F2L3CE9149AW01

THIS IS A NON-WORK PLAN TASK ORDER FOR THE FOLLOWING MATOC CONTRACTORS ONLY.

ONLY Proposals for this requirements are being solicited from the MATOC contractors for the follow ing MATOC contracts issued by 411th Contracting Support Brigade (CSB).

Proposals from offerors other than these MATOC Contractors w ill not be considered for aw ard.

Contract Number: W91QVN-18-D0080, 0082, 0084, 0085, 0089, 0090, 0091, 0092, 0113, 0115, 0116,0118, 0119, 0120, 0121 and 0124.

A. Site Visit: Offerors w ho intend to propose on this solicitation are strongly encouraged to attend site visit. See site visit Clause FAR 52.236-27 in Section L. Offerors are required to have a valid Korean Identif ication card w hen attending the site visit orientation.

B. SUBMISSION OF PROPOSAL: See section L for details. If the contractor is unable to submit the proposal in response to this RFP, the contractor shall submit the "No-offer letter" by date and time specif ied in this solicitation.

C. BASIS OF AWARD: See Section M of this solicitation.

MS. AN, HYE SON 315-755-9307

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

17-Jun-2019

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________45 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, X negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES X NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________28 Jun 2019 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

RCO KUNSAN, UNIT #2112

APO AP 96264-2112

W90VN7

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

01:00 PM (hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: 0503-354-9930 TEL: FAX:

W90VN719R0047 20

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W90VN719R0047

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job

REPAIR SEWER LINE NEAR BLDG 2548

FFP

REPAIR SEWER LINE NEAR BLDG 2548, Kunsan AB.

The contractor shall provide all supervision, labor, tools, parts, materials and transportation necessary to provide service as stated in the Statement of Work and Drawings here in.

FOB: Destination MFR PART NR: Null

PURCHASE REQUEST NUMBER: F2L3CE9149AW01

PSC CD: Z2JZ

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Estimated War Hazzard Amount is

FFP

Zero (0) FOB: Destination

NET AMT

Section C - Descriptions and Specifications

STATEMENT OF WORK

DETAILED-SPECIFICATION

The following sections with exception of Section 1A are from the "Standard Technical Specifications for O&MA (Operation & Maintenance Army) Projects, Korea" issued in Oct 2015 by the Department of the Army Installation Management Agency, Korea Region Office and apply to this project. The specifications are available from the 8th Civil Engineer Squadron in building 702, Requirement & Optimization (R&O) Office.

INDEX

SECTION NO. TITLE

DIVISION 1 - GENERAL REQUIREMENTS

1A Statement of Work 013000 Administrative Requirements 013201 Project Schedule 013300 Submittal Procedures 013526 Government Safety Requirements 013529 Health, Safety, and Emergency Response Procedures for Contaminated Sites 014200 Sources for Reference Publications 014500 Quality Control 015720 Environmental Protection 017800 Closeout Submittals

DIVISION 2 – EXISTING CONDITIONS

024100 Demolition and Deconstruction 026113 Excavation and Handling of Contaminated Material 026500 Underground Storage Tank Removal 028100 Transportation and Disposal of Hazardous Materials

DIVISION 3 - CONCRETE

031113 Structural Cast-In-Place Concrete Forming 031500 Concrete Accessories 032000 Concrete Reinforcing 033000 Cast-In-Place Concrete 033053 Miscellaneous Cast-In-Place Concrete

DIVISION 31 – EARTHWORK

310000 Earthwork

DIVISION 32 – EXTERIOR IMPROVEMENTS

320533 Landscape Establishment

321116.16 Base Course for Rigid and Subbases for Flexible Paving 321116 Subbases for flexible paving

321123 Aggregate and/or Graded-Crushed Aggregate Base Course 321124 Graded Crushed Aggregate Base Course for Pervious/Flexible Pavement 321210 Bituminous Tack and Prime Coats 321211 Bituminous Surface Treatment 321216 Hot-Mix Asphalt HMA for Roads 321237 Fuel-Resistant Coal Tar Sealer 321200 Aggregate Surface Course 321613 Concrete Sidewalks and Curbs and Gutters 329223 Sodding

DIVISION 33 – UTILITIES

333000 Sanitary Sewers

NOTE: Wherever “Special Clauses” or “Special Provisions” appears in OMA sections substitute “clauses and/or special provisions of this contract.”

