Text version
TRANSIENT PAD
PANTON PAD
ROKAF
NORTH
LOOP
NORTH DV PAD
SOUTH DV PAD
WRM PARKING AREA
TREE
AREA
JUVAT
PAD
SOUTH
LOOP
RENOVATE WOLFPACK CAFE-PHASE II
NOT TO SCALE
NORTH
SHT. NO. REF. NO. DESCRIPTION
DRAWING SCHEDULE
DRAWN BY:
DESIGNED BY:
CHECKED BY:
SCALE:
DRAWING NO:
PROJECT NO:
REF. NO:
CHIEF, CONSTRUCTION MANAGEMENT
CHIEF OF DESIGN
CHIEF OF CONTRACTS
ENVIRONMENTAL FLIGHT
FIRE DEPARTMENT
CORROSION ENGINEER
COMMUNICATIONS
BIOENVIRONMENTAL ENGINEERING
SAFETY
SECURITY POLICE
USING AGENCY
CHIEF, OPERATIONS FLIGHT
CHIEF, ENGINEERING FLIGHT
BASE CIVIL ENGINEER
AS SHOWN
KUNSAN AB, KOREA
LOCATE MAP
MLWR 15-1050
YUN
LOCATION MAP
RENOVATE WOLFPACK CAFE-PHASE II
MLWR15-1050
SHEET 1 OF 10
C-1
EXIST AND REMOVE FLOOR PLAN
NEW FLOOR PLAN
C-1
A-1
A-2
BASE HOSPITAL
BASE CIVIL ENGINEER
ENGINEERING FLIGHT
CONSTRUCTION MANAGEMENT
YUN
KYH
UNITED STATES AIR FORCE
8th CIVIL ENGINEER SQUADRON
KUNSAN AIR BASE, REPUBLIC OF KOREA
THIS PROJECT
BLDG 1027 (WOLFPACK CAFE)
MAIN GATE
NEW CEILING PLAN
A-34 OF 10
CEILING DETAILS
A-45 OF 10
NEW INTERIOR & EXTERIOR FINISH SCHEDULE
A-56 OF 10
E-1
E-2
E-39 OF 10
EXIST REMOVE ELECTRICAL PLAN
NEW LIGHTING PLAN
NEW POWER PLAN
E-39 OF 10
NEW POWER PLAN
E-410 OF 10
NEW COMMERCIAL LAN PLAN
CAB NG
1 2
3 4
5 6
7 8
9 10
11 12
KEY NOTES
PROJECT AREA
LIGHTING FIXTURE SCHEDULE
NOTES FOR THE LIGHTING WORK
NEW PANELBOARD "B" LOAD SCHEDULE
L E G E N D
L E G E N D
FIBER OPTIC PATCH PANEL
ETHERNET SWITCH
48 PORT PATCH PANEL
| 1_15-1050C-1 (Location Map)-Layout1 |
| 2_15-1050A-1 (Remove Floor Plan)-Layout1 |
| 3_15-1050A-2 (New Floor Plan)-Layout1 |
| 4_15-1050A-3 (New Ceiling Plan)-Layout1 |
| 5_15-1050A-4 (Ceiling details)-Layout1 |
| 6_15-1050A-5 (New Interior & Exterior Finish Schedule)-Layout2 |
| 7_15-1050E-1 (REMOVAL PLAN) |
| 8_15-1050E-2 (NEW LIGHTING PLAN) |
| 9_15-1050E-3 (NEW POWER PLAN) |
| 10_15-1-50E-4 (NEW LAN PLAN) |