F2L3CE8292AW01
Install Sprinkler System at Fire Station
“THIS IS A NON-WORK PLAN TASK ORDER FOR THE FOLLOWING MATOC CONTRACTORS ONLY.”
ONLY Proposals for this requirement are being solicited from the MATOC contractors for the follow ing MATOC contracts issued by 411th Contracting Support Brigade (CSB). Proposals from offerors other than these MATOC Contractors w ill not be considered for aw ard.
Contract Number: W91QVN-18-D-0080, 0081, 0082, 0083, 0084, 0085, 0086, 0087, 0088, 0089, 0090, 0091, 0113, 0114, 0115, 0116, 0117, 0118, 0119, 0120, 0121, 0122, 0123, 0124, 0125, 0126, 0127, 0128, and 0164.
A. Site Visit: Offerors w ho intend to propose on this solicitation are strongly encouraged to attend site visit. See site visit Clause FAR 52.236-27 in Section L. Offerors are required to have a valid Korean Identif ication card w hen attending the site visit orientation.
B. SUBMISSION OF PROPOSAL: See section L for details. If the contractor is unable to submit the proposal in response to this RFP, the contractor shall submit the "No-offer letter" by date and time specif ied in this solicitation.
C. BASIS OF AWARD: See Section M of this solicitation.
D. See FAR 52.232-18, Availability of Funds in this solicitation.
SSGT CRIPE, NICHOLAS T. 315-755-9309
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
23-Oct-2018
(RFP)
(IFB)
X
CALL:
Install Sprinkler System at Fire Station
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________360 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
YES X NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________12 Nov 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
RCO KUNSAN, UNIT #2112
APO AP 96264-2112
UNITED STATES
W90VN7
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
01:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
MLWR16-1032
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: 0503-354-9930 TEL: FAX:
W90VN719R0010 44
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lot
MLWR16-1032, Install Fire Station Sprinkler
FFP
MLWR16-1032, Install Fire Station Sprinkler Description- MLWR16-1032, Install Fire Station Sprinkler FOB: Destination MFR PART NR: Null
PURCHASE REQUEST NUMBER: F2L3CE8292AW01
PSC CD: Z1EZ
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
ESTIMATED WAR HAZARD AMOUNT
FFP
The Estimated War Hazard Amount is zero (0)
NET AMT
Section C - Descriptions and Specifications
STATEMENT OF WORK
TECHNICAL
SPECIFICATIONS FOR
MLWR16-1032
INSTALL SPRINKLER
SYSTEM
AT FIRE
STATION
KUNSAN AIR
BASE
(NON-WORK PLAN TASK ORDER BY MATOC)
8TH CIVIL ENGINEER
SQUADRON KUNSAN AIR
BASE, KOREA
OCT 2018
DETAILED-SPECIFICATION
The specification sections listed below are applicable to this project. The specifications are from the “Standard Technical Specifications for O&MA Projects, Korea”, dated Jan 2014, located on the 411th CSB Web Page, https://www.usfk.mil/ Resources/ContractingwithUSFK.aspx. The electronic version of the specifications is Acrobat® PDF format and can be read with the Acrobat Reader software.
INDEX
SECTION NO TITLE
DIVISION 01 - GENERAL REQUIREMENTS
013000 Administrative Requirements 013201 Project Schedule 013300 Submittal Procedures 013526 Governmental Safety Requirements 013529 Safety, Health and Emergency Response Procedures for Contaminated Sites 014200 Sources for Reference Publications’ 014500 Contractor Quality Control 015000 Temporary Construction Facilities 015720 Environmental Protection 015800 Project Identification 017800 Closeout Submittals 017823 Operation and Maintenance Data
DIVISION 02 - EXISTING CONDITIONS
024100 Demolition and Deconstruction
DIVISION 03 – CONCRETE
0311130010 Structural Cast-In-Place Concrete Forming 0315000010 Concrete Accessories 0320000010 Concrete Reinforcing 033000 Cast-In-Place Concrete
DIVISION 05 - METALS
055013 Miscellaneous Metal Fabrications
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
071353 ELASTOMERIC SHEET WATERPROOFING
072113 Board and Block Insulation 072400 Exterior Insulation and Finish Systems 076000 Flashing and Sheet Metal 079200 Joist Sealing
DIVISION 08 – OPENINGS
081113 Steel Doors and Frames 087100 Door Hardware 089100 Metal Wall and Door Louvers
DIVISION 09 - FINISHES
092200 Support for Plaster and Gypsum Board 092900 Gypsum Board 095100 Acoustical Ceiling 099000 Paints and Coatings
DIVISION 21- FIRE SUPPRESSION
2113130010 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22- PLUMBING
220000 Plumbing, General Purpose
DIVISION 23 - HEATING, VENTILATING, AND AIR CODITINGS
230000 Air Supply, Distribution, Ventilation, and Exhaust Systems 230300 Basic Mechanical Materials and Methods 230593 Testing, Adjusting, and balancing for HVAC
DIVISION 26 - ELECTRICAL
262000 Interior Distribution System 265100 Interior Lighting 283176 Fire Alarm / Detection and Mass Notification
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
2831640010 Fire Detection and Alarm System, Addressable
DIVISION 31- EARTHWORK
310000 Earthwork 311100 Cleaning and Grubbing
DIVISION 32 - EXTERIOR IMPROVEMENTS
321116 Base Course for Rigid and Subbase for Flexible paving 321123 Aggregate and/or Graded-Crushed Aggregate Base Course 321210 Bituminous tack and Prime Coats 321237 Hot-Mix Asphalt (HMA) for Roads 321613 Concrete Sidewalks and Curbs, and Gutters 321724 Pavement Markings 329223 Sodding
DIVISION 33 - UTILITIES
331100 Water Distribution 334000 Strom Drainage Utilities 337002 Electrical Distribution system, Underground
DIVISION 40 - PROCESS INTEGATION
400513 Welding Process Piping
NOTE: Wherever "Special Clause" or "Special Provisions" appears in OM&A sections substitute "clauses and/or special provisions of this contract."
