This document contains a request for information (RFI) regarding a federal contract opportunity to replace cameras and related equipment at multiple buildings on Kunsan Air Base in South Korea. The RFI seeks clarification on several specifications in the statement of work, including the required number and types of cameras, switches, equipment racks, patch panels, UPS systems, and other related equipment. Responses were requested by September 4th, 2022 to validate the accuracy of the statement of work. Additional details sought include the required switch ports and uplink speeds, ability of contractors to access certain areas for installation, substitution of equipment brands, and specifications for switches, fiber modules, and video recording systems.

View the file

Other files

File Type Posted
W90VN722R00720001 Main Gate CCTV amendment.pdf PDF
W90VN722R0072.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

RFI #DOC/REFERENCEREQUEST DESCRIPTIONDATE REQUESETDRESPONSE
BLDG 1305
1Survey / SOW para 2.1The survey did not cover cameras beyond the mantrap. Please verify that the SOW is accurate, 5 fixed cameras and 4 PTZ cameras.09/04/2022SOW is correctM2 Comments
2Survey / SOW para 2The SOW calls for Cisco 3950 48 port switches, please validate that 48 ports are or are not needed. The government stated in the survey that 24 ports were sufficient. Please specify the number of ports required?09/04/202224 ports are sufficient
3Survey / SOW para 2It was identified in the survey that a switch will need to be replaced, what uplink speed is required by the government 1Gb, 10Gb?09/04/202210Gb is perferredJNCC Comments
4Survey / SOW para 2.1The site survey did not include seeing the coms closet. Is a new equipment rack required? If so, is a full sized rack required or half rack?09/04/2022A new rack is not requiredUSACISA-P NETOPS Comments
5Survey / SOW para 2.1The survey did not include seeing the coms closet. Is a new patch panel required?09/04/2022A new patch panel is not requiredSAIC STA Comments
6Survey / SOW para 2.1Does this location require a new UPS?09/04/2022A new UPS is required
7Survey / SOW para 2During the survey Koreans were not allowed inside the building past a certain point. During the install will Koreans be allowed to pull cable and install cameras, or only US citizens?A request will have to be made through PACAF for any non-US personel to be allowed within the facility.
BLDG 2834
8Survey / SOW para 2.2Please verify that the SOW is accurate, 3 fixed cameras and 2 PTZ cameras.09/04/2022The requested camera amount is correct
9Survey / SOW para 2The SOW calls for Cisco 3950 48 port switches, please validate that 48 ports are or are not needed. The government stated in the survey that 24 ports were sufficient. Please specify the number of ports required?09/04/202224 ports are sufficient
10Survey / SOW para 2It was identified in the survey that a switch will need to be replaced, what uplink speed is required by the government 1Gb, 10Gb?09/04/202210Gb is perferred
11Survey / SOW para 2.2Is a new equipment rack required? If so, is a full sized rack required or half rack?09/04/2022A new rack isn't required
12Survey / SOW para 2.2Is a new patch panel required?09/04/2022Not required if RMAG project is completed first
13Survey / SOW para 2.2Does this location require a new UPS?09/04/2022Not required if RMAG project is completed first
BLDG 2843
14Survey / SOW para 2.3Please verify that the SOW is accurate, 4 fixed cameras and no PTZ cameras.09/04/2022The requested camera amount and type are correct
15Survey / SOW para 2The SOW calls for Cisco 3950 48 port switches, please validate that 48 ports are or are not needed. The government stated in the survey that 24 ports were sufficient. Please specify the number of ports required?09/04/202224 ports are sufficient
16Survey / SOW para 2It was identified in the survey that a switch may not be needed at this location, please verify if a switch is needed or not needed?09/04/2022A switch will not be required if the RMAG project is completed before this project.
17Survey / SOW para 2.3The site survey did not include seeing the coms closet. It was stated that another project already planning to upgrade the switch and equipment at this location. Please verify that no rack is required?09/04/2022COMM Rack is not required if RMAG project is conducted before the CCTV Project.