DIVISION 1 GENERAL REQUIREMENTS

SECTION 1A STATEMENT OF WORK

INDEX

1A-1 DESCRIPTION OF WORK

1A-2 PRINCIPAL FEATURES

1A-3 PERFORMANCE PERIOD

1A-4 LIST OF DRAWINGS

1A-5 GENERAL CONDITIONS

1A-1 Description of Work: The work under work task 5663881, Repair sewer line near Bldg.2548, Kunsan AB consists of furnishing all labor, equipment, materials, transportation and supervision necessary to perform all the work as shown on the drawings and indicated herein.

1A-2 Principal Features: The description of the work is approximate and includes the principal features only.

This general outline does not in any way limit the responsibility of the contractor from performing all work indicate herein and applicable specification.

1. Scope of Work

1.1. General Work

1.1.1. The quantities given in SOW is for government estimate purpose and contractor shall double- check them at its own liability before applying for bid. Contractor shall apply for bid with the verified quantities.

1.1.2. The contractor shall field-verify all the elevations and confirm the elevations of new sewer system with BCE before start of sewer construction.

1.1.3. The manhole top elevations shall be set to avoid submergence of the cover by surface water runoff and ponding.

1.1.4. The water tight mechanical seal shall be applied for inlet/outlet of manhole and approved by COR before work start.

1.1.5. Contractor shall provide temporary bypass line under construction.

1.1.6. All damages caused by this project must be restored to original or better condition.

1.2. Civil Work

1.2.1. Saw cut and excavate the construction site.

1.2.2. Install temporary screen to work areas for safety.

1.2.3. Remove existing septic tank (1ea) and install new sewer manhole (1ea)

1.2.4. Replace existing 8” sewer line (Approx. 70LF) with new 8” PVC pipe to the new sewer manhole

1.2.5. Install new 8” PVC pipe from the new manhole to existing manhole

1.2.5. Backfill the excavation area

1.2.6. Restore AC pavement and sidewalk

1.2.7. Grade disturbed area toward existing open ditches and restore sodding.

1.2.8. Remove temporary screen and clean construction site.

1A-3 Performance Period

1. The performance period shall be 45 calendar days after Notice to Proceed (NTP) is issued. The contractor shall attend pre-construction conference prior to NTP being issued and needs to submit construction schedule prior to pre-construction conference.

2. Pre-Construction Conference: The Contractor shall be required to attend a pre-construction conference at the contracting office, building 753 on Kunsan AB prior to NTP being issued. The Contractor will be notified by the Contracting Officer's Representative as to time and date this conference will be held.

3. Working Hours: Working hours for the Contractor shall be between the hours of 0800 and 1700. The contractor shall not work on Saturdays, Sundays, Observed Korean/US Federal holidays and ORI/ORE/UCI exercises. If the Contractor desires to work during periods other than aforementioned, additional government inspection forces may be required. The Contractor must make his/her request to the Contracting Officer Representative three (3) working days in advance of his/her intention to work during other periods to allow assignment of additional.

1A-4 List of Drawings

SHT NO REF NO DESCRIPTION

1 of 4 G – 1 Cover sheet 2 of 4 C – 1 Site Plan 3 of 4 C – 2 Manhole Details 4 of 4 C – 3 Misc. Details

1A-5 General Conditions

1. General Requirement:

1.1. The contractor shall visit the work site, carefully examine the specifications/drawing, and identify all conditions which may affect the work schedule or associated scope of work after Notice to Proceed (NTP) is issued. The contractor shall identify discrepancies or omissions in the specifications/drawing, and immediately notify the COR to obtain clarification prior to establish work schedule.

1.2. The contractor shall provide all supervision, labor tools, equipment, transportation and materials required for the completion of the above described work as explained by the definitive work scope below.

