4e_MLWR17-1012,_Combined_Drawings_for_STRU.pdf
PDF 858 KB Posted
- Attached to
- Relocate ARM/DEARM Crew Shack
- Solicitation number
- W90VN7-18-R-0055
About this file
Drawing 5/7
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESIGN DATA
WALL
STIRRUP OR TIE
PRECAST CONCRETE COVER, REFER TO ACI-318 CHAPTER 7.
3. PROTECTIVE COVER SHOWN IS FOR CAST-IN-PLACE CONCRETE ONLY. FOR
2. THICKER PROTECTIVE COVER INDICATED IN SPECIFIC DETAILS SHALL GOVERN.
1. PROTECTIVE COVER SHOWN IS MINIMUM PERMITTED
75 CLR.
CONCRETE CAST
AGAINST EARTH
BEYOND
CONCRETE EXPOSED TO
EARTH OR WEATHER
NOTE
EXTERIOR
C
L R
MAIN OR TEMPERATURE
EARTH/CONC
BAR (TYP)
STIRRUP OR
TIE
EARTH
FACE
SURFACE
TEMPERATURE
BAR (TYP)
STIRRUP OR
MAIN OR
FORMED CONC
40 CLR
TIE
MAIN OR
BAR (TYP)
TEMPERATURE
BEAM
BARSMAIN BAR
40 CLR
CONCRETE NOT EXPOSED TO
EARTH OR WEATHER
COLUMN
STIRRUP
20 CLR 20 CLR
40 CLR.
BEAM
MAIN
40 CLR
SLAB
AND SHALL BE MODIFIED TO SUIT THE SELECTED EQUIPMENT.
CLEAN AND ROUGH JOINT SHALL REFER TO A CONCRETE TO CONCRETE CONTACT
SURFACE WHICH IS CLEAN AND FREE OF LAITANCE AND INTENTIONALLY ROUGHENED
1. DIMENSIONS, LOCATIONS, AND SIZES OF EQUIPMENT SUPPORTS, PADS, AND ROOF
OR WALL OPENINGS SHOWN ON THESE DRAWINGS ARE FOR INFORMATION ONLY
2. ANCHOR BOLTS SHALL BE SIZED AND LOCATED AS REQUIRED BY THE EQUIPMENT
A MINIMUM DISTANCE OF 150mm SHALL BE MAINTAINED FROM CENTER OF ANCHOR
3. SEE MECHANICAL DRAWINGS FOR ADDITIONAL PIPES, RISERS, VENTS, AND DUCTS
4. CONCRETE PLACED OVER PIPING SHALL BE POURED ONLY AFTER THE PIPING HAS
TO AN AMPLITUDE OF 6mm (MINIMUM). JOINT SHALL BE CLEANED WITH WATER BLAST
MANUFACTURER'S SHOP DRAWINGS.
BOLT TO EDGE OF EQUIPMENT PAD.
WHICH PENETRATE THE ROOF, FLOOR OR WALL.
BEEN INSPECTED, TESTED AND APPROVED.
B. MECHANICAL EQUIPMENT
GENERAL NOTES
A. CONCRETE CLEAN AND ROUGH JOINT(CRJ)
CHIPPING HAMMER, OR OTHER SUITABLE MEANS.
(mm)
APPROX
HOOKS
(mm)
A OR G
STANDARD STIRRUPS OR TIES
1 D=4d FOR HD13 THRU HD16 BARS
1 D = 6d FOR HD13 THRU HD25 BARS
D = 8d FOR HD29 AND HD32 BARS
MAIN BARS
HD19
HD22
HD16
HD13
HD29
HD32
HD25
A
B
(mm)
HD16
HD10
HD13
BAR SIZE
D
D=6d FOR HD19 AND HD22 BARS
SEISMIC STIRRUPS OR TIES
1 D=4d FOR HD13 THRU HD16 BARS
2 FOR 90° HOOK SEE A
APPROX.
A OR G
(mm)
(mm)
H
C
HD10
HD16
HD19
HD13
HD22 135
40 80
BEAM
A
O
R
G
(mm)
DIMENSION
65mm min.
