LH-SMD are the perferred SFP for the project |
| 37 | SOW para 2. | Can the VICADS NVR be substituted with Botch | 09/04/2022 | No, also all cameras have to be compatible with the VICADS software, and have driver support. |