1.3. The contractor shall remedy at his own expense any damaged to U.S. Government owned or controlled real or personal property, when that damaged is the result of the contractor’s failure to conform to the contract requirements or any such defect of equipment, materials, workmanship, or design.

2. Warranty of Construction: See FAR Clause 52.246-21-Warranty of Construction in this solicitation.

3. Use of Government Buildings: The contractor will not be permitted to utilize any Government building or facility for his job site office space or storage area for materials without prior written approval of the Contracting Officer.

4. Utilities: Identification: The government does not know the location of utilities in the work area.

Accordingly, the Contractor shall be solely responsible for locating and marking the exact location of all existing utilities within the contract work area prior to any excavating, trenching, backfilling or earth disturbance. The Contractor is solely responsible for any and all damage to existing utilities in the contract work area. Upon request by the Contractor, the Government shall furnish all available information in its possession concerning utilities in the contract work area. However, the accuracy of the information provided by the Government is not guaranteed and is only intended to provide some measure of assistance to the Contractor.

The Contractor shall call 8th Communications Squadron (DSN 782-2666) to have underground cable routes marked. Base Civil Engineer does not have nor shall it provide record drawings of 8th Communications Squadron cable plan. Contractor is responsible for protecting all existing utilities in accordance with contract clause titled, "Protection of Existing Vegetation, Structures, Equipment, Utilities and Improvements". Any visible sign or indication of possible utilities or appurtenances thereto not specifically indicated on the drawings shall be brought to the immediate attention of the Contracting Officer prior to any excavation for proper disposition.

5. Notification of Inspection: Prior to starting work at the work site, the contractor shall inform the COR of the actual date that the contractor intends to start work. The contractor shall also give the COR or project inspector no less than a two (2) work day notice prior to each demolish, concrete placement, or any other work deemed necessary by the COR or project inspector. The contractor shall also give at least a seven (7) work day written notification of the pre-final and final inspections to the COR.

6. Disposition of Material: The Contractor shall abide by the most current edition of wastes control Act (폐기물관리법) established by the Department of Environment (환경부) and 2014 OMA Specs. The aforementioned Law and Specifications shall be downloaded from official publication website for Korea ministry of Government Legislation (법제처) http://www.moleg.go.kr and the USFK, http://www.usfk.mil/usfk/. The Contractor shall remove/dispose of all construction debris and rubbish resulting from the work under this contract.

7. Dust Control: The Contractor shall control the generation of dust and flying particles from his operations to prevent creation of a nuisance to Government personnel and operations in occupied portions of the building and in the surrounding area.

8. Contractor’s Equipment: All contractor equipment used in the performance of this contract shall be subject to a functional and safety inspection(s) at any time by the COR or project inspector IAW U.S. Air Force Safety http://www.moleg.go.kr/ http://www.usfk.mil/usfk/ http://www.usfk.mil/usfk/

Regulations and EM 385-1-1, U.S. Army Corps of Engineers Safety and Health Requirements Manual. Any equipment found not to be functional or safe shall be immediately repaired, replaced, or removed from the worksite by the contractor. Additionally, the contractor will provide the COR or construction inspector a listing of all equipment to be used on site prior to the start of work, NLT (10) days after NTP. Applicable U.S. Air Force Safety Regulations include UFC 3-560-01 (Electrical Safety, O&M; with Change 4), AFI 32-1064 (Electrical Safe Practices), AFI 91-302 (Air Force Occupational and Environmental Safety, Fire Protection, and Health Standards) and AFPAM 91-210 (Contract Safety... although this is more for our use in setting up contracts than for the contractor in executing them) and their source reference documents. Unclear or conflicting information between these documents can be clarified via RFI from the contractor to 8 CES/CEOER.

9. Alerts: During military alerts or special operations, anticipated not to exceed forty (40) working days per year of contract duration, the contractor may be denied access to the base or the work areas. When the contractor is prohibited from access to the base or worksite for one (1) day or less per month, no adjustment in the contract time will be made. When the contractor is prohibited access for more than one (1) day per month, an adjustment to the contractor’s schedule will be made by the Contracting Officer (KO).

