Hydraulic Test and Analysis of Fire Pump/Sprinkler System
Solicitation number
W90VN7-18-R-0045
Issued by

About this file

Review Block 14 and the amended PWS highlighted in Red for the changes to this solicitation.

View the file

Other files

File Type Posted
Building_Location_Map.pdf PDF
W90VN718R0045.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F2L3CE8213AW01

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

A. 1.5: Change to Period Of Performance Date from 100 Days to 120 days after the notice to proceed by the KO.

B. 6.1: Changes to Applicable Publication Dates and Current editions

C. Technical Exhibit 2: Item number 20 (Aircraft rinse facilities) removed from building requesting services.

D. All other terms and condition of the solicitation remain the same.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 11

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-Aug-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W90VN718R0045

X 9B. DATED (SEE ITEM 11)

21-Aug-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-Aug-2018

CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

RCO KUNSAN, UNIT #2112

APO AP 96264-2112

UNITED STATES

W90VN7 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W90VN718R0045

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

DELIVERIES AND PERFORMANCE

The following Delivery Schedule item for CLIN 0001 has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

180 dys. ADC 1 8 CES/CEACF

8 CES/CER

KUNSAN AFB, KOREA

APO AP 96264

782-7059 FOB: Destination

F2L3CE

To:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

120 dys. ADC 1 8 CES/CEACF

8 CES/CER

KUNSAN AFB, KOREA

APO AP 96264

782-7059 FOB: Destination

F2L3CE

The following have been modified:

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT (PWS)

Review, Hydraulic Test and Analysis of Fire Pump/Sprinkler System

Part 1

General Information

1. GENERAL: This is a non-personnel service contract to provide engineering services, Review, Hydraulic Test and Analysis of fire pump/Sprinkler System on various location on the Kunsan Air Base. The Government will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform analyzing existing fire pump system to evaluate the necessity of fire pumps as part of fire sprinkler system as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

1.2 Background: The Kunsan Air Base has maintained numerous fire pumps that deemed unnecessary and are risky to failure. The base water pressure supplying to fire sprinkler system on base is quite stable and considered sufficient to the fire suppression system without operating fire pumps. In addition some of old fire pumps could have not maintained and repaired because parts are not readily available in the market. Due to age of construction and loss of historical design data, the base cannot evaluate existing sprinkler system especially necessity of fire pumps and will need to obtain the hydraulic basis of sprinkler and pump selection to evaluate that existing pump system is necessary with current water condition.

1.3 Objectives:

Obtain hydraulic calculation data of each fire sprinkler system.

Decrease number of unnecessary fire pumps resulting in saving base operation/maintenance/repair cost Comply with the fire code and regulatory requirement Improve fire protection stability by minimizing maintenance area Record keeping helps future development and repair

1.4 Scope: Review all as-built and construction data provided by the Government, perform survey, test hydrants adjacent to the buildings and carry out hydraulic calculation. Based on the result of calculation, the contractor shall judge and recommend that the government keep or remove fire pumps. Report all the test and calculation data and recommend new piping layout and cost estimation in the case the removal is recommended.

1.5 Period of Performance: The period of performance shall be for 120 days (one hundred twenty days) after the notice to proceed (NTP) by the KO. All deliverables shall be submitted within the performance period.

1.6 General Information

1.6.1 Recognized Holidays: The contractor shall not be required to perform services on the holidays listed below.

1st Monday, September (Labor Day) Chu Sok day (as recognized by the Korean Government no to exceed 3 days) 2nd Monday, October (Columbus Day) 11 November (Veteran’s Day) 4th Thursday, November (Thanksgiving Day) 25 December (Christmas Day)

1.6.2 Hours of Operation: The contractor is responsible for conducting business, between the hours of 0800 to 1700 hours, Monday thru Friday except Federal and ROK recognized holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor shall not be reimbursed when the government facility is closed for the above reasons. The Contractor shall at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.

When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.6.3 Place of Performance: The work to be performed under this contract will be performed at various location on base to test hydrants and survey each fire sprinkler system. See the technical exhibit 2, list of fire pumps/buildings.

1.6.4 Type of Contract: The government will award a firm fix type contract.

1.6.5 Security Requirements: The contractor and employees must comply with all security requirements imposed by the local installation commander at all times while performing work under this contract.

1.6.5.1 Base Passes. The COR will be responsible for providing escorts for the contractor's employees. Contractor and COR or authorized escort shall meet at Kunsan AFB visitor center for base pass and access.

