Combined_Drawing_Set.pdf

PDF 601 KB Posted

Attached to
Replace Floor Finish 35th SQ Ops B2567
Solicitation number
W90VN7-19-R-0040
Issued by

About this file

Combined Drawing for MLWR191047, Replace Floor Finish 35th SQ Ops B2567, Kunsan AB.

View the file

Other files

File Type Posted
W90VN7-19-R-0040_Replace_Floor_Finish_for_B2567.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRANSIENT PAD

PANTON PAD

ROKAF

NORTH

LOOP

NORTH DV PAD

SOUTH DV PAD

WRM PARKING AREA

TREE

AREA

JUVAT

PAD

SOUTH

LOOP

REPAIR FLOOR FINISH AT 35TH SQ OPS, B-2567

NOT TO SCALE

NORTH

SHT. NO. REF. NO. DESCRIPTION

DRAWING SCHEDULE

DRAWN BY:

DESIGNED BY:

CHECKED BY:

SCALE:

DRAWING NO:

PROJECT NO:

REF. NO:

CHIEF, CONSTRUCTION MANAGEMENT

CHIEF OF DESIGN

CHIEF OF CONTRACTS

ENVIRONMENTAL FLIGHT

FIRE DEPARTMENT

CORROSION ENGINEER

COMMUNICATIONS

BIOENVIRONMENTAL ENGINEERING

SAFETY

SECURITY POLICE

USING AGENCY

CHIEF, OPERATIONS FLIGHT

CHIEF, ENGINEERING FLIGHT

BASE CIVIL ENGINEER

AS SHOWN

KUNSAN AB, KOREA

LOCATE MAP

MLWR 19-1047

YUN

LOCATION MAP

REPAIR FLOOR FINISH AT 35TH SQ OPS, B-2567

MLWR 19-1047

SHEET 1 OF 2

C-1

NEW FLOOR FINISH PLAN FOR B-2567

C-1

A-1

BASE HOSPITAL

BASE CIVIL ENGINEER

ENGINEERING FLIGHT

CONSTRUCTION MANAGEMENT

YUN

KYH

UNITED STATES AIR FORCE

8th CIVIL ENGINEER SQUADRON

KUNSAN AIR BASE, REPUBLIC OF KOREA

THIS PROJECT

BLDG 2567

MAIN GATE

1_MLWR19-1047C-1 (Location Map)-Layout1
2_MLWR19-1047A-1 (New Floor finish Plan)

File details come from the government source that posted it.