11. Notification of Inspections: Prior to starting work at the work site, the contractor shall inform the COR of the actual date that the contractor intends to start work. The contractor shall also give the COR or project inspector no less than a two (2) working day notice prior to each concrete placement, asphalt placement field test, protective coating, or any other work deemed necessary by the COR or project inspector. The contractor shall also give at least a seven (7) working day written notification of the pre- final and final inspections to the COR. The contractor has a responsibility to attend the pre-final and final inspections and submit the final inspection report to the COR. The final inspection report include a signature of COR to conform the work has been completed based on the specification and shop drawing.

12. Testing: Costs of all tests, unless designated to be performed by the Government, will be at the contractor's expense. It is the responsibility of the contractor to schedule all tests and to notify the Contracting Officer or his representative prior to any required testing.

13. Close-out/Turnover Materials: The contractor shall be responsible for providing the following materials as part of final turnover to the U.S. Government: AS-built drawings shall be submitted to COR for review and acceptance in electronic format utilizing AutoCAD 2006 or higher and submitted on CD/DVD format (2 copies). When all materials have been turned over, the COR or project inspector will notify the KO so that the final payment may be released. Up to fifteen (15%) percent of the total contract amount may be withheld pending complete turnover of material stated in this paragraph."

14. Contractor’s Equipment: All contractor equipment used in the performance of this contract shall be subject to a functional and safety inspection(s) at any time by the COR or project inspector IAW U.S. Air Force Safety Regulations and EM 385-1-1, U.S. Army Corps of Engineers Safety and Health Requirements Manual.

Any equipment found not to be functional or safe shall be immediately repaired, replaced, or removed from the worksite by the contractor. Additionally, the contractor will provide the COR or construction inspector a listing of all equipment to be used on site prior to the start of work, NLT

(10) working days after NTP. Applicable U.S. Air Force Safety Regulations include UFC 3-560-01 (Electrical Safety, O&M; with Change 4), AFI 32-1064 (Electrical Safe Practices), AFI 91-302 (Air Force Occupational and Environmental Safety, Fire Protection, and Health Standards) and AFPAM 91-210 (Contract Safety... although this is more for our use in setting up contracts than for the contractor in executing them) and their source reference documents. Unclear or conflicting information between these documents can be clarified via RFI from the contractor to 8 CES/CEPMC.

15. Submittal Requirements: The contractor shall provide two (2) copies of AF Form 3000, Material Approval Submittal. These submittals shall be catalog cut, specification, and sample sheet from a recognized manufacturer of the product. Submittals shall conform to the requirements of the technical specifications (Applicable section) and/or as shown on the contract drawings.

16. Material Compliance: The contractor shall be responsible to ensure that all materials used in the performances of the contract meet the specifications and requirements of this contract. Material(s) not meeting the specifications or not approved on AF Form 3000, Material Approval Submittal (or shall not be transported to the worksite. The COR or project inspector will be the approving authority for all materials used in the performance of this contract. All material(s) shall be new and the standard product of a manufacturer who is regularly engaged in the manufacturing of such products. Any materials used in the performance of this contract not approved on an AF Form 3000 shall be removed and replaced, at the expense of the contractor, and not the U.S. Government unless the government determines that the item does meet the specifications in the contract.

17. Contractor-Furnished Material and Contractor-Furnished Equipment (CFM/CFE): All CFM/CFE, including construction equipment, will not be permitted to enter Kunsan Air Base unless each item is approved on a DD Form 1149, Requisition and Invoice/Shipping Document. The contractor shall be responsible to notify the COR or project manager at least three (3) work days prior to the arrival of, or removal of, any CFM/CFE at Kunsan Air Base. DD Form 1149 is available on open source internet (http://www.dcma.mil/dcman/NPP/files/dd1149.pdf ).