DIVISION 1 GENERAL REQUIREMENTS
SECTION 1A STATEMENT OF WORK
INDEX
1A-1 DESCRIPTION OF WORK
1A-2 PRINCIPAL FEATURES
1A-3 OTHER COVERNMENT DOCUMENS PUBLICATIONS
1A-4 PERFORMANCE PERIOD
1A-5 LIST OF DRAWINGS
1A-6 GENERAL CONDITIONS
1A-7 ENVIRONMENTAL PROTECTION SPECIFICATION
1A-1. Description of Work: The work under project MLWR16-1032, Install Sprinkler System at Fire Station consists of furnishing all labor, equipment, materials, transportation and supervision necessary to perform all the work as shown on the drawings and indicated herein.
Overall function relocation of Fire Department (Bldg 2815) to another facility is not a feasible option. Therefore, this project shall be executed through three phases to minimize disruption to operations of Fire Department while sustaining mission capability.
1A-2. Principal Features: This project includes the detailed specifications and drawings as provided under this task order.
2. SCOPE of WORK:
Schedule #1, Repair (K): All work shall be in accordance with the attached drawings and specifications.
2.1. CIVIL WORK
The general civil works shall be repairing works by provision of the fire water system, sewer system and replacement of site items (PCC pavement, solid sodding)
2.1.1. Provide fire water line, PIV and fittings.
2.1.2. Provide sewer line for floor drain.
2.1.3 Replace existing Portland Cement Concrete pavement.
2.1.4. Replace existing solid sodding.
2.2. ARCH WORK
Per the replacement of the existing sprinkler system, the existing ceiling is to be replaced or painted. For an added sprinkler room extension, two existing exterior windows of the bunk rooms shall be blocked and painted. The room shall be constructed of concrete at floor, wall, and roof.
2.2.1. Replace existing ceiling with new. (See finish schedule)
2.2.2. Paint Ceiling.
2.2.3. Infill existing window opening with concrete and Gypsum Wall Board finish after window removal.
2.2.4. Paint wall.
2.2.5. Enclose for sprinkler room with concrete slab floor, EIFS finish concrete wall, concrete slab roof and roofing (fluid applied waterproofing system including insulation), gutter, downspout, concrete splash block, and concrete stoop.
2.2.6. Remove existing EIFS and paint existing concrete wall.
2.3. STRUC WORK
2.3.1. Added Sprinkler room constructed of concrete at floor, wall and roof.
2.4. MECH WORK
HVAC Repair Work
2.4.1. Repair by replacement of existing, deteriorated diffusers, registers, grilles, louvers, and associated ductwork with new, as indicated on plans.
2.4.2. Repair by replacement of existing deteriorated heating system within the Sprinkler Room (156) with new electric unit heater.
2.4.3. Repair by replacement of existing deteriorated exhaust system within the Sprinkler Room (156) with new roof mounted exhaust fan.
2.4.4. Provide the temporary male’s restroom ( 2ea ) female’s restroom( 1ea ).
2.4.5. Provide the temporary hand washer ( 2ea ).
2.4.6. All Mechanical systems shall be tested, adjusted, and balanced by the contractor in strict accordance with applicable sections of Division 23 - Mechanical O&MA Standard Technical Specifications for Miscellaneous Projects, Korea. The HVAC Testing, Adjusting, and Balancing (TAB) report shall be submitted to the project COR for government review and approval.
Fire Protection Repair Work
2.4.5. Repair by replacement of existing fire protection system with new wet type sprinkler system, as indicated on plans. The wet type sprinkler system shall include the alarm check valve assembly, backflow preventer, sprinkler piping, heads, test valves and all necessary components. The wet type sprinkler system shall be installed in accordance with NFPA 13 and UFC3-600-01.
2.5. ELEC WORK
Lighting System
2.5.1. Repair by replacing deteriorated existing light fixtures with new as indicated on plan.
2.5.2. Remove and reinstall the existing ceiling mounted occupancy sensor switch as indicated on plan.
Power System
2.5.3. Repair by replacing deteriorated existing power connection wires with new in accordance with replacement of mechanical equipment
2.5.4. Repair by replacing deteriorated existing panelboard with new.
Public Announcement System
2.5.5. Remove and reinstall the existing ceiling mounted speaker as indicated on plan
Fire Alarm System / Mass Notification System
2.5.6. Repair by replacing deteriorated existing fire alarm control panel with new including mass notification system.
2.5.7. Repair by replacing deteriorated existing fire alarm bells, pull stations, smoke detector, heat detector, fire alarm notification visual signal strobe (15 candela & 75 candela), speakers and Local Operation Console including associated wiring and conduits.