SIZE
HD10
D
DETAILING
4d or
J
A OR G
(mm)
BAR
D
180°HOOK
180° HOOKS
(mm)
J
A OR G
d
BEAM
D E
T A
I L
I N
G
D A
O
R
G d
90°HOOK
A OR G
(mm)
HOOKS
90° d
L c
DIMENSION
DETAILING
D E
T A
I L
I N
G
D I M
E N
S I O
N d
90° HOOK
D
L
90°
D c
A OR G
6d
135 HOOK
H
D d
H d
D I M
E N
S I O
N
135 HOOK
135° HOOKS
D
D
D E
T A
I L
I N
G
D I M
E N
S I O
N
BAR
SIZE
(mm)
D d
A
O
R
G
135° HOOKS
H(mm)
A OR G
M I N
SLEEVE
M I N
SLEEVE
BEAM
MIN
MIN
SECTION "A-A"
SLEEVE
"A"
GRADE BEAM
FOOTING OR
STEM WALL
"A"
PARALLEL PIPE PERPENDICULAR PIPE
M I N
MIN
BELOW THIS PLANE
EMBEDMENT PERMITTED
NO PIPE OR CONDUIT
FOOTING OR GRADE
NOT TO SCALE
STANDARD HOOK FOR MAIN BARS, STIRRUPS & TIES
NOT TO SCALE
WALL INTERSECTIONS
NOT TO SCALE
CONCRETE PROTECTION FOR REINF BARS
NOT TO SCALE
PIPE OR CONDUIT AT FOUNDATION
NOTE : SEE PLUMBING DRAWINGS
FOR SLEEVE DETAIL
FOR
BAR CLEAR COVER
TEE INTERSECTION
FOR
CORNER
STANDARD HOOKS
STANDARD HOOK
MAIN BAR
ADDED VERT BARS
WALL HORIZ BARS
WALL VERT BARS
SEE
SEE
SF001
SF001
STANDING SEAM METAL ROOFING
SSMR
RIM JOIST
RJ
EAVE STRUT
ES
BOPC
BOTTOM OF PILE CAP
CONC
CONCRETE
CONSTRUCTION JOINT
CNJ
CONTINUOUS OR CONTINUE
CONN
CWB
CAPILLARY WATER BARRIER
HIGH STRENGTH BOLT
IJ
ISOLATION JOINT
DET
DETAIL
DIAMETER
DIA
DIM
DIMENSION
DN
DOWN
DWG
DRAWING
DWGS
DRAWINGS
EACH FACE
EF
EACH
EA
EL
ELEVATION
EQUIP
EQUIPMENT
EW
EACH WAY
EJ
EXPANSION JOINT
EXP JT
EXPANSION JOINT
EXST
EXISTING
FL
FLOOR
FNSH
FINISH
FOOT
FT
HGT
HEIGHT
GRADE BEAM
GB
GALVANIZED
GALV
HORIZ
HORIZONTAL
HSB
JOINT
JT
ELEC
ELECTRICAL
EQ
EQUAL
INDICATOR PILE
IP
WWF
VARIABLE
VAR
WITH
W/
VERT
VERTICAL
TRANSVERSAL
TRANS
TYP
TYPICAL
THICKENED SLAB
TS
TOC
TOP OF CONCRETE
THROUGH
THRU
TOP BAR
T BAR
THK
THICKNESS
BOTTOM BAR
B BAR
BOTTOM MOST BAR
BM BAR
STRUCTURAL
STRL
STL
STEEL
STD
STANDARD
SQ
SQUARE
SPEC(S)
SPECIFICATION(S)
SIMILAR
SIM
SCHEDULE
SCHED
STRUC
STRUCTURAL
RO
ROUGH OPENING
ROOM
RM
RFG
ROOFING
REQUIRED
REQD
REPL
REPLACE OR REPLACEMENT
REINFORCED OR REINFORCEMENT
REINF
RC
REINFORCED CONCRETE
RADIUS
RAD
PROJECT
PROJ
PANEL
PNL
PC