18. Air Force (AF) Form 103, Base Civil Engineering Work Clearance Request: Prior to starting any work, The contractor shall be responsible to have a valid AF Form 103, Base Civil Engineering Work Clearance Request (dig permit) in his possession. No work shall be performed under this contract without a valid AF Form 103 in the contract’s possession. Request for a Base Civil Engineering Work Clearance Request shall be submitted to the COR or project inspector a minimum of ten (10) calendar days prior to starting any work under the terms of this contract.

19. Safety Requirement AFOSHSTD91-501 (Air Force Occupational and Environmental Safety, Fire Protection, and Health Standard) shall be complied with. All AFOSH standards shall be complied with as applicable. The contractor shall also comply with applicable sections of EM 385-1-1, U.S. Army Corps of Engineers Safety and Health Requirements Manual. The manual can be downloaded from official publication website for the US Army Corps of Engineer, http://www.usace.army.mil . Training shall be conducted for all employees by the Contractor on appropriate safety measures and on the employee's obligation to obey all existing base safety regulations.

20. Fire Protection The contractor shall comply with the provisions of the Base Fire Protection program, 8FW32-2001 (Fire Prevention Program). The manual can be downloaded from official publication website for Air Force e- Publishing site, http://www.e-publishing.af.mil/. The contractor shall provide suitable fire extinguishers at any material storage area constructed by the contractor as well as at the work site(s). The contractor shall ensure that all contractor employees understand that there will be no smoking inside or within 50 feet of any U.S.

Government facility, at any time, during performance of work under this contract. The COR or project inspector will identify to the contractor the designated smoking area(s) for the contractor’s employees prior to starting any work. The contractor shall ensure that all contractor employees are aware of the designated smoking area(s) and shall ensure that all contractor employees use the designated smoking area. Any contractor employee found smoking in any U.S. Government facility, at any time, will be removed from the work site by the COR or project inspector. The COR or project inspector will notify the KO of the removal of any contractor employee for violation of the “no smoking” policy.

21. Burning/Welding Operations: The contractor shall be responsible to obtain a burning/ welding permit prior to any burning or welding operation. The contractor shall notify the COR or project inspector not less than five (5) work days prior to such operations and shall return the permit to the U.S. Government inspector at the completion of the permit period. Contractor shall provide fire watch during all open flame/ welding work.

22. Security Requirement: The contractor shall be required to obtain base access to Kunsan AB to perform the requirements of this contract. It shall be the responsibility of the contractor to prepare the necessary base access paperwork IAW USFK regulation 190-7, Installation Access Control, and submit and submit it to the Security Police, Pass and Registration Section on Kunsan AB for review and approval. USFK regulation 190-7 is http://www.dcma.mil/dcman/NPP/files/dd1149.pdf http://www.usace.army.mil/ http://www.e-publishing.af.mil/ available on open source internet (http://8tharmy.korea.army.mil/g1_AG/Programs_Policy/PublicationsRecords/Regulations/USFK/USFK% 20Reg%20190-7%20Installation%20Access%20Control2013.pdf)

23. Contractor’s Responsibilities: It shall be the responsibility of the contractor to have full control of all contractor personnel during the performance of work under the terms of the contract. The contractor shall be responsible to ensure that no contractor personnel receive any instructions for addition/deletion of work from any Government personnel including the COR or project inspector. Any instructions for additional work shall only be issued by the KO. The contractor shall be responsible for any cost incurred for any additional work, which is not identified in the contract documents to include the specifications or on the contract drawings. The contractor shall be responsible to inform the COR or project inspector of any request form any Government personnel for additional work. The contractor shall provide the COR or project inspector with name and office of the individual requesting the additional work and the type of additional work being requested. The COR or project inspector will take the necessary actions to inform the KO to prevent such situation.

24. Progress Schedule: The contractor shall prepare and submit the AF Form 3064, Contract Progress Schedule no later than three (3) working days after notice to proceed is issued. The contractor shall submit three (3) copies of the AF Form 3064 for approval by the COR or project inspector and KO.