Schedule #II, New Construction (L): None
1A-3. Other Government Documents and Publications.
a. UFC 4-022-01, Security Engineering Entry Control Facilities/Access Control Points.
b. UFC 4-022-02, Selection and Application of Vehicle Barrier.
c. UFC 4-022-03, Security Fences and Gates.
d. UFC 3-120-01, Sign Standard, dated 1 March 2014.
e. UFC 3-201-01, Civil Engineering, dated 1 June 2013.
f. UFC 3-250-01FA Pavement Design for Roads, Streets, Walks and Open Storage Areas, dated 6 January 2004.
g. UFC 1-200-01 Unified Facilities Criteria Design: General Building Requirements dated 1
July 2013.
h. UFC 3-101-01, Unified Facilities Criteria Design: Fire Protection Engineering for Facilities: Architecture, dated 26 September 2006, including Change 3, I March 2013.
i. UFC 3-600-01, Unified Facilities Criteria Design: Fire Protection Engineering for
Facilities for Buildings, dated 9 February 2012, Change 1, 1 March 2013.
j. UFC 4-010, DoD Unified Facilities Criteria: Minimum Antiterrorism Standards for Buildings, dated 9 February 2012, Change 1, dated 1 October 2013.
k. UFC 4-022-01, Unified Facilities Criteria Design: Security Engineering Entry Control facilities/Access Control Points, dated 25 May 2005.
l. TI 800-01, Technical Instructions Design Criteria, dated 20 July 1998 with revision thru 16 Sep 2005.
m. NEPA 101, Life Safety Code, 2012 Edition.
n. International Building Code (IBC), 2012 Edition.
o. Engineering Regulations.
ER 1110-345-100: Design Policy for Military Construction.
ER 1110-345-700: Design Analysis.
ER 1110-345-720: Specifications
p. DoD ABAAG, Department of Defense Architectural Barrier Act Accessibility Guidelines, 31 October 2008.
q. Occupational Safety and Health Standards (29 CFR Parts 1910, OSHA).
r. BHMA/ANSI Standard for Hardware.
s. UFC 3-410-01 Heating, Ventilating and Air Conditioning, 1 July 2013.
t. UFC 3-420-01 Design: Plumbing Systems 25 Oct 2004 including change "8", 27 Oct
2009.
u. ASHRAE Standard 62.1-2010 Ventilation for Acceptable Indoor Air Quality.
v. UFC 3-501-01, Electrical Engineering with Change 2, 2 July 2012.
w. UFC 3-520-01, Interior and Exterior Lighting and Controls, with Change2, I September 2012.
x. UFC 3-530-01, Exterior Electrical Power Distribution, with Chang 1, 1 July 2012.
y. IEEI C2 2012: National Electrical Safety Code.
z. NEPA 70: National Electrical Code, 2011.
aa. TM 5-811-1, Electrical Power Supply and Distribution, February 1995.
bb. Manual on Uniform Control Device for Streets and Highways issued by Federal Highway Administration
cc. Standard Technical Specifications for OMA Projects, Korea
dd. Architectural Compatibility and Design Guide of Kunsan Air Base, ROK (I Jun 2009)
1A-4. PROJECT DURATION: 360 calendar days upon receipt of NTP (Notice to Proceed)
4.1 Contractor must attend pre-construction conference prior to notice to proceed (NTP) being issued and needs to submit construction schedule prior to pre-construction conference.
1A-5. LIST OF DRAWINGS: The work shall conform to the following contract drawings and standard detail drawings (dated Oct 2014, issued by the Department of the Army, Installations Management Agency, Korea Region Office and located on the 411th CSB Web Page to Fedbizops (https://www.fbo.gov/) all of which form a part of the specifications.