PILE CAP
PEDESTAL
PED
PEJ
PRE-MOLDED EXPANSION JOINT
OPPOSITE
OPP
OPNG
OPENING
ON CENTER
OC
NTS
NOT TO SCALE
LONGITUDINAL
LONGIT
NUMBER
NO
NOT IN CONTRACT
NIC
NON FROST SUSCEPTIBLE MATERIAL
NFSM
NA
NOT APPLICABLE
MISCELLANEOUS
MISC
MIN
MINIMUM
MANUFACTURE
MFR
MEZZANINE
MEZZ
MACHINE BOLT
MB
METAL
MET
MECH
MECHANICAL
MIDDLE
MID
MAX
MAXIMUM
MATERIAL
MATL
MAINT
MAINTENANCE
LG
LENGTH
COLUMN
COL
CONCRETE MASONRY UNIT
CMU
CLEARANCE
CLR
CRACK CONTROL JOINT
CLJ
CJ
CONTROL JOINT
CENTER LINE
CL
BOT
BOTTOM
BEAM
BM
BKS
BARRACKS
BLDG
BUILDING
ARCHITECTURAL
ARCH
ANCHOR BOLT
AB
WELDED WIRE FABRIC
AUTOMATIC WELDING STUD
AWS
ABBREVIATIONS
QTY
QUANTITY
SF001
SF001
S E
T I D
1398_CONTRACT (100%)
10 APR '18
MLWR 17-1012
F Y
O
M A
F
M
L W
R
P
A C
K A
G E
C O
N S
T R
U C
T
N
O R
T H
A
R M
D
E A
M
E
W
S
H A
C K
K U
N S
N
I
B
S
E
K
O R
E A
SF001
NONE
G E
N E
R A
L
N
O T
E S
D
E S
I G
N
D
A T
Y P
I C
L
D
T
A I L
S
K.H.JEONG
2 3
A
B
FOUNDATION PLAN
SCALE: 1/50
SLOPE
N
A
B
ROOF FRAMING PLAN
SCALE: 1/50
ROOF SLOPE
SC1
SC1
SC1
SC1
SC1
SC1
SC1
SC1
SC1SC2
SC2
SC2
600 600
SRG1
SRG1
SRG1
SRG1
SRG1
SRG1
SRG1
SRG1
SRG1
SRG1
S R
G
S R
G
S R
G
S R
G
S R
G
S R
G
S R
G
S R
G
S R
G
S R
G
F_GB1F_GB1
F
G B
F
G B
F
G B
COLUMN SCHEDULE
SC1 : H-150X150X7/10
SC2 : DIA139.8X6.0t
ROOF STEEL BEAM SCHEDULE
SRG1 : H-150X150X7/10
200THK SLAB
FOOTING SCHEDULE
F_GB1 : FOOTING GRADE BEAM 600X700
W/ 400 THK OVER-EXCAVATION
AND STRUCTURAL BACKFILL
15 PER 100
ROOF SLOPE
15 PER 100
STANDING SEAM
METAL ROOF
STANDING SEAM METAL ROOFING(SSMR)
BASIS OF DESIGN FOR ENGINEERING PROPERTIES
CONFORMING TO SPECIFICATION SECTION
STRUCTURAL STANDING SEAM METAL ROOFING
07 61 13. 00 10 (WITH CEMP-T CERTIFICATION)
IS MBCI SUPERLOK 12, 22GA.
CONC STOOP
SF501
SEE
SC1
CONC STOOP
NEW WORK
INSTALL NEW NORTH ARM/DEARM CREW SHACK WITH FOUNDATION
1 1
AND LIGHT GAUGE STEEL FRAME SYSTEM
LEGEND
MOMENT CONNECTION
175 150
2 31
P : LC-150x75x25x4 ROOF PURLIN
11 E.Q. SPACE PURLIN
SLOPE
200THK SLAB
200THK SLAB
200THK SLAB
2%
2%
1 1
SRG1
SRG1
SRG1
SRG1
SRG1
SEE FOR DET.