25. Operation & Maintenance (O&M) Manual and As-built Drawings: The Contractor shall furnish to the KO or COR with two (2) copies of installation drawings as hard copies and electronic formats as Auto CAD files depicting all as-built conditions. Mark-ups shall be neat, clear, and legible in all respects. These as- built shall be submitted completely, prior to project final inspection. The Contractor shall also provide two

(2) copies of O&M manuals to the COR not later than ten (10) days after the final inspection is satisfactorily accepted by the Government. The Manual shall include at least but not limit to, routine maintenance procedures and frequencies, possible breakdowns and repairs, troubleshooting guides and list of spare parts and their manufacturers.

26. Utility Outages/Road Closures: The Contractor shall be the responsibility of the contractor to request, in writing, to the COR or project inspector, a minimum of thirty (30) calendar days in advance for any water outage, electrical outage, or road closure. The contractor shall provide a requested date and estimated time for the water outage, electrical outage, or road closure. The COR or project inspector will be responsible for determining the impact of the water outage, electrical outage, or road closure. The COR or project inspector will also be responsible for the processing of the contractor’s request for a water outage, electrical outage, or road closure. The contractor shall have written approval from the COR or project inspector before any water outage, electrical outage, or road closure.

27. Asbestos Containing Materials: No asbestos containing materials (ACM) shall be used under this contract. ACM is any material containing more than 1% asbestos by weight, either along or mixed with other fibrous on non-fibrous materials.

http://8tharmy.korea.army.mil/g1_AG/Programs_Policy/PublicationsRecords/Regulations/USFK/USFK%20Reg%20190-7%20Installation%20Access%20Control2013.pdf http://8tharmy.korea.army.mil/g1_AG/Programs_Policy/PublicationsRecords/Regulations/USFK/USFK%20Reg%20190-7%20Installation%20Access%20Control2013.pdf http://8tharmy.korea.army.mil/g1_AG/Programs_Policy/PublicationsRecords/Regulations/USFK/USFK%20Reg%20190-7%20Installation%20Access%20Control2013.pdf

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 N/A N/A N/A Government

QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

1 8 CES/CEACF

8 CES/CER

KUNSAN AFB, KOREA

APO AP 96264

782-7059 FOB: Destination

F2L3CE

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE

0001 45 dys. ANP

0002 N/A N/A N/A N/A

Section I - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.203-2 Certificate Of Independent Price Determination APR 1985 252.201-7000 Contracting Officer's Representative DEC 1991 252.225-7041 Correspondence in English JUN 1997

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 45 calendar days.

(End of clause)

52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)

The Contractor shall perform on the site, and with its own organization, work equivalent to at least 50 percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.

(End of clause)

Section J - List of Documents, Exhibits and Other Attachments

List of Drawings

SHT NO REF NO DESCRIPTION

1 of 4 G – 1 Cover sheet 2 of 4 C – 1 Site Plan 3 of 4 C – 2 Manhole Details 4 of 4 C – 3 Misc. Details

Section K - Representations, Certifications and Other Statements of Offerors

CLAUSES INCORPORATED BY FULL TEXT

5152.204-4032 REPRESENTATIONS AND CERTIFICATIONS

(a) SUBCONTRACTING:

If the offeror contemplates subcontracting, it must obtain prior written approval of subcontractor from the PCO or ACO, and list below: (1) the names and addresses of the subcontractor(s), (2) the type of subcontracting, and (3) the estimated price for each subcontract.

(b) AFFILIATED OFFERORS:

(1) Business concerns are affiliates of each other when, either directly or indirectly, one concern controls or has the power to control the other, or a third party controls or has the power to control both.

(2) Each offeror shall furnish, below, the following information:

(i) Whether the offeror has any affiliates;

(ii) The names and addresses of all affiliates of the offeror; and

(iii) The names and addresses of all persons and concerns exercising control or ownership of the offeror and any or all of its affiliates, and whether they are common officers, directors, stockholders holding controlling interest, or otherwise.

AFFILIATED CONCERNS. : (Name, location and, in detail, controlling interest in each)

(c) PRINCIPAL OWNER(S) OR STOCKHOLDER(S):

Each offeror shall list below the name(s) and address(es) of the principal owner(s) or stockholder(s) of the company and percentage of ownership. If a major portion is publicly traded and/or otherwise widely distributed, state that, with the percentage so affected.