18Survey / SOW para 2.3The survey did not include seeing the coms closet. It was stated that another project already planning to upgrade the switch and equipment at this location. Please verify that no new patch panel is required?09/04/2022See line 17
19Survey / SOW para 2.3The survey did not include seeing the coms closet. It was stated that another project already planning to upgrade the switch and equipment at this location. Please verify that this location does not require a new UPS?09/04/2022See line 17
ATC BLDG 2829
201Survey / SOW para 2.4The survey did not cover going inside the air traffic control tower. Please verify that the SOW is accurate, there are no fixed cameras and 3 PTZ cameras.09/04/2022The requested camera amount and types are correct
21Survey / SOW para 2The SOW calls for Cisco 3950 48 port switches, please validate that 48 ports are or are not needed. The government stated in the survey that 24 ports were sufficient. Please specify the number of ports required?09/04/202224 ports are sufficient
22Survey / SOW para 2It was identified in the survey that a switch will need to be replaced, what uplink speed is desired by the government 1Gb, 10Gb?09/04/202210Gb is perferred
23Survey / SOW para 2.4The site survey did not include seeing the coms closet. Is a new equipment rack required? If so, is a full sized rack required or half rack?09/04/2022An equipment rack will be required
24Survey / SOW para 2.4The survey did not include seeing the coms closet. Is a new patch panel required?09/04/2022A patch panel will be required
25Survey / SOW para 2.4Does this location require a new UPS?09/04/2022An UPS will be required
BLDG 2007 ECP
26Survey / SOW para 2.5The survey only identified 2 PTZ cameras, but the SOW states that there are 3 PTZ cameras. Is the 3rd PTZ camera the camera on or near BLDG 2008 that is pointed at the ECP?09/04/2022The survey ID'd 3 PTZ cameras, Two above the guard shack, and one on the corner of bldg 2004 at eye level.
BLDG 2003 VCC
27Survey / SOW para 2.6Please verify that the SOW is accurate, 4 fixed cameras and no PTZ cameras.09/04/20224 total cameras is correct
28Survey / SOW para 2The SOW calls for Cisco 3950 48 port switches, please validate that 48 ports are or are not needed. The government stated in the survey that 24 ports were sufficient. Please specify the number of ports required?09/04/202224 ports are sufficient
29Survey / SOW para 2It was identified in the survey that a switch will need to be replaced, what uplink speed is desired by the government 1Gb, 10Gb?09/04/202210Gb is perferred
30Survey / SOW para 2.6During the site survey it was not stated clearly whether a new equipment rack required? If so, is a full sized rack required or half rack?09/04/2022A new rack is not required
31Survey / SOW para 2.6Is a new patch panel required?09/04/2022A patch panel is required
32Survey / SOW para 2.6Does this location require a new UPS?09/04/2022An UPS is required
Solicitation
33SOW para 2.For the 5 Cisco switches 3950, 48 does the government have particular model that is required, is POE required, what are the requirements for the uplink (1Gbps, 10Gbps, etc..) what is the maximum distance required?09/04/2022POE+ is required for all switches to power the cameras
34SOW para 2.For the 5 switches mentioned in the SOW, are Cisco Catalyst 9300 Switches sufficient? C9300-24P-A09/04/2022Cisco 9300-24P-E switches are required
35SOW para 2.During the site survey it was identified that a switch replacement in building 2843 was not needed. The SOW states that 5 switches were required. Does the switch that is not needed subtract from the total to be 4 switches?09/04/2022We still request the 5th switch to be used as shelf stock.
36SOW para 2.The solicitation does not mention providing SFP modules. What SFP modules are required as related to type, speed, and distance?09/04/2022GLC-LH-SMD are the perferred SFP for the project
37SOW para 2.Can the VICADS NVR be substituted with Botch09/04/2022No, also all cameras have to be compatible with the VICADS software, and have driver support.

&"Helvetica Neue,Regular"&12&K000000&P mailto:M@%20Comments

File details come from the government source that posted it. Updated .