ITEM NO TITLE
G-01 TITLE SHEET, SCHEDULE OF DRAWINGS & CROSS REFERENCING
CONVENTIONS
G-02 PROJECT LOCATION PLAN
C-001 CIVIL ABBREVIATIONS, NOTES, LEGEND AND SCOPE OF WORK
CU101 UTILITY PLAN
CU201 FIRE WATER LINE PROFILE
CU202 SEWER LINE PROFILE
C-501 MISC DETAILS - 1 C-
502 MISC DETAILS - 2 C-503
MISC DETAILS - 3
AE001 ABBRERVIATIONS, MATERIAL INDICATIONS & SYMBOLS
AE002 GENERAL NOTES & SCOPE OF WORKS
AE101 NEW 1ST FLOOR PLAN
AE102 NEW 2ND FLOOR PLAN
AE103 NEW ROOF CEILING PLAN
AE104 1ST & 2ND FLOOR REFLECTED CEILING PLAN
AE201 ELEVATIONS
AE301 CROSS SECTIONS - 1
AE302 CROSS SECTIONS – 2
AE401 EXTERIOR WALL SECTION
AE501 CEILING DETAILS
AE502 ROOF DETAILS
AE503 MISC DETAILS
AE601 INTERIOR FINISH SCHEDULE – 1
AE602 INTERIOR FINISH SCHEDULE – 2, MATERIAL COLOR SCHEDULE &
EXTERIOR FINISH SCHEDULE
AE603 DOOR SCHEDULE, TYPE, HARDWARE SCHEDULE & DETAILS
AE604 LOUVER SCHEDULE, TYPE & DETAILS
SF001 GENERAL NOTES, DESIGN DATA & TYPICAL DETAILS
SF101 NEW SPRINKLER ROOM PLANS
SF501 SECTION & DETAIL
MH001 LEGEND & ABBREVIATIONS
MH002 GENERAL NOTS & SCOPE OF WORK
MD101 EXIST/REMOVAL 1ST FLOOR HAVC PLAN
MH101 NEW 1ST FLOOR HAVC PLAN
MH401 NEW SPRINKLE ROOM HAVC PARTIAL PLAN & EQUIPMENT CHEDULE
MH501 HVAC MISC. DETAIL
PP101 NEW SPRINKLE RM. PLUMBING PIPING PLAN & DETAIL
FX101 NEW 1ST FL FIRE PROTECTION FOR CLASSIFICATION HAZARD PLAN
FX102 NEW 2ND FL FIRE PROTECTION FOR CLASSIFICATION HAZARD PLAN
FX103 NEW 1ST FL PROTECTION PIPING PLAN
FX104 NEW 2ND FL & MECH RM FIRE PROTECTION PIPING PLANS
FX301 FIRE PRTECTION SECTIONS
FX501 FIRE PROTECTION MISC. DETAILS-1
FX502 FIRE PROTECTION MISC. DETAILS-2
FX901 MECH ROOM FIRE PROTECTION ISOMETRIC DIAGRAM
E-001 LEGEND AND ABBREVIATION
E-002 GENERAL NOTES AND SCOPE OF WORK
ED101 REMOVAL/EXIST 1ST/2ND FLOOR ELECTRICAL PLANS
EL101 EXIST/NEW 1ST FLOOR LIGHTING/POWER PLAN
EL102 EXIST/NEW 2ND FLOOR LIGHTING PLAN, CONN. DIAGRAM AND LOAD
SCHEDULE
EL501 NON-STANDARD LIGHT FIXTURE DETAILS
EL601 LIGHT FIXTURE SCHEDULES
EY101 EXIST/NEW 1ST/2ND FLOOR PA SYSTEM PLANS
FA101 NEW 1ST FLOOR FIRE ALARM/MASS NOTIFICATION SYSTEM PLAN
FA102 NEW 2ND FLOOR FIRE ALARM/MASS NOTIFICATION SYSTEM PLAN
FA601 NEW FIRE ALARM/MASS NOTIFICATION SYSTEM DIAGRAM
FA602 FIRE ALARM/MASS NOTIFICATION SYSTEM SEQUENCE OF
OPERATION
1A-6. GENERAL CONDTIONS
1. SPECIFICATIONS: The project shall comply with the MLWR16-1032, Install Sprinkler System at Fire Station, Kunsan AB, Korea, Contract (100%) Technical Specifications. The Standard Technical Specifications for O&MA (Operation & Maintenance Army) Projects, Korea dated Jan 2014 are available on the 411th CSB Web Page, https://www.usfk.mil/ Resources/ContractingwithUSFK.aspx.
2. ALERTS: During military alerts or special operations, anticipated not to exceed forty (40) working days per year of contract duration, the contractor may be denied access to the base or the work areas. When the contractor is prohibited from access to the base or worksite for one (1) day or less per month, no adjustment in the contract time will be made. When the contractor is prohibited access for more than one (1) day per month, an adjustment to the contractor’s schedule will be made by the Contracting Officer (KO).
3. DAILY REPORTING: The contractor Project Manager shall be responsible to report to the COR or Government project inspector at 0800 during normal work days, or at 1700 during night shifts . The contractor project manager shall provide the COR or Government project inspector with a daily report detailing the work which is being accomplished at the worksite. Failure on the project manager’s part to report to the COR or Government project inspector will result in a letter being forwarded to the KO recommending appropriate action by the KO for the contractor’s lack of coordinating the daily work report.