(d) STANDARDS OF CONDUCT CERTIFICATION:

This is to certify that, to the best of my knowledge and belief, except as described below, no representative of this firm who deals with US Government employees on any aspect of this procurement is a former US Government employee, to include former US military personnel. I understand that this certification is continuing in nature and places a duty on me and my firm to notify the Contracting Officer of any additional individual(s) who fit the above description prior to the individual's assuming duties.

(i) Name ______________________________________________ Former rank/grade ____________________________________

Last US Government position ___________________________

(ii) Name ______________________________________________ Former rank/grade ____________________________________ Last US Government position ___________________________

(iii) Name ______________________________________________ Former rank/grade ____________________________________ Last US Government position ___________________________

Firm ____________________________________________________ Name _____________________________________________________ Signature __________________________________________________

Title _____________________________________________________ Date of Execution ____________________________________________

(e) TAXES:

(1) References:

(i) Contract clause entitled "FAR 52.229-06 Taxes—Foreign Fixed-Price Contracts (Jan 1991)."

(ii) US-ROK Status of Forces Agreement (SOFA), Articles IX and XVI.

(iii) ROK Customs Law, Law No. 1976, promulgated on 29 November 1967, as amended.

(iv) ROK Value Added Tax Law, Law No. 2934, promulgated on 22 December 1976 (effective date 1 July 1977), as amended.

(v) ROK Special Excise Tax Law, Law No. 2935, promulgated on 22 December 1976 (effective date 1 July 1977), as amended.

(2) Contractor shall state the types and estimated amount of taxes that would normally apply to such transactions but are excluded from this proposal.

(i) Customs Tax (except for ROK MND-funded contracts or delivery orders):

Name Number Cost/Unit of Item of Units w/o Tax % of Tax Tax/Unit Tax Total

This item will be imported specifically for this contract? Yes _____ No _____

(ii) Special Excise Tax:

Name Number Cost/Unit of Item of Units w/o Tax % of Tax Tax/Unit Tax Total

Name of item manufacturer

(iii) Value Added Tax (VAT):

Input VAT on materials purchased for this contract. 10% _____ Input VAT on transportation leased/rented for this contract.10% _____ Input VAT on equipment leased/rented for this contract. 10% _____ Input VAT on services purchased for this contract. 10% _____ Output VAT on total contract amount. 10% _____

(iv) Special Excise (Petroleum) Tax:

No. of U/P Liters w/o Tax Tax/Unit Total Tax Amount

Regular Gasoline ________ (L) ________ w________ w_____________ Premium Gasoline ________ (L) ________ w________ w_____________ Diesel ________ (L) ________ w________ w_____________ Other ________ (L) ________ w________ w_____________

(v) Education Tax.

(3) Name of the oil company from which POL products will be purchased:

Oil Company: _________________________________________ (Name only)

(4) I certify by this submission that all supplies and services to be purchased for this contract have been proposed exclusive of Value Added Tax, applicable Customs Tax (except ROK MND-funded contracts and delivery orders), Special Excise Tax, and Education Tax.

Signed (Chop)

(f) CERTIFICATIONS AND REPRESENTATIONS

By submitting an offer, each offeror agrees to be bound by all certifications and representations in this solicitation.

The Government reserves the right to require any and all certifications and representations to be completed and signed in hard copy by the successful offeror prior to contract award. Failure of an offeror to complete the certifications and representations within the time directed by the Contracting Officer may result in a determination that the contractor is not a responsible offeror for this acquisition.

Section L - Instructions, Conditions and Notices to Bidders

CLAUSES INCORPORATED BY FULL TEXT

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Site visits may be arranged during normal duty hours by contacting:

*Date: 19 Jun 2019 *Time: 10:00 AM *Location: 411th CSB Kunsan RCO, Bldg 753, Kunsan Air Base Interested offers must contact the POC below by 18 Jun2019 @ 4:00 PM, if interested in attending the site visit to arrange base access:

*Name: Mr. Pak, Kwang Un Telephone: (063)-470-4643 or DSN:782-4643

(End of provision)

5152.236-4011 CONSTRUCTION PRICE RANGE

Pursuant to FAR 36.204 the estimated price range is between $ 25,000 and $100,000.

