TRANSIENT PAD
PANTON PAD
ROKAF
NORTH
LOOP
NORTH DV PAD
SOUTH DV PAD
WRM PARKING AREA
TREE
AREA
JUVAT
PAD
SOUTH
LOOP
(AAS) SHELTERS
NOT TO SCALE
NORTH
SHT. NO. REF. NO. DESCRIPTION
DRAWING SCHEDULE
DRAWN BY:
DESIGNED BY:
CHECKED BY:
SCALE:
DRAWING NO:
PROJECT NO:
REF. NO:
CHIEF, CONSTRUCTION MANAGEMENT
CHIEF OF DESIGN
CHIEF OF CONTRACTS
ENVIRONMENTAL FLIGHT
FIRE DEPARTMENT
CORROSION ENGINEER
COMMUNICATIONS
BIOENVIRONMENTAL ENGINEERING
SAFETY
SECURITY POLICE
USING AGENCY
CHIEF, OPERATIONS FLIGHT
CHIEF, ENGINEERING FLIGHT
BASE CIVIL ENGINEER
AS SHOWN
KUNSAN AB, KOREA
LOCATE MAP
MLWR18-1021
YUN
LOCATION MAP
PAINT AIRCRAF ARRESTING SYSTEM (AAS) SHELTERS
MLWR18-1021
SHEET 1 OF 3
C-1
NEW FLOOR PLAN AND ELEVATIONS FOR BAK-12
NEW FLOOR PLAN AND ELEVATIONS FOR BAK-14
C-1
A-1
A-2
BASE HOSPITAL
BASE CIVIL ENGINEER
ENGINEERING FLIGHT
CONSTRUCTION MANAGEMENT
YUN
KYH
UNITED STATES AIR FORCE
8th CIVIL ENGINEER SQUADRON
KUNSAN AIR BASE, REPUBLIC OF KOREA
THIS PROJECT
BAK-12 (4EA) AND BAK-14 (6EA)
MAIN GATE
ARCH DRAWINGS
PAINT AIRCRAFT ARRESTING SYSTEM
RIGHT ELEVATION FRONT ELEVATION
LEFT ELEVATION BACK ELEVATION
| 1_MLWR18-1021C-1 (Location Map)-Layout1 |
| 2_MLWR18-1021A-1 (Bak-14, B-3171, 3172 & 3175E&W)-Layout1 |
| 3_MLWR18-1021A-2 (Bak-14, B-3171,3172E&W and 3175E&W))-Layout1 |
File details come from the government source that posted it. Updated .