4. NOTIFICATION OF INSPECTIONS: Prior to starting work at the work site, the contractor shall inform the COR of the actual date that the contractor intends to start work. The contractor shall also give the COR or project inspector no less than a seven (7) work day notice prior to each concrete placement, asphalt placement field test, protective coating, or any other work deemed necessary by the COR or project inspector. The contractor shall also give at least a seven (7) work day written notification of the pre-final and final inspections to the COR. The Construction Management Element of the 8th Civil Engineering Squadron is located in building #705, Kunsan Air Base, Korea; base phone extension is 782-6197 or commercial (063) 470-
6197. (CDRL 1)
5. CLOSE-OUT/TURNOVER MATERIALS: The contractor shall be responsible for providing the following materials as part of final turnover to the U.S. Government: AS-built drawings shall be submitted to COR for review and acceptance in electronic format utilizing AutoCAD 2006 or higher and submitted on CD/DVD format (3 copies). Operations and Maintenance (O&M) training shall be provided to U.S. Government personnel on new mechanical systems NLT (7) work days, not counting weekends, prior to final acceptance. O&M Manuals shall be submitted in both electronic and hard copy format (3 copies each) (7) work days prior to final acceptance. Turnover of all new facility keys and salvageable material (if any) shall be submitted to COR or project inspector. Contractor shall prepare DD form 1354 (Transfer and Acceptance of DOD Real Property) with type and quantity of construction material installed. When all materials have been turned over, the COR or project inspector will notify the KO so that the final payment may be released. Up to fifteen (15%) percent of the total contract amount may be withheld pending complete turnover of material stated in this paragraph." (CDRL 2)
6. AIR FORCE MATERIALS: All salvageable materials removed from the worksite shall remain the property of the U.S. Government. All other such materials shall be disposed of by the contractor IAW AF regulations, upon coordination with the COR or project inspector. Applicable AF regulations include AFI 32-7001 (Environmental Management), AFPAM 32-7043 (Hazardous Waste Management Guide), AFI 32-1052 (Facility Asbestos Management), AFI 32- 7042 (Waste Management), UFC 4-451-10N (Hazardous Waste Storage, and UFC 1-900-01 (Methods for the Reduction, Reuse, and Recycling of Demolition Waste) and their source reference documents. Unclear or conflicting information between these documents can be clarified via RFI from the contractor to 8 CES/CEPMC.
7. CONTRACTOR’S EQUIPMENT: All contractor equipment used in the performance of this contract shall be subject to a functional and safety inspection(s) at any time by the COR or project inspector IAW U.S. Air Force Safety Regulations and EM 385-1-1, U.S. Army Corps of Engineers Safety and Health Requirements Manual. Any equipment found not to be functional or safe shall be immediately repaired, replaced, or removed from the worksite by the contractor.
Additionally, the contractor will provide the COR or construction inspector a listing of all equipment to be used on site prior to the start of work, NLT (10) days after NTP. Applicable U.S.
Air Force Safety Regulations include UFC 3-560-01 (Electrical Safety, O&M; with Change 4), AFI 32-1064 (Electrical Safe Practices), AFI 91-302 (Air Force Occupational and Environmental Safety, Fire Protection, and Health Standards) and AFPAM 91-210 (Contract Safety... although this is more for our use in setting up contracts than for the contractor in executing them) and their source reference documents. Unclear or conflicting information between these documents can be clarified via RFI from the contractor to 8 CES/CEPMC. (CDRL 3)
8. MATERIAL COMPLIANCE: The contractor shall be responsible to ensure that all materials used in the performances of the contract meet the specifications and requirements of this contract. Material(s) not meeting the specifications or not approved on AF Form 3000, Material Approval Submittal (or shall not be transported to the worksite. The COR or Base Civil Engineer Officer will be the approving authority for all materials used in the performance of this contract. All material(s) shall be new and the standard product of a manufacturer who is regularly engaged in the manufacturing of such products. Any materials used in the performance of this contract not approved on an AF Form 3000 shall be removed and replaced, at the expense of the contractor, and not the U.S. Government unless the government determines that the item does meet the specifications in the contract.
9. CONTRACTOR-FURNISHED MATERIAL AND CONTRACTOR-FURNISHED
EQUIPMENT (CFM/CFE): All CFM/CFE, including construction equipment, will not be permitted to enter Kunsan Air Base unless each item is approved on a DD Form 1149, Requisition and Invoice/Shipping Document. The contractor shall be responsible to notify the COR or Base Civil Engineer Officer at least three (3) work days prior to the arrival of, or removal of, any CFM/CFE at Kunsan Air Base. DD Form 1149 is available on open source internet (http://www.dcma.mil/dcman/NPP/files/dd1149.pdf).
10. CONTRACTOR’S TEMPORARY FACILITES: Erection of any facility by the contractor shall be coordinated with the COR or project inspector. An approved U.S.
Government Real Estate Permit from the Base Civil Engineer (BCE) shall be in the contractor’s possession before erection of any facility. Any contractor erected facility shall be removed and the area cleaned within seven (7) calendar days in normal installation access areas and (5) duty days in installation restricted areas after completion of the contract requirements and prior to final invoice payment.
11. Air Force (AF) FORM 103, BASE CIVIL ENGINEERING WORK CLEARANCE
REQUEST:
Prior to starting any work, The contractor shall be responsible to have a valid AF Form 103, Base Civil Engineering Work Clearance Request (dig permit) in his possession. No work shall be performed under this contract without a valid AF Form 103 in the contract’s possession. Request for a Base Civil Engineering Work Clearance Request shall be submitted to the COR or Base Civil Engineer Officer a minimum of ten (10) calendar days prior to starting any work under the terms of this contract.
12. SAFETY: AFOSHSTD91-501 (Air Force Occupational and Environmental Safety, Fire Protection, and Health Standard) shall be complied with. All AFOSH standards shall be complied with as applicable. The contractor shall also comply with applicable sections of EM 385-1-1, U.S. Army Corps of Engineers Safety and Health Requirements Manual.
13. FIRE PROTECTION: The contractor shall comply with the provisions of the Base Fire Protection program, 607 AOGI (Air Operations Group Instruction) 32-2001. The contractor shall provide suitable fire extinguishers at any material storage area constructed by the contractor as well as at the work site(s). The contractor shall ensure that all contractor employees understand that there will be no smoking inside or within 50 feet of any U.S. Government facility, at any time, during performance of work under this contract. The COR or project inspector will identify to the contractor the designated smoking area(s) for the contractor’s employees prior to starting any work. The contractor shall ensure that all contractor employees are aware of the designated smoking area(s) and shall ensure that all contractor employees use the designated smoking area.