1.6.5.2. Vehicle Passes. All contractor vehicles used in the performance of work under this contract shall be registered, operated, and maintained in accordance with USFK Regulation 190-1 when such motor vehicles are operated on a U.S. Government installation. All contractor personnel operating a motor vehicle on this installation shall be aware of current driving policies and abide by these policies. Any contractor traffic violations may result in the denial of further driving privileges on this installation.

1.6.5.3. PHYSICAL Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. Information provided by the government shall not be used in any other area except that as described in the PWS. At the close of each work period, government facilities, equipment, and materials shall be secured and returned to original status.

1.6.6 Special Qualifications:

1.6.6.1 Professional Fire Protection Engineer(FPE): Contractor shall provide a certified Fire Protection Specialist who has passed the fire protection engineering written examination administered by the National Council of Examiners for Engineering Survey (NCEES) with a minimum of 5 years’ experience dedicated to fire protection engineering that can be verified with documentation. All the services provided by the contractor shall be certified and warrantied by the FPE. Submit the name and documentation of certification of the proposed Fire Protection Engineer at the technical proposal and resubmit no later than 5 days after the Notice to Proceed (NTP).

1.6.6.2. Mechanical Engineer and Other technicians: Mechanical engineer and other technicians who surveys, tests and performing services shall have at least 3 years’ experience dedicated to fire protection industry and can be verified with documentation. Submit the name and documentation of proposed technicians at the technical proposal and resubmit no later than 5 days after the NTP.

1.6.7 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor shall apprise the Government of problems, if any, being experienced.

Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

1.6.8 Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract:

perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.6.9 Identification of Contractor Employees: All contractor personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They shall also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

1.6.10 Data Rights The Government has unlimited rights to all documents and material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership and copyrights belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government will be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.6.11 SAFETY REQUIREMENTS: In performing work under this contract, the contractor shall:

1.6.11.1 Conform to the safety requirements contained in the contract for all activities related to the accomplishment of the work.

1.6.11.2 Perform work in a safe manner as required by OSHA 2206, General Industry, Occupational Safety and Health Standards (29 CFR 1910) and Korea Environmental Governing Standards by US Force Korea.

1.6.11.3 Provide protection to government property to prevent damage during the period of time the property is under the control or in possession of the contractor.

1.6.11.4 Include a clause in all subcontracts to require subcontractors to comply with the safety provisions of this contract as applicable.

1.6.11.5 Record and report promptly (within one hour) to the contracting officer or COR, all available facts relating to each instance of damage to government property or injury to either contractor or government personnel.

1.6.11.6 In the event of an accident or mishap, take reasonable and prudent action to establish control of the accident or mishap scene, prevent further damage to persons or property, and preserve evidence until released by the accident and mishap investigative authority through the contracting officer.

1.6.11.7 If the government elects to conduct an investigation of the accident or mishap, the contractor shall cooperate fully and assist government personnel in the conduct of investigation until the investigation is completed.

1.6.11.8 Include a clause in each applicable subcontract requiring the subcontractor's cooperation and assistance in accident reporting and investigation.

PART 2

DEFINITIONS & ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1. DEFINITIONS:

2.1.1. CONTRACTOR. A supplier or vendor having a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.2. CONTRACTING OFFICER (KO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5. DELIVERABLE. Anything that can be physically delivered but may include non-physical things such as meeting minutes.

2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal. The Key Personnel of this services are listed in the paragraph 1.6.6, Special Qualification.

2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9. QUALITY ASSURANCE Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.11. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.1.12. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.12. WORK WEEK. Is defined as Monday through Friday, unless specified otherwise.

2.2. ACRONYMS:

ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial Off the Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement

QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Plan TE Technical Exhibit

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.1. General: The Government will provide, without cost to the contractor, reasonable amounts of water necessary at each facility to perform the requirements of this contract. The Government will also provide, for emergency purposes only, the following services: Security Police and Fire Protection. These services can be contacted at telephone extension 063-470-4471.

3.2. Any time the contractor uses one of the above emergency services, the Contract Manager shall immediately report to the COR with all of the details. The Contract Manager will be required to submit, in writing, within two (2) calendar days, the details surrounding the use of this service to the COR

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1 General : The contractor shall furnish everything needed to perform this contract according to all its terms.

This includes, but is not limited to, all personnel, vehicles, expendable materials, and any other incidental items necessary to perform this survey, test and analysis.

PART 5

SPECIFIC TASKS

5. Specific Tasks: Any work performed here shall be verified and warrantied by the Fire Protection Engineer (FPE) and reports generated directly from each performance shall be approved and certified by the FPE via either stamping or signing each document.

5.1. Basic Services. The contractor shall provide services for flow test and analysis of existing fire sprinkler system inclusive of fire pump to provide the government a recommendation that each fire pump in the sprinkler system is necessary. Analysis includes review of existing data, building survey and hydraulic calculation for sprinkler system.

5.2. Scheduling work: Before the contractor begins services, the contractor shall notify COR and submit the scheduled not later than 10 days after the NTP. Each flow test location/schedule shall be coordinated with the base fire department and 8 CE fire protection shop through the COR.

5.3. Collect and Review as-built data: The contractor shall notify and request COR all relevant documents such as as-built drawings, design conditions, building construction data with related to fire sprinkler system in individual building. The data that the government/COR will provide to the contractor shall be used as reference and shall not be used or part of as the basis and or proof of system analysis. The government is not liable for data reliability and accuracy and the contractor shall verify the data accuracy via his/her own field survey/investigation as specified in 5.4.

5.4. Field Survey and Investigation: After review of existing data, the contractor shall verify by him/herself of existing installation of fire pump and suppression system. These survey and field-verified data shall be used in the hydraulic calculation and basis of assessment and recommendation that pump is necessary for the fire suppression system.

5.5. Hydrant test: The contractor shall flow test hydrants most adjacent to the building list in the technical exhibit

7.2 in accordance with applicable NFPA code. Location will be informed to the contractor by 8 CE fire protection shop. Test and record pressure vs flow data as indicated in the code. Records shall include at least but not limit to test date/time, hydrant # & size, location, name of company/tester, and flow test calculation. Any tools and equipment necessary to test hydrants shall be provided by the contractor.

5.6. Hydraulic Calculation of fire sprinkler system. With all verified information, the contractor shall perform hydraulic calculation for each fire sprinkler system in accordance with applicable NFPA code. If any commercial software is used for the calculation, the Contractor shall inform and advise COR of the software the contractor is utilizing before the calculation. If any spreadsheet is used for the calculation, the contractor shall reveal and open all functions and formulas to the Government for review. For each location, see the technical exhibit, Fire pump/building list.

5.7. Analysis of all verified/calculated data and Reporting to the Government.

5.7.1 Determine the installed fire sprinkler system demand based on the current building uses and occupancy classifications, application of NFPA 13 design criteria, and area/density system design method. Compare the system demand (pressure and volume) to the available water supply of the water distribution system based on water modeling and water flow test data.

5.7.2 Provide recommendations and actions on the disposition (retain/upgrade or removal) of the fire pumps and associated equipment including fire pump controllers, fuel tanks, priming tank for the listed buildings. For systems which the base water distribution system is “capable” of supporting, provide recommended actions on proper connections from base water distribution system to the installed fire sprinkler systems. For systems the base water supply is “not capable” of supporting, analyze the sizes of the existing fire pump, cistern, and infill line, and provide recommendations and actions to correct the identified deficiencies.

5.7.3 For the “capable” actions above paragraph 5.7.2, the contractor shall submit new recommended piping layout and construction data estimation based on current market price. New recommended piping layout shall be scaled Auto-CAD designed drawings and estimation shall list all the parts/components necessary to construct new piping that are commercially available.

5.7.4 Reporting: The contractor shall frequently report to the government for review in every step of performance and reports shall be finally consolidated at the conclusion of performance. All the deliverables that the contractor shall submit to the government are listed in the Technical Exhibit #1, Deliverables.

PART 6

APPLICABLE PUBLICATIONS

6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)

6.1. The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures as below.

NFPA (National Fire Protection Association): All applicable NFPA codes, the most current edition of #13(2016 edition), #20 (2016), #25 (2017) and #291 (2016) shall be primarily used for these services.