SEE FOR DET.
SF101
1/50
F O
U N
D A
T I O
N
R
O O
F
F
R A
M I N
G
P
L A
N S
K.H.JEONG
S E
T I D
1398_CONTRACT (100%)
10 APR '18
MLWR 17-1012
F Y
O
M A
F
M
L W
R
P
A C
K A
C O
N S
T R
U C
T
N
O R
M
D
E A
E
W
S
H A
C K
K U
N S
S
E
K
O R
E A
2000mm10005000
SCALE: 1:50
3000 150
HD10 @300 O.C.
SLOPE 2%
STIRRUPS
HD10 @300 O.C.
STIRRUPS
4-HD16 TOP & BOT.
HD10 @300 O.C.
STIRRUPS
HD13 @300 O.C.
E.W.
COMPACTED STRUCTURAL
BACKFILL
600600 2250 3750 600
F_GB1 F_GB1 F_GB1
SC2 : DIA139.8X6.0t
SC1 : H-150X150X7/10
SRG1 : H-150X150X7/10
SRG1 : H-150X150X7/10
1 2 3
800600
2975 4500300 450
HD10 @300 O.C.
STIRRUPS
HD13 @300 O.C.
1700 600
F_GB1
SC1 : H-150X150X7/10
3000600
F_GB1
SC1 : H-150X150X7/10
3050 1650
HD10 @300 O.C.
STIRRUPS
SC1 : H-150X150X7/10 SC1 : H-150X150X7/10SC1 : H-150X150X7/10
B A
1700 3050 2100
11200
COMPACTED STRUCTURAL
BACKFILL
SLOPE AREA
450450
600 600 850 600 600 1050850 1050
200THK CONC SLAB
OVER VAPOR BARRIERHD13 @300 O.C.
E.W.
200THK CONC SLAB
OVER VAPOR BARRIER
SCALE:
WALL SECTION-1
1/30
SF101
SCALE:
WALL SECTION-2
1/30
SF101
SRG1 : H-150X150X7/10 SRG1 : H-150X150X7/10
4-HD16 TOP & BOT. 4-HD16 TOP & BOT.
4-HD16 TOP & BOT. 4-HD16 TOP & BOT.
SC1 : H-150X150X7/10
S E
T I D
1398_CONTRACT (100%)
10 APR '18
MLWR 17-1012
F Y
O
M A
F
M
L W
R
P
A C
K A
C O
N S
T R
U C
T
N
O R
M
D
E A
E
W
S
H A
C K
K U
N S
S
E
K
O R
E A
SF401
1/30
B U
I L
D I N
G
C
R O
C
T I O
N S
K.H.JEONG
SCALE:
CONNECTION DETAIL
1/10
SF101
306030
100 100
100 100
SCALE:
DETAIL
1/10
SF401
9040 90 40
SCALE:
DETAIL
1/10
SF401
40 7540
4040 75
75 407010707540
SCALE:
CONNECTION DETAIL
1/10
TYP. PART
SPLICE PART
RIM JOIST
SCALE:
PURLIN DETAIL
1/10
SF101 SF101
@MECH.
RM
150x150 WWF
HD13
FNSH FL.
NFSM.
40CLR
W/ SEALANT
MW10(#8)-
10 PEJ
SCALE:
CONC STOOP DETAIL
1/20
SF101
S E
T I D
1398_CONTRACT (100%)
10 APR '18
MLWR 17-1012
F Y
O
M A
F
M
L W
R
P
A C
K A
C O
N S
T R
U C
T
N
O R
M
D
E A
E
W
S
H A
C K
K U
N S
S
E
K
O R
E A
SF501
M I S
C
D
E T
A I L
S
K.H.JEONG
1/10, 1/20
| SF001 GENERAL NOTES, DESIGN DATA & TYPICAL DETAILS |
| SF101 FOUNDATION/ROOF FRAMING PLANS |
| SF401 BUILDING CROSS SECTIONS |
| SF501 MISC. DETAILS |
File details come from the government source that posted it.