Any contractor employee found smoking in any U.S. Government facility, at any time, will be removed from the work site by the COR or project inspector. The COR or project inspector will notify the KO of the removal of any contractor employee for violation of the “no smoking” policy.
14. BURNING/WELDING OPERATIONS: The contractor shall be responsible to obtain a burning/ welding permit prior to any burning or welding operation. The contractor shall notify the COR or project inspector not less than five (5) work days prior to such operations and shall return the permit to the U.S. Government inspector at the completion of the permit period.
Contractor shall provide fire watch during all open flame/ welding work.
15. VERIFICATION OF ACTUALITIES: (FAR Clause 52.236-2 Site Visit)
16. HOUSEKEEPING: (FAR Clause 52.236-12 Cleaning Up / 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities and Improvement & 52.236-13 Accident Prevention)
17. BASE ACCESS: The contractor shall be required to obtain base access to Kunsan Air Base to perform the requirements of this contract. The contractor shall be responsible to submit a base access request letter no later than five (5) calendar days prior to start this contract. It shall be the responsibility of the contractor to prepare the necessary base access paperwork IAW USFKregulation 190-7, Installation Access Control, and submit it to the COR or project inspector. USFK regulation 190-7 is available on open source internet (http://8tharmy.korea.army.mil/g1_AG/Programs_Policy/PublicationsRecords/Regu lations/USFK/USFK%20Reg%20190-7%20Installation%20Access%20Control2013.pdf
18. ANTITERRORISM (AT) and OPERATIONS SECURITY (OPSEC):
18.1 AT Level I training: This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access to USAF installations, facilities and controlled access areas shall complete AT Level I awareness training within 14 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer. AT level I awareness training is available at the following website: http://jko.jten.mil
18.2 Access and general protection/security policy and procedures: This standard language is for contractor employees with an area of performance within USAF controlled installation, facility, or area. Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
18.3 For contractors that do not require CAC, but require access to a DoD facility or installation: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
18.4 iWATCH Training: This standard language is for contractor employees with an area of performance within an USAF controlled installation, facility or area. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 14 calendar days of contract award and within 14 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.
18.5 Threat Awareness Reporting Program: For all contractors with security clearances. Per AR 381-12 Threat Awareness and Reporting Program (TARP), contractor employees must receive annual TARP training by a CI agent or other trainer as specified in 2-4b.
19. REPAIR WORK: It shall be the contractor’s responsibility to repair all areas of patch work to match existing areas. This work shall include all areas inside of the facility as well as any other areas that the contractor may have damaged during the performance of work under the terms of this contract.
20. CONTRACTOR’S RESPONSIBILITIES: It shall be the responsibility of the contractor to have full control of all contractor personnel during the performance of work under the terms of the contract. The contractor shall be responsible to ensure that no contractor personnel receive any instructions for addition/deletion of work from any Government personnel including the COR or project inspector. Any instructions for additional work shall only be issued by the KO.
The contractor shall be responsible for any cost incurred for any additional work, which is not identified in the contract documents to include the specifications or on the contract drawings.
The contractor shall be responsible to inform the COR or project inspector of any request form any Government personnel for additional work. The contractor shall provide the COR or project inspector with name and office of the individual requesting the additional work and the type of additional work being requested. The COR or project inspector will take the necessary actions to inform the KO to prevent such situation.
21. PROGRESS SCHEDULE: The contractor shall prepare and submit the progress schedule as specified in the Standard Technical Specifications for O&MA Projects, Korea.
22. DRAWING SUBMITTALS: All drawings shall be submitted prior to the start of any work. Any additional drawings (As-built, field changes, etc.) shall be submitted to the COR or project inspector no later than ten (45) calendar days prior to contract completion for delivery orders with period of performances (PoP) less than 180 days and (60) days prior to contract completion delivery orders with PoP’s greater than 180 days. If submittal cannot be submitted within the timeframe the contractor must notify the COR or project inspector in writing why he/she cannot meet the requirement.
23. UTILITY OUTAGES/ROAD CLOSURES: The Contractor shall be the responsibility of the contractor to request, in writing, to the COR or project inspector, a minimum of thirty (30) calendar days in advance for any water outage, electrical outage, or road closure. The contractor shall provide a requested date and estimated time for the water outage, electrical outage, or road closure. The COR or project inspector will be responsible for determining the impact of the water outage, electrical outage, or road closure. The COR or project inspector will also be responsible for the processing of the contractor’s request for a water outage, electrical outage, or road closure. The contractor shall have written approval from the COR or project inspector before any water outage, electrical outage, or road closure. (CDRL 5)
24. ASBESTOS CONTAINING MATERIALS: No asbestos containing materials (ACM) shall be used under this contract. ACM is any material containing more than 1% asbestos by weight, either along or mixed with other fibrous on non-fibrous materials.
25. OZONE DEPLETING SUBSTANCES: No Class I ODS shall be used in the performance of this contract, nor be provided as a part of the equipment. This prohibition shall prevail over any other provision, specification, drawings or referenced documents.
26. MATERIAL SAFETY DATA SHEETS (MSDS): It shall be the responsibility of the contractor to furnish Material Safety Data Sheets (MSDS), in English and Korean, for all hazardous material(s) used under the terms and conditions of this contract. The type of materials that the contractor shall submit MSDSs for include, but is not limited to, paint, primer, lacquer, stain, joint compound, caulking, exterior insulation systems, emergency exit lights, cleaning fluids, oil, etc., and any other type of product deemed necessary by the Contracting Officer’s Representative (COR) or Base Civil Engineer Officer , required by U.S. Government Environment Laws and Regulations, or Korean Environmental Laws and Regulations.
a. SUBMITTAL REQUIRMENTS:
(1) The contractor shall be responsible to process these Material Safety Data Sheets (MSDS) on an AF Form 3000, Material Approval Submittal. The AF Form 3000 shall be submitted to the COR or project inspector no later than fifteen (15) calendar days after the Notice to Proceed (NTP) is issued by the Contracting Officer (KO). The contractor shall submit four (4) copies of the AF Form 3000 with carbon paper. The contractor shall submit the AF Form 3000 to the COR or project inspector for review prior to submitting the AF Form 3000 with carbon paper. It will be the responsibility of the COR or project inspector to verify the AF Form 3000 to ensure that all hazardous materials are submitted in the proper format. (CDRL 6)
(2) It shall be the responsibility of the contractor to list each type of hazardous material on the AF Form 3000. The contractor shall also be responsible to list the quantity, unit of measure (i.e.: each, liter, gallon, etc.), and size of container(s). It will be the responsibility of the COR or project inspector to verify these quantities and containers prior to initialing off on the AF Form 3000.
(3) After verification of all hazardous materials by the COR or project inspector and the contractor, the COR or project inspector will then be responsible to process this AF Form 3000. After receiving approval for all hazardous materials, it will be the responsibility of the COR or project inspector to provide the KO and contractor with a copy of the signed AF Form 3000 for the official files.
(4) After receiving approval of all hazardous materials required under the terms and conditions of this contract, the contractor shall be responsible to process these Material Safety Data Sheets (MSDS) through the HazMart Pharmacy located in building #823, military telephone DSN 782-5247, commercial telephone (063) 470-5247. The HazMart Pharmacy will be responsible to issue a bar code for each hazardous material that shall be affixed to each container by the contractor. The contractor shall be responsible to post an approved copy of the AF Form 3000 at the worksite storage area as well as keep a signed copy by AF Form 3000 in the contractor’s field office.
(5) It shall be the responsibility of the contractor to provide the COR with a new AF Form 3000 for any additional hazardous materials brought onto Kunsan Air Base throughout the term of the contract. This shall include any new materials as well as any additional quantities over and above the originally quantities.
(a) HAZARDOUS MATERIALS STORAGE: The contractor shall be responsible to store all hazardous materials in an approved storage container or storage area. This storage container may be either a metal or wood locker which is capable of being secured when not in use as well as at the end of each workday. The contractor shall be responsible to provide an approved storage location for large quantities of hazardous materials which can also be secured when not in use as well as at the end of each workday. The contractor shall be responsible to keep an approved AF Form 3000 on the inside of the door to the storage container and also keep a copy of the approved AF Form 3000 posted at the storage area
(b) DISPOSAL REQUIREMENTS FOR HAZARDOUS MATERIALS: The contractor shall be the responsibility of the contractor to remove and dispose of any remaining hazardous materials upon completion of the contract to include the removal of hazardous materials from the worksite as well as the contractor’s field office area. The contractor shall be responsible to dispose of these remaining hazardous materials, off the installation, at the contractor’s own expense, in strict accordance with existing Korean Environmental Laws and Regulations. The contractor shall be responsible to notify the COR or project inspector prior to disposing of any hazardous materials off the installation to ensure that all hazardous materials are properly handled and disposed of correctly. After use of final disposal of all hazardous materials, it will be the responsibility of the COR or project inspector to notify the HazMart Pharmacy of the final disposition of the hazardous material in order for the HazMart Pharmacy to update the AF-EMIS database.
(c) HAZARDOUS MATERIAL SPILLS: In the event that the contractor accidentally spills any hazardous materials at the worksite, the contractor shall be the responsibility of the contractor to immediately notify 8 CES/CEAN, Environmental section located in Building #705, military telephone DSN 782-6239/6240, commercial telephone (063) 470-2312/6337. The contractor shall be responsible to identify the location of the spilled material, the quantity of spilled material, and the type of spilled material. The contractor shall also be responsible to notify the COR or project inspector. The contractor shall not under any conditions, remove and dispose of any spilled hazardous material(s) without prior approval of 8 CES/CEAN.
27. DISPOSAL REQUIRMENTS: The contractor shall be responsible to designate, in writing, to the COR or project inspector the exact location(s) for the disposal of the steel revetment, soil, and concrete. The contractor shall also be responsible to provide the COR or project inspector with a copy of the license for the disposal location(s) issued by the Korean Government. The contractor shall be responsible to accompany the COR or project inspector on a site visit of the disposal location(s) prior to the removal and disposal of any steel revetment, soil, or concrete.