INSTRUCTION TO OFFERORS

1. GENERAL INSTRUCTIONS FOR PREPARATION OF PROPOSAL:

The Government intends to award without discussion, but reserves the right to conduct discussions if deemed necessary and to establish a competitive range for efficiency in accordance with FAR 52.215-1(f)(4).

Offeror(s) may, at the discretion of the Government, be asked to provide more information and clarification regarding their proposals. The Government may make a final determination as to whether an offer is acceptable or unacceptable solely based on the proposals as submitted, without requesting any further information. However, if it is deemed necessary the Government may, at its sole discretion, request additional information clarifying but not substantially changing any proposal as submitted.

SUBMISSION OF PROPOSAL:

FBO SUBMISSION REQUIRED: Offers shall be submitted to the Federal Business Opportunities (FBO) website (https://www.fbo.gov/), or if FBO is not available, email to hyeson.an.ln@mail.mil with the evidence document such as screen shot. The FBO unavailability is limited to only FBO server problem not individual failure/problem.

All questions should be emailed to hyeson.an.ln @mail.mil within five (5) days after the solicitation is issued.

CLOSING DATE: The electronic offer shall be submitted by 1300 hours on the closing date of RFP.

SUBMISSION REQUIREMENTS

PRICING PROPOSAL: The pricing proposal must clearly indicate prices for each Contract Line Item Number in Section B - Supplies or Services and Prices.

DETAILED OFFER BREAKDOWN: The detailed offer breakdown must clearly identify all costs that can materially impact the statement of work.

SECTION K - Representations, Certifications and Other Statements of Offerors

SECTION K-TAXES: Offerors must complete all tax portions of SECTION K. The offeror shall review all expenses to ensure that all applicable taxes are excluded from the overall price. In addition, offerors shall propose exemptions of specific ROK taxes that are legitimate, attributable to the contract, and authorized by the applicable stated references.

SECTION K-OTHER: Offerors must complete all Non-Tax related portions of SECTION K.

COMPLIANCE WITH SOLICITATION: Failure to submit the above requirements under SECTION L may be grounds for determining the proposal to be non-compliant. For example, if a detailed offer breakdown is not submitted, the contracting officer will be unable to find the offeror's pricing proposal acceptable and the offeror's proposal will be ineligible for award. Non-compliance will only be cured if the government holds discussions as detailed in SECTION L.

Section M - Evaluation Factors for Award

EVALUATION CRITERIA

The pricing proposal shall be evaluated to determine whether it is complete and reasonable. A complete and reasonable pricing proposal will be deemed acceptable.

The detailed offer breakdown will be used by the contracting officer to determine whether proposed prices are complete and reasonable. A detailed offer breakdown may be used by the contracting officer to determine whether an offeror is able to complete the requirements under the contract, and/or whether discussions will be conducted pursuant to instructions to the offerors.

SECTION K - Representations, Certifications and Other Statements of Offerors

SECTION K-TAXES will be evaluated to determine whether it is complete. In addition, propose exemptions of specific ROK taxes will be evaluated to determine whether they are legitimate, attributable to the contract, authorized, and reasonable. A complete SECTION-K that only proposes exemptions of specific ROK taxes that are legitimate, attributable to the contract, necessary to complete the Task Order, do not improperly overstate any proposed tax exemption, authorized, and reasonable will be deemed acceptable.

SECTION K-OTHER will be evaluated to determine whether it is complete. A complete SECTION K-OTHER will be deemed acceptable.

BASIS FOR AWARD: Award shall be made to the responsible offeror submitting the lowest priced offer that is evaluated as acceptable for all evaluation criteria

1. Scope of Work
1.2. Civil Work
1A-3 Performance Period
1A-4 List of Drawings
19. Safety Requirement
20. Fire Protection
List of Drawings

File details come from the government source that posted it.