UFC (United Facilities Criteria) 3-600-01, Fire Protection Engineering with change 2, Mar 2018 UFC (United Facilities Criteria) 3-600-02, Operation and Maintenance – Inspection, Testing and

Maintenance of Fire Protection System, Sep 2010 USFK KEGS (Korea Environmental Governing Standard) 201-1, Jun 2012

PART 7

ATTACHMENT/TECHNICAL EXHIBIT LISTING

7. Attachment/Technical Exhibit List:

7.1 Attachment 1/Technical Exhibit 1 – Deliverables Schedule

7.2 Attachment 2/Technical Exhibit 2 – Fire Pump List/Buildings (Building Location Map is provided separately as attachement on FBO. For official use only for this solicitation)

TECHNICAL EXHIBIT 1

DELIVERABLES SCHEDULE

Deliverable Frequency # of Copies Medium/Format Submit To Qualification Documents (paragraph. 1.6.6)

Once at the technical proposal and Again upon award 5 days after NTP

1 original copy each time.

Hard copy at the proposal and hard copy or scanned document via email.

Through the COR, Mr. Yi, Pyong Ki, 8CES/CEOER, BLDG 702, Kunsan Air Base

Work Schedule (paragraph 5.2)

10 days after NTP and upon changed.

1 original copy Hard copy or scanned copy via email

Same as Above

Hydrant Test Result Form (paragraph 5.5)

1 day after each test and consolidated in the final report

1 manual worksheet + 1 electronic file

Paper and electronic file via email

Same as Above

Hydraulic Calculation (paragraph 5.6)

1 day after the calculation is completed and consolidated in the final report

1 copy 1 electronic file via email

Same as Above

Consolidated Report

– Draft for review (paragraph 5.7)

30 days before the end of performance

2 hard copies + 2 CDs

Bound document and MS-Office, Auto-CAD, Adobe PDF in CD

Same as Above

Final Consolidated Report – Final (paragraph 5.7)

Last day of performance

2 hard copies + 2 CDs

Bound document and MS-Office, Auto-CAD, Adobe PDF in CD

Same as Above

TECHNICAL EXHIBIT/DRAWING

FIRE PUMPS LIST/BUILDINGS

TECHNICAL EXHIBIT 2

No Bldg

Q'ty Service Bldg. Description Brief Pump Specs/Manufacturer Type Size

1 767 1 Fire Pump Station horiz.Split Case , Fairbanks ‐ 453A Diesel 1500 GPM

2 802 1 Patriot Veh MX shop horiz.Split case , AP Aurora ‐ 453A Diesel 1500 GPM

3 822 1 Supply Whse horiz.Split case , AP Aurora Electric 1500 GPM

4 841 1 Supply Whse horiz.Split case, , Peerless ‐

6AEF16G

Electric 1500 GPM

5 969 1 WRM Whse horiz.Split case , ap Aurora ‐ 453A Electric 1500 GPM

6 1113 1 BX (new area) horiz.Split case , Peerless ‐ 6 AEF 16G

Electric 1500 GPM

7 1115 1 Commissary horiz.Split case , Firebanks 453A Electric 1500 GPM

8 1310 1 SFS horiz.Split case Electric 1500 GPM

9 1415 1 Supply Storage horiz.Split case , ap Aurora ‐ 4X481X11A

Electric 1500 GPM

10 1435 1 Dorms horiz.Split case , Fairbank ‐ 2823A Electric 1500 GPM

11 2254 1 Jet Engine MX shop Electric 1500 GPM

12 2257 1 Aircraft Engine Depot Vertical Split case , AC pump ‐ 10X8X17F

Electric 1500 GPM

13 2565 1 Aircraft Engine MX horiz.Split case Electric 1500 GPM

14 2567 1 35th SQ Ops Vertical turbine , Reddy Buffaloes ‐ Sub‐7

Electric 1500 GPM

15 2609 1 Fire Pump Station horiz.Split case , Peerless ‐ 5

AEF14

Diesel 1500 GPM

16 2719 1 Munition control Admin horiz.Split case , Peerless ‐ 4 AEF 11G

Electric 1500 GPM

17 2735 1 Conv. Munition shop horiz.Split case , Peerless ‐ 4

AEF11

Diesel 1500 GPM

18 2803 1 Fire Truck Refuel STN horiz.Split case , Peerless ‐ 4

AEF11

Diesel 1500 GPM

19 2819 1 Jet Engine MX shop horiz.Split case , AP Aurora ‐ 453A Electric 1500 GPM

20 2827 1 Aircraft Rinse Fac horiz.Split case , A‐C Fire pump ‐ 10X8X17F

Diesel 1500 GPM

21 2852 1 Weapon Release Shop horiz.Split case , Allis‐Chalmers ‐ 8X6X12F

Electric 1500 GPM

Total: 20 Buildings, 20 Fire Pumps

(End of Summary of Changes)