The COR or project inspector will be responsible to complete a DD Form 1901, Plant Visit Request/Report for each of the disposal locations. The COR or project inspector will be responsible to provide the KO with a copy of the DD Form 1901 identifying any discrepancies which may not conform to the contract requirements. It will be the responsibility of the KO to review this DD Form 1901 and to determine any corrective actions that the contractor shall be responsible to comply with. The contractor shall also be responsible to notify the COR immediately in the event that the disposal location(s) are no longer licensed or capable of disposing of the steel revetment, soil, or concrete in accordance with AFI 32-7042 (Waste Management).
28. ESCORT PRIVILEGE: Personnel of the Contractor or any representative of the contractor entering Kunsan AB shall abide by all security regulations imposed by Installation Commander at all times and shall be subject to security checks. Contractor personnel and property shall be subject to search and seizure upon entering the confines of the installation, while on, and upon leaving the confines of Kunsan AB.
a. Escort Privileges: The Contractor shall be responsible to obtain escorting privileges on base passes for the Contract Manager (CM), Quality Control (QC) Manager, Safety Manager with a limit of three (3) persons and one (1) vehicle pass per base pass. It is the Contractor’s responsibility to ensure that the escorting official has full control over all escorted individuals at all times. Any individual found on the installations unescorted will be removed from the installation and the escort official’s escorting privileges will be immediately withdrawn. Any individual removed from these installations will not be authorized further access to these installations.
b. Return Post Passes: On the contract completion date, the contractor shall turn in all passes that were issued for this contract to the sponsor and final payment will not be processed until such items are returned.
29. Contractor personnel: (FAR Clause 52.236-6 Superintendence by the Contractor
1A-7. ENVIRONMENTAL PROTECTION SPECIFICATION
PART 1 GENERAL
1.1 ENVIRONMENTAL MANAGEMENT SYSTEM
a. Contractor shall ensure all workers are familiar with the goals of the Kunsan AB Environmental Management System (EMS) as stated in the installation’s Environmental Policy Statement and have an awareness of EMS.
b. The Environmental Policy Statement commits the installation 1) to compliance with the requirements of USFK regulation 201-1, Korea Environmental Governing Standards (KEGS) and other applicable legal and policy requirements, 2) for continued environmental improvement and pollution prevention, 3) to reduce risk from environmental impacts of base activities, and 4) understanding that everyone on the installation is responsible for complying with the environmental regulations.
c. The Contractor's work under this contract shall conform with all operational controls identified in Kunsan AB EMS and provide monitoring and measurement information necessary for the Government to address environmental performance relative to the goals of the EMS.
d. Where environmental training is required for contractor employees to complete contract tasks, the Contractor shall provide proof of completion of training to the contracting officer when requested.
1.2 AIR EMISSIONS
a. Dust Control: The Contractor shall take appropriate measures to minimize the generation of dust as a result of their works, operations and activities IAW KEGS Section 2-3.l during and after construction until the site is reclaimed. These measures shall include regular and effective treatment of gravel roads and working areas, use of dust extractors on drilling equipment, wet drilling equipment and operation, water sprays on aggregate crushing and screening operation etc. Dump trucks to be used in the transportation of materials are to be fitted with tarpaulins to prevent dust or other material spilling during transportation.
b. Ozone Depleting Substance (ODS) Control: The Contractor is prohibited from installing any new equipment using Class I & II ODS. The contractor shall not intentionally release any Class I or Class II ODS refrigerant in the course of maintaining, servicing, repairing, or disposing of appliances, industrial process refrigeration units, air conditioning units, or motor vehicle air conditioners.
Contractor shall collect refrigerant from all potential sources, including, but not limited to, air conditioners, refrigerators, freezers, and chillers, found remaining in the work areas prior to commencing removal or demolition. If collection is not possible, all equipment containing chemical refrigerants will be appropriately moved and placed into segregated storage areas for either re-use or recycling.
c. Volatile Organic Compound Control: The contractor shall use low concentration volatile organic compound (VOC) materials where possible to reduce/minimize VOC emissions, and maintain fossil fuel burning equipment to reduce nitrogen oxides emissions in an effort to not increase ambient ozone levels
1.3 STORMWATER POLLUTION PREVENTION MEASURES
The Contractor will ensure all workers are familiar with the applicable Stormwater Pollution Prevention Best Management Practices in KEGS Section 4-3.f(1) and Table 4-8.
Hazardous materials must be stored indoors, in non-rusty drums or under a man-made cover sufficient to provide protection from sun, wind, and precipitation events and painting clean-up materials (thinners, rinsates) must be captured. Oil leaks or spills from all equipment and vehicles must be captured using drip pans. Spill response pads and booms must be available where hazardous materials, including fuel, are stored, used and transferred. Sediment, trash, litter, washwater and any solid objects must be kept out of the stormwater sewers.
Contractors will implement Air Force Civil Engineer Support Agency (AFCESA) ETL 03- 1, Storm Water Construction Standards, specifically Sections 7, 8, 9 & 10, excluding CONUS requirements in 8.5, 8.5.1, 8.5.2.
1.4 EROSION AND SEDIMENT CONTROL
Contractor is required to submit an erosion control plan to 8 CES/CEIE for approval prior to any site work.