W90VN7-18-R-0013__Combined_Drawings.pdf

PDF 3 MB Posted

Attached to
REPAIR DORMITORY, B- 1401 at Kunsan AB, Korea
Solicitation number
W90VN7-18-R-0013
Issued by

About this file

Combined Drawings

View the file

Other files

File Type Posted
W90VN7-18-R-0013_Repair_Dorm,_B-_1401.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRANSIENT PAD

PANTON PAD

ROKAF

NORTH

LOOP

NORTH DV PAD

SOUTH DV PAD

WRM PARKING AREA

TREE

AREA

JUVAT

PAD

SOUTH

LOOP

REPAIR DORMITORY B-1401

NOT TO SCALE

NORTH

SHT. NO. REF. NO. DESCRIPTION

DRAWING SCHEDULE

DRAWN BY:

DESIGNED BY:

CHECKED BY:

SCALE:

DRAWING NO:

PROJECT NO:

REF. NO:

CHIEF, CONSTRUCTION MANAGEMENT

CHIEF OF DESIGN

CHIEF OF CONTRACTS

ENVIRONMENTAL FLIGHT

FIRE DEPARTMENT

CORROSION ENGINEER

COMMUNICATIONS

BIOENVIRONMENTAL ENGINEERING

SAFETY

SECURITY POLICE

USING AGENCY

CHIEF, OPERATIONS FLIGHT

CHIEF, ENGINEERING FLIGHT

BASE CIVIL ENGINEER

AS SHOWN

KUNSAN AB, KOREA

COVER SHEET/LOCATE MAP

MLWR18-1011

YUN

LOCATION MAP AND DRAWING SCHEDULE

NEW 3RD FLOOR PLAN

REPAIR DORMITORY B-1401

MLWR18-1011

SHEET 1 OF 18

NEW 4TH FLOOR PLAN

C-1

NEW 1ST FLOOR PLAN

NEW 2ND FLOOR PLAN

CT-1

A-1

A-2

A-3

A-4

BASE HOSPITAL

BASE CIVIL ENGINEER

ENGINEERING FLIGHT

CONSTRUCTION MANAGEMENT

YUN

KIM, YONG HYON

UNITED STATES AIR FORCE

8th CIVIL ENGINEER SQUADRON

KUNSAN AIR BASE, REPUBLIC OF KOREA

THIS PROJECT

B-1401

MAIN GATE

ROOF DETAILS

EXTERIOR WALL SECTIONS

ELEVATIONS

NEW ROOF PLAN

A-9

A-5

A-8

A-7

A-6

GUTTER, DOWNSPOUT & CONCRETE SPLASH BLOCK DETAILS

DETAILS

SECTIONS

NEW ROOF FRAMING-2

NEW ROOF FRAMING-1

ATTIC FLOOR FRAMING-2

ATTIC FLOOR FRAMING-1

ROOF SCUTTLE & STAIR DETAILS

S-7

S-6

S-5

S-4

A-10

S-3

S-2

S-1

ENLARGE 1ST, 2ND THRU 4TH FLOOR PLAN

1_MLWR18-1011C-1 (Location Map and Drawing Schedule)-Layout1
2_MLWR18-1011A-1 (1st Floor Plan)-1st Floor Plan
3_MLWR18-1011A-2 (2nd Floor Plan)-2nd Floor Plan
4_MLWR18-1011A-3 (3rd Floor Plan)-3rd Floor Plan
5_MLWR18-1011A-4 (4th Floor Plan)-4th Floor Plan
6_MLWR18-1011A-5 (Enlarge 1st, 2nd thru 4th Floor Plan)-Layout1
7_MLWR18-1011A-6 (New Roof Plan)-Layout1
8_MLWR18-1011A-7 (Elevations)-Layout1
9_MLWR18-1011A-8 (Exterior Wall Sections-2)-Layout1
10_MLWR18-1011A-9 (Roof Details)-Layout1
11_MLWR18-1011A-10 (Roof Scuttle & Steel Ledder Details, & Chimney Details)-Layout1
12_MLWR18-1011S-1 (Attic Floor framing Plan-1)-배치1
13_MLWR18-1011S-2 (Attic Floor Framing Plan-2)-배치1
14_MLWR18-1011S-3 (New roof Framing Plan-1)-배치1
15_MLWR18-1011S-4 (New Roof Framing Plan-2)-배치1
16_MLWR18-1011S-5 (Sections)-배치1
17_MLWR18-1011S-6 (Details)-Layout1
18_MLWR18-1011S-7 (Gutter & DS, Conc splash Details)-1st Floor Plan

File details come from the